ANDES Project
___________________________________________
ROLES AND APPROVALS
739547767.docx 2 of 33
TABLE OF CONTENTS
1. SOLUTION OVERVIEW............................................................................5
1.1. Scope.........................................................................................................................5
1.11. Interfaces................................................................................................................ 25
739547767.docx 3 of 33
1.13. Key Design Considerations and Out of Scope....................................................25
1.18. Assumptions...........................................................................................................26
739547767.docx 4 of 33
1. SOLUTION OVERVIEW
1.1. Scope
Roll out Brazilian solution to countries in LATAM (Argentina, Chile, Peru, Colombia, and Panama + small countries)
with the functionalities already deployed for Brazil with Fit/GAP phase; Blueprint design; System and integrations
development; Testing; Go Live and Hyper Care.
In order to achieve cost and timeline objectives, current scope is considering deploy the BR SAP template into the
countries in scope, including only for legal requirements and any locally distinct processes that add value for the
customer. Back-office processes (e.g. AR, AP, SCM, etc.) should be standardized across the region with the
objective to minimize the cost per transaction (GBS).
Background & Context
Risk record open for Chile related to patching of the old ERP environment (we cannot apply latest security
patches)
SAP is imperative for LATAM and we had a serious risk of business interruption, like a severe incident in Chile
in June. ERP’s do not fully attend
SOX and business requirements. Currently local and manual solutions/workarounds, shadow IT applications
are defined to address the need.
Due to the lack functionality and maintenance from the vendors of the old current ERP’s versions; It is also
important to mention that we will not be able to fully take advantage of the GBS implementation until we get
a common ERP.
We have currently 4 different ERPs (BaaN IV c2, iScala 2.3 SR2, Oracle EBS 11i.5.10.2, SAP R3 ECC 6.0).
The project will have two Go Live waves, ensuring controlled rollout of new SAP processes/functionality without
impact to the adopting Business Units (BUs).
