N R L

PROJECT Numaligarh Refinery Expansion Project


CLIENT Numaligarh Refinery Ltd.
NAME OF WORK Relocation/Enabling Works forDCU Revamp
CONSULTANT Engineers India Limited
JOB NO : B440
CONTRACTROR M/s P K Construction
WORK ORDER NO. 4300073416 dtd. 08.08.2022

Pour card
Date of
Sl No. report Pour card Details UOM Quantity
pouring
No.

10/12/2022 Raft of type IV pipe sleeper 32N/S24,23,22 pour


Pedestal of type IV pipe sleeper S24, 23. Anchor
1 card
pipe sl no. 01raft
sleeper (location 32NPrecast
32N/S21. offsite DCU)
PWB Slab 1. cum 5.575
2 10/15/2022 (pour card sl.no.-2 location-32N offsite, dcu site) cum 12.141

10/20/2022 Pipe sleeper pedestal 32N/S22,21. (Pour Card


3 Sl.No. 3 , Location 32N offsite area, DCU Site) cum 5.529

Type VIII pipe sleeper Raft, Precast PWB Slab 2.


10/22/2022 Pour card sl no.4 (location-32N offsite near
4 crusher house DCU) cum 5.708

Raft of Goal post foundation 32N/PS12,Type IV


10/29/2022 Pipe sleeper Raft 32N/S17, Precast PWB Slab
3&4. Pour card Sl No.5 (Location-32N offsite,
5 DCU) cum 6.220

11/1/2022 Raft of Goal post foundation 32N/ps12,Type VIII


Pipe sleeper pedestal 32N/S20, Precast PWB Slab
6 5. Pour card Sl No.6 (Location-32N offsite, DCU) cum 6.184

11/3/2022 Pedestal of Goal post foundation 32N/ps12,Type


IV Pipe sleeper raft 32N/S19,17. Pour card Sl
7 No.7 (Location-32N offsite, DCU) cum 5.631

11/5/2022 Type IV Pipe sleeper pedestal 32N/S19,16. Pour


8 card Sl No.8 (Location-32N offsite, DCU) cum 6.156

Type IV Pipe sleeper pedestal 32N/S17, Pedestal


11/9/2022 of goal post foundation 32N/PS12. Precast PWB
Slab 6,7,8,9,10,11. Pour card Sl No.9 (Location-
9 32N offsite, DCU) cum 10.195
11/15/2022 Type IV Pipe sleeper raft 32N/S18, Raft of goal
post foundation 32N/PS10. Raft of Type VII pipe
sleeper 32N/S25. Precast PWB Slab 12,13,14.
10 Pour card Sl No.10 (Location-32N offsite, DCU) cum 11.773

Pedestal of goal post foundation 32N/PS10. Raft


11/17/2022 of Type VII pipe sleeper 32N/S26. Precast PWB
Slab 15,16,17, 18. Pour card Sl No.11 (Location-
11 32N offsite, DCU) cum 5.961

11/19/2022 Type IV pipe sleeper pedestal 32N/S18, Type IV


pipe sleeper raft 32N/S03. Precast PWB Slab 19.
12 Pour card Sl No.12 (Location-32N offsite, DCU) cum 5.566

Type IV Pipe sleeper pedestal 32N/S03, Raft of


11/21/2022 goal post foundation 32N/S08, Raft of PWB,
precast PWB Slab 20. Pour card sl no 13 (32N
13 offsite DCU) cum 18.124

Type IV Pipe raft 14N/S06, Type VII pipe Sleeper


11/23/2022 raft 14N/S02&S03. Pour card sl no 14 (32N offsite
14 DCU) cum 5.776

Pedestal of Goal post foundation 32N/S08, Raft


11/24/2022 of goal post foundation 32N/S07, Wall of PWB
13. Precast PWB Slab-21. Pour card Sl no 15.
15 (32N offsite DCU) cum 12.040

