You are on page 1of 1

KEY PLAN :

CF2
LEGEND :

CF2
CF2
B

POTONGAN A
CF1 SKALA NTS
CF2 CF2 CF2 CF2 CF1
CF1
A

DETAIL PLAFOND PLAN 1


1 2 3 4 5 6 SKALA 1 : 150

4 20/02/2023 KETIRA SDS R4


4 10/01/2023 KETIRA SDS R3

3 28/10/2022 KETIRA SDS R2


2 17/10/2022 KETIRA SDS R1
1 26/09/2022 KETIRA SDS R0

C NO. DATE ISSUED BY ISSUED TO REV DESCRIPTION

PROJECT :

CMEI (Civil, Mechanical, and Electrical &


Instruments) Design Engineering Consultancy for
CF2 CF2 Project Dates (Appointment for Engineering
Design Consultant) for PT Sari Dumai Sari Oleo,
Lubuk Gaung, Dumai, Indonesia

OWNER :

CF2
B
DESIGN CONSULTANT :

CF2
SCALE SIGN DATE

POTONGAN B
1 : 150

CF2
DRAWN BY ADE

CF2 SKALA NTS DESIGN BY PUTRI, ST.

CHECKED BY Y. A. TANGKETASIK, ST. IAI.

APPROVED BY IR. PAUL RETIKA Msc.

APPROVED
BY OWNER PT. SARI DUMAI SEJATI

A PLANNING :

ARCHITECTURE

DRAWING TITLE :

LAB H2 PLANT
DETAIL PLAFOND PLAN 2 DETAIL PLAFOND
SKALA 1 : 150
1 2 3 4 5 6 FOR CONSTRUCTION DRAWING NO. : SHEET

SDO-DATES-A.LABH2P-010

A3

You might also like