You are on page 1of 26
Roya Commision fr ub and Yanbu Form-JCPDI Technical Submittal Review Sign-off RY MANAGEMENT PROCEDURE eTA-CD.90:18 Rtachment G2 Conroe No oI CONTRACTOR SUBMITTAL NO: 409 “HTL: 17 er instaliton of mates hand es (1-05) Note: (erty Proce Correa Wh prezeming It tern eaters Bs [ay res ote: Permission t0 procoed does not consiute {Seapunce of design cba, calclaon sneak Imatnode or materle developed or seated the apa: does not relare the contactor from his onal ebigatons. ‘Auth. Representative ai ‘Sarai wen ont Coma saan Conmenaut crane ton eriasts emt ‘rere ta ei ical art Un a a srt san cere Orn Be SERIE Se he emt satrap aon cto poor eran ew Pear Fe tgroate ae tsecomaon TENTS ARE ATTACHED ‘SuaUIUIOD moWNeY JENWANS IeOIUHTOL usuniede woraniisu09 Iddof-WuogsusWUIOD eee majnay Jeauigns [euyraL ) gue pu pegn.2j opt eo Slowgit sue WLS A552 ek (Cte fa Ses oe a ame tat 2S Technical/Non-Technical/TQ/FCD Submittal Contract No: PDI -2004 ojat name nfratractre Development Including Roads Utes Residential Area Dc ~ Area 3 ‘Transmittal No: (400 Sits MOR AOTALATENGFABUHCS MONE (TT q i | q I | tne Tiaras ween ee sna TB onane women Om = Aeon 1 tonnes er ct wate I TS cominon meetin a srt oles o= a= — fan GAovead) soe LL As 5 £8 C}\C se ca ate os oc et oe ea 2S ‘GHIWA GEO.ENGINEERIWG CORPORATION (9AUDI) BRANCH INSPECTION AND TEST PLAN (ITP) JAZAN CITY FOR PRIMARY AND DOWNSTREAM INDUSTRIES (JCPDI) CONTRACT NO. JCPDI 1-2004 ITP FOR INSTALLATION OF MANHOLES & HANDHOLES (ITP-T-003) Revision Control Page DOCUMENT NO: 01-00-00 REVISION 100 DATE OF ISSUE : 18/10/2022 fer) oa aa a aoe | sarnt NHOLES. engineer 1c 7 a laesu oats ose te, heptane eset 2 fs PRORCTNAWE TRFRASTROCTORE DEVELOPMENT INCLUDING ROAD & UTILITIES RESIDENT Ase e3 che CONTACTO TOT ITP FORM INDEX SHEET TEM FORM NUMBER? NO. DESCRIPTION REFERENCE RECORD | REMARKS 1.0 _| Request or inspection (RFD 1C-TA.CD.0043 ALB 20 _ | Suvey Reports IPF-CVLO01 3.0 _ | Material Receiving Inpecton Report IPF-CVL-003 40° [Ho Point Release Farm (HPR) ITPP-HPRAOINC-TA-CD-00- OB AWA xcavation Bac Compocton s0__| Cheekit TPF-CVL002 ‘Stel Renforeement & Enbednene 60 [cheskist ITPP-CvL-004 10 | Formwork Checkist ITPP-CVL-005 ) a0 | re-concrete Placement Inspection TPP-CVL-06 Checklist 9.0 | Concrete Pour Card rree-cvL-oo7 100 __| surface Preparation Cheklis rer.cv1-009 110 | concrete Sufae Prctcton Checklist ITPP-CVL-O10 12.0 | Materia tnspectonReawest (MIR) ‘MIR Chit JCPDLE-2004 toy Conmison or 0 nan so wane rocsoure A © eaves: ror inspection orm crea mame | CNC: ‘CONTRACT NO: JoPON-2006 projet TtesFRASTRUGTURE DEVELOPHENT INCLUDING ROADS & UTILITIES RESIDENTIAL AREA OISTRICT + [REQUEST FOR INSPECTION - JCPD1 PROJECT CONTRACTOR :China Geo Engnecing Corporation Company REQUEST NO: RFHELECT 200-0000 10 Engr munanas usran Gu ‘RC Auaand Rapes enseucon Department ‘THRE OF nsPECTION: Dome Charon, = Clvcoumen — pcrmca, sumer Cretan waren recom Coss Chsirasvsewer —C) maron Cove ‘WOULD YOU PLEASE CONDUCT INSPECTION ANO WITNESS THE PORTION OFTHE WORK AS FOLLOWS: DESCRITION care [we | LocaTow | ‘CONTRACTOR'S CERTIFICATION: ‘vnipecton ns too do ad end wk scong the agroved Dring, Spaces end ITY Tes Proce. REQUESTED BY: verinio 