Sl.

No Description Unit Qty

Internal walls & ceiling shall be cement


rendered in two layers as
Specified and painted with PVA (Polyvinyl
Acetate) alkali‐resisting formulation of
Emulsion paint with high washability as
1 directed by engineer. The paint should be Sqm 672or 30*30
washable paint and capable of resisting a 8000
scrub test.
Item shall be done as per approved drawings
and client specification to complete the works
in all aspects. Including erection of scaffolding.
External Wall :
Approved quality of highly weather resistant
synthetic resin based paint shall be used as
2 directed by the Engineer for exterior face of Sqm 412or20.2*20.4
concrete & masonry surface as per approved
drawings and client specification to complete
the works in all aspects. Including erection of
scaffolding
The laying of floor & wall of battery room shall
be covered with anti alkaline or anti-acid
ceramic tiles of an approved quality and colour.
3 It should be laid on a bed of mortar and joints Sqm 40or 6.3*6.4m
shall be grouted using pliastic mix white
cement (Control Building) and as approved by
the customer or approved drawings.
The laying of floor & wall toilets and wash
4 rooms shall be covered with High-density Sqm 67or 8.1*8.1m
ceramic floor tiles as approved.
Rate Amount

380 255,360.00

430 177,160.00

300 12,000.00

350 23,450.00

467,970.00
Siemens Gamesa (SEGR)

S.NO ITEM DESCRIPTION

B Fence / Gate
Excavation : All charges to do excavation in all kind of soils upto the required level as per
approved drawing, including levelling, grading, trimming and compacting the top layer of
soil of excavated pit, testing to receive the succeeding work, transportion and
disposal/shifting of surplus/unsuitable excavated soil to the designated location( those
quantities not covered in "Disposal of Surplus Earth" item), including dewatering or
lowering of water table by suitable means & not to effect stabilty of soil mass. Including
shoring/strutting etc.and dealing with existing services. Work should be executed as per
the levels mentioned in approved drawing/specifications & as per L&T engineer.For the
1 measurement, Foundation Plan size only will be considered as per Drawing .Working
space,slope cutting,step cutting (if neccessary ) will be in SC scope.Excavation beyond
approved levels should be 100% avoided & will not be paid. Any extra work required in the
case will be in SC scope without any extra payment. Work includes all necessary tools &
tackles,labour, consumables, P&M, fuel etc. Work should be carried out with all safety &
quality.

Backfilling: All charges to do Backfilling with excavated earth in foundations ,incl. of soil
spreading, levelling, watering,compacting & testing as per approved drawing ,
specifications & L&T engineer with all safety & quality.Soil to be placed in even layers with
thickness not greater than 0.3 m. Each layer shall be thoroughly compacted using 10 T
roller or suitable equipment to achieve required compaction as per specifications/drawing.
Min. 98% compaction is requires as per Mod. AASHTO at OMC. Necessary compaction
2 tests to be carried out in presence of L&T/Client/Consultant. After approval of tested layer
test results, work for next layer to be started. Work includes all necessary tools &
tackles,labour, consumables, P&M, fuel etc.Work should be carried out with all safety &
quality.

Disposal of Surplus Earth : All charges for disposal of Excess excavated material in
accordance with the instructions issued by L&T/Client/Consultant's Engineer to designated
area for lead upto 01 Km. any lead from the site, including Spreading & levelling of soil,
3 rock, boulders, etc. at the place of disposal. .Excavated material suitable for backfilling
shall be removed to a tip and stored seperately as instructed by L&T/client/consultant for
future use.

Bituminous paint for foundation : All charges for supply & application of bituminous paint
to cover alll the concrete porus surfaces in foundation and other under ground structures
as per approved drawings, client specification & as per the instructions of L&T engineer to
4 complete the works in all aspects with all safety & quality. Work includes supply of
paint,manpower ,all necessary tools & tackles, consumables etc.Work should be carried
out with all safety & quality.
Plywood Shuttering : All charges for supply, erection, dismantalling,stacking of shuttering
and required props , support and steel scaffolding as per approved drawings &
specification and as per the instructions of L&T Engineer with all safety & quality. Work
includes making, fixing the wooden plywood shutters (film faced - water proof ) with all
good supports (steel props ) with correct line and level as per approved drawings. Work
5 includes supply & application of demoulding agents, deshuttering/de staging etc. including
supply of all plywood, supports,consumables, labour, tools & tackles with all P&M etc.
Smooth formwork shall be used for the exposed faces. Work should be carried out with all
safety & quality.

Plain cement concrete of class C12/15 (Cube Strength- 15N/mm2) : All charges for supply
& laying of C15 concrete with minimum cement content of 150kg/M3, as per the approved
mix design,technical specifications & instructions of L&T Engineer, surface preperarion to
recieve PCC should be levelled & compacted , shuttering, laying & finishing of PCC, curing
6
as per drawing, technical specifications & specifications for all masonry foundations and
footing pads & other works.All inclusive of supply of Cement, aggregate,labour,tools &
tackles,shuttering materials,consumables with all P&M etc. Work should be carried out
with all safety & quality.

Reinforced Structural concrete of grade C25/30 (30 N/mm2 Cube Strength): All charges
for supply & laying of C30 concrete, i.e. with minimum cement content of 350 kgs/m3 or as
per approved drawings, approved mix design, client specifications which shall be filled into
formwork and vibrated around steel reinforcement , (Manually or with pump),
compaction, concrete preparation, surface preparation unless otherwise stated,
embedment preparation, striking/stripping, cleaning, chamfer, rebate, groove, throats,
7 ends opening, curing, cube casting, testing, etc.as per approved drawings & specifications
& as per the instructions of L&T engineer. All inclusive of supply of Cement,
aggregate,sand, admixture, labour,tools & tackles, with all P&M etc. Work shoud be
carried out with all safety & quality.

