CONSTRUCTION OF EIDGHA JUMMAH MASJIDH , MATHUR ,

MADURAI.
REQUIREMENT OF MATERIALS.

SlNo DESCRIPTION QTY RATE PER AMOUNT

1 CEMENT 715 450 Bag 321750

2 M SAND 10 14000 Load 140000

3 3/4" jalli 7 8500 Load 59500

4 1.5" jalli 3.5 8000 Load 28000

5 BRICKS 9.5 33000 Load 313500

STEEL RODS FOR


6 REINFORCEMENT
a 8mm 269 rods 1294
b 10mm 274rods 2060
c 12mm 108 rods 1172
d 16mm 92 rods 1774
Total. 6300 65 Kg. 409500