Late / Expensive project Applica�on complica�ons: • Revit planning (Civil Project) due • Needs learning �me. • Navisworks to repe��ve tasks in the • Needs effort to create • ETAP design phase of a project. custom solu�ons. • HAP Primarily in placing and Workplan changes can take months planning the MEP systems to implement as the repe��ve tasks (Mech, Elect, Pluming) as are �me consuming. each single fire detector is placed by hand in a whole building for example.
Customers: Emo�onal Impact: Alterna�ves
Mechanical and Electrical The engineer takes a huge chunk of Shortcomings: Design Engineers who their �me constantly working to • Steep learning curve specialize in MEP design place and route cables on a drawing • Resource intensive work. for every single component for every (Devices to run them room in the whole building. (100s - need great 1000s of repe��ve tasks) computa�onal Therefore, less �me with their loved- resources) ones and less �me for life. • Cost (other than the devices to run the Quan�fiable impact: applica�ons, apps A single workplan change can lead to themselves are costly) months of edits and small changes • Cross- to sa�sfy every new requirement as applica�on/pla�orm there are many variables at play challenges (files from when there’s many custom placed one app doesn’t work objects in a drawing set. flawlessly with others) • Complex clash detec�on (systems for fire, AC, lights need not be overlapping as it’s physically impossible to build)