Reinforcement Bar Works : All charges for supplying , storing, cutting, bending & fixing of
reinforcement bar for all leads & lifts , (yield strength Shall not be less than 500 Mpa) as
per approved drawings & specifications & as per the instructions of L&T engineer with all
safety & quality. Any testing required as per technical specifications will be in SC scope.
Item includes storage of rebars at site above ground, away from contamination ,
establishing cutting & bending yard , equipment's for cutting & bending , carrying cutting &
8 bending as per BBS , BBS to be submited for approval before commencement of cutting
and bending . Incl.of supplying steel , all consumables , tools , Cover blocks , binding wire ,
chair rods, spacers, intercarting , shifting & Placing, Binding etc.in Sub-Contractor's scope.
Work should be carried out with all safety & quality. Reinforcement Steel to be supplied
by L&T

Installation of GI Post : All charges to fixing of rolled steel galvanised iron post in the
concrete foundation as per approved drawings, client specification and directed by
Engineer In-charge to complete the works in all aspects. Security fence shall comprise
posts set at 3.0m centres. GI post bottom top and bottom to be welde with sole plate .Also
at every post for erthing connection 40x40x8mm falt plate to be welded as per the
9 approved drawingincluding . Stretcher bar to be connected with every tension post by
means of tension band .supply of all required supports,consumables, labour, tools &
tackles with all P&M etc. Smooth formwork shall be used for the exposed faces. Work
should be carried out with all safety & quality.Supply of GI post and other accessories will
be in L&T scope.
Fixing of Galvanized plastic coated wire mesh panels : All charges to fixing Plastic coated
GI wiremesh between the GI posts tied with tie wire at 30cm c/c on tension wire and at
each posts by tension band as per approved drawings and client specification to complete
10 the works in all aspects.Including supply of all required supports,labour, tools & tackles
with all P&M etc. Work should be carried out with all safety & quality.Supply of wire
mesh ,tie wire and eye bolt will be in L&T Scope.

Fixing of G.I. Wire : All charges for erection of Galvanized 5 mm Fastening/tension wire
fixed to a GI post through eye bolt as per approved drawings , client specifications and
directed by Engineer In-charge to complete the works in all aspects. including supply of all
11 required supports,consumables, labour, tools & tackles etc. Work should be carried out
with all safety & quality. Supply of Tension wire,eyebolt and tension band will be in L&T
Scope.

Fixing of Galvanized 2.5mm two strands barbed wire-3 rows Al charges for supplying &
erection of galvanized 2.5mm two strands barbed wire-3 rows between the GI posts as per
approved drawings ,client specification and directed by engineer in-charge to complete the
12 works in all aspects. Materials approval is to be taken from L&T Engineer/Consultant
including supply of all required materials, supports,consumables, labour, tools & tackles.
etc. Work should be carried out with all safety & quality.

13 Main Gate
Excavation : All charges to do excavation in all kind of soils upto the required level as per
approved drawing, including levelling, grading, trimming and compacting the top layer of
soil of excavated pit, testing to receive the succeeding work, transportion and
disposal/shifting of surplus/unsuitable excavated soil to the designated location( those
quantities not covered in "Disposal of Surplus Earth" item), including dewatering or
lowering of water table by suitable means & not to effect stabilty of soil mass. Including
shoring/strutting etc.and dealing with existing services. Work should be executed as per
the levels mentioned in approved drawing/specifications & as per L&T engineer..For the
14 measurement, Foundation Plan size only will be considered as per Drawing .Working
space,slope cutting,step cutting (if neccessary ) will be in SC scope.Excavation beyond
approved levels should be 100% avoided & will not be paid. Any extra work required in the
case will be in SC scope without any extra payment. Work includes all necessary tools &
tackles,labour, consumables, P&M, fuel etc. Work should be carried out with all safety &
quality.

Backfilling: All charges to do Backfilling with excavted earth in foundations ,incl. of soil
spreading, levelling, watering,compacting & testing as per approved drawing ,
specifications & L&T engineer with all safety & quality.Soil to be placed in even layers with
thickness not greater than 0.3 m. Each layer shall be thoroughly compacted using 10 T
roller or suitable equipment to achieve required compaction as per specifications/drawing.
Min. 98% compaction is requires as per Mod. AASHTO at OMC. Necessary compaction
15 tests to be carried out in presence of L&T/Client/Consultant. After approval of tested layer
test results, work for next layer to be started. Work includes all necessary tools &
tackles,labour, consumables, P&M, fuel etc.Work should be carried out with all safety &
quality.

Disposal of Surplus Earth : All charges for disposal of Excess excavated material in
accordance with the instructions issued by L&T/Client/Consultant's Engineer to designated
area for lead upto 01 Km. any lead from the site, including Spreading & levelling of soil,
16 rock, boulders, etc. at the place of disposal. .Excavated material suitable for backfilling
shall be removed to a tip and stored seperately as instructed by L&T/client/consultant for
future use.
Bituminous paint for foundation : All charges for supply & application of bituminous paint
to cover alll the concrete porus surfaces in foundation and other under ground structures
as per approved drawings, client specification & as per the instructions of L&T engineer to
17 complete the works in all aspects with all safety & quality. Work includes supply of
paint,manpower ,all necessary tools & tackles, consumables etc.Work should be carried
out with all safety & quality.

Plywood Shuttering : All charges for supply, erection, dismantalling,stacking of shuttering


and required props , support and steel scaffolding as per approved drawings &
specification and as per the instructions of L&T Engineer with all safety & quality. Work
includes making, fixing the wooden plywood shutters (film faced - water proof ) with all
good supports (steel props ) with correct line and level as per approved drawings. Work
18 includes supply & application of demoulding agents, deshuttering/de staging etc. including
supply of all plywood, supports,consumables, labour, tools & tackles with all P&M etc.
Smooth formwork shall be used for the exposed faces. Work should be carried out with all
safety & quality.

Plain cement concrete of class C12/15 (Cube Strength- 15N/mm2) : All charges for supply
& laying of C15 concrete with minimum cement content of 150kg/M3, as per the approved
mix design,technical specifications & instructions of L&T Engineer, surface preperarion to
recieve PCC should be levelled & compacted , shuttering, laying & finishing of PCC, curing
19
as per drawing, technical specifications & specifications for all masonry foundations and
footing pads & other works.All inclusive of supply of Cement, aggregate,labour,tools &
tackles,shuttering materials,consumables with all P&M etc. Work should be carried out
with all safety & quality.

