Crane Methodology
RