Project Name PUNJAB ARTERIAL ROADS IMPROVEMENT PROJECT
FOR SUSTAINABLE DEVELOPMENT Proposed Financing As per discussion with ADB representative, 50% loan amount will be provided by ADB & 50% by AIIB. Total cost in Draft PC-1 in lieu of loan is $767.76 M. As per COBP 2021-23, ADB Loan is $210 M. Executing Agency C&W Department. Background Keeping in view the Spatial Strategy of Punjab, up gradation of major arterial roads is a dire need to provide better connectivity of agriculture, livestock, tourism, & industrial zones of Punjab with Motorway and CPEC. Scope Construction of following roads: 1. Chichawatni-Rajana/Pir Mahal –Chowk Azam-Layyah- Taunsa (204 KM road) 2. Shorkot-Jung (56 KM road) 3. Hasilpur-Bahawalnagar (75 KM road) 4. Depalpur-Pakpattan Shareef-Vehari Road (150KM road) Outcome Safety, efficiency, and sustainability of the road network in southern Punjab improved Output Part of the provincial highway network improved. Institutional capacity on road sustainability strengthened.