Reinforced Structural concrete of grade C25/30 (30 N/mm2 Cube Strength): All charges
for supply & laying of C30 concrete, i.e. with minimum cement content of 350 kgs/m3 or as
per approved drawings, approved mix design, client specifications which shall be filled into
formwork and vibrated around steel reinforcement , (Manually or with pump),
compaction, concrete preparation, surface preparation unless otherwise stated,
embedment preparation, striking/stripping, cleaning, chamfer, rebate, groove, throats,
20 ends opening, curing, cube casting, testing, etc.as per approved drawings & specifications
& as per the instructions of L&T engineer. All inclusive of supply of Cement,
aggregate,sand, admixture, labour,tools & tackles, with all P&M etc. Work shoud be
carried out with all safety & quality.

Reinforcement Bar Works : All charges for supplying , storing, cutting, bending & fixing of
reinforcement bar for all leads & lifts , (yield strength Shall not be less than 500 Mpa) as
per approved drawings & specifications & as per the instructions of L&T engineer with all
safety & quality. Any testing required as per technical specifications will be in SC scope.
Item includes storage of rebars at site above ground, away from contamination ,
establishing cutting & bending yard , equipment's for cutting & bending , carrying cutting &
21 bending as per BBS , BBS to be submited for approval before commencement of cutting
and bending . Incl.of supplying steel , all consumables , tools , Cover blocks , binding wire ,
chair rods, spacers, intercarting , shifting & Placing, Binding etc.in Sub-Contractor's scope.
Work should be carried out with all safety & quality. Reinforcement Steel to be supplied
by L&T
Plastering - All charges to do plastering 20 mm thick with two coats using cement & sand
mortar ratio of 1:3 including supplying of materials & laying the plastering including
supplying of all materials like Cement, sand, water, etc., Mixing of mortar, applying in
position as per the thickness mentioned in the Approved Drawing/Specification, GI
hexagonal mesh reinforcements to protect cracks,Concrete surface
22 hacking,pre-watering/priming of surface to be plastered,making of grooves, curing with
water to a minimum of 7 days or as per technical specifications, Fixing, removing of
required Staging for work, necessary tools & tackles, labour, consumables etc..Including
testing of materials.Work should be carried out with all safety & quality Standards

Painting
All charges for Supplying & application of two coat Weather resistant Quartz paint over
plastered surface as directed by the Engineer in-charge and as per approved drawings and
client specification to complete the works in all aspects.Approval for material should be
23
taken from L&T / Client / Consultant. Material sample approval as per project specification
and requirement. Work includes Fixing, removing of required Staging for work, necessary
tools & tackles, labour, consumables etc.Including testing of materials.Work should be
carried out with all safety & quality Standards

Installing of 6m wide Galvanized Sliding gate : All charges to supply & erection of 6m wide
Galvanized Sliding gate and its accessories ( 6m wide 1nos + 1m wide personal gate
inclsive). Making of shop drawings, Approval for material and finished product should be
taken from L&T / Client / Consultant Material approval and shop drawing approval as per
24 project specification and requirement Work includes supply & erection of required
materials , including supply of all supports,consumables, labour, tools & tackles with all
P&M etc. Work should be carried out with all safety & quality Standards.
RFQ Unit rate for
UNIT QUANTITY labour Total Remark
(A) (B)

Cum 25.04 480.00 12,019.20

Cum 5.1 95.00 486.40

Cum 20.0 -

Sqm 125 150.00 18,750.00


Sqm 292.68 230.00 67,316.40

Cum 7.48 980.00 7,330.00

Cum 19.92 1,028.00 20,474.84

MT 2.43 11,500.00 27,945.00

MT 10.56 1,460.00 15,417.60


Sqm 1412.30

160
80.00 112,984.00

Rm 279.06 250.00 69,765.00

RM 1674.36 250.00 418,590.00

Cum 2.20 480.00 1,056.00

Cum 1.19 95.00 113.05

Cum 1.01 250.00 252.50


Sqm 11.20 150.00 1,680.00

Sqm 20.75 230.00 4,772.50

Cum 0.42 980.00 411.60

Cum 3.00 1,028.00 3,084.00

MT 0.19 11,500.00 2,185.00


Sqm 8.96 135.00 1,209.60

Sqm 8.96 85.00 761.60

Nos. 1 8,000.00 8,000.00

Total carried to summary 794,604.29


S.NO

2a

3
4

1
2

2a

6
7

2a

3
4

8
1

6
1

2a

2a

3
4

6
Siemens Gamesa (SEGR)

ITEM DESCRIPTION

Supplying & Laying / Installing of Storm water drain inclusive of all civil works
Supplying & Laying / Installing of SURFACE DRAIN (1.5 x 1m) inclusive of all civil works-Total Length 635m.The
breakup quantities as follows
Excavation : All charges to do excavation in all kind of soils upto the required level as per approved drawing,
including levelling, grading, trimming and compacting the top layer of soil of excavated pit, testing to receive the
succeeding work, transportion and disposal/shifting of surplus/unsuitable excavated soil to the designated
location( those quantities not covered in "Disposal of Surplus Earth" item), including dewatering or lowering of water
table by suitable means & not to effect stabilty of soil mass. Including shoring/strutting etc.and dealing with existing
services. Work should be executed as per the levels mentioned in approved drawing/specifications & as per L&T
engineer.For the measurement Foundation Plan size only will be considered.Working space,slope cutting,step cuttin
(if neccessary ) will be in SC scope.Excavation beyond approved levels should be 100% avoided & will not be paid.
Any extra work required in the case will be in SC scope without any extra payment. Work includes all necessary tool
& tackles,labour, consumables, P&M, fuel etc. Work should be carried out with all safety & quality.
Backfilling: All charges to supply of non-expansive selected soil,(LL≤ 25 , Plasticity Index ≤ 6 , CBR <40, Sand Equivalen
≥25, Los Angles Abrasion Value ≤ 50 ,Organic matter contend < 0.5) as approved by L&T / Client / Consultant, spreading
levelling, watering,compacting & testing as per approved drawing , specifications & L&T engineer with all safety &
quality. The selected soil shall be placed in even layers with thickness not greater than 0.3 m. Each layer shall be
thoroughly compacted using 10 T roller or suitable equipment to achieve required compaction as per
specifications/drawing. Min. 98% compaction is requires as per Mod. AASHTO at OMC. Necessary compaction test
to be carried out in presence of L&T/Client/Consultant. After approval of tested layer test results, work for next layer
to be started. Work includes all necessary tools & tackles,labour, consumables, P&M, fuel etc.Work should be carrie
out with all safety & quality.
Backfilling: All charges to do Backfilling with excavted earth in foundations ,incl. of soil spreading, levelling,
watering,compacting & testing as per approved drawing , specifications & L&T engineer with all safety & quality.Soil
be placed in even layers with thickness not greater than 0.3 m. Each layer shall be thoroughly compacted using 10
roller or suitable equipment to achieve required compaction as per specifications/drawing. Min. 98% compaction is
requires as per Mod. AASHTO at OMC. Necessary compaction tests to be carried out in presence of
L&T/Client/Consultant. After approval of tested layer test results, work for next layer to be started. Work includes all
necessary tools & tackles,labour, consumables, P&M, fuel etc.Work should be carried out with all safety & quality.
Disposal of Surplus Earth : All charges for disposal of Excess excavated material in accordance with the
instructions issued by L&T/Client/Consultant's Engineer to designated area for any lead from the site, including
Spreading & levelling of soil, rock, boulders, etc. at the place of disposal. Unit rate should be quoted as Cum/km of
soil .Excavated material suitable for backfilling shall be removed to a tip and stored seperately as instructed by
L&T/client/consultant for future use. This item rate applicable for disposal location beyond 5km from the site.
For less then 5km disposal location following item rate is applicable

