Question Answer

Hi! Could you provide us with the Hi Sofia, the material extraction is meant to give
material computations for the students the opportunity to try out what conducting an
practice exercise, considering that LCA might take. We also have to extract material
nowadays we work with BIM quantities from drawings every now and then in our
models, that computing takes a consulting work. However, you will get a filled out
lot of time, and that it's not what template on Wednesday taht you can also try out.
contributes to our learning of
LCA? I really want to do the
exercise, but I don't have the time
required to compute the entire
project.

website says recordings are Hi Joakim, recordings are uploaded to the Academy
avaliable after session 5, correct? within 24 hours of the live session

website says recordings are ok, can you enclose a direct link please?
avaliable after session 5, correct?

website says recordings are https://academy.oneclicklca.com/courses/construction


avaliable after session 5, correct? -lca-bootcamp-spring-2024

I haven't been able to find the Hi, here's the direct link to the course space just in case.
training document on the Everything is uploaded there, the live session materials
bootcamp homepage. Are they within 24 hours of the live session
uploaded yet? https://academy.oneclicklca.com/courses/construction
-lca-bootcamp-spring-2024

Hello! I believe that I originally Hi Jack, your One Click LCA account and the Academy
signed up to webinar under a account are two separate accounts, so you can access
di erent email, can I still access the Academy and the materials only using your Academy
the records and materials through credentials, and the software with your One Click LCA
my buisness account? credentials.

To clarify as Leondaro is a bit fast, Hi Ben, embodied carbon entails everything from A to C,
B1-B7 is operational carbon and but leaves out the operational modules B6 (energy use)
A1-A3 is embodied carbon? and B7 (water use)
cheers

How exactly do the Scope 1, 2, Scope 1, 2 & 3 emissions are basically related to the
and 3 emissions categories align organisational level of emissions. LCA assessment is
with the A, B, C, and D LCA more on project / product level and all the emissions
categories? usually fall into a certain scope within the GHG protocol
(scopes 1, 2 or 3) depending on how the specific
organisation is connected to the source of the emission.
E.g. all the materials we buy for the building (A1-A3) from
external actor would go to scope 3 emissions.
what does "cradle to gate" mean ? It refers to the manufacturing of a product, including A1-
A3 emissions. The gate kinda ends the manufacturers
own emissions of producing the X material

what does "cradle to gate" mean ? An assessment that only considers the initial materials’
impacts is what we call a cradle to gate assessment. If
we assess just from A1 to A3 life cycle stages then it is
cradle to gate assessment.

Could talk more to removal of B6 Hi Yashima, these two modules represent the
and B7 in embodied carbon operational carbon of the assessment. All the other
assessment? modules represent embodied carbon. When assessed
together, they make up an whole life cycle assessment.

What is on the Y axis? Y axis was the example building's carbon emissions. It
started with upfront(materials and construction) and
then there were lower emissions annually until year 60
when the building will be deconstructed.

I heard A4 includes round trip. Is A4 usually does include a return trip. in One click LCA
that correct? you can adjust the loads and distances so that the
return trip can be calculated either with some kind of a
load %, or as return empty (0%).

is transportation of construction No, this is not part of the building's LCA system
workers counted in A5? boundary according to EN15978 or any other LCA
methodology

For a manufacturers EPD, when Hi Richard, the A4 value in EPDs is presenting an average
goods are delivered country wide, scenario for transport of the product and based on
what transport di erence should typical distance + transport method. The most accurate
be used for A4 LCA results you will be getting if you have the exact
distance from manufacturer to the construction site and
the actual method of transport and fuels used.

Is it possible to use A4 data from No, this is not possible, because this is only indicative in
EPDs? EPDs as the construction site can be any distance from
the factory.

Is the LCA bootcamp the same as Yes, the content is the same. Just di erent language.
the ACV Spanish course?

What is di erence between C3 Hi Marvi, C3 holds the impacts from waste processing:
and D phases or stages? recycling, preparation for reuse, and use as energy. D
module holds the benefits and loads beyond the system
boundary, so e.g., if a material is prepared for recycling,
that would be at C3, and then D module would hold the
actual recycling into new products and the benefits of
using that material instead of a virgin material
Which norm/policy is used for rules on how module D is calculated are defined by the
module D? is there any regulation standards (e.g. EN15978) or LCA methodologies e.g.
for circularity? RICS in the UK or RE2020 in France

Is it important to avoid double Hi! Good question, D module is only calculated for virgin
counting this benefit from Module materials so that you can claim the D module benefits of
D? I.e as a benefit to the old the material. If you are then in turn using recycled metal
building in module D and as a for example, you would see the lower emissions in A1-A3
benefit to a new construction with modules indeed.
reduced Product Stage emissions.

