0% found this document useful (0 votes)
446 views3 pages

Material List Template

This document is a material list for an unnamed construction project located at an unspecified location. It includes sections for mobilization materials, materials for civil works, and materials for ducting. However, the list does not include any details about specific materials, quantities, units, rates or costs. It appears to be a template for a material list that still needs to be populated with project-specific information.

Uploaded by

Estimate
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
446 views3 pages

Material List Template

This document is a material list for an unnamed construction project located at an unspecified location. It includes sections for mobilization materials, materials for civil works, and materials for ducting. However, the list does not include any details about specific materials, quantities, units, rates or costs. It appears to be a template for a material list that still needs to be populated with project-specific information.

Uploaded by

Estimate
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

MATERIAL LIST

Project Name:
Project Location:

Item Mobilization Materials Qty. Unit Rate Cost Cost w/ 10% margin
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
SUBTOTAL - -

Item Materials for Civil Works Qty. Unit Rate Cost Cost w/ 10% margin
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
SUBTOTAL - -

Item Materials for Civil Works Qty. Unit Rate Cost Cost w/ 10% margin
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
SUBTOTAL - -

Item Materials for ducting Qty. Unit Rate Cost Cost w/ 10% margin
- -

-
-
-
-
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
SUBTOTAL - -

Total Budget
- AED
- AED w/ 10% margin

Prepared By: Approved By:

Project Coordinator Project Manager

Site Engineer

Procurement Specialist
MATERIAL LIST

Project Name: Jumeirah Park Villa M33


Project Location: Jumeira Park, Dubai

Item Mobilization Materials Qty. Unit Rate Cost Cost w/ 10% margin
1 Temporary Fencing 20 rolls 65.00 1,300.00 1,430.00
2 Personal protective equipment (PPE) 5 pcs 102.85 514.25 565.68
3 First Aid Kit 1 pc 23.00 23.00 25.30
4 Caution Tape 4 rolls 10.00 40.00 44.00
5 Safety Cones 8 pcs 20.00 160.00 176.00
6 Taslleeh Signage 1 pc 4,000.00 4,000.00 4,400.00
7 Vertical Storage Cabinet (HDPE) 2 pcs 2,900.00 5,800.00 6,380.00
SUBTOTAL 11,837.25 13,020.98

Item Materials Qty. Unit Rate Cost Cost


1 Weather-resistant Exterior paint 8 drums 130.00 1,040.00 1,144.00
2 Textured Paint 8 drums 91.00 728.00 800.80
3 Interior Paint 6 drums 270.00 1,620.00 1,782.00
4 Primer Paint 14 drums 95.00 1,330.00 1,463.00
5 Joint Compound 14 drums 50.00 700.00 770.00
6 Sand Paper 7 rolls 3.00 21.00 23.10
7 Paint rollers 10 pcs 10.50 105.00 115.50
8 Plastic stick 4 pcs 18.00 72.00 79.20
9 Paint brushes 10 pcs 7.35 73.50 80.85
10 Paint trays 4 pcs 10.00 40.00 44.00
11 Plastic sheeting 4 rolls 6.00 24.00 26.40
12 Masking Tape 1 box 55.00 55.00 60.50
SUBTOTAL 5,808.50 6,389.35

Item Tools Qty. Unit Rate Cost Cost


1 Scaffolding 20 sqm
2 Ladder 2 pcs
3 Power washer 1 pc

Total Budget
17,645.75 AED
19,410.33 AED w/ 10% margin

Prepared By: Approved By:

Project Coordinator Project Manager

Site Engineer

Procurement Specialist