Upto 1km
Upto 2km
Upto 5km
Plain cement concrete of class C12/15 (Cube Strength- 15N/mm2) : All charges for supply & laying of C 15
concrete with minimum cement content of 150kg/M3, as per the approved mix design,technical specifications &
instructions of L&T Engineer, surface preperarion to recieve PCC should be levelled & compacted , shuttering, laying
& finishing of PCC, curing as per drawing, technical specifications & specifications for all masonry foundations and
footing pads & other works.All inclusive of supply of Cement, aggregate,labour,tools & tackles,shuttering
materials,consumables with all P&M etc. Work should be carried out with all safety & quality.
Reinforced Structural concrete of grade C30/37 (37 N/mm2 Cube Strength) All charges for supply & laying of C
30 concrete, i.e. with minimum cement content of 400 kgs/m3 or as per approved drawings, approved mix design,
client specifications which shall be filled into formwork and vibrated around steel reinforcement , (Manually or with
pump), compaction, concrete preparation, surface preparation unless otherwise stated, embedment preparation,
striking/stripping, cleaning, chamfer, rebate, groove, throats, ends opening, curing, cube casting, testing, etc.as per
approved drawings & specifications & as per the instructions of L&T engineer. All inclusive of supply of Cement,
aggregate,sand, admixture, labour,tools & tackles, with all P&M etc. Work shoud be carried out with all safety &
quality.
Plywood Shuttering : All charges for supply, erection, dismantalling,stacking of shuttering and required props ,
support and steel scaffolding as per approved drawings & specification and as per the instructions of L&T Engineer
with all safety & quality. Work includes making, fixing the wooden plywood shutters (film faced - water proof ) with al
good supports (steel props ) with correct line and level as per approved drawings. Work includes supply & applicatio
of demoulding agents, deshuttering/de staging etc. including supply of all plywood, supports,consumables, labour,
tools & tackles with all P&M etc. Smooth formwork shall be used for the exposed faces. Work should be carried out
with all safety & quality.
Reinforcement Bar Works : All charges for storing, cutting, bending & fixing of reinforcement bar for all leads & lifts
(yield strength Shall not be less than 500 Mpa) as per approved drawings & specifications & as per the instructions o
L&T engineer with all safety & quality. Any testing required as per technical specifications will be in SC scope. Item
includes storage of rebars at site above ground, away from contamination , establishing cutting & bending yard ,
equipment's for cutting & bending , carrying cutting & bending as per BBS , BBS to be submited for approval before
commencement of cutting and bending . Incl.of supplying steel , all consumables , tools , Cover blocks , binding wire
chair rods, spacers, intercarting , shifting & Placing, Binding etc.in Sub-Contractor's scope. Work should be carried
out with all safety & quality.(Supply of reinforcement will be in L&T Scope)
Supply and laying of random rubble masonery works including manpower & Material with necessary PPES as per
project requirement including lead & lift
Supplying & Laying / Installing of Manhole with top cover (At a minimum interval of 30m) inclusive of all civ
works
MANHOLE TYPE 1 (0.6*0.6)-30nos
Excavation : All charges to do excavation in all kind of soils upto the required level as per approved drawing,
including levelling, grading, trimming and compacting the top layer of soil of excavated pit, testing to receive the
succeeding work, transportion and disposal/shifting of surplus/unsuitable excavated soil to the designated
location( those quantities not covered in "Disposal of Surplus Earth" item), including dewatering or lowering of water
table by suitable means & not to effect stabilty of soil mass. Including shoring/strutting etc.and dealing with existing
services. Work should be executed as per the levels mentioned in approved drawing/specifications & as per L&T
engineer.For the measurement Foundation Plan size only will be considered.Working space,slope cutting,step cuttin
(if neccessary ) will be in SC scope.Excavation beyond approved levels should be 100% avoided & will not be paid.
Any extra work required in the case will be in SC scope without any extra payment. Work includes all necessary tool
& tackles,labour, consumables, P&M, fuel etc. Work should be carried out with all safety & quality.
Backfilling: All charges to supply of non-expansive selected soil,(LL≤ 25 , Plasticity Index ≤ 6 , CBR ≥40, Sand Equivalen
≥25, Los Angles Abrasion Value ≤ 50 ,Organic matter contend < 0.5) as approved by L&T / Client / Consultant, spreading
levelling, watering,compacting & testing as per approved drawing , specifications & L&T engineer with all safety &
quality. The selected soil shall be placed in even layers with thickness not greater than 0.3 m. Each layer shall be
thoroughly compacted using 10 T roller or suitable equipment to achieve required compaction as per
specifications/drawing. Min. 98% compaction is requires as per Mod. AASHTO at OMC. Necessary compaction test
to be carried out in presence of L&T/Client/Consultant. After approval of tested layer test results, work for next layer
to be started. Work includes all necessary tools & tackles,labour, consumables, P&M, fuel etc.Work should be carrie
out with all safety & quality.
Backfilling: All charges to do Backfilling with excavted earth in foundations ,incl. of soil spreading, levelling,
watering,compacting & testing as per approved drawing , specifications & L&T engineer with all safety & quality.Soil
be placed in even layers with thickness not greater than 0.3 m. Each layer shall be thoroughly compacted using 10
roller or suitable equipment to achieve required compaction as per specifications/drawing. Min. 98% compaction is
requires as per Mod. AASHTO at OMC. Necessary compaction tests to be carried out in presence of
L&T/Client/Consultant. After approval of tested layer test results, work for next layer to be started. Work includes all
necessary tools & tackles,labour, consumables, P&M, fuel etc.Work should be carried out with all safety & quality.
Disposal of Surplus Earth : All charges for disposal of Excess excavated material in accordance with the
instructions issued by L&T/Client/Consultant's Engineer to designated area for any lead from the site, including
Spreading & levelling of soil, rock, boulders, etc. at the place of disposal. Unit rate should be quoted as Cum/km of
soil .Excavated material suitable for backfilling shall be removed to a tip and stored seperately as instructed by
L&T/client/consultant for future use. This item rate applicable for disposal location beyond 5km from the site.
For less then 5km disposal location following item rate is applicable
Upto 1km
Upto 2km

