You are on page 1of 1

Joint Venture of Sino hydro Corporation Limited & Power China SEPCO1 Electric

Power Construction Co., Ltd


Address :Avenida marginal 856, Costa do sol,Maputo
Doc, No. 48/MCS/RFI/2024/ER
REQUEST FOR INSPECTION
Project Name: Design, Supply & Installation, Commission and Handover of the Matambo 400 kV Substation
in Mozambique and extension of the existing Matambo 220 kV Substation, including diversion of
approximately 4,5 km of Road Nr.301 - PACKAGE B
Contract No.: IV/TD B – EDM/MOMA/2021
To, GOPA International Energy Consultant (Intec) Sinohydro Serial
No.48/MCS/RFI/2024
Date:23/03/2024
Dear Sr. / Madam,
We apply for inspection of EARTHING LAYING & JOINT WELDING for eqpt. Riser near Shunt reactor area at
400kv-SUBSTATION-Matambo.
Estimated 25/03/24
Inspection Time From 09:00 AM
Inspection Date
Inspection Level Hold Inspection Witness Surveillance
Earthing &Joint
welding for
Works Include
equipment’s
Foundations
Related Documents;

Contract Specification
400KV-Substation area
Approved Earthing layout Equipment foundation drawings
Approved Drawings
MOMA-3B-KHO-MO-6100-006-01
Approved Method
Statement N/A
Name of the Line 400/220/33kv-Matambo-Earthing layout

Section & Location 400kv-Substation area

We apply to start the Earthing Laying and joint welding of Equipment’s Structure
Description of Works
at 33kv/220kv/400kv-substation.
Requested By
Yang Yan Long 23/03/2024 Yang Yan Long
Sinohydro Signature & Date Name

Remarks: 51mtrs (approx.) Length of Earthing laying & 0Nos.of Joint /welding points. - Behind shunt
reactor area.