739547767.docx 5 of 33
1.2. Organizational Structure
739547767.docx 6 of 33
1.2.2. Logistic (Plant / Sales Org. / Purchase Org. / Purchase Group)
739547767.docx 7 of 33
Purchasing Purchasing
Plant Sales Organization
Organization Group
CL10 - IA-Material
CL10 - IA-Vicuña Mackenna CL10 - IA C01, C02, C03, C04, C05, C06, C07, C08
CL16 - IA-Service
CL30 - EL-Material
CL30 - EL-Vicuña Mackenna CL30 - EL C16, C17, C18, C19, C20, C21, C22
CL36 - EL-Service
CL90 - ZC-Vicuña Mackenna CL90 ZC- Corporate CL90 - ZC Corporate C23, C24
PE20 - MO-Lima
PE20 - MO-Material
PE21 - MO-Arequipa PE20 - MO P05 , P06 , P07 , P08
PE26 - MO-Service
PE22 - MO-Operador Logistico
PE30 - EL-Lima
PE30 - EL-Material
PE31 - EL-Operador Logistico PE30 - EL P09 , P10 , P11
PE36 - EL-Service
PE32 - EL-ELDS Lima
PE90 - ZC Oficina Javier Prado
PE90 ZC- Corporate PE90 ZC- Corporate P12 , P13
PE91 - ZC-Av. Argentina
CO90 - ZC-Siberia
O09 - Grupo GBS IM&S,
CO91 - ZC-Lagartos CO90 ZC- Corporate CO90 - ZC Corporate
O10 - Grupos GBS IM&S
CO92 - ZC-Barranquilla
739547767.docx 8 of 33
Purchasing Purchasing
Plant Sales Organization
Organization Group
EC10 - IA-Material
EC10 - IA-Quito EC10 - IA E01
EC16 - IA-Service
EC20 - MO-ADIPHARM EC20 - MO-Material
EC20 - MO E02
EC21 - MO-Oficina EC26 - MO-Service
PA91 - ZC-FP Costa Del Este PA90 ZC- Corporate PA90 - ZC Corporate
739547767.docx 9 of 33
Purchasing Purchasing
Plant Sales Organization
Organization Group
DO10 - IA DO10 - IA
DO00 - Material
DO20 - MO DO20 - MO N01 , N02 , N03 , N04 , N05 , N06 , N07 , N08 ,
DO60 - Service
DO30 - EL DO30 - EL N09 , N10 , N11 , N12
739547767.docx 10 of 33
Plant Storage Location
2002 Analitica IAMA
2004 Turbocharging
2006 O&G Sist. Indust
2008 Power Generation
2007 Instrumentos IAMA
AR10 - IA
2009 Control Tech.
SUBC Subcontratación
1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
AR11 - IA Zona Franca TERC Zona Franca
AR20 Motion
SUBC Subcontratación
AR20 - MO 1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
AR21 - MO Zona Franca TERC Zona Franca
AR30 Eletrification
SUBC Subcontratación
AR30 - EL 1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
AR31 - EL Zona Franca TERC Zona Franca
4001 Produccion
4002 Almacen
4003 Pañol Repuestos
AR32
SUBC Subcontratación
EL Tucumám
1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
AR33 - EL Tucumám FP 4004 Finish Goods
6001 Autolink Mat.
6002 MV Sec. Distrib.
6003 Recloser Mat.
6004 Relays
6005 OCB (Int. Ext.)
6006 NSPPCompactSubSt
6007 Autolink Produc.
AR34 - ELDS
6008 MV Sec. Prod.
6009 Recloser Produc.
6010 Producción CSS
SUBC Subcontratación
1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
AR35 ELDS Zona Franca TERC Zona Franca
739547767.docx 11 of 33
AR40 Robotics & D.Aut.
SUBC Subcontratación
1500 Reparación Calidad
AR40 - RA
ZGAR Garantia
TERC Terceros
TERC Zona Franca
AR41 - RA Zona Franca TERC Zona Franca
AR90 - Corporate Oficina Chile AR90 Oficina Chile
AR91 - Corporate El Jaguel AR91 El Jaguel
739547767.docx 12 of 33
Company Code: CL10 - Chile
Plant Storage Location
CL10 Central
SUBC Subcontratación
1500 Reparación Calidad
ZGAR Garantia
CL10 - IA-Vicuña Mackenna TERC Terceros
CL12 – TW – Op.Logist.
CL13 – Staging 01
CL14 – Staging 02
CL15 – Bodega IA
CL20 Central
SUBC Subcontratación
1500 Reparación Calidad
CL20 - MO-Vicuña Mackenna
ZGAR Garantia
TERC Terceros
CL22 - TW – Op.Logist.
CL21 Central
SUBC Subcontratación
1500 Reparación Calidad
CL21 - MO-Rio Refugio
ZGAR Garantia
TERC Terceros
CL23 - TW – Op.Logist.
CL40 Central
SUBC Subcontratación
1500 Reparación Calidad
CL40 - RA-Vicuña Mackenna
ZGAR Garantia
TERC Terceros
CL42 - TW – Op.Logist.
CL30 Central
SUBC Subcontratación
1500 Reparación Calidad
CL30 - EL-Vicuña Mackenna
ZGAR Garantia
TERC Terceros
CL32 - TW – Op.Logist.
CL90 - ZC-Vicuña Mackenna CL30 Central
739547767.docx 13 of 33
1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
0001 MOSE 4131
0002 MOSE 4159
0003 MOMG 4156MODP 4015
PE20 - MO-Lima SUBC Subcontratación
1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
0001 MOSE 4131
SUBC Subcontratación
PE21 - MO-Arequipa 1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
0001 MOMG 4156/MODP 4015
SUBC Subcontratación
PE22 - MO-Operador Logistico 1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
0001 ELSP 3078/ELSB 3085
SUBC Subcontratación
PE30 - EL-Lima 1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
0001 ELSP 3078/ELSB 3085
SUBC Subcontratación
PE31 - EL-Operador Logistico 1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