Upto 5km

Plain cement concrete of class C12/15 (Cube Strength- 15N/mm2) : All charges for supply & laying of C 15
concrete with minimum cement content of 150kg/M3, as per the approved mix design,technical specifications &
instructions of L&T Engineer, surface preperarion to recieve PCC should be levelled & compacted , shuttering, laying
& finishing of PCC, curing as per drawing, technical specifications & specifications for all masonry foundations and
footing pads & other works.All inclusive of supply of Cement, aggregate,labour,tools & tackles,shuttering
materials,consumables with all P&M etc. Work should be carried out with all safety & quality.
Reinforced Structural concrete of grade C30/37 (37 N/mm2 Cube Strength) All charges for supply & laying of C
30 concrete, i.e. with minimum cement content of 400 kgs/m3 or as per approved drawings, approved mix design,
client specifications which shall be filled into formwork and vibrated around steel reinforcement , (Manually or with
pump), compaction, concrete preparation, surface preparation unless otherwise stated, embedment preparation,
striking/stripping, cleaning, chamfer, rebate, groove, throats, ends opening, curing, cube casting, testing, etc.as per
approved drawings & specifications & as per the instructions of L&T engineer. All inclusive of supply of Cement,
aggregate,sand, admixture, labour,tools & tackles, with all P&M etc. Work shoud be carried out with all safety &
quality.
Plywood Shuttering : All charges for supply, erection, dismantalling,stacking of shuttering and required props ,
support and steel scaffolding as per approved drawings & specification and as per the instructions of L&T Engineer
with all safety & quality. Work includes making, fixing the wooden plywood shutters (film faced - water proof ) with al
good supports (steel props ) with correct line and level as per approved drawings. Work includes supply & applicatio
of demoulding agents, deshuttering/de staging etc. including supply of all plywood, supports,consumables, labour,
tools & tackles with all P&M etc. Smooth formwork shall be used for the exposed faces. Work should be carried out
with all safety & quality.
Reinforcement Bar Works : All charges for storing, cutting, bending & fixing of reinforcement bar for all leads & lifts
(yield strength Shall not be less than 500 Mpa) as per approved drawings & specifications & as per the instructions o
L&T engineer with all safety & quality. Any testing required as per technical specifications will be in SC scope. Item
includes storage of rebars at site above ground, away from contamination , establishing cutting & bending yard ,
equipment's for cutting & bending , carrying cutting & bending as per BBS , BBS to be submited for approval before
commencement of cutting and bending . Incl.of supplying steel , all consumables , tools , Cover blocks , binding wire
chair rods, spacers, intercarting , shifting & Placing, Binding etc.in Sub-Contractor's scope. Work should be carried
out with all safety & quality.(Supply of reinforcement will be in L&T Scope)
Pre Cast Concrete Cover slab - All charges for supplying and fixing of Precast concrete cover slab of grade C25/3
(cube strength -30N/mm2) for Man Hole.Size, thickness and lifting arrangements should be as per approved
drawing,specifications and L&T engineer instructions .Cover slab should have smooth bottom ,top and side
finish.Works incl. supply of all materails,manpower,tools and tackles,P&M..etc.Work should be carried out with all
safety & quality.

MANHOLE TYPE 2 (0.76*0.76)-10nos

Excavation : All charges to do excavation in all kind of soils upto the required level as per approved drawing,
including levelling, grading, trimming and compacting the top layer of soil of excavated pit, testing to receive the
succeeding work, transportion and disposal/shifting of surplus/unsuitable excavated soil to the designated
location( those quantities not covered in "Disposal of Surplus Earth" item), including dewatering or lowering of water
table by suitable means & not to effect stabilty of soil mass. Including shoring/strutting etc.and dealing with existing
services. Work should be executed as per the levels mentioned in approved drawing/specifications & as per L&T
engineer.For the measurement Foundation Plan size only will be considered.Working space,slope cutting,step cuttin
(if neccessary ) will be in SC scope.Excavation beyond approved levels should be 100% avoided & will not be paid.
Any extra work required in the case will be in SC scope without any extra payment. Work includes all necessary tool
& tackles,labour, consumables, P&M, fuel etc. Work should be carried out with all safety & quality.
Backfilling: All charges to supply of non-expansive selected soil,(LL≤ 25 , Plasticity Index ≤ 6 , CBR <40, Sand Equivalen
≥25, Los Angles Abrasion Value ≤ 50 ,Organic matter contend < 0.5) as approved by L&T / Client / Consultant, spreading
levelling, watering,compacting & testing as per approved drawing , specifications & L&T engineer with all safety &
quality. The selected soil shall be placed in even layers with thickness not greater than 0.3 m. Each layer shall be
thoroughly compacted using 10 T roller or suitable equipment to achieve required compaction as per
specifications/drawing. Min. 98% compaction is requires as per Mod. AASHTO at OMC. Necessary compaction test
to be carried out in presence of L&T/Client/Consultant. After approval of tested layer test results, work for next layer
to be started. Work includes all necessary tools & tackles,labour, consumables, P&M, fuel etc.Work should be carrie
out with all safety & quality.
Backfilling: All charges to do Backfilling with excavted earth in foundations ,incl. of soil spreading, levelling,
watering,compacting & testing as per approved drawing , specifications & L&T engineer with all safety & quality.Soil
be placed in even layers with thickness not greater than 0.3 m. Each layer shall be thoroughly compacted using 10
roller or suitable equipment to achieve required compaction as per specifications/drawing. Min. 98% compaction is
requires as per Mod. AASHTO at OMC. Necessary compaction tests to be carried out in presence of
L&T/Client/Consultant. After approval of tested layer test results, work for next layer to be started. Work includes all
necessary tools & tackles,labour, consumables, P&M, fuel etc.Work should be carried out with all safety & quality.