What is / are the standards Scope 1 to 3 emissions are defined by the GHG Protocol
covering scope 1 to 3 emissions? and refer mostly to corporate GHG reporting

How do you account for recycled Hi! The recycled materials would have lower A1-A3
materials in cradle to completion emissions but no D module benefits can be claimed. D
? Is there a D-type negative input module is only calculated for the virgin materials of the
for your calculation or is that product and results are negative and always presented
included in the EPD of the separately, never taken o from the actual A-C
recycled material. e.g. using emissions. D module is calculated automatically based
biogenic recycled materials. on the material type and C module scenario and in
EN+A2 EPDs the D module is also presented. Biogenic
carbon is usually presented separately from D module
but this depends a bit on the standard you are following.

Please elaborate on biogenic Hi Yamini, biogenic carbon is the carbon stored in


carbon biogenic materials, such as wood and other fibrous
materials. The CO2 absorbed by the plants is turned to
carbon that stays within the material as long as the
material exists, and emits back to the atmosphere as
co2 when the material decomposes

Some construction systems Hi Mark, this a very good question! basically, wood
manufacturers market their products, when they come from a sustainably managed
products as carbon negative due forest can be considered carbon neutral. With changes
to sequestration (i.e timber wall in forestry practices, the land-use and land-use change
panel systems). Is this incorrect associated carbon flows can actually turn the product
with respect to the 2 methods you into carbon negative, BUT only for the biogenic carbon
mentioned for accounting for part. Other parts of the production chain do cause
biogenic carbon (as I suppose this emissions that usually make the products carbon
carbon will be released as some positive (processing, transport, installation and so on).
point) So all in all it would be di icult to find a product that is
carbon negative. So both of the methods consider that
the biogenic carbon moves from atmosphere to product
and back to atmosphere, but the part from other sources
(fuels) stay within the system.

On biogenic carbon, according to Hi Charlie, In RICS tool biogenic content is shown


the RICS Professional Standard, separately so not in the value of A1-A5. Then it is
biogenic carbon should be released in the module C3.
included in A1 as a negative and
C3/C4 as a positive, when
carrying out a whole life carbon
assessment. Where carrying out
an upfront assessment )A1-A5
only), the biogenic carbon should
not be included in A1, but stated
seperately as a carbon storage
figure.

On biogenic carbon, according to Sorry that is incorrect. Biogenic carbon should be


the RICS Professional Standard, included as a negative in A1 for a whole life carbon
biogenic carbon should be assessment. This then allows the positive emission in
included in A1 as a negative and C3 so you get the -1/+1 balance accross the lifecycle.
C3/C4 as a positive, when Happy to discuss o line?
carrying out a whole life carbon
assessment. Where carrying out
an upfront assessment )A1-A5
only), the biogenic carbon should
not be included in A1, but stated
seperately as a carbon storage
figure.

On biogenic carbon, according to Hi Charlie, sorry of being unclear! Yes even if it is part of
the RICS Professional Standard, the A1-A3 module, in our tools the biogenic content is
biogenic carbon should be reported in its own column based on the requirements
included in A1 as a negative and for reporting for GLA specifically. So you can consider
C3/C4 as a positive, when that it is part of the product stage and then re-released
carrying out a whole life carbon in C3 module. But if you are only assessing A1-A5
assessment. Where carrying out modules, the tools would give you the results
an upfront assessment )A1-A5 automatically without needing to minus the biogenic
only), the biogenic carbon should content from the A1 module.
not be included in A1, but stated
seperately as a carbon storage
figure.

Are these options chosen by If this question refers to the data type, it is on the
default when picking the assessor on how to apply it.
assessment type?

what is the percentage di erence This depends on the embodied carbon of the product
of a result between using only that you have used. Generic materials represent an
generic components' data and average performing product in the region of your project.
actual components' data? If you use an average performing product the di erence
will be very small.

what is the percentage di erence so that means if a project is still in an early stage, it
of a result between using only would be okay to use generic database to compare and
generic components' data and show results of this project as a baseline model. Do I
actual components' data? understand correctly?

what is the percentage di erence Yes, that is correct


of a result between using only
generic components' data and
actual components' data?