0001 ELDS Service 3442
0002 ELDS 3435/3446
SUBC Subcontratación
PE32 - EL-ELDS Lima
1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
PE90 - ZC Oficina Javier Prado PE90 - CorporateCO / CorporateRE
PE91 - ZC-Av. Argentina PE91 - CorporateCO / CorporateRE
739547767.docx 14 of 33
2007 Instrumentos IAMA
2009 Control Tech.
SE00 Service
SUBC Subcontratación
1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
CO11 - IA-PRINCIPAL
SUBC Subcontratación
CO11 - IA-Lagartos 1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
CO12 - IA-PRINCIPAL
SUBC Subcontratación
CO12 - IA-Barranquilla 1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
CO20 - MO-PRINCIPAL
SUBC Subcontratación
CO20 - MO-Siberia 1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
CO21 - MO-PRINCIPAL
SUBC Subcontratación
CO21 - MO-Lagartos 1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
CO30 - EL-PRINCIPAL
SUBC Subcontratación
CO30 - EL-Siberia 1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
CO31 - EL-PRINCIPAL
SUBC Subcontratación
CO31 - EL-Lagartos 1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
CO90 - ZC-Siberia CO90 - SIBERIA
CO91 - ZC-Lagartos CO91 - LAGARTOS
CO92 - ZC-Barranquilla CO92 - PARALELO 108
739547767.docx 15 of 33
SUBC Subcontratación
1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
EC20 - MO STOCK
ECXC - EXCEDENTES
ECDM - MO DEMO
EC20 - MO-ADIPHARM SUBC Subcontratación
1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
EC21 - MO-Oficina ECDM – MO STOCK
EC30 – EL STOCK
ECXC - EXCEDENTES
ECDM - EL DEMO
EC30 - MO-ADIPHARM SUBC Subcontratación
1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
EC31 - MO-Oficina EC31 - EL STOCK
EC90 - ZC-Oficina EC90 – Corporate Almacen
739547767.docx 16 of 33
SUBC Subcontratación
1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
PA30 – FP (Principal)
SUBC Subcontratación
PA30 - EL-FP Costa Del Este 1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
PA90 - ZC-FP Costa Del Este PA90 – Principal
739547767.docx 17 of 33
SUBC Subcontratación
1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
DO30 - EL-PRINCIPAL
SUBC Subcontratación
DO30 - EL 1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
DO90 - ZC-Corporate DO90 - ZC-PRINCIPAL
739547767.docx 18 of 33
1500 Reparación Calidad
ZGAR Garantia
TERC Terceros
SV90 - ZC-Corporate SV90 - ZC-PRINCIPAL
1.3.1. FI – Finance
Chart of Accounts
A chart of accounts is a structure that contains the G/M accounts used by one or more companies in the
company.
Operational chart of accounts: The operational chart of accounts contains the G/M accounts that are used
for daily postings in the company code. If cost and revenue accounting is active, the chart of accounts is also
used to post to the controlling area.
Group chart of accounts: The group chart of accounts contains the G/M accounts that the entire group of
companies uses and is required if you use external consolidation and reporting for your group.
Alternative chart of accounts (local): An alternative chart of accounts is specific to a country or region that
contains the major accounts that meet the requirements of specific legal reports in that country or region.
739547767.docx 19 of 33
ACCOUNT PAYABLE
Master data is divided into 2 segments with different types of information which is useful for different areas of an
organization.
The creditor master data is divided into:
General data: these are the supplier's own data, they are data that do not change according to the company or
purchasing organization where they are created, for example, name or company name, address, tax
identification, tax status, etc.
Company data: these are the data that interest the company in which the provider is created, for example, the
associated account, the payment methods, the treasury group, the data of tax interest such as withholdings, etc.
Purchase organization data: these are the data referring to the purchase conditions, such as the payment
terms, the price scheme, the usual purchase currency, etc.
To create a vendor master data, you must use an account group which defines two especially important things:
Determine the field status of the account master data: The status field is what determines which data is
required, optional, or remain hidden at the time the master data is created.
Defines the number range: for each group you can create a different number range, or you can even assign
the same range to multiple groups.
Currently, the Template handles account groups that are not useful for other LATAM countries, especially since
providers that are national for one country can be from abroad to others. The definition, use and process to be given to
supplier groups in relation to all countries is pending by the ABB team.
BANKS
The relevant master data for bank transactions are:
Country bank: this is the code that represents a country's banking institutions. The Central Bank of each
country assigns a code to the enabled banks. This code is saved as a country bank or general bank.
Own bank: Set up to identify the general bank in which companies have one or more bank accounts.
Account ID: This concept represents the bank accounts held by the company code in its own bank. The same
bank itself can have one or more accounts.
G/M account: This master data contains information that controls the account assignments of
the transactions and the processing of the data.
1.3.2. CO – Controlling
Describe1
Describe2
Etc.
739547767.docx 20 of 33
1.3.4. SD - Sales & Distribution
Describe1
Describe2
Etc.