8 ae gee ‘enataeion oF GRA Wrage INSPECTED BY: WITNESSED BY: RoE TARAS Pe Cr ermnoven Dis4venoven wert conan) Cls-reicre eter to rears bw) COMMENTS! REMARKS: (iii Seas Sao Ee ATTAGHENTS: Spuiargt tune For Re rea ‘Dinepecton 2 Test Pan feprovod Shop oraving(s) Cl Approved Tecra Submit independant Tsing Lab Repods) survey reports) Ofer = a oo = oo = os es esse = z he ee eel oe esse) ame acer woes | ee | cteannes] 0000 93) — mmm Rae] nto ie] a waa] Scr TOONS dal ON wes Tuoss Aanune O34 oo 19-760:0N La¥tuNo> 2-360 THGHYT AIVLINYS chic susmacccononsar wcurcrgstumnsasoumn. | (Gi, TMIATERIAL RECEIVING INSPECTION REPORT Yorn sions (0 arms crn xcro cy f mansrcramesccnent 0 0 a jmerscnon conn sex o o o ren coven 0 0 o oo ghle St HOLD POINT RELEASE FORM form No EERO pwoce rms fre Jocmngnos a pesrption: fo ane Date/Tine ot inspection ‘sean DateTine cf nspeton [ie eatonaraaon Tae Ta Sian Dae ane [Sen [oar eer eins Te — = Jtveon Monee ce manage rents Work: 1 MayFrocted Nav notProcees Fornosa poston: postion irate ture: inspection DateTime Jnspection Datei Apc eh nbs i moctoune Hold Point Release (HPR) ietweoones Atatam A E a ae RT| — pagent aes (Q9p) coe snessonvumconsinnrncommnrncs — CVC Fem tGe EXCAVATION BACKFILL/ COMPACTION CHECKLIST oa cat era Frege Neaber Contin [2S Cin City Ray fenportie e Fane Peeing. eansanEavonet teraton Deion Eran one esa enon es eet a ace ee 17 keep cleaning without wate, ros, C1 Sasbed i re 1216 sosied Le ck ieaea Spaced corte nad [aeeios ric tare oss re [OS [Pemeieing began |C1Unsatistied |Compacted Elevation: [Ci Unsatisfied sti cone wih peicaion [GSS (lonpandDerity 3 a ST IRET [ton se acess [Etaetind —_[aguetatng [C Uneatsioa = [ecu Tsai | Wes tt Emo compat rondo) | ae tse? | Si ied |e nad Toran Sind Te oa x. or exis id Tet EU Fa Wu oF Conan Te eT Pat et ep, = C1 Release for next layer backfl; Cl Finish the backfil work completed. a ‘ue conTACTOR CONTRACTORS te Nn ane ne sonar sonst = owe c= at STEEL REINFORCEMENT ‘& EMBEDMENT / CHECKLIST aa Sat [OTHE an 7 Te on SEE . ws | Seer eae rane RSE ERE eLearn Spires uy acme Te wing, eget mh > [ Remit isis maaan ee So) SS ceased [erasers oe ET + |Sten [ Satine Lael ‘Location are correct and secured with wire tern a pe Tews onsen co pe ta etek a he Fran Heese oer Se aa Aeron eS a eee voy ao 4 « |GSSe Hissar ere am “Angle iron, Hanhote Frame BrjectsPee'S-Ftecon rom corosion and damage eS sas TTT eer oo eve tiate | erage ara [siiu/eguon jaa apes) ena oa ee ae = = oe som oI — oa oa oa INFRASTRUCTURE DEVELOPMENT INCLUDING ROAD AND UTILITIES RESIDENTIALAREA DISTRICT | -AREA3 Fe Na PREM OS FORMWORK CHECKLIST apr Oe osatin Dizon una |_JOPOIE20 ‘rag No a Tan Tao No Inapoction Gontonts ReIPME hack ald on Tana & Sab, va a Bee 1, | sea capo oteor no oad of i upper yer The vere Sums ofthe upp an lowe ppt ae wah th pln fale bea hack and ve ay aking ae at of es ‘orn sd suze wood form soe wh non water 2 | etre peurng corre. Chowk en oly be fn ha bo cu eae en roe {Comal an beta, an ot veg mater ‘Sect ed ete eon Dimensions ab Leeson [Alcorn Phiness Sibir, Sore eon Spa) Fae wok | Sates Pepsatonconines) Felyetyan seat Vag Bar) [tines amir spe Fem OF Conroe Caer Top of ones Tw enone, Frommer ast ae ffeesnea