Exhibit A Exhibit A, Attachment 1-1
Scope of Indirect Work Table Section 10. Responsibility Table

X : Responsible party (Refer corresponding sections of Attachment 1-1 for the details)

Corresponding
Section No. of
Section No. of
Cost Allocation Item Chiyoda Subcontractor Remarks
Attachment 1-1 in
in Exhibit B
Exhibit A

2. 2.1. Transportation
Transportation of Indirect materials (including temporary
facilities) X

Transportation of Construction Equipment X


3. 2.2. Subcontractor's Home Office Work X
4. 2.3. Temporary Facilities
4.1. 2.3.1. Jobsite Temporary Facilities
4.1.1. 2.3.1. a) Land area
Request to provide required area X
Provide limited area for temporary facilities Please refer to Area allocation
X
map
Provide additional area for temporary facilities if the
provided area is insufficient X

4.1.2. 2.3.1. b) Buildings and Facilities


[1] Jobsite office
Chiyoda office X
Subcontractor office X
[2] Jobsite warehouse
Chiyoda warehouse X
Subcontractor warehouse X
[3] Fabrication shop, maintenance shop
For Chiyoda use X
For Subcontractor use X
[4] Safety facilities
For Chiyoda use X
For Subcontractor use X
[5] Toilet, rest shelter, ablution
For Chiyoda use X
For Subcontractor use X
It will be applied for in-Plant
For common use for all subcontractors X area only.
[6] Others
Others, required for the Work X
4.1.3. 2.3.1. c) Utility Facilities
[1] Electrical power generation & distribution
For Chiyoda use X
For Subcontractor use X
[2] Telecommunication system
For Chiyoda use X
For Subcontractor use X
[3] Water
a. Drinking water
For Subcontractor use X
b. Demineralised water
For Subcontractor use X
c. Industrial water
For Chiyoda use X
For Subcontractor use X
[4] Sanitary waste water system Septic tank system is required
Waste water treatment unit and sanitary piping
For Chiyoda use X
For Subcontractor use X
[5] Fuel station Not applicable. The
Subcontractor shall utilize
Commercial fuel stations.
4.1.4. 2.3.1. d) Other Facilities
[1] Fence, gate house, guard hut, security lighting
At the Jobsite battery limit X Refer to drawings
For Chiyoda temporary facilities X
For Subcontractor temporary facilities X
[2] Temporary road, parking, laydown
Main route X Refer to drawings
For Chiyoda temporary facilities X
For Subcontractor temporary facilities X
[3] Others

Page 1 of 4
Document No. MSP-ICS-1001-1
Revision 2
Exhibit A Exhibit A, Attachment 1-1
Scope of Indirect Work Table Section 10. Responsibility Table

X : Responsible party (Refer corresponding sections of Attachment 1-1 for the details)

Corresponding
Section No. of
Section No. of
Cost Allocation Item Chiyoda Subcontractor Remarks
Attachment 1-1 in
in Exhibit B
Exhibit A

For Chiyoda use X


For Subcontractor use X
4.2. 2.3.2. Project Camp and Accommodation Facilities outside project
area
4.2.1. 2.3.2. a) Land Area
Provide limited area for temporary facilities X
4.2.2. 2.3.2. b) Project Camp and Accommodation Facilities
For Chiyoda use X
For Subcontractor use X
4.2.3. 2.3.2. c) Utility Facilities
[1] Electrical power generation & distribution
For Chiyoda use X
For Subcontractor use X
[2] Telecommunication system
For Chiyoda use X
For Subcontractor use X
[3] Water
a. Drinking water
For Subcontractor use X
b. Demineralised water
For Subcontractor use X
c. Industrial water
For Chiyoda use X
For Subcontractor use X
[4] Sanitary waste water system
Waste water treatment unit and sanitary piping
For Chiyoda use X
For Subcontractor use X
4.2.4. 2.3.2. d) Other Facilities
[1] Fence, gate house, guard hut, security lighting
For Chiyoda's facilities X
For Subcontractor's facilities X
[2] Temporary road, parking, laydown
For Chiyoda's facilities X
For Subcontractor's facilities X
[3] Others
For Chiyoda use X
For Subcontractor use X
5. 2.4. Jobsite and Camp Operation
5.1. 2.4.1. Salaries, Wages and Allowances X
5.2. 2.4.2. Jobsite Operation
5.2.1. 2.4.2. a) Field Office Administrations
For Chiyoda X
For Subcontractor X
5.2.2. 2.4.2. b) Medicals
[1] Ambulance X
[2] First AID treatment at the Jobsite clinic
For Chiyoda X
For Subcontractor X
[3] Dispensary
For Chiyoda X
For Subcontractor X
[4] Medical treatment / surgical operation at a hospital in
the city
For Chiyoda X
For Subcontractor X
5.2.3. 2.4.2. c) Safety
[1] Safety Equipment (such as fire extinguisher, safety
instrument)

For Chiyoda X
For Subcontractor X
[2] PPE
For Chiyoda personnel X
For Subcontractor personnel X
5.2.4. 2.4.2. d) Security