Disposal of Surplus Earth : All charges for disposal of Excess excavated material in accordance with the
instructions issued by L&T/Client/Consultant's Engineer to designated area for any lead from the site, including
Spreading & levelling of soil, rock, boulders, etc. at the place of disposal. Unit rate should be quoted as Cum/km of
soil .Excavated material suitable for backfilling shall be removed to a tip and stored seperately as instructed by
L&T/client/consultant for future use. This item rate applicable for disposal location beyond 5km from the site.
For less then 5km disposal location following item rate is applicable
Upto 1km

Upto 2km

Upto 5km
Plain cement concrete of class C12/15 (Cube Strength- 15N/mm2) : All charges for supply & laying of C 15
concrete with minimum cement content of 150kg/M3, as per the approved mix design,technical specifications &
instructions of L&T Engineer, surface preperarion to recieve PCC should be levelled & compacted , shuttering, laying
& finishing of PCC, curing as per drawing, technical specifications & specifications for all masonry foundations and
footing pads & other works.All inclusive of supply of Cement, aggregate,labour,tools & tackles,shuttering
materials,consumables with all P&M etc. Work should be carried out with all safety & quality.
Reinforced Structural concrete of grade C30/37 (37 N/mm2 Cube Strength) All charges for supply & laying of C
30 concrete, i.e. with minimum cement content of 400 kgs/m3 or as per approved drawings, approved mix design,
client specifications which shall be filled into formwork and vibrated around steel reinforcement , (Manually or with
pump), compaction, concrete preparation, surface preparation unless otherwise stated, embedment preparation,
striking/stripping, cleaning, chamfer, rebate, groove, throats, ends opening, curing, cube casting, testing, etc.as per
approved drawings & specifications & as per the instructions of L&T engineer. All inclusive of supply of Cement,
aggregate,sand, admixture, labour,tools & tackles, with all P&M etc. Work shoud be carried out with all safety &
quality.
Plywood Shuttering : All charges for supply, erection, dismantalling,stacking of shuttering and required props ,
support and steel scaffolding as per approved drawings & specification and as per the instructions of L&T Engineer
with all safety & quality. Work includes making, fixing the wooden plywood shutters (film faced - water proof ) with al
good supports (steel props ) with correct line and level as per approved drawings. Work includes supply & applicatio
of demoulding agents, deshuttering/de staging etc. including supply of all plywood, supports,consumables, labour,
tools & tackles with all P&M etc. Smooth formwork shall be used for the exposed faces. Work should be carried out
with all safety & quality.

For Footing

For Walls

Reinforcement Bar Works : All charges for storing, cutting, bending & fixing of reinforcement bar for all leads & lifts
(yield strength Shall not be less than 500 Mpa) as per approved drawings & specifications & as per the instructions o
L&T engineer with all safety & quality. Any testing required as per technical specifications will be in SC scope. Item
includes storage of rebars at site above ground, away from contamination , establishing cutting & bending yard ,
equipment's for cutting & bending , carrying cutting & bending as per BBS , BBS to be submited for approval before
commencement of cutting and bending . Incl.of supplying steel , all consumables , tools , Cover blocks , binding wire
chair rods, spacers, intercarting , shifting & Placing, Binding etc.in Sub-Contractor's scope. Work should be carried
out with all safety & quality.(Supply of reinforcement will be in L&T Scope)
Pre Cast Concrete Cover slab - All charges for supplying and fixing of Precast concrete cover slab of grade C25/3
(cube strength -30N/mm2) for Man Hole.Size, thickness and lifting arrangements should be as per approved
drawing,specifications and L&T engineer instructions .Cover slab should have smooth bottom ,top and side
finish.Works incl. supply of all materails,manpower,tools and tackles,P&M..etc.Work should be carried out with all
safety & quality.

Supplying & Laying / Installing of Subsoil drain - 160 mm PERFORATED PIPE DRAIN 160mm dia
Excavation : All charges to do excavation in all kind of soils upto the required level as per approved drawing,
including levelling, grading, trimming and compacting the top layer of soil of excavated pit, testing to receive the
succeeding work, transportion and disposal/shifting of surplus/unsuitable excavated soil to the designated
location( those quantities not covered in "Disposal of Surplus Earth" item), including dewatering or lowering of water
table by suitable means & not to effect stabilty of soil mass. Including shoring/strutting etc.and dealing with existing
services. Work should be executed as per the levels mentioned in approved drawing/specifications & as per L&T
engineer.For the measurement Foundation Plan size only will be considered.Working space,slope cutting,step cuttin
(if neccessary ) will be in SC scope.Excavation beyond approved levels should be 100% avoided & will not be paid.
Any extra work required in the case will be in SC scope without any extra payment. Work includes all necessary tool
& tackles,labour, consumables, P&M, fuel etc. Work should be carried out with all safety & quality.
Backfilling: All charges to do Backfilling with excavted earth in foundations ,incl. of soil spreading, levelling,
watering,compacting & testing as per approved drawing , specifications & L&T engineer with all safety & quality.Soil
be placed in even layers with thickness not greater than 0.3 m. Each layer shall be thoroughly compacted using 10
roller or suitable equipment to achieve required compaction as per specifications/drawing. Min. 98% compaction is
requires as per Mod. AASHTO at OMC. Necessary compaction tests to be carried out in presence of
L&T/Client/Consultant. After approval of tested layer test results, work for next layer to be started. Work includes all
necessary tools & tackles,labour, consumables, P&M, fuel etc.Work should be carried out with all safety & quality.

