Title : Structure Design Rev.

: B
Calculation Sheet
Location : Kulon Progo - Yogyakarta
Project : NEW YOGYAKARTA INT' AIRPORT Prepared by : Checked by :

= 10656 kN

= 17761 kN

Vu / f = 4107 kN < 4753 Tul. Geser Minimum

Vs = Vu / f - Vc = 555 kN

spasi tul geser s = 319 mm Pasang Tul. Geser Minimum

Tulangan Geser Dipasang 5 dia 13 @ 300

Dipasang 5D13-300

b. Tulangan Sengkang Area Tumpuan :

Mu = 14500 kNm

Mn = 15500 kNm, dari diagram interaksi

Mn/Mu = 1.07

c=1.3 Mn/Mu = 1.39

Vu = 2381 kN

c.Vu = 3309 kN

Tulangan Geser :

Data : Mutu beton f`c = 35.0 MPa

lebar penampang bw = 2500 mm

tinggi penampang h = 1500 mm

cover cov = 30 mm

Dia. Tul. lentur utama D = 32 mm

Dia. Tul. Geser dia = 13 mm

Teg. Leleh tul utama fy = 400 MPa

Teg. Leleh tul geser fyv = 400 MPa

tinggi penampang eff d = 1,500 - 30 - 13 - 32/2 = 1441 mm

Tulangan Geser :

Geser ultimate Vu = 3309 kN

Faktor reduksi geser f = 0.60

Jumlah kaki tul geser n = 5

Luas tul geser Av = 664 mm2

= 1/6 x sqrt(35.0) x 2,500.0 x 1,441.0= 3552 kN

0.5 Vc = 1776 kN

= 4753 kN

= 10656 kN