Raft of combine goal post foundation 32N/PS11,


11/27/2022 Type VII pipe sleeper pedestal 32N/S25 & 26,
Pedestal of goal post foundation 32N/PS10,
Precast
PedestalPWB Slab-22.
of goal Pour card sl32N/PS07,
post foundation no-16. (32N
PWB
16 offsite
13 brackets , slab. Pour card sl no. 17 (32N offsite cum
DCU) 11.835
17 11/28/2022 area) cum 9.999

Type vii pipe sleeper pedestal 14N/S02, S03. Raft


11/30/2022 of goal post foundation 32N/S06.Pedestal of goal
post foundation 32N/S08, pedestal of combine
footing 32N/PS11. pour card sl no. 18 (14N &
18 32N area) cum 10.496

Pedestal of goal post foundation 32N/S07. Type


12/2/2022 IV pipe sleeper pedestal 14N/S06. Pedestal of
combine footing 32N/PS11. Pour card sl no. 19
19 (14N & 32N area) cum 5.769

Type VIII pipe sleeper raft 32N/S28. pedestal of


12/6/2022 goal post foundation 32N/S06. Pour card sl no.
20 20. (32N offsite DCU) cum 5.999
12/7/2022 Type V box culvert raft, Precast PWB Slab PWB
21 13. Pour card sl. No-21 (32N offsite DCU) cum 13.860

12/9/2022 Type VIII pipe sleeper pedestal 32N/S28. Pedestal


of goal post foundation 32N/S08,07. Pedestal of
goal post foundation 32N/S06. Pour card sl no.
22 22 (32N offsite) cum 6.062

Wall of type V Box Culvert. Raft of Goal post


12/10/2022 founadtion 32N/S05. Pour card sl no. 23 (32N
23 Offsite DCU) cum 12.998

12/14/2022 Raft of Combine Goal post foundation 14N/PS03.


Type VII pipe sleeper raft 15N/S04,S03. Pour card
24 sl no. 24 (14N & 15N tank farm area) cum 23.800

12/19/2022 Type V box culvert wall, Type II goal post raft and
pedestal, type VIII & IA Pipe sleeper raft. Pour
25 card sl no 25 (32N & 15N Area offsite DCU) cum 24.122

12/21/2022 ab of box culvert type V. Pour card sl. No. 26


26 (32N offsite DCU east side of crusher house.) cum 11.880

Raft & Pedestal 14N/PS05 & 03, Type II Pedestal


12/22/2022 , Precast PWB slab, Pour card sl. No. 27 (14N
27 Tank Farm Area) cum 24.073

12/24/2022 Type VIII pipe sleeper raft 32N/S15, 14A , Type IV


28 pipe slp. Raft. Pour card sl. No. 28 (32N area) cum 11.645

12/28/2022 PWB 13 raft, type IV pipe sleeper pedestal, type


VIII pipe sleeper raft , tie beam crusher shed
29 foundation. Pour card sl. No. 29 (32N area) cum 33.605
12/29/2022 Raft of precast box culvert, Type IV pipe sleeper
30 raft. Pour card sl. No. 30 (32N area) cum 12.100

12/30/2022 Type II Structural support raft, Type VIII pipe


sleeper 14N/S07, combine goal post pedestal
31 14N/PS05. Pour card sl. No. 31 (32N & 14N area) cum 12.347
12/31/2022 PWB 13 Wall, Tie beam of crusher shed
32 foundation. Pour card sl. No. 32 (32N area) cum 12.660

Type IA pipe sleeper pedestal 15N/S05, Type VII


1/4/2023 pipe sleeper pedestal 15N/S02, PWB Slab 31.
33 Pour card sl. No. 33 (32N area) cum 5.940
1/6/2023 Raft of PWB 12 , Type IV pipe sleeper raft
32N/S11, Type VII pipe sleeper raft 15N/S01,
type IV pipe Sleeper pedestal 32N/S2, 13 Pour
34 Card Sl. No.34 (Location 32N & 15N area) cum 24.249

1/7/2023 Raft of Type IX structural pipe support


32N/PS02,03 (PWB Slab 32, 33, 34), PWB 13
35 Haunch Pour Card sl No 35 (Location 32N area) cum 17.970

