Part-A Micro Project Proposal

Title of Micro project : Sub-station equipment: Collect specification from different


manufacturers and prepare report.

Aims of micro-project:
Aim:
To study the sub station equipment and there function and also know about there
specification.

Benefits :
To know about the function, rating, specifications etc about the equipment of substation.

2.0 Course outcome addressed:


a) Follow safety rules for substation
b) Maintain substation earthing and neutral grounding
c) Maintain the substation equipment and bus bar layout
d) Interpret single line diagram of substation
e) Maintain Gas Insulated Substation

3.0 Procedure:
A)In first week we all group members have collected the information about microproject
topic
B) In this second week we all group member submit topic to subject teacher.
C) In third week we all group members discussed about the how we are going to do this
microproject
D) In fourth week we all group member go to internet to check about specifications of
different components of substation

E) In fifth week we know about all information of these equipment and also know about the
specifications of it.
F)In sixth week we all group member make an report and submit to respectiv faculty.

4.0 Action Plan (sequence and time required for major activity.)
Sr Details of Activity Planned start Planned Name of Responsible
N date finish date Member
o
1 Formation of Group 1 feb 6 feb All members
2 Selection of micro project topic 7 feb 14 feb All members
3 Collecting information/data of micro 15 feb 21 feb All members
project
4 Make an report of specifications 22 feb 3 mar All members

5 Checked by Respected madam and done 4 mar 10 mar All members


with the Correction.
6 Preparation of micro project Report 11 mar 26 mar All members

5.0 Resources used:


Sr. Name of Resources Specifications Quantity Remark
No.
1 Mobile Redmi 1 Available

2 Books Power System 01 Available


3 Internet 4G 01 Available

6.0) Group Members :


Sr. Name of Group Member Roll no
No.
1 Deshmukh Ayan Anwar 32
2 Deshmukh Javvad Sajjad 33
3 Kendre Somnath Angad 37
3 Nila Kedar Parmeshwar 58
Part – B Micro-Project
Title of Micro project
Sub-station equipment: Collect specification from different manufacturers and prepare report.

1.0 Rationale
One of the main roles of substations is to convert electricity into different voltages. This is
needed so the electricity can be transmitted throughout the country and then distributed
throughout local neighbourhoods and into our homes, businesses and buildings.

2.0) Aims/benefits of Micro – Project:


Benefits:

1.We get to know the more information about the substation equipment.
2 we get the practical knowledge about the specifications of equipment of substation

3.0) Course outcomes addressed:-


Follow safety rules for substation

4.0) Literature review:

Substation Functions
Switch transmission and distribution circuits into and out of the grid system. Measure electric
power qualities flowing in the circuits. Connect communication signals to the circuits.
Eliminate lightning and other electrical surges from the system.
Substations generally have switching, protection and control equipment, and transformers. In
a large substation, circuit breakers are used to interrupt any short circuits or overload currents
that may occur on the network.
From our point of view, here are five of the most valuable benefits that digital substations
provide for utilities.
They cost less to deploy. …
They’re safer to manage. …
They help transform substation control rooms into micro data centers. …
They support easier maintenance. …
They provide access to real-time data.

5.0) Actual methodology followed:


1.Formation of group for micro project.
2.Selection of topic of micro project.
3.Searching of required information for Micro-project
4.We all group member search on internet about the manufacturer and there specifications of
the equipment of sub station.
5. Then we start to make an report on it
6 Then we all member submitting this report to respective faculty

6.0) Actual resources used:


Sr. Name of resources Specifications Quantity Remark
No.
1 Mobile Phone Redmi 1 Available
2 Book Power system 1 Available
3 Internet 4G 1 Available

7.0 Output of micro-project:-


1) we know about the specifications and there are many things about the
components of substation
2) we know about the cost of equipment

8.0 Skills developed:


1, problem solving and team leadership

9.0 Application of micro project:-


1) generally this report helpful to those who want to know about the
specifications of the equipment of an substation.
2) This report helpful to who want to know about the function of components of
an substation

You might also like