You are on page 1of 65
fo commision fr Han }, Construction Department Technical Submittal Review Contato: JOPOLE2006 Re Tamia No: TN 498 INSTALLATION OF PaeKADED SUnSTANION a 0) Ciwentnyroaes C3 ser enint ‘th Representative [MUHAMMAD USMAN GUL PSY mtb win nt cons set tac commen canon “emumen tr pis eat roe uc tite or pezeta = —— en z Taam seo) waa aR TORO OO) | soa pepe aaa [ruig Dau BunoeL BBuguononasog wogesyonds eno sos sequny esUEHL 6p si | senna ewan 9 THOa= SAD wOTENGAS THEE 900 axon may ea 1osfang mays E90 Panso%H sO | ‘uy 1380009 Eee ‘Aaponenon, et T "HUBUULIOD meine TER TGTS POTUDSL qusuniedeg uopanasuog, Faaunpeny rrooao-¥31 IddDf-w0g syusWIOD mainay [eRIwugns jeauysa4 @ rues ue Weg oH eg Saaloee Wyle dept et \C tm Se Ton = em vt 2 Technical/Non-Technical/TQ/FCD Submittal Contract No: SCPD! 12004 Prec Name: fastrcture Development cuing Roads & Utes Residential Area Dit Area 2 ig tS an msm, =-—— oO Oo =——-O— eter mine wernt Hi setts CO ssnnee ee mere Co ame eons a Ment ate = Ty ortnomt mmc o TD isarnoet Dom Doe a = ‘tera js gS ‘i ron Sat eo Royal Commission for Jubal and Yanbu | Document Type Royal Commission at lazan ‘Method Statement METHOD STATEMENT Sioaiatl ove LL Asn ed Csi Gam sts sor I= 0m 1 ZS nh 0€0.ENOINEERV CORPORATION (AUDI BRANCH Infrastructure Development Including Roads and Utilities Residential ‘Area District 1-Area 3 CONTRACT NO: JPDI1-2004 Installation of Package Substation, 13.8kV/400-231V, 3-Phase, 4-wire, 60Hz rev. | pare | pescuprion | prepareoey: | cHEckED By ppRoven BY: No: Tnstaliavon of Package Substation, actical aC | ANOCManager &Safety | Project Manager 00 | 7/06/23 | .aevoozaiv, ‘Manager 3hase, ire, one contents 1. PURPOSE 2. SCOPE OF WORK 2.1 General Description 2.2 Pant and Equipment 2.3 Material 2. Site Planning and Prepsration 255 Delivery, Storage, and Handling 2.6 Work Methodology forthe Installation of Package Substation, 1.8V/400-231V, Phase, 4- vireo 2.6.1 Excavation fo the Foundation of Package Substation 2.6.2 Access Requirements forthe Excavated Trench 2.6.3 Compaction Test on the Subvgrade Foundation 2.64 Blindng/Lean Conerete and Formwork 2.65 Rebar’s installation 2.65.1 Rebar’ Fabrication 2.65.2 Installation of Reba’s 2.6.6 Formwork 2.6.7 Concrete Works 2.6.8 Waterproofing Install 2.6.8.1 waterproofing instalation ion & Damp Proofing Installation 2.6.8.2 Damp Proofing istllation 2.6.9 Backing Works 2.6.10 installation of Package Substation 3.0 Organizational Chart, Responsibilities & Supervision Royal Commision fr fubal'and anbu Royal Commission a lazan 4.0 WorkForce 50 Health and Safety 5.1 RiskASsessments (Se attachment) 5.2. Environmental safety& Health Contractor 5. Protective and SafetyEquipment 54 ContractualRequiremants 55 Information toPersornel 5.6. EmergencyProcedure 6.0 Environmental Issues 7.0 Quality Assurance 8.0 Appendices: 8.1 Rsk Assessments {8.2 Organization Chart 18.3 Drawing Details of PSS {8.4 Drawing forthe Location Project Site 25 Traffic Management pan 8.6 Excavation Permit 8.7 PTB.CARD (PRE-TASK BRIEFING) 8.872 Table £89 TPC for Operators andEquipment 1. PURPOSE Method Statement (China Geo-Engineering Corporation wil lize this method statement i intended to ‘utine the way, procedures and proper execution inthe installation of Pakage Substation, 13.84v/400-251V, Phas, 4 wires, SoHE 2.cOPE OF WORK. 2.1 General Descroten Royal Commission atazan ‘Method Statement ‘Wor inclues the supply and installation of Unit Substations complete with al the necessary controls, indications, protections and other accessories, Scope Includes excavations, reinforced concrete foundations electrical connection from the Ring Main Unit tothe 13.8KY sideor the transformer, cable supports, terminations and grounding system, 2.2 Plant and Equipmest To execute the jo, below listed plant & equipment shall be used but not limited to the following Roller Compactor ‘© Plate Compactor 1+ Backhoe/Excavator ey Loader iting Eauipment Hand Tools ‘Mobile Cane/Boom Truck Sting/Bet shackle 2.3 Material ‘The material used shall be accordance with the Contract Project Specification and conformance as er IFC drawings such as Package Substation, 13 KV/€00-231V, 3-Phase, 4 wires, ols Mates forthe Construction of Foundation and other Materials to complete the scope of works 24 ite Planning and Preparation conduct ste vist and check the existing site conditions to evaluate the necessary mates, for the instalation of Package substation 13 8KV/400-231V, 3-Phae, wie, GOH. Makin proper plans and arargig materials requred intaly will make the working process smooth = Prepare safety precaution messures fr the protection af personnel, equipment and ‘environment. Approved IFC drawings/Shop drawings Inspection & Test Plan ‘yal Commission foriubal'andanbu | Dscurnent Type Royal Commission at lazan ‘Method Statement RC Approved Vendor Supplier RC Material Submittal for Approvsl REFERENCES: «Section 261117 ~ Packaged Substations '. Section 01340 ~Shop Drawings, Materials, Sample and Miscellaneous submittal «Section 01400 - Quality Contec 1. Section 03300 Cas-n-Place Concrete fe Section 03200- Concrete Rein‘orcement {Section 03100~Concrete Formnerk Section 02200~ Earthwork /hITP-€.002~ Installation of Package Unt Substation, 13.8kV/400-232V, 3phas, 4 wire, 60H 2:5 Delivery, Storage, and Handing + Dalver shipping splits lo path, + Coordinate