owt e fut | conan potion Entbolenpste sal be | Prrenbednent Ppesaare 4 | Sompummdeetem | oer ps risng aa i pan Urupwinthecovaton | Preserved | Cate te poste ‘feetgtne spain Tene speoteamn,” [opens |S esinn ad ranatonpoation “op of cor evn 0 7 5 | esuneycneck | deo oa SOTERA SP IES ving Sanat omens ceca Puc Nave ae Nae = Sorat Sonat eed ‘] ‘ane an ids ugsuedeenuof voangsueajouotedal) Tear] ue euro 9) soadsine-21 ones sneuasy 96900 evo ouasesa 404 Baar isun0o orn] Ec 7 SIseN0 20 Sev ONY SHA pmanomeeo C) wn L]_rsllsosp wentmrd Sarai] "uns 30 NOOO vam ONE odor ON REAUED, ag ou NOB ‘ISPINOSHO NOILOSASNI LNAWHOW1d S1SHONOD-SUd wove sa on wA| a ~ © INFRASTRUCTJRE DEVELOPMENT INCLUDING ROAD AND UTILITIES RESIDENTIAL AREA DISTRICT 1 AREA-3 ‘CONCRETE POUR CAI _ -_ or amber a ‘ee Volofone Das Bein ‘Chak fr Fo are dn Gina Teeerie Regi Cangas ‘Aico eli ick cn oappave ig (YON) ‘Sha ‘Apion one ening Agate Dogri ‘Const en There ‘Gk Adee Vibro "peo nih Nese Dae ei Da Wot Pact Sa TT Peet Compe aw Ta Gm Psd ‘OTHERS ERE RoPHC Yas a ‘Sie - Sie a De: Chic Fem ie PCV SURFACE PREPARATION CHECKLIST Report No: INFRASTRUCTURE DEVELOPMENT INCLUDING RAODS& | causa wit | scotia UTILITIES RESIDENTIAL AREA DISTRICT 1 AREA - 3. Teor: Seat i Te Tapco Subrontactr fe | [eottmts Gatos | Sans |= St pate | * | ero 2 Utd [Uae iene > hos | > od mh 9 Unsatisfied © Unsatisfied Removeany ol, grease and |. Satisiod o Satisied 1 wacetatoremarl | Gates | Uae 3 Sar Yo toa 2 | poe ean © Unsaisfed © Unsatisfied @ sasoa [= Sid Pree ncaa Preperation of a ee cee es ‘Unsatisfied 5 Unsalisfied ofan @ falsis Yo So 4 | euttote sennzoe oe 8 Unsatisfied Unsatisfied Tes fies Gora te g |ssteatalbormmed [0 Sates |Salad Sette vances |e tami | etirgetae area > aia |e eae 6 | rer reset ad 3 Unsalistiod Unsatisfied = rs oRTCTORS GE oa Te = ry Sot Stn Sora oa ae Da Chic CONCRETE SURFACE PROTECTION CHECKLIST Form Nor wTPFEWOTE Reporte Dat INFRASTRUCTURE DEVELOPNENT INCLUDING ROADS AND UTILITIES RESIDENTIAL AREA DISTRICT 1 AREA 3 ‘ConactNo JCP 2004 Lozaton Desc Drawing No Tag No: Sutroneact: ate ‘ap math of nating Inspection tens Subcontractor ‘Surface wo recave the waleprotng mate tal bed fe fa ll grease ose pales, decayed mat alga and curing campourd Coating Matoals shal be appli ony in favorable canons as pr manufacturers recormendaton eating coverage areas market ‘Check the ype of coating, intra and nur of coat requied embrane salto, leping nd lengh| etondod above te ground level Required coating Ory fn cknass achieved Memtranethekness and number of Layer Protection Boar: thickness Instat and lng extended above the gourd Instalan of prlocton board ter approval of valeooing pir fo backing works eat: ‘OTHERS (CONTRACTOR OC Naw: Nane Name ‘Satu ‘Sora ‘Sha Inza v FR PRIMARY ANO COWSTRANM NOUSTRES ‘CONTRACT NOJCPD200¢ at TON REQUEST (i CONTRACTOR: Chia Geo Egeine Ac thorized anatuconDepartnent TPE oF mse¢cnON: » Xe eo (we) ‘econ ‘ecRPTON DaTeorinsracron [Time twcariow [erin pectin a boo do noun wort earings approved Sawing econ [nates Procure equesteo review anion wana (C0) ETS mea wanesse08y: Wow powr crest evn nseecron checnist Covens:sunvey ces Jvoenenoeur src ug esis ores: tached every Hote

You might also like