739547767.docx 21 of 33
1.4. Common Business Processes (valid for all clusters)
1.4.1. FI – Finance
ANTICIPATION REQUEST
It is a statistical document, that is, it does not generate accounting movements at the time of its creation. This item will
only be recorded in the general ledger at the time of payment (F-53) or registration by transaction (F-48).
AUTOMATIC PAYMENT
This option will be used to make massive payments, that is, it is the generation of borders that will be sent to the banks
electronically. Through it we will be able to select all the payments that are maturing on a certain date and process them
at the same time.
All payment must be in the name of the provider registered in the System. Payment is not allowed on behalf of a third
party.
PAYROLL PAYMENTS
739547767.docx 22 of 33
The entries of amounts related to Payroll are created by the Human Resources Department through the Rhevolution
system, with the generation of an electronic payment file, where they are sent to the Bank (Itaú), to make the payment to
the employees.
The accounting for these payments is grouped by a total amount per branch and sent to SAP after approval on a Lotus
Notes basis, and a file (PLC > Account Entry Spreadsheet) is sent to carry out the accounting of the output of these
payments.
TAX PAYMENT
The accounting of taxes and taxes are made by the Accounting, Taxes and Human Resources Departments, and sent to
the Financier for payment through collection guides.
These postings are verified and released in the SAP System considering their respective maturities.
After the releases and conferences of the payments, the Suppliers department, through the ZFITAXPOSTER transaction,
and based on an Excel file, generates the open items for these payments.
Thus, the payment proposal is generated through transaction F110 and generates the payment cycle, thus considering
the corresponding providers and their respective due dates.
For some taxes and duties, the Suppliers department receives electronic files from the responsible departments to send
them to the banks.
The postings for tax payments that were not possible to generate the electronic file by the person in charge are entered
manually in the Bank's system by the Suppliers department.
RETURN OF PAYMENT
Payment return files are generally received by the Accounts Receivable department. The consistency files and the final
declaration are downloaded to the SAP system. Consistency files are downloaded only to verify that payments have
been scheduled. If the bank rejects any payment at the time of canceling consistency, the SAP system automatically
reopens the item, allowing correction on departure and forwarding to the Bank.
PAYMENTS REFUSED
Payments rejected by the bank through DOC and TED in days after the due date are analyzed and returned for payment
by the Accounts Payable department. In the rejected departure, a history of the reason for the return is observed.
1.4.2. CO – Controlling
Description1
Description2
Etc.
739547767.docx 23 of 33
The indicated business processes will be supported via the implementation of the following SAP CO components,
along with supporting applications/interfaces:
Description1
Description2
Etc.
The indicated business processes will be supported via the implementation of the following SAP CO components,
along with supporting applications/interfaces:
Description1
Description2
Etc.
The indicated business processes will be supported via the implementation of the following SAP SD components,
along with supporting applications/interfaces:
Description1
Description2
Etc.
Field Service
In-House Repair
Warranty Management
Customer Returns
The indicated business processes will be supported via the implementation of the following SAP CS components,
along with supporting applications/interfaces:
Service Notifications
Service Orders
Service Contracts
Service Notifications
The SAP CS Service Notification component supports the following functions:
Enter customer notifications
Document the condition of the service object
Warranty and/or Service Contract checks
Credit Limit warnings/checks
Request the necessary service Tasks
Track the progress of the Tasks to be performed
Track history on Equipment (ex. number of Service Orders over a period of time)
739547767.docx 24 of 33
The SAP CS Service Notification serves as a launch platform for the following processes:
Creation of a Service Order for sending Field Service Engineers (FSE) to a customer site
Advanced Shipment and delivery of Spare Parts
Warranty Replacement/Warranty Repair Processing
The SAP CS Service Notification affords visibility and recording of the following components:
Customer Data and Partner Functions (Sold-to, Ship-to, Bill-to, Payer etc.)
Contact Person and Employee Responsible
Purchase Order reference field
Sales Document reference field (ex. for Service Contract integration)
Technical Objects – Equipment, Material/Serial Numbers
Catalog Codes – Object Part, Damage, Cause
Notification Description (Short Text and Long Text)
Notification Tasks and Workflow
Credit Card Details (ex. Paymetrics)
Service Orders
SAP Service Orders are used to record the details of Services agreed upon by a service provider and a service
recipient. Service Orders act principally as cost-collectors, and contain all of the information needed to plan,
execute, and bill for a Service. Service Orders are linked to Service Notifications, and typically follow from the
creation of a Service Notification.