delivery of package substavions to allow movement into ‘designated space. + Store package substation components protected from weather and 50 Condensation ‘wil not form on of in unis. Provide temporary heating According to manutacturer'swriten instructions. + Handle package substation somponents according to manufacturers witien Instrctions, Use factory-nstalled lifting prowsions. that can be moved past obstructions h dey 2.6 Work Methodology 2.6: Excavation forthe Foundaton of Package Unit Substation Before the surface of any part ofthe worksites disturbed or the works thereon are commenced, the Cntractor shal ake and recor levels of any such parti 2 manner agreed withthe Royal Commision. Contractor must appoint a competent person to supervise excavations, lveihing, ad baking In accordonce with Nayal Commission requirements ‘Te excavation competent persc shall ensue thatthe latest revision of ‘drawings have been used to locate all underground instalations and buried services inthe are tobe excavated. Royal Commision at azan ‘Method Statement ‘Royal Commision for ubal and Yenbu | Document Type The width oF excavation shall be made minimum to comfortably contain the space of worker standing on ether side or sufficient to work and as per RC standard, Stakes, contol survey points, and benchmarks shall be established and malntained during construction by the Contractor. Slope of all open excavations and trenches shall becutat the angle of repose for the sll condtions (i. dry sand 38 degrees; wet sand 22 degree). Contractor sal ensure that al the excavation i safe to werk around throughout construction actives unt backfiled and to take approvalpecit from Safety Department. Excavated material tobe placed at safe stance from edge of the excavation. Ladders aces to trench must be secured at thelr highest point. ‘The necessay service access with slope shall be provide as required, Ifthe excavation area is deeper than 3 meter, the CSC will provide benching system /ster by step two or more steps. And this 3 meter deep vill be re conflematior in actual site conditions. ‘The inclined excavation slope should be 34 degrees. ll trenches shall be under Inspection Re Safety Department and Site Engineer fr approval me sch ‘Ameans of ccs & gress shal be povided every 25 feet (7.6m) forall excavation and trenches. As per RC standard ‘Aluminum ladder to access the worker and shall be approved from safety department. Aluminum ldder shal be bath side hand suppor calling. ‘Atal deep excavations (20 fet/6.08m or more) access must be restricted anda ‘means of monitoring acces and egress at the entrance must be established. 26.3 Compaction Tes on the Sub-Grade Foundation Control sol compaction during consruton providing maximum percentage of ‘lens spectied foreach area csslfetion Control the mlsture content of ‘rel thc optimum s determined by ASTM DISS, Methed D Percentage of Maximum Dent Reqlrement: Compt sl tonot ss than the following pecentage of maxim dry deny or lative dena determined in TRoyal Comission Ter ubell and Yanbu | Daeurnent Type. Royal Commission atJazan ‘Method Statement accordance with ASTM D 1557, Method D, or ASTM D4253/04254. ‘+ Spectic type of il Backfill material : Percentage requirements fr fed ‘compaction denstes compaction around foundations, equipment, pipes, minor structures, et shal be as fllows, or as recommended by the piping or equipment manufacturer as percentage of Maximum Dry Density Minimum Acceptable Percentage Compaction Field asTmaD1s570r ‘AstM04253/04254 asta 02922 Relative Density Select BackfilStructural Backtil 95 B General Back 90 7 Sand Backfl 0 7 Trench Bottom 95 Eo Bose Fil/Subarade 100078 ‘This above requrenents as per RC Standard and Contract Specification, 2.64 Blinding/Leos Concrete and Formwo ‘+ Aplastized sheet vapor barr, nim 0.25 mm {20 mis) in thickness shal be placed beneath lear concrete. ‘+ Lean concrete should be leveled and cover all area under the RC foundation. Marking of foundation shal be done by surveyor (Thickness of lean concrete as per the IFC rowing) + Lean Concrete with28 dos design strength of 20 MPa as per IFC drawings, ‘2 Rebar’ ton 2.65.1 Rebar's Fabricator yal Commision for lubai and Yanbu | Dacarnant Type | Royal Commission at fzan Method Statement | ‘+ NiReinforcing bas tobe high strength, high bond bars conforming to the requirements ASTM AGIS, grade 6C (240 Mp). + steel Wire: ASTM AB, plain, cold-dravn, steel + Reinforcing steel shall be accurately bent, cut or formed to the dimensions and configurations shown on the Contract Orawings or the Approved Shop Drawings + Welding of reinforcing stel bars isnot allowed, unless reinforcement complying with ASTM ATO6M is used «When epoxy-coated enforcing bars are sheared, saw cut or cut by other means during fabrication process, the cut ends shal e coated with the same patching materials used fer the epair of daraged coating +All chairs tie wires er other devices used to connect, support, secure or fasten pony coated reinforcement shall be coated with acelectrc material such as nylon, ep0xY or plas 126.52 Installation of Rebar's + Reinforcement shall be placed in accordance withthe Contract Drawings or Approved Shop Drawing ‘Only reinforcing that free of ol, dit, loose mortar or other deleterious materials, ‘hich affect bonding capacity, shal be