Page 2 of 4
Document No. MSP-ICS-1001-1
Revision 2
Exhibit A Exhibit A, Attachment 1-1
Scope of Indirect Work Table Section 10. Responsibility Table

X : Responsible party (Refer corresponding sections of Attachment 1-1 for the details)

Corresponding
Section No. of
Section No. of
Cost Allocation Item Chiyoda Subcontractor Remarks
Attachment 1-1 in
in Exhibit B
Exhibit A

[1] Gate pass ID


Prepare ID card X
Cost for ID card 1st issue of ID card will be free of
charge. Any replacement ID
issued due to lost, damage etc,
X shall be issued at the cost of 5
USD/person/ID and back-charged
to the Subcontractor.
[2] Security services
At the Jobsite battery limit X
For Chiyoda temporary facilities X
For Subcontractor temporary facilities X
5.2.5. 2.4.2. e) Environment
At Chiyoda’s warehouse
Disposal of waste material from Chiyoda’s warehouse X
to a location
At other areas designated by the local government.
Return of surplus, scrap and excess materials to
Chiyoda’s warehouse or Chiyoda’s designated area
X
within the battery limit

Disposal of hazardous waste material to a location


designated by the local government X

Disposal of general waste material to a location


X
designated by the local government
5.2.6. 2.4.2. f) Warehouse Management
Chiyoda's warehouse X
Subcontractor's warehouse X
Construction Equipment for warehouse operation
For Chiyoda X
For Subcontractor X
5.2.7. 2.4.2. g) Others
Operation of common rest shelter,toilet and Ablution.
X
Operational cost for common rest shelter, toilet and
X
Ablution
5.3. 2.4.3. Project Camp / Accomodation Operation
For Chiyoda camp / Accomodation X
For Subcontractor camp / Accomodation X
5.4. 2.4.4. Owned Camp or Rental of Accommodations Not USED
5.4. 2.4.5. Personnel Transportation (including Busses) Only Registered Bike and Vehicle
are allowed to enter the Project
area.
Subcontractor is requested to
arrange bus transportation for all
of workers including local workers
(workers from Gresik area)
For Chiyoda personnel X
For Subcontractor personnel X
6. 2.5. Indirect Materials and Scaffolding
6.1. 2.5.1. Provision of indirect materials X
6.2. 2.5.2. Scaffolding Common Scaffolding will be
provided by Chiyoda.

Additional Scaffolding other than


Common Scaffolding shall be
X
provided and managed by
Subcontractor.
Refer to Attachment 1-3 of Exhibit
A.

7. 2.6. Utility
7.1. 2.6.1. Electricity
For Chiyoda use X
For Subcontractor use X
7.2. 2.6.2. Telecommunications
For Chiyoda use X
For Subcontractor use X
7.3. 2.6.3. Water
7.3.1. a. Drinking water
For Subcontractor use X
7.3.2. b. Demineralised water
For Subcontractor use X

Page 3 of 4
Document No. MSP-ICS-1001-1
Revision 2
Exhibit A Exhibit A, Attachment 1-1
Scope of Indirect Work Table Section 10. Responsibility Table

X : Responsible party (Refer corresponding sections of Attachment 1-1 for the details)

Corresponding
Section No. of
Section No. of
Cost Allocation Item Chiyoda Subcontractor Remarks
Attachment 1-1 in
in Exhibit B
Exhibit A

7.3.3. c. Industrial water


For Chiyoda use X
For Subcontractor use X
7.4. 2.6.4. Sanitary Waste
For Chiyoda X
For Subcontractor X
7.5. 2.6.5. Fuel
For Chiyoda use X
For Subcontractor use X
7.6. 2.6.6. Steam, Air, Nitrogen for Pre-commissioning Not Used
8. 2.7. Insurance, Taxes and Duties
2.7.1. Insurance
Workmen’s compensation insurance and employer’s X
liability insurance
Automobile liability insurance and Automobile physical X
damage insurance
Marine cargo insurance and inland transportation X
insurance for the equipment and materials to be brought
by the Subcontractor
Protection and indemnity insurance X
Property damage insurance X
Other insurance as required X
Erection all risks insurance X Deductible of US$1M
Third party liability insurance X Coverage up to US$5M, per
occurrence deductible of
US$10k
Marine cargo insurance for the equipment and materials X
to be brought by Chiyoda from outside the country of the
Jobsite
2.7.2. Taxes and Duties
All taxes and duties related to the Subcontractor’s X VAT to be excluded from
performance of the Work. Contract Price

Import duties for permanent materials


For Chiyoda supplied materials X
For Subcontractor supplied materials X The Client may provide an
import duty exemption for
permanent materials. In case
the Client is able to provide
such exemption, please show
the price of the import duties
separately.

Import duties for the Subcontractor's Construction X


Equipment, indirect materials, equipment and
temporary facilities
9. 2.8. Cost for measures against COVID-19
For Chiyoda's performance of the Work X
For Subcontractor's performance of the Work X

Page 4 of 4