Service Contracts
Service Orders are used principally for single or short-term-duration Service events between ABB and its
customers. Service Contracts represent longer-term agreements, generally for periods up to 1 year or more,
where Service events are billed to the customer on a periodic basis, and revenue recognized accordingly.
739547767.docx 25 of 33
The indicated business processes will be supported via the implementation of the following SAP PS components,
along with supporting applications/interfaces:
Description1
Description2
Etc.
The indicated business processes will be supported via the implementation of the following SAP PM components,
along with supporting applications/interfaces:
Description1
Description2
Etc.
The indicated business processes will be supported via the implementation of the following SAP PP components,
along with supporting applications/interfaces:
Description1
Description2
Etc.
The indicated business processes will be supported via the implementation of the following SAP PP components,
along with supporting applications/interfaces:
Description1
Description2
Etc.
739547767.docx 26 of 33
At this point, the gaps detected for each of the clusters / countries that make up the object of the implementation rollout
are added, they are identified individually by each one of them.
These points or requirements are requested by the BPOs for current processes or required by country regulations within
each of the current processes managed by the Template
ARG-URY
Treasury Bank Statement and reconciliations
ID 1582 ARG: is required to manage from the new SAP different EM/RF (Accounts at a moment of the Receive the
goods/services).
Currently exist only one SAP account and then is reclassify manually to others types of Vendors.
ABB template has only one GL account also.
ARG-URY
Automatic Check Not Legal Vendors/Purchase Invoices
ID 1928 ARG: request to add and automatic process and validation to verified if the Vendor and the Purchase Invoice
is legal.
According a Legal electronic file with a new Program. Currently Argentina does not have this functionality in SAP.
Automatic Check of Exchange Rates (Invoice issue date Vs SAP Table Rate)
Automatic Check of Exchange Rates (Invoice issue date Vs SAP Table Rate)
ID 1929 ARG: request to add and automatic validation to verify the difference between the Exchange Rate in the
Issue Invoice that are posted against the SAP Exchange Rate table and check a value as limit.
Currently Argentina does not have this functionality in SAP.
739547767.docx 27 of 33
In case that we continue with the Z programs, will be necessary to review technically and extend the Program to the
new SAP.
ANTICIPATION REQUEST
It is a statistical document, that is, it does not generate accounting movements at the time of its creation. This item will
only be recorded in the general ledger at the time of payment (F-53) or registration by transaction (F-48).
ARG-URY
Blocking type to control a Credit note posted
ID 1105 ARG: a Blocking type “F” was implemented that ensures that an invoice affected by a Purchase Order, with
an Open Advance, cannot be released for payment without the Credit Note canceling the advance has been posted
(development in SAP)
AUTOMATIC PAYMENT
This option will be used to make massive payments, that is, it is the generation of borders that will be sent to the banks
electronically. Through it we will be able to select all the payments that are maturing on a certain date and process them
at the same time.
All payment must be in the name of the provider registered in the System. Payment is not allowed on behalf of a third
party.
ARG-URY
Program to send TXT Electronic File with payments to Bank
ID 1930 ARG/URY: Is required a Program to create the TXT eletronic files, according the formats of local Banks.
Currently have the Program Zpaylink which creates the TXT file with Payments information created by Trx F110 in
SAP according some Argentina and Uruguay Banks formats requirements. Currently download and send manually to
each Bank.
ABB Template must confirm which Program has to be used by these 2 Countries. The ARG/URY Program or the
Brazil Program.
In case that we continue with Zpaylink will be necessary to review technically and extend the Program to the new
SAP.
Payment Advice
ID 1942 ARG/URY: is required to send to the vendors a payment advice form with all the information related each
payment, invoices, withholding, etc.
Currently these countries have a Z Program in SAP.
ABB Template does not have a program which send these forms according local requirements.
In case that we continue with the Z program, will be necessary to review technically and extend the Program to the
new SAP.
739547767.docx 28 of 33
A manual bank statement occurs when is not possible the bank sends all bank movements by files, so manually users
maintain this information by transactions properly development to this functionality.
Currently Argentina has internal Process and a Z program developed to have this solution.
ABB Template does not have a program to fulfill these local requirements according the local Banks Structure formats
and the module is configured according Brazil requirements.
In case that we continue with the current Z program will be necessary to review technically and extend the Program to
the new SAP, also make all the configurations of the Treasury modules related all the Banks, reconciliations keys,
etc.