I ask who to determine the live answered


lifetime of the building that will be
step to determine lcc

if we're building with straw bales If there is an EPD then it will most likely be in our
or prefab modules and it's not in dataabse already. If not, you can ask for it to be added by
the data base, we have to put just email to support@oneclicklca.com. If there is no EPD at
manualy EPD to software? all and no generic material as well, then you can either
use a proxy(closest match) or create a private datapoint
yourself and use it in your assessment.

For retrofit projects, can we use Hi Dennis, for retrofit it can be hard to get the quantites
scan data of a building to for existing materials (one could use Carbon Designer
translate it into One-click for getting these in One Click), but if you have them you
software and calculate the LCA of can mark these as reused materials and then add all the
an existing building? for before new materials as you would calculate the full life cycle
and after assessments for these and also include the B and C module
emissions for the existing materials.

How do we account for biogenic If you are using EPDs made according to EN15804+A2,
carbon? the biogenic carbon is reported in the EPD. For other
sources you might need to do some background digging
to find out what the actual content it. The Carbon
footprint standard also contains information on how to
calculate the biogenic carbon content.

Yesterday you have shown a Hi, this is the community.oneclicklca.com, and you can
space where people can discuss find the Bootcamp discussions under the topic
di erent topic, make posts and "Academy"
seach for usefull info related to
OneClick. Can you repeat how
this can be accessed?

how many environment impact Hi Nisarg, this depends on what standard your EPD is
indicators are there (total nos ) ? made according to. The EN 15804+A2 has 13 mandatory
impact categories and several optional ones, PEF has
16, and ISO 21931 has 6 if i recall correctly.

in the case of burning wood to When emissions from incineration are reported in C3,
produce energy, arent the module D will include the benefits from o seting fossil
emissions already accounted for fuel consumption for the production of the same
amount of energy
in C3? is Module D only for
Positive Impacts?

Hello, please can one input your Hi, you can create your own private datapoints, but you
own material specification need an expert license for this. One way is also to create
outside the materials provided in private constructions using other material datapoints as
one click data base. I'm currently proxies but you need an expert license i think for this one
doing dissertaion on the as well.
utuilzation of plastic waste in the
building and construction industy
in west Africa, from literature
review carried out i have gotten
the material specification which
was tested in these reviews and i
need to imput it into the software
but its been a little confusing,
such as eco bricks and tiles but
they can't be found in the material
specification. I'm trying to
compare the traditional
construction brick materials with
this eco plastic bricks and tiles.

result of 13 mandatory impact The tool will provide results for all mandatory indicators
indicator will directly give by one depending the LCA method and/or standard you wish to
click lca? comply with.

If EPDs are used also as a Hi Franziska, the EPD standard EN 14025, EN 15804 and
marketing tool for producers, are ISO 21031 all contain quite strict rules on how an EPD
the EPD standards rigorous must be constructed. The EN/ISO standards also require
enough to make sure they are not third-party verification before publication, which is
misused? generally thought to be a sign of reliability.

to calculate A2 impact what Hi Nisarg, do you mean the module A2 (transport of raw
details / inputs required to one materials to processing) or are you referring to the
lick lca software ? standard +A2 discussed here?

to calculate A2 impact what transport of raw material to processing


details / inputs required to one
lick lca software ?

to calculate A2 impact what This data is embedded in the EPD or generic datapoint,
details / inputs required to one so there is no need to input a separate value for it. If you
lick lca software ? are interested in creating EPDs, where this would be
more relevant, you might want to check out our EPD
Bootcamp where the background data is discussed
more.
Is it possible to achieve LEED hi, it depends on what credit you would like to achieve.
certification for a building just by Part of the LEED points for building are achieved via LCA
doing an LCA ? but it will involve optioneering and achivemernt of a
reduciton % on GWP and other indicators, guidance on
what credits can be achieved with One Click LCA can be
found here: https://oneclicklca.com/certifications/leed-
v4

Can one click create an EPD? Yes, we have a product LCA option, for which you need a
separate license. With the correct license you can
access the EPD generator

in EPD impact of electricity which we also dont know how electricity is generated (e.g
is coming directly through grid , thermal powerplant or through renewable power
how its calculated , is there any sources)
grid emission factor which is
standard for all?

in EPD impact of electricity which live answered


is coming directly through grid ,
how its calculated , is there any
grid emission factor which is
standard for all?

