Assessor declaration
I hereby certify that this student has been assessed by me and that the assessment has been carried out
according to the required assessment procedures.
Assessor name
Assessor signature
Date
Feedback
Student signature
Date
A copy of this page must be supplied to the office and kept in the student’s file with the evidence.
Assessment task 1
a suitable place to complete activities that replicates a business environment including a meeting space and
computer and internet access
comply with the due date for assessment which your assessor will provide
i Assessment information
Information about how you should complete this assessment can be found in
Appendix A of the Business Works Student User Guide. Refer to the appendix
for information on:
where this task should be completed
Note: You must complete and submit an assessment cover sheet with your
work. A template is provided in Appendix B of the Student User Guide.
However, if your RTO has provided you with an assessment cover sheet, please
ensure that you use that.
Activities-Assessment task-2
4. Complete your planning
When you complete Section 2, include the following activities into your
implementation strategy:
System initial roll out – how will information about the system be
communicated to staff and how will you encourage full participation from the
outset?
Training and support – how will training and support for staff using the system
be implemented and managed immediately and for future staff training needs?
Monitoring – how will monitoring processes for usage, security and output take
place and during which frequencies and timeframes will these activities take
place?
Insert into this section the current situation and issues which Insert activities to take place if anticipated issues do occur
could affect the execution of the roll out
Members of the team are located in different parts of the world The work schedule of all team members should be properly
1
with different time zones. planned by business to ensure that everyone will be able to work
efficiently and contribute to achieve the goals of the business.
Trello was already previously used but was not fully adapted. There should be a training or workshop for all team members so
2
that everyone will be familiar with using this system (Trello) until we
find better system.
chaos of files
3
Insert into this section the objectives which you would like to achieve Insert into this section the measurements which will be used to assess
whether the objectives have been successfully achieved
1 File-sharing and collaboration through Google Drive/Teams/one drive Files are organized and are easily available, immediate access on file
2 Improve communication among staffs by using cloud base system Staffs would be able to focus on their task on real-time basis rather than
allocating their time to reply or searching for files through emails
attachment.
Training or trial run for a new software system (Google Drive)
Strategy for Achieving Objectives
Person(s)
Date by which each step responsible
Break down each objective into clear and ordered steps which need should be completed. for
to be taken to achieve the objective that you have set. completing
each step.
EXAMPLE-DO NOT COPY
Training or trial run for a 1. Email invitation will be sent out to the dedicated staffs for 23/06/203 Emails sent to every
new software system training sessions and additional materials will be attached in participant and CC to
(Google Drive) the email. all directors and
supervisors
2. During the training session, staffs are advised to follow 24/06/2023 Training conducted as
trainer’s instructions. per plan. One
contingency
mentioned at training
– How to remove
someone from file
sharing
3. Feedback form will be given out at the end to understand if 24/06/2023 Encouraged staffs to
staffs are more confident than before when using the system. provide feedback on
the training session
Monitoring
Continuous
improvement
Strathfield College RTO: 91223 CRICOS Provider Code: 02736K
BSBTWK503 Manage meetings| 3