Pedestal of Type IX structural pipe support


1/11/2023 32N/PS02,03 PWB 13 Wing wall raft. Pour Card
36 sl No 36 (Location 32N area) cum 13.908

1/13/2023 Type II Box culvert wall, Crusher shed TB 2&4,


Type VII Pipe sleeper Pedestal 15N/S01. Pour
37 Card Sl.No. 37 (Location-32N & 15N area) cum 21.909
1/17/2023 Raft of PWB 10 And PWB Precast Slab 35. Pour
38 card sl. No. 38 (Location 14N Area) cum 17.606

Raft of Structural Pipe T-Support 15N/TS01,02,


1/18/2023 Precast PWB slab 36 Pour Card Sl no-39
39 (Location 15N area) cum 6.680
1/19/2023 Type II Box Culvert Slab, PWB Slab 37 Pour Card
40 Sl no-40 cum 5.848

1/21/2023 Raft & Wall of PWB 10, PWB 12 wall, Precast Pwb
slab 39, Raft of structural pipe suuport 14N/PS01.
41 Pour card sl no-41 (Location 32N & 14N area) cum 25.720

Raft of Structural pipe support 32N/PS04, 05.


1/24/2023 PWB13 Haunch. Pour card sl No-42 (Location-
42 32N Area) cum 13.149
1/25/2023 Precast PWB 10 wall. Pour card Sl no-43.
43 (Location-14N area) cum 6.048
1/27/2023 Raft 14N/PS02. Pour card sl no-44. (Location-14N
44 area) cum 5.408

Raft PWB 11, Type VI pipe support pedestal


1/29/2023 15N/PS01,02, precast PWB slab 40. Pour card sl
45 no-44. (Location-14N area) cum 27.008

Precast Type II Box Culvert slab, type II Pedestal


1/30/2023 14N/PS01, 02, 32N/PS04, 05 Pour Card sl no-46
46 (Location 14N & 32N area) cum 6.614
1/31/2023 PWB 11 wall. Pour card sl no. 47 (Location 32N
47 area) cum 14.650
2/3/2023 Precast PWB slab. PWB 11 haunch. Pour card sl
48 no 48 (Location 32N area) cum 5.832
Type VII pipe sleeper raft 32N/14B. Preacast PWB
2/8/2023 slab 47, 48, 49. Pour card sl no-49 (Location 32N
49 area) cum 15.434

Type VII pipe sleeper pedestal 32N/14B. Type II


2/11/2023 pipe support pedestal 32N/PS06,08. PWB10
haunch. Pour Card sl no 50 (Location-32N & 14N
50 Area) cum 23.599

Type V pipe support raft 32N/PS07, PWB slab,


2/14/2023 Type IX pipe support raft 32N/PS02", PS/03 (pour
51 card sl no. 51) area 32N cum 41.975
2/15/2023
52 Precast PWB slab (91 to 98) (Pour card sl no-52) cum 5.934

Type I pipe support raft 32N/S02, Type XI pipe


2/16/2023 support pedestal 32N/S08, Type III pipe support
raft 15N/PS01. Pour card sl no. 53. Location-32N
53 & 15N area cum 11.460

Type V pipe support pedestal 32N/PS07, PWB


2/21/2023 slab 99 to 105, Type IX Pipe support pedestal
32N/PS02" 03". Pour card sl no-54. Location-32N
54 & 15N area cum 11.524

Type I pipe support 32N/S02, Type III Pipe


2/24/2023 Support Raft 15N/PS01, Type VII pipe support
raft 32N/S01/14N/S08. Pour card sl no. 55.
55 Location-32N 14N & 15N area cum 5.252

Type VII pipe sleeper raft 14N/PS01A, Type VII


3/3/2023 pipe support pedestal 32N/S01, 14N/S08 Pour
56 card sl no. 56. Location-32N 14N Area. cum 5.119

TYPE VII pipe sleeper RAFT 14N/S04, Type II pipe


3/6/2023 sleeper beam 32N/S02, Structural pipe T-Support
pedestal 14N/PS01A, PWB slab Pour card sl no
57 57. Location 32N&14N Area cum 5.346
= 710.011
Remarks