Disposal of Surplus Earth : All charges for disposal of Excess excavated material in accordance with the
instructions issued by L&T/Client/Consultant's Engineer to designated area for any lead from the site, including
Spreading & levelling of soil, rock, boulders, etc. at the place of disposal. Unit rate should be quoted as Cum/km of
soil .Excavated material suitable for backfilling shall be removed to a tip and stored seperately as instructed by
L&T/client/consultant for future use. This item rate applicable for disposal location beyond 5km from the site.
For less then 5km disposal location following item rate is applicable

Upto 1km

Upto 2km

Upto 5km

Sand Filling: All charges for supplying and filling of river sand below concrete pipes per approved drawing ,client
specification/approval. and directed by Engineer In-charge. All charges for supply of Sand ,
PVC Perforated Pipe -160 mm dia : Aall Charges
filling,levelling,watering,compacting,testing etc. forfor
theSupply anddepth
required fixingas
of per
160mm dia PVC
approved perfoarated
drawing, pipe at L&T
specifications
required
engineer level , slope
with all as&per
safety approved
quality. drawings,client
Approval specification
for Sand material shouldand directed
be taken by L&T
from Engineer In-charge
/ Client . to comply.
/ Consultant. The
Including supply of 160mm dia PVC perfoarated pipe and fixation,loading,unloding,fixing & levelling of
pipes ,excavation for pipes and backfilling,Sand filling , morator fixing , Covering pipe joint with cement mortar or
sealent, supply and fixing required collars.. etc. Work includes all necessary tools & tackles, labour, consumables,
P&M, fuel etc.Work Shall be carried out with all safety & quality standards
Gravel Filling : All charges to supply and filling of 40 mm gravel and not more than 15% shall pass a 9.5 mm sieve
over the concrete porous pipe to avoid clogging of pipe darin with soil as per approved drawings , client specification
and directed by Engineer In-charge to complete the filling,levelling,compacting,etc. for the required depth as per
approved drawing, specifications L&T engineer with all safety & quality.Work includes supply of gravels, all necessa
tools & tackles,labour, consumables, P&M, fuel etc.Work includes micro levelling of top layer as per the required lev
& slope as per the approved drawing. Work Shall be carried out with all safety & quality standards
Supplying & Laying / Installing of Subsoil drain - 200mm dia Drain Pipe - Concrete porous pipe
Excavation : All charges to do excavation in all kind of soils upto the required level as per approved drawing,
including levelling, grading, trimming and compacting the top layer of soil of excavated pit, testing to receive the
succeeding work, transportion and disposal/shifting of surplus/unsuitable excavated soil to the designated
Backfilling:
location( thoseAllquantities
charges tonot
supply of non-expansive
covered in "Disposal ofselected
Surplus soil,(LL≤ 25 , Plasticity
Earth" item), includingIndex ≤ 6 , CBR
dewatering or<40, Sand Equivalen
lowering of water
≥25, Los Angles Abrasion Value ≤ 50 ,Organic matter contend < 0.5) as approved by L&T / Client / Consultant, spreading
levelling, watering,compacting & testing as per approved drawing , specifications & L&T engineer with all safety &
Backfilling: All charges
quality. The selected soilto do Backfilling
shall be placed inwith excavted
even earth
layers with in foundations
thickness ,incl. of
not greater thansoil0.3
spreading, levelling,
m. Each layer shall be
watering,compacting & testing as per approved drawing , specifications & L&T engineer with all safety & quality.Soil
be placed in even layers with thickness not greater than 0.3 m. Each layer shall be thoroughly compacted using 10
Disposal of Surplus
roller or suitable Earth to
equipment : All charges
achieve for disposal
required of Excess
compaction excavated
as per material in accordance
specifications/drawing. Min. 98%with the
compaction is
instructions issued by L&T/Client/Consultant's Engineer to designated area for any lead from the site, including
Spreading & levelling of soil, rock, boulders, etc. at the place of disposal. Unit rate should be quoted as Cum/km of
Upto.Excavated
soil 1km material suitable for backfilling shall be removed to a tip and stored seperately as instructed by

Upto 2km

Upto 5km

Sand Filling: All charges for supplying and filling of river sand below concrete pipes per approved drawing ,client
Concrete porous pipeand
specification/approval. -200 mm diaby: All
directed Charges
Engineer for Supply
In-charge. Alland fixingfor
charges of supply
200mmofdia concrete
Sand , porous pipe at
required level and slope as per approved drawings,client specification and directed by Engineer In-charge
filling,levelling,watering,compacting,testing etc. for the required depth as per approved drawing, specifications . to comp
L&T
Including supply of 200mm dia concrete porous pipe and fixation,loading,unloding,fixing & levelling of
engineer with all safety & quality. Approval for Sand material should be taken from L&T / Client / Consultant. The
pipes ,excavation for the pipes and backfilling,Sand filling , morator fixing , Covering pipe joint with cement mortar or
sealent , supply and fixing of required size collar..etc. Work includes all necessary tools & tackles, labour,
consumables,
Gravel Filling P&M, fuel etc.Work
: All charges Shalland
to supply be filling
carried
of out
40 with
mm all safety
gravel and& not
quality
morestandards
than 15% shall pass a 9.5 mm sieve
over the concrete porous pipe to avoid clogging of pipe darin with soil as per approved drawings , client specification
and directed by Engineer In-charge to complete the filling,levelling,compacting,etc. for the required depth as per
approved drawing, specifications L&T engineer with all safety & quality.Work includes supply of gravels, all necessa
Supplying & Laying / Installing of Subsoil drain - 300 mm dia Drain Pipe - Concrete porous pipe

