The document specifies the requirements for an orifice to be installed in a boiler feed water line. It details the operating parameters like flow rate, temperature, pressure. It specifies the orifice should be made of SS316, have a 150mm line size and be tested to IBR standards. The supplier must provide technical details, pressure drop calculations and certificates to meet the specifications.
The document specifies the requirements for an orifice to be installed in a boiler feed water line. It details the operating parameters like flow rate, temperature, pressure. It specifies the orifice should be made of SS316, have a 150mm line size and be tested to IBR standards. The supplier must provide technical details, pressure drop calculations and certificates to meet the specifications.
The document specifies the requirements for an orifice to be installed in a boiler feed water line. It details the operating parameters like flow rate, temperature, pressure. It specifies the orifice should be made of SS316, have a 150mm line size and be tested to IBR standards. The supplier must provide technical details, pressure drop calculations and certificates to meet the specifications.
S. No. Description Specification 1 Medium Boiler feed Water 2 Flow 105000 kg/hr Max 78000 kg/hr Nor 10500 kg/hr Min 3 Operating temperature 110 DEG 4 Operating pressure 104 Kg/cm² 5 Design pressure 105 Kg/cm² 6 Differential pressure 0-6000 mmwc 7 Material of construction SS 316 8 Location In between Flange 9 Test IBR 10 Line size 150 NB SCH 80 11 Material of pipe SA 106 Gr B 12 Design code BS 1042/Equt. 15 NB (Socket weld) 2 pair of tappings to be provided. In this I should be 13 Transmitter tapping size plugged with suitable material. 14 Quantity 1 No. 15 Tag No 1FE 101 Note: Supplier to confirm the differential pressure will be sufficient. 1 This flow measuring device should be in a position to measure flow at 20% of flow 2 accurately as signals are being taken for some controls. SUPPLIER TO FURNISH THE FOLLOWING WITH OFFER 1 Permanent pressure drop across orifice. 2 Tapping detail 3 GA drawing with dimensional details 4 Q vs H curve (with temp. compensation curves) 5 Technical data sheet DOCUMENTS REQUIRED FROM SUPPLIER 1 Test certificate 2 IBR certificate 3 6 sets of O & M manual