Installed. After installation, the reinforcement shall be maintained in clean conltion unt the conerete is placed, + poston, support, secure reinforcement against lsplacement by formwork, construction, or concrete placement operations. Locate and support reinforcing by metal chairs, ners, bolsters, spacers and hangers, as required “+ Concrete Cover for Substructures/Foundation referring IFC Drawing 2008-SE-A1-1001 Rev.01 1) Unformed Surface Cas against Earth 75mm i) Formed Surface Exposed t0 EB nnn 75 1s) Formed Surface Exposed to Weather som Royal Commission a zan Method Statement ‘spices of reinforcing bars shall be as shown on the Contract Drawings or the approved shop drawings. Please refer for more details in Drawing No. 2004-SE-A1-1001 Rev.01 for compiying the standard reinforcement splices for minimum lap of spliced work +The formwork forthe Foundation of the Pad Mounted Switchgear will be installed to the exact sites, shapes, lines and dimensions shown in approved shop drawing/FC “drawings a required to obtain accurate alignment, levels and plumb work In finish steuetres +The formwork installed to permit fr an easy removal without hammering or prying against concrete surfaces Use crush plates or wrecking plates where stripping may damage cast concrete surfaces ‘+ Provide the exposed siges of the Foundation of 25 mm x25 mm Chamfer. 2.6.7 Concrete Works + Pouring of Foundation up to the approved top level ofthe Foundation or approved shop drawing fr thereference, The Compressive Strength of 28 days should bes minimum of 30M, + Ready mix Conerete shall comply with the requirements of ASTM COM in Section (03300, and as herein specifies, 1) Delete the references for allowing addtional water tobe added tothe batch for ‘material with insffient slump, Aiton of water tothe batch will not be permite. 2} During het weather, or under conditions contributing to rapid setting of concrete, 3 shorter mining time than specified in ASTM C94 may be require. (a) When the ai temperature is between 29° Cand 35°C, reduce the mixing and Uelivery ime. from hours to 75 mioutes, and when the air temperature is above 35, * reduce the mixing and delivery tne to160 minutes ‘+ The Quality Cntr Engineer shall provide the following testing at the point of placement, provide consistency measurements such as concrete temperature, Slump bby ASIM C1434, mentoring the ambient temperature. Ana the third party wil prepare sample of & ses of standrd cylinders or as per RC requested forthe Compressive Strength Tests ‘Royal Commision foriubailand Yonbu | Document Type Royal Commision atlazan ‘Method Statement ‘+ The slump ofdelivered concrete, as measured In accordance with ASTM C143, atthe time of dlschege fram the truck shall not exceed the working limit shown in pa2.. Page no, 18a Section 03300. And the concrete temperature should not exceed 30°C upon displacement if exceed 30 C wil be rejected. + Canslidate concrete placed in forms by mecharical vibrating equipment supplemented by hand-spading, ding or taping. Use equipment and procedures for consolidation of cancrete in accordance withthe recommended practices of ACI309 tosuit the type of concrete and projet conditions. Vibration of forms and reinforcing ll aot be permitted + Donat use vbrators to transport concrete inside of forms. Insert and withdraw vibrators veriealy and unformiy spaced locations not father than the visible effectiveness ofthe machine. Place vibrators to rapidly penetrate the layer of concrete and at least 150mm into the preceding layer, Do not Insert vibrators nto lower layers of concrete tat have begun to set, At each insertion, limit the duration of vibration to the time necessary to consolidate the concrete and complete embed ment of Feinforcemest and other embedded items without causing segregation ofthe mix Waterpr Installation & Damp Proofing instal 2.6.8.1 Waterproofing Installation ‘+ Wiaterproging shal be quid type equol to NITOPROOF 600 Manufactured by FOSROC ‘or equivalent as per RC Approval + surfaces stall be dry an free fom ol grease loose particles, and decayed matesls, moss or alae growth + quid waterproofing shall be applied by brush, trowel, squeegee or alles spray (horzontalsurfaces ont) “guid Waterprooting shall be applied ata minimum wet Ml thickness of 1.3 mm(1.3 lters/sa, eter) in adltion to the preparatory work 5.8.2 da + Damp practing shall be impregnating stane base liquid tye equal to Dekguard S Manufactired by FOSROC or equlvalent a pre RC appeoval 1 surfaces stall be dry and free from ol, grease, lose particles, decayed mater, moss br algae growth. Curing compounds, fused during curing operations, shal be removed by sand blasting or other mechanical means [Royal Commision foriubaiendVanbs —[Doeument type «| Royal Commision at Jazan Method Statement ‘+ The primer and topcoat shall be applied by brush, spray or roller without thining ‘Minimum application rates shall be Primer 0.4 liters/m® Tofcoat -0.2iters/m* 1+ Repeated application ofprimer/topcoat shall be made to atain the above minimum application ‘ates, The primer shal be allowed to dy fora minimum of two hours before topcoat application 2 Works + Backfill excavations as promptly as work permits, but nat until completion of the follwing Acceptance bythe Royal Commission of construction below finish grade including, ‘where