PAYROLL PAYMENTS
The entries of amounts related to Payroll are created by the Human Resources Department through the Rhevolution
system, with the generation of an electronic payment file, where they are sent to the Bank (Itaú), to make the payment to
the employees.
The accounting for these payments is grouped by a total amount per branch and sent to SAP after approval on a Lotus
Notes basis, and a file (PLC > Account Entry Spreadsheet) is sent to carry out the accounting of the output of these
payments.
TAX PAYMENT
The accounting of taxes and taxes are made by the Accounting, Taxes and Human Resources Departments, and sent to
the Financier for payment through collection guides.
These postings are verified and released in the SAP System considering their respective maturities.
After the releases and conferences of the payments, the Suppliers department, through the ZFITAXPOSTER transaction,
and based on an Excel file, generates the open items for these payments.
Thus, the payment proposal is generated through transaction F110 and generates the payment cycle, thus considering
the corresponding providers and their respective due dates.
For some taxes and duties, the Suppliers department receives electronic files from the responsible departments to send
them to the banks.
The postings for tax payments that were not possible to generate the electronic file by the person in charge are entered
manually in the Bank's system by the Suppliers department.
ARG-URY
Withholding Tax Certificates
ID 1943 ARG: is required to send to the vendors a Withholding tax Certificates forms with all the information related
withholding taxes, etc.
Currently this country has a Z Program in SAP.
ABB Template does not have a program which send these forms according local requirements.
In case that we continue with the Z program, will be necessary to review technically and extend the Program to the
new SAP.
739547767.docx 29 of 33
PAYMENTS WITH CHECKS
Payment by check will only be made for branch refunds and refunds or in the case of any legal process that requires
payment by check. These must be signed by authorized approvers in accordance with the Judicial Power.
ARG-URY
Checks Payment method
ID 1935 and ID1936 ARG/URY: required to have a process, module, Programs and Forms to pay with Checks
Payment method.
ABB Template does not include the steps of this Process/request and does not provide the module, Programs, forms,
etc.
ABB Template must confirm if we can replicate the Process, configurations, Programs, Forms to the new SAP.
RETURN OF PAYMENT
Payment return files are generally received by the Accounts Receivable department. The consistency files and the final
declaration are downloaded to the SAP system. Consistency files are downloaded only to verify that payments have
been scheduled. If the bank rejects any payment at the time of canceling consistency, the SAP system automatically
reopens the item, allowing correction on departure and forwarding to the Bank.
PAYMENTS REFUSED
Payments rejected by the bank through DOC and TED in days after the due date are analyzed and returned for payment
by the Accounts Payable department. In the rejected departure, a history of the reason for the return is observed.
ARG-URY
Employees Travel and Expenses processes and reimbursement
ID 1951 and 1952 ARG/URY: is required to have in the new SAP a Process functionality related Employees travel
and Expenses and reimbursement of expenses.
Currently these countries have Tool connected with Lotus notes and Z program in SAP as a solution with approvals
levels and Workflows integrated with cost objects, positions, etc.
ABB template must define the next steps related this Functionality/Module required that is not cover in detail or
with a specific program by the template. Also, Lotus notes will be deactivated.
PETTY CASH
Currently, the Template does not handle petty cash processes.
ARG
Petty Cash Process/Program
ID 1955 and 1956 ARG/URY: is required to have in the new SAP a Process functionality to manage a small
expenses and refund.
Currently these countries have a defined Process and Z Program with approvals levels and Workflows, etc.
ABB template does not include this Process in the Template and do not provide any global program as a solution.
In case that we continue with the Z program, will be necessary to review technically and extend the Program to the
new SAP.
739547767.docx 30 of 33
1.6. Process Flow
1.11. Interfaces
739547767.docx 31 of 33
1.14. Test Strategy
<topics to be considered: definition of the scope of the test, who will test, how the test will
be executed, in which period the test will take place, what tools will be used, acceptance
criteria, who will approve the final results >
<SAP: for Gate 3, the Test Plan and Execution document (use template TPE) must be
created to further detail and plan this item>
1.18. Assumptions
739547767.docx 32 of 33
1.21. Documents (IS)
<specify all documents to be created and made available in the official IS documentation
repository as part of the project, as required according to IS Governance. Insert more lines
as required. This list will be used to validate finished and approved documentation at the
Gate 4 and 5 Reviews>