NUMBER : TSNH00481505

Applicant: Qingdao Toposh Jewelry Co., Ltd Date : Jan 19,2024


Attn : Chelsea

Overall Rating
Pass ( X )
Fail ( )

Sample Description:
One (1) submitted samples said to be (Non-nickel plated)
Item Name :
PO No. : --
Style No. :
Item No. :
Buyer : --
Goods Exported To : AU
Country of Origin : China
******************************************************************************************************************************
Tests Conducted:
As requested by the applicant, for details refer to attached page(s)
*****************************************************************************************************************************
To be continued

Authorized By :
For Intertek Testing Services
(Tianjin) Ltd. Qingdao Branch

David Zhang
Senior Manager

Page 1 of 5
NUMBER : TSNH00481505
Conclusion:
Tested Component(s) Standard Result

(1) Client’s Requirement For Chemical Composition Pass


Analysis
******************************************************************************************************************************
To be continued

Authorized By :
For Intertek Testing Services
(Tianjin) Ltd. Qingdao Branch

David Zhang
Senior Manager

Page 2 of 5
NUMBER : TSNH00481505
Test Data:

#1.Chemical Composition Analysis

Test method:Refer to HB 7716.13-2002,GB/T 4698.14-2011,GB/T 4698.2-2011,


GB/T 4698.15-2011,GB/T 4698.7-2011
Acceptance standard:ASTM F136-13(Table 3)
Test instrument:ICP-OES & CS-2800 & ONH analyzer
Test result:See below table

Sample No. Element Test result(%) Requirement(%) Conclusion

C 0.006 ≤0.08 Pass

H 0.0061 ≤0.012 Pass

O 0.080 ≤0.13 Pass

1# N 0.017 ≤0.05 Pass

Al 6.20 5.50~6.50 Pass

Fe 0.068 ≤0.25 Pass

V 4.20 3.50~4.50 Pass


Conclusion: The results meet the requirements of Table 3 in ASTM F136-13

******************************************************************************************************************************
To be continued

Page 3 of 5
NUMBER : TSNH00481505

Components List

(1) Silver color plating metal big hoop

Remark :As requested by the applicant, the testing was conducted only on components listed in this report.
Other components were not tested.

Date sample received : Jan 09,2024


Testing period : Jan 09,2024 To Jan 19,2024
*****************************************************************************************************************************
To be continued
This report is made solely on the basis of your instructions and/or information and materials supplied by you. It is not intended to be a recommendation for any
particular course of action. Intertek does not accept a duty of care or any other responsibility to any person other than the Client in respect of this report and only
accepts liability to the Client insofar as is expressly contained in the terms and conditions governing Intertek’s provision of services to you. Intertek makes no warranties
or representations either express or implied with respect to this report save as provided for in those terms and conditions. We have aimed to conduct the Review on a
diligent and careful basis and we do not accept any liability to you for any loss arising out of or in connection with this report, in contract, tort, by statute or otherwise,
except in the event of our gross negligence or wilful misconduct.

Page 4 of 5
NUMBER : TSNH00481505
Photo

************************************************************************************************************************************

End of report

Page 5 of 5

You might also like