applicable, damp proofing, waterproofing, and perimeter insulation. + Inspection testing approval an recoring lations of underground utes. = Removalof wash and debris, +The Contractor shall perform the flowing tests Before backfling to ensure tha the mats meet the requirements. TSIM [ASTM DSS7 | Maximan Density & Opium Moisture Content ool ‘stn [ASTWDBT | Casation of sol for Engineering Purposes asim [asTw DR Partie ae analy oF ls aston [AST gui ito ie asia [STADIA asi and lastly — inde FT + strsture Bick Fil rater sal be placed with densty control in succesve horizontal ayers of nat tore han 200 en in tose depth ach ayer skal be spread uniformly, wetted ordied isrequred, and rolled with an approved tamping o power ole. ~The bck shal be brought up uniformly on all sides ofthe structure. Each later of beck shall be compacted to 95%, maslmum densty as determined by AST C1SS7, "Noinbin the optenum mostre content +2 for compaction of baking mater 10 [Roya ommsion for kailand Yanbu [Document wpa G9) | 91 commision azn ‘Method Statement 0 Instatation Works of Pad tation 2.6.10 Bamination + Gromine areas and space conditions for complance with requirements for package substations and other conditions affecting performance of work “Examine oughingin of conduits and grounding systems to very the flowing: “Ving entries comply with avout equements. 2 Entries are within condul-entry tlerances specited by manufacturer land nc feeders wil have to eross secion barriers to reach load or ne lugs, + framing walls, floors, roofs, and conere conditions For package substation instalation 1 Venfy that ground connections are in place and that requirements in Section 60526 "Grounding and Bonding for Electrical Systems’ have been tet. Maxmum ground resistance shall be S ohms at package substaton locaton, 1+ Proceed wth instalation ony alter unsatistactory conditions have been bases for suitabl 2.6.02 Istallatlon + Before LFing Operations of Package Substation (PSS) this should be complied ‘Safety Manager shall ensue that every iting operation involving the iting equigment i 2) Properly planned by a competent person b) Appropriate Supervised «) Caried ut ina safe manner inthis regulation “ting operation’ means an operation concerned with the Litng or lowering of load. ll iting equipment owned, hired must be properly serviced and inspected to meet legislative requirements and to ensure thatthe its operations its used for can be performed ina safe and satisfactory ‘+ Ensure that al Lifting equipment used for ling operations is appropriate for the task, used correctly and that employees involved in the organizing, planning and use Lifting equipment are suitabiy tained, All relevant infermation, training and instuction are gven to users of iting equipment ang they are ‘competent to carty ou those tasks. ‘+ Maintain minimum clearances and workspace at equipment according. to manulacturer’s wetten instructions and NFPA 70, a ‘Royal Commision forlubsiland Yanbu [ Document Type Royal Commision at azan Method Statement + Construct concrete foundation pads for Installation of package substation In accordance with the Royal Commssion standard drawings fr seneral dimensions and spectiatin fr Cast in lace Concrete, + Encase the underground condul/duct system extension in concrete Extend the grounding conductor in the duct bank as shown on the RoyalCowmission standard drawings. “+ Installed: ground grid tridrg oud rods and one test wellas shown onthe Royal Commission standard drawings + Connect armary cabling. and grounding cables tothe package substation Seal paclage substation compartment interfaces wth concrete pads to prevent ingress of dust. 2.6.0.3 entiation 1+ dently feld-instaled wiring and components and provide warning Signs as spectiedin Section 260553 "Wdentiicaton fo Bactrical Systems." + Operating Insvuctons: Frame printed operating instructions fer package substations, incucing Key interocing, control sequences, tlementery single-ine diagram, sl emergency procedures, Fabscate fared finished wood or metal and cover Instructons with clear acre plastic, Mount orfront of package substaton. + Ince the folowing information on the nameplate forthe package substatcn 1 Mediun Vatage distibution transformer pet 261210, 2. Ring Main Unk per 261320. 3. Lon valine distribution panel 262814 4. Identfeaton and PO numbers forthe package substation ted inside the left oor of the Low-Voltage Dstibution Panel compartment. + Mount sagram plate showing the package substation assembly in one ne dagram format and ercutidentication next to the namepiate, + Labels fer danger, caution, and warring. and for special or non-standard ‘operating instructions shall be inscribed with both Arable and Engi. Dange’, Caution and warning labels shal have red letterng on @ whit background, Special ornon- standard operating instruction labes shal have black letters on a white background. An equipment identicaion label shall be mounted adjacent to the package substation Tame. The label sal sow the purchase order number and the Roya Commission projec number. + addition to manufacturer's nameplates, each package substaten hall be dentfied as per Royal Commission equipment desgnation, detall 3¢ luhich wl be furnished after the awardof the contract. 