Excavation : All charges to do excavation in all kind of soils upto the required level as per approved drawing,
including levelling, grading, trimming and compacting the top layer of soil of excavated pit, testing to receive the
succeeding work, transportion and disposal/shifting of surplus/unsuitable excavated soil to the designated
Backfilling:
location( thoseAllquantities
charges tonot
supply of non-expansive
covered in "Disposal ofselected
Surplus soil,(LL≤ 25 , Plasticity
Earth" item), includingIndex ≤ 6 , CBR
dewatering or≥40, Sand Equivalen
lowering of water
≥25, Los Angles Abrasion Value ≤ 50 ,Organic matter contend < 0.5) as approved by L&T / Client / Consultant, spreading
levelling, watering,compacting & testing as per approved drawing , specifications & L&T engineer with all safety &
Backfilling: All charges
quality. The selected soilto do Backfilling
shall be placed inwith excavted
even earth
layers with in foundations
thickness ,incl. of
not greater thansoil0.3
spreading, levelling,
m. Each layer shall be
watering,compacting & testing as per approved drawing , specifications & L&T engineer with all safety & quality.Soil
be placed in even layers with thickness not greater than 0.3 m. Each layer shall be thoroughly compacted using 10
Disposal of Surplus
roller or suitable Earth to
equipment : All charges
achieve for disposal
required of Excess
compaction excavated
as per material in accordance
specifications/drawing. Min. 98%with the
compaction is
instructions issued by L&T/Client/Consultant's Engineer to designated area for any lead from the site, including
Spreading & levelling of soil, rock, boulders, etc. at the place of disposal. Unit rate should be quoted as Cum/km of
Upto.Excavated
soil 1km material suitable for backfilling shall be removed to a tip and stored seperately as instructed by

Upto 2km

Upto 5km
Sand Filling: All charges for supplying and filling of river sand below concrete pipes per approved drawing ,client
specification/approval. and directed by Engineer In-charge. All charges for supply of Sand ,
filling,levelling,watering,compacting,testing etc. for the required depth as per approved drawing, specifications L&T
engineer with all safety & quality. Approval for Sand material should be taken from L&T / Client / Consultant. The
sand shall be placed in even layers with thickness not greater than 0.2 m. Each layer shall be thoroughly compacte
using 5 T roller or suitable equipment to achieve required compaction, Including necessary compaction tests to be
carried out in presence of L&T/Client/Consultant. Work includes all necessary tools & tackles,labour, consumables,
P&M, fuel etc.Work should be carried out with all safety & quality.Required tests at lab & approval of material to use
and required tests at field, maintaining proper records etc. will be in Sub Contractor's scope.
For measurement of executed Quantities refer annexure ...... (Mode of Measurements)
Work includes micro levelling of top layer as per the required level & slope as per the approved drawing.

Concrete porous pipe -300 mm dia : all Charges for Supply and fixing of 300mm dia concrete porous pipe at
required level and slope as per approved drawings,client specification and directed by Engineer In-charge . to comp
Including supply of 300mm dia concrete porous pipe and fixation,loading,unloding,fixing & levelling of
pipes ,excavation for the pipes and backfilling,Sand filling , morator fixing , Covering pipe joint with cement mortar or
sealent , supply and fixing of required size collar..etc. Work includes all necessary tools & tackles, labour,
consumables, P&M, fuel etc.Work Shall be carried out with all safety & quality standards

Gravel Filling : All charges to supply and filling of 40 mm gravel and not more than 15% shall pass a 9.5 mm sieve
over the concrete porous pipe to avoid clogging of pipe darin with soil as per approved drawings , client specification
and directed by Engineer In-charge to complete the filling,levelling,compacting,etc. for the required depth as per
approved drawing, specifications L&T engineer with all safety & quality.Work includes supply of gravels, all necessa
tools & tackles,labour, consumables, P&M, fuel etc.Work includes micro levelling of top layer as per the required lev
& slope as per the approved drawing. Work Shall be carried out with all safety & quality standards
RFQ Unit rate for
UNIT QUANTITY labour Total
(A) (B)
0.00
0.00

Cu.m 228.60 480.00

109,728.00

Cu.m 0.00

Cum 0.00

Cum / KM 0.00

-
cum 0.00 -
cum 0.00 -
cum 0.00 -
Cu.m 95.25 980.00

93,345.00

Cu.m 277.81 1,028.00

285,591.25

Sqm 1250.00 230.00

287,500.00

MT 16.67 11,500.00

191,690.63

Cum 746.00 550.00


410,300.00

0.00
-
0.00 -

Cu.m 99.84 480.00

47,923.20
Cu.m 99.84 95.00

9,484.89

Cum 0.00

Cum / KM 0.00

-
cum 0.00 -

cum 0.00
-

cum 0.00
-

Cu.m 1.33 980.00

1,298.89

Cu.m 13.94 1,028.00

14,335.42

sq.m 202.18 230.00

46,500.48
MT 0.70 11,500.00

8,018.35

Cu.m 2.12 2,300.00

4,868.64

0.00
-

Cu.m 57.98 480.00

27,830.40

Cu.m 57.98 95.00

5,507.77

Cum 0.00

Cum / KM 0.00

-
cum 0.00
-

cum 0.00
-
cum 0.00 -

Cu.m 0.67 980.00

659.34

Cu.m 11.24 1,028.00

11,555.13

0.00

sq.m 53.50 230.00


12,305.92

sq.m 80.26 230.00


18,458.88

MT 0.56 11,500.00

6,463.23

Cu.m 1.12

RM 0.00
-
Cu.m 0.00

Cum 0.00

Cum / KM 0.00

cum 0.00
-

cum 0.00
-

cum 0.00
-

Cu.m 108.05 250.00


27,013.50

RM 1293.33 140.00
181,066.67

Cu.m 116.40 300.00

34,920.00

RM 0.00
-
Cu.m 82.44 480.00
39,571.20

Cu.m 82.44 95.00


7,832.25

Cum 0.00
-

Cum / KM 0.00
-

cum 0.00
-

cum 0.00
-

cum 0.00
-

Cu.m 8.70 250.00


2,175.00

RM 290.00 180.00
52,200.00

Cu.m 17.40 300.00


5,220.00

RM 210.00 250.00
52,500.00

Cu.m 0.00
-

Cu.m 66.08 95.00


6,277.41

Cum 0.00
-

Cum / KM 0.00
-

cum 0.00
-

cum 0.00
-

cum 0.00
-
Cu.m 8.40 250.00

2,100.00

RM 210.00 280.00

58,800.00

Cu.m 25.20 300.00

7,560.00

Total carried to sumarry 2,070,601.44


Sl.No Description Unit Qty

Aluminium Windows and Rolling shutters -


Supplying , Installing, Windows and Rolling
shutters including frames & Hard ware
materials as per approved drawing and client
1 specification. All window furniture shall be Sqm 8.82
strongly made, well finished, good quality
"stock pattern" articles and where
appropriate shall be designed for external
use. All window furniture shall be cleaned,
oiled, adjusted and left in perfect working
order.
2 Supply and fixing of rolling shutter Sqm 9.75