Professional Documents
Culture Documents
Contract Specification
400KV-Substation area
Approved Earthing layout Equipment foundation drawings
Approved Drawings
MOMA-3B-KHO-MO-6100-006-01
Approved Method
Statement N/A
Name of the Line 400/220/33kv-Matambo-Earthing layout
We apply to start the Earthing Laying and joint welding of Equipment’s Structure
Description of Works
at 33kv/220kv/400kv-substation.
Requested By
Yang Yan Long 23/03/2024 Yang Yan Long
Sinohydro Signature & Date Name
Remarks: 51mtrs (approx.) Length of Earthing laying & 0Nos.of Joint /welding points. - Behind shunt
reactor area.