1+ Each package substation hal have is unique umber and the circu numbers stencled beth inside and outside of enclosure. Al incoming ard 2 6 Foyal Cammiccon for Iubai and Yanhuy | Baume! Type Royal Commision at.aran ‘Method Statement ‘outgoing ccuts shale Mlentiieg 2610.4 Connections + Ground equipment according to Section 260526 “Grounding and Bonding tor Electrical Systems” + Connect wiing according to Section 260519 “Lowotage Electrical Power Conductors ane Cables” 26.1055 Cleaning + ter completing equipment instalation and before — energiing. Inspect unt components. + Remove paint spatters and other spots, it, and debris. Repair damaged fish to match anginal sh, Vacuum interiors of package substation 30 Responsibilities & 5 1+ The Project Manages over allin charge of the Project and he wil get daily ‘monitoring and weakly auc report and participated insite inspections to very that the works implementation with accordance tothe Project Specifications +The constuction Manager shall review and confirm that all works being implemented as per the activities stated in the method statement ad in compliance withthe Royal Commision cdes, standards and project specications 1+ The Safety Manager assumes te lead safety poston ands responsible for the overall project monitoring and administering safety program designed to provide assistance in recognizing, evaluating and subsequently eliminating or controlling hazardous acts for conditions. He warks in close coordination with the client's safety personne in ‘conjunction with 1 Project Manager and Construction Manager assisting in the implementation ofthe safety program © The QA/CC Enginer shal ensure the development and implementation of the quality management system In the organization in accordance with Royal Commission standard and specfleatons, Responsible fr controling and maintalning the quality of the work andthe araducts as per established standards and up tothe satisfaction of the company. Field Engineer and Superintendent Responsiiltes are to manage al daly activites as per plan and schecule, They coordinate with the HSE department to ensure that proper safety implementation respective to personnel Equipment and Environment 2 Tayel Conmizion forbs andvanba—[BecureneType | Royal Commision at azan ‘Method Statement | Td all | are strictly dering Fld Supervisor responsibilty sto monitor everyday fd actives, assuring that implementation is as per RC Standard. + Qualified Persons who are knowledgeable in the installation, operation, and ‘maintenance of underground electric power distribution equipment along with the associate hazards, A qualified person is one whois rained and competent. 4.0 WorkForce Field Engineess Qc inspectors surveyor Safety Officer Equipment Operators Foremen usted Peron Helpers 5 Health and sfety ‘5.1 Ris Assessments See the attachment in Appendices in Section 8.1 Sefer to Risk Assessment + Envionmental health rules and regulation + Atthe projec: site office and or jb site, adequate garbage / rash drums with cover shall providefor the immediate disposal of trash by all employees, every acy in fice Corjobsite shall be provided with these drums and shall be empties and disposed the arbage dal + Environmental and management response puts our safety policy s displayed in reception areas to demonstrate management's commitment toa zero injury philosophy and best practice in provided a safe working environment. 5.2 Envlznnmental Safety & Health Contractor + Wear at all he time suitable protective dating, gloves and eye protection, dust masks shouldbe use all the time; the wet adhesive may cause iitation by skin contact. + Lftng equipment and carrer hal not use its full capacity to handle load. Tojal Commizion foriubal and Yanbu | Document wre Royal Commision at azan Method Statement All envionment and health shal be take care Execute periosic cleaning to keep ste [Adjacent properties free of accumulations of waste materials, debris, rubbish and \windblown debris resulting from construction operation. {Allthe csinfetion procedure shall follow the RC method{s) and standards) 2s required. Prevent acunulation of waste which creates hazardous condition. Collect and remove waste material, debris and rubbish from ste periodically unt execution offal leaning and dispose of site in lvl manner ‘Conduct clearing and disposal operation to comply with local environmental as. Provide pass cover over electrical and electronic components to reduce dust accumulationin interior part ‘Al person alltime when on the site have to wear 2 protective helmet. tis essentl to be propery aijusted to the wearer's head. Metal hard hats ae prohibited. "No holes in the helmet ¬ tobe painted Safety shoes boots shal be sued toll personnel onthe site. Safety shoes compli with ANSI standards which shouldbe ol, abrasion and heat resistant fully useful forthe ‘onstruction sites ‘Appropriate asses and eye protection tobe issued to workman as required. Factor to be considered in selecting eye protection include the degre required an¢ the comfort provided as required by ANS. Inplaces where high slopes workers shall be equipped with a safety ul body harness ‘ith etrivalline securely anchored tobe structure. Rubber boot: tobe provided during concrete works. These boots should bein good conditonin order to prevent any contact of concrete with worker foot Allworkers asa requirement will use protective hand gloves to protect against sharp oF rough edges, chemicals and hot or cold surface accordingly. Self-contained breathing apparatus tobe available in need to use. Ear plug shall be provided during compaction works. Fl and compacted in orderly ‘manner using equipment maintained in the fst cass operating coneition ‘5.3 Protective and Safety Equipment {All person atal time when onthe ste have to wear a protective helmet. Its essential to be property zdjusted tothe wearer's hea. Metal hard hats are prohibited. “No holes inthe helmet & not to be painted. 