In the A-module: if an activity is A1 to A3 will depend on the data source selected, A4


choosen as a "Market of X" and A5 is pre-filled by the tool depending on the location
instead of the activity on its own of the construction site and the location of manufacture
"X", do you still need to declare of the product
the transport of the material or is
this included in the "Market-
assumption"?

In the A-module: if an activity is When adding e.g. gravel in A1, you can also take "market
choosen as a "Market of X" of gravel". In the description, it is often mentioned that
instead of the activity on its own within the market 'transport is integrated'. Thus, i can
"X", do you still need to declare assume by takin the market one, I don't have to fill in the
the transport of the material or is A2 (transport) module?
this included in the "Market-
assumption"?

In the A-module: if an activity is Whereas this is still manditory when taking just gravel.
choosen as a "Market of X"
instead of the activity on its own
"X", do you still need to declare
the transport of the material or is
this included in the "Market-
assumption"?

As the end of life is unlikely to be live answered


known, does the One Click
software allow you to provide data
for a number of end-of-life
scenarioas - e.g. for timber 100%
recycled, 100% reuse, 100%
energy from waste? This way the
user can then determine the end
of life impacts based on their
design.

the sessions are two hours or 1 2h


hour daily?

Will there be walkthroughs of the Hi Isabelle, no, all the exercise materials are within the
exercises? course space for individual use

I've donwloaded the building There should be a specifications pdf document that
example document and have a describes the build up of the various eleemtns like
pdf measure app, however I don't external walls, floors etc. Then, by measuring the
know how to tell which part of the eleemnt quantities and using the specs document, you
building scheme is what kind of will be able to convert the element quantities to material
material. quantities.

Is there a guide on the help centre


or can you tell us how to
di erentiate the materials in the
schemes?
I've donwloaded the building I saw it but, for example, on the "Specs and drawings 5_
example document and have a L01 Floor Plan.pdf " there seem to be di erent kind of
pdf measure app, however I don't materials specified by color, and I don't know which
know how to tell which part of the material is assigned to which color
building scheme is what kind of
material.

Is there a guide on the help centre


or can you tell us how to
di erentiate the materials in the
schemes?

i feel scope 3 emission / impact live answered


calculation is very challenging ,
raw material is coming from
various countries so during
transportation of raw material to
factory what is emission impact
its very di icult to calculate as per
my understanding , how once
clock LCA can give accurate
results ?

i cannot find the homework on the live answered


dashboard can you specify where
the homework is?

What is the deadline for live answered


completing homework exercise?

Are these live sessions available live answered


as recording to view later

How does a fitout LCA work? live answered

After I finish the boot camp, can I Hi Dennis, this bootcamp is about construction LCA, so
create my own EPD and publish for EPDs I suggest you take the EPD Bootcamp (summer
it? 2024) that you can find on the academy.oneclicklca.com

where I can find the sessions and You need to access the course space to see the course
recordings as I didint find anything contents
on my dashboard https://academy.oneclicklca.com/courses/construction
-lca-bootcamp-spring-2024

typically when we specify a live answered


product it is understood as "or
equivalent other" does that mean
the EPDs have to be the same?
Thanks Maija You should be able to see the links to coming sessions
Im already enrolled before but each under their own heading, and yesterday's recording
nothing in the main courses tab when you access the course space

Does any standard or code reflect There are some regulations that require an "As-built"
anything about revisiting LCA LCA. This will take into account the actual materials and
during the life cycle of the building products but not the actual energy consumtpion for B6
based on the risk assessment or or actual replacements for B4.
any inspection ?

Sorry, that's what I meant: Project Yes you will be able to create Building LCA projects
LCA! Will I be able to create
Building LCA assessments

Does it need to report end of life live answered


for cement and concrete?

I guess we get certified with one live answered


click for recognition ?!

Please am on Academy now. But It you need to enroll/resume course to be able to access
is asking me to join a course the course space

You might also like