15 [Rayal CommsavonforJubailana Yanbu [Bacumant Type Royal Commision at lazan| ‘Method Statement ‘+ Safety hoes/boots shal be issued to al personnel on the site, Safety shoes complies vith ANSI standards which shouldbe ol abrasion and heat resistant ful useful forthe construction ses + Appropriate glasses and eye protection tobe issued to workman as requted.Factorsto be considered in selecting eye protection include the degree required andthe comfort, provided as required by ANSL ‘+ Inplaces where high topes workers shall be equipped with a safety full body harness ‘ith etreval tine securely anchored to the structure. + Rubber boots tobe provided duriag concrete works. These boots shouldbe good in ‘condition in order to prevent any contacts of concrete with workers foot ‘+All workers 352 requirement will use protective hand gloves to protec against sharp oF rough edges, chemicals and hot ” col surface accordingly. ‘+ Self-contained breathing apparatus tobe avalabe in need to use + ar plug shall be provided during compaction works. ll and compact in orderly manner ‘using equipment maintained in ist las operating condition. ‘© Wear atl the te suitable protective clothing, loves and eye protection, dust masks, shouldbe used during all the time; the wet adhesive may cause ration by skin contac + Lftng equipment and carries shall not use its fully capacity to handle aload 54 Contractual Requirements ‘+ Al safety and health which are required to Full by the contractor wil be taken caren accordance with the internationd &H & 5 standards in conjunction with len’s specication, standard and instructions. 55 Information to Personne 1 Safety and environmental education and information tobe dsseminated to all the employees in shape of seminars, safety tool box meeting and safety refresher courses. 156 Emergency Procedure + Fist ald clinics available at stein the hour of need. Emer posted and displayed onsite on appropriate locations. Rescue alds wil be in place salves retsevallines,sefety harness te 1 Inthe even of heat tress and strokes 2 fully equipped ambulance i avalable to transport the wet tothe nearest hospital for treatment ‘During iting no one under the iting materials. ney Telephone number are 6 Toyal Commission orhuballond Yanbu | Dasument Type Royal Commission at azan Method statement 6.Eovironmental Issues ‘Environmental impact assessment none ‘Environmental safety and heath contractor requirements same as addressed in above section 3.2 + Contractual requirements Please ee the Section 3.4 above ‘Emergency Procedure Please se the Section 3.6 above 7. Quality Assurance 174 Contractual Requirements =A general overview of the whole area which will make it easier for the project implementation and execution team to have an ides about the existing site condtion of the aree being worked upon, Ths wil azo contribute to better planning and better ‘implementation ofthe project exzcution methodologies. ‘Shall deploy and maintain suffisent, suitably qualified and experienced personnel to the project for the management and execution of qualty requirements described within the contract. = Personnel shall be provided with all tools, plant, equipment, software and hardware ‘necessary to enable them to full projet quality requirements, Shall identify and provide details of the roles and responsibilities of ‘each member of Mis Quality Control Greaniation within the Project Quality Plan. Details of (quality control staff qualifatiens and experience shall be submitted to the Royal Commission for review within te timescales defined within the contract. ~All the quality contol personrel shall be suficentiy experienced, competent and trained inthe methods and skis required to enable them to perform their task to the satisfaction of the Royal Commession. They shall remain on site at all times during the execution of work with complete authority to take any action necessary t0 ensure compliance with the cortract documents. 71.2.Gaitical Works ‘The major pats ofthe project ere the most tcl pat of these actives in terms of {uaity, safety and environmental covers. Care must be teken to ensure that all ‘works unde the scape in accordance wth the contact documents. As per the contrat, the Royal Commission and the Environmental Protection Control Department wil als need to Inspect and approve the works prir to commence v al Commision forluballand Yonbu [Document pe yal Commision at zan Method Statement ae — ea [Another equaly important asnect to be considered isthe testing that required fiom the ste that will make avaiable as an inventor item forthe use inthe project where required as per the contract documents and drawings. Therefore, allthe project required materials wil be sampled and sent tothe Third-Party independent agency laboratories with the full witness and inspection by the Royal ‘Commission. The testing wil dent the materials which is suitable to the projet ste [Any materials will not be used until testing has not been done and completed and the reauiste Thiel Party Inspection agency reports ae furnished and reviewed. ‘Shall also incude within his Project Qualty Plan a procedure describing how he proposes to nduct and train project personnel (including sub-contractors and sew employees) inthe contents and requirements of his Project Quality Plan. Records shall bbe maintained ‘73 spection and Testing In view ofthe above, the QC/QA Manager has developed as Inspection and Testng Pian after carefully reviewing the Project Contract documents and the specifications, to cover al the required testing and inspection ates specified under the scope of this projec. ‘This TP wil te followed and implemented extensively to provide the Qu and to document workin the project. ty coversge ‘an important part of the IP isthe testing ofthe raterial. Samples wil be collected by personnel from the Third Party Inspection agency from the site and then moxed careful fron the site to ther lboratacies forthe tess to be conducted. Some ofthe tests that wil be done are Feld Density Tests and classification of sols. The rate of sampling wil follow the standards and limits as per required Standards nd Speeicaton I the works taken by sub-contractor the contractor wilt commence unt al he preliminary éacumentation procedures are not furnished and approved by the Royal Commission. Establish and implement a procedure for inspection and testing to ensure that all speciied inspections and tests ae carried out and the results documented. This procedure shall define the requirement fo the production of a Project Inspection and ‘est Plan (ora series of Project Inspection and Test Plans). Inspection and. Test Plans shall be prepared by sutaby qualifled and fxpertenced personnel who understand the processes involved. Prir 80 Submision, they shall be signed, dated and authored by the Contractor's Qual Control Manager ‘The inal submission ofthe Contractor's Project Quay Plan shall contain a Uist of all 18 Foyal Commision for Jubail and Yanbu | Dacument Type Royal Commision atJazan Method Statement a en | ees the Inspection and Test Plans applicable to the scope ofthe project. 174 Follow Up & Evaluation ‘The specified actives shall be first and foremost visually checked and inspected thoroughly before any further activity can proceed. Ourng the evaluation, rectiicaion measures shall be implemented ovr the areas wiere deviations were noted Re inspection shall be conducteé on the rectified areas to show conformance to the Specifications to the specication after standards and specifications have been comple with, [A site activities shall conform with the Royal Commision standard and specications ‘and in acordance withthe Project Contract Documents ‘8.0 APPENDICES : (See Attachment) B.A Risk Assessments 8.2 Organization Chart £.3 Drawing Detalls of PSS {84 Drawing forthe Location Project site 185 Taffic Management Plan 6 Excavation Permit 18.7 PTR CARD (PRE-TASK BRIEFING) BapzTable 8.9 TPC for Operators and Equipment » 8.0 APPENDICES 8.1 RISK ASSESSMENTS “SAVQ Z NIHLIM NAMVL 38 OL NOLL | a airs ain ease cucu | | - a SUNOH ZT NIHLIM EDI. JBOLNOLDY| (OTe - reir scene er | mos ~___ NOuD¥s ALTIOTA ‘SEO vou {__l] § | eepino ARS eva santas 7a aAOWAAY ONY GaMGTAE As amavamia -UNLWNOIS "UALWNOIS: ‘BHYN 193r0%a -LNAWSSASSV “STH ) @ ALNSWSSASSV YSTY ofp | ween: | | ie mars wee [| maneents| gael ; Lae cess orem cent ae | seas | | | | — ). LNAWSSASSY STY ALNSWSSASSV STH nyse . vegoommea veoso| find 500 3008 ai |r| e| omgammonmtese | “Secea| pu odnaun et | © ener wan | poe) a Ag wou ee on wes ANAWSSASSY STE oH cra ore seis vem fasts Toman 20 -LNAWSSASSV STY spezmuang sparen ogo aes + a a worst] 9 |e| © slele AotoHSET | yea seyo | eons ata | § aero wma uns | seadeu'sany aan veubegas © ‘ence vjeteau aa pep saNN + car ‘stent A vanpe9 ees sens sap thoes "sop pe seat pucneeebu uSoauncn een + comp sa fates | peu heute a [el e| mescummvneirany |, ’ vite feaiadieng| 288 Seu ae eo LNAWSSASSY ISTE npseme somata owohors « spy ee : elele 00) ‘mmese ‘edse2eurc | you sgn | woes un keg amgs’| urging | sade | sperey ei yond | aoe LNAWSSASSY ST af zi pes 3 Se some noun sng pee ruled, ppt ams ‘BeaRU DIES ALNSWSSASSV STS silaani faal , tas Pile | eemeescete |e : “a cle] seoumosose -] RE amet sau6ig WUS /INO* ai yess oy asnyoq eR x09 OL sountu wee eine asl. — ro) = ‘mrara)agen v = ee | sour | tn as ee ert | PMSA | om a um OOS — —7 = rete ee ANAWSSASSW STU ato eae sumoe| geste . —_——| -LNAWSSASSY AST Chic RISK ASSESSMENT ‘Risk Assessment acknowledgement and traningattendance 1, the undersigned herewith confirm that Iam flly understand the attached Risk assessment and Method statements. 1 further contin tha Lam avare ofthe Risks involved vith he ask and will adhere to the required control messes nd site Safty requirements. isk Assessment Heading Risk Assessment Number: Date: Project Name Area Responsible Supervisor: Safery Represenatve ‘Name ‘Company Number? | Job discription ama Number mena 8.2 ORGANIZATION CHART f= = =| ges ——— -_ a 8.3 DRAWING DETAILS OF PSS 0z0/2z0z 4SS J°u Zz0z ‘1EqUIanON g : Uo paredaig aLvaoduod ONTIYSAINIONS-O4D VNIHO * YSWOLSND ZH 09 ‘A OOb/AA 8°ET “VAM OOE NOLLVLSENS ADWIOVd dos NOLLWOIsIDAdS WWOINHDAL “vIdvuv IdNVS ‘AvVWNvG "G11 "OD SYAWYAOASNVAL IGNVS AHL iol ‘SIDE ELEVATION ‘mon os ea Ly COMPARTMENT ie conparent LV FRONT ELEVATION TOLERANCE: 150 2760-V 1 | GTR EER ew mE (HO om 1 | esr] rine wa The. eerie [aween rue 1 [esr | to nae 7@_ | oon/sre lure ee rae [ee Jenne orn et os | ram |w om cn — 5 rere free sc Te a Te = e208 a he. [= WY RAL WY (BP) Gd AGRE BRE Tse ot [0077 ATA METER D9 R138 W760 Ke On om i a a The Saudi [Gam —fe 1 alone z a Transformers [Geico 1 z]eue a [PT Co. Ltd. donee 1 22] sr ac; SUBSTATION : 300 kVA Pater (Ol 01 %435mm— Leet Lot HV SIDE FRONT ELEVATION a ‘CHANNEL Y80x60rie TN aaa SIDE ELEVATION 11 UW BUSDUCT FOR PANEL CONNECTION SUITABLE FLANW CONNF=TORS ARF To BE USED FOR HV BUSHINGS TOP view Hw BL — 95 Ww Ly POWER FREQUENCY voLTAGE — 3 Kv 8a 630- Hert, 40 Se esa polo e - — af, | eis re 270190 240 15. x 200 157 i rregeuct_. | seo, zh: © 06 FRONT VIEW Leceno: B Baar haat, 1 Re 1 Se Sn can oe SIDE view The Saudi fas pes eae Transformers [eecrea fos 1) 22] sun S| Co. Ltd c fe = ay P587/51938 LEGEND; 0) ENCLOSURE = AWAZNC SHEET 2 mm {2 GASKETED Doom Win STOPPER @ 15 waa onenet 630.97 /500 A MCB 14 Dean oReaKtR 3h, 4004400 At-2Hos (ce) 15 PROVISION OR CERERATOR CANES Oe STKEL MRE wh Fae 7 vata wercR nr Le 99 CT shomne Temas ® 40 SOCKET OUTLET 1 COWTROL FUSES : 2 A. 4 Nor. @ 12 Gownoe Fuses 10" 2 nor, 13 Current TravsromeR 260/54 @ 4 oa sf WH Sup a HUN Us 8) 18 NEURAL BUSBAR ‘Sous (COPPER) 17 GROUND BUSSAR soxsmm (COPPER) 1 MELTING 10 GROUND Une BUSI SOxdmn (COPPER) 19 Buseue Suprosr 20 EantvaicTERUIAL M12 21 Sét"bo0R HANDLE WI' MLA LOCK SUTABLE Fon Wa MASTER KEW HEB & PAD LOCKISLE COVER 22 ADWSIABLE CABLE CLOUD SUPPORT 23 ftMOUaLE ABLE ENTRY PLATE (SILL) WINOUT RES 26 GROUND 10 ENCLOSURE. REMGVABLE Uke (Go's mm Gane ev CABLE) 25 DPE TOR GENERATOR CABLE FRONT ELEVATION (wimiour Doors) fou 11 22|son LW PANEL BOARD : 500 A [raving Wr ay GENERAL ARRANGEMENT P567/31938A | Ah] fi | Sar = SISIETSBI3} waters, 0 kw METER oir. vce — Nor wT ence tt SYR ]e]STR Sh see, aoale 2 ri ae cna ae 2 ey ee eaters 24 ORE NL 1 2, 3, 26 MO row socKET ouneT Te Pina Raa Ot eusrow emer oe a ae | ag a m= bag EES eee reso WIRING Gon tut eae AS IQ] UE] NPE REGAN eo | 487/51996 [44 8.4 DRAWING FOR THE LOCATION PROJECT SITE 8.5 TRAFFIC MANAGEMENT PLAN Technical Submital Review Sign-Off Form eet sta Conran serge 00% aon tv 1 hotatnnant 6 heated Repaantome seyret Seem men ae rt annals =e |_| We = Reet \ =H | 8.6 EXCAVATION PERMIT ‘Kingdom of saudl Arabla 4yoq.auall dupa! as Loos Royal Comin for Rian arb asin Jap dull ala eancrr novia (QE) ih rai os ‘aero : en China Geo-Engincering Corporation Branch. (CEC) P.O.Box No. 8160, Jubail 35513, Kingdom of Saudi Arabia ‘Aontion: YuanPeng ‘Adbarized Representative Subject: Contact No. JOPDI E2004, Inasructure Development Intuing Roads and Utlties Residential Area Dit 1~ Area 3 A entemen Please find attached the “Excavation and Werk Permit” submittal. This approval is for ‘excavation port cay “Tiss for your iefomation and necassary action peeLz Engr Ronsampnes BouraaKos ‘Authorized Representative Royal Commision fbi Yous Jeeta yore and dewatcan [Ea omens ge det gh ashe yyy - re ss EXCAVATION AND WORK PERAMT Momat E] yin CM EH Poa (Een Oe he fit Teather Feira agaan_[Sstcenreereese evoonteh se Pf pesraetataiaamaaie mm 5 = [== [Or Saige 2 ST =T T= Sey ae = ~o- aan ls ee hee cae Or ie IC-OM-RD-03-02-01/01 [=a ————— chle [Seto ar — [aor or wy SECON Opal —— auipentto be Und: {AVATORS OUMP TRUCKS whew odors isin Rate ACCOENT, FRE MEGHAN FALUN HAT STHESS, HONORA STOR, RNG STSAAT Worker ne 1 aa ponies Chae ua [Ra ara Besthetim [Aowroved dowing atch ponds TST] JR —_— eT re meLwa [wand one . Se, ESE SBS Mm Semcon Ff ‘weewaces/tanee | es SOOO Bete Beemer | rcalns (eta ley pression comment am the reese) 2 barra wring st esta slong the aration to so aling hard ine exaaton 2 fe4sar inspection must be conducted by Excavation compete person toads safety ssees | 275m dace mute oe teacten orale cee ope epee | eauomen techs, hones te] soa be volsiestone toe | 6 eep heat equipment ana tem exesiton/Wendes ges escheat 7 sulin gut ofcod kg mater ma be profes wrested ep waters in dic sum ght Section 3: Counter snare and Agproval ean ren ae [oxar Ni IO ne [Conca See] — baz —| et Pecitisue agen [oi py aH Pe Rea! a 55820935 aun [Ste roves Wie etris conn EIVETE Sectlon $: Work Permit aceptance [competent peon] fost {tans _[iceei No. | Conc ne] — Saas oe avai competent peion —| tg. Usman foseansis50 | ayes —| ido rt conto create sp se en at pt Wo wt OR be ae no ean Esser Eves NS AG Sez) Det Tae ade DRO | — Spratre [ta We Fema hg Saf ahat os apo Ware ear Os omg pwn Not: Work emt allo Sate rine area Wea roel garSnea SOT compas 8.7 PTB CARD (PRE-TASK BRIEFING) i qe a ce a en [an ae Ni eae oie THRE RTON SST) ‘Seman tat ty matne dared oelaeie mean SA MRR lesa ABH! Nyon on pad PB gies a cx 8.8 P2 TABLE amen samme mama Be Luan on ast aero] yy | wm | cee ee me of aaron ener tm Se causa) 292] amen) tau zone fawn ca] eo sama] sain) orzo] asa] [es | al — al wee] ant eal wal noel ao ee ac Soe mares Coc el erm || 8.9 TPC FOR OPERATORS AND EQUIPMENT v00z"I Iaaor NOLWYOd¥OD ONIYTINIDN] 039 VNIHD vo0e-1igaor NOLLWYOd¥OD ONIYIZNION3 039 VN - ] ‘GOOWHaW wisvA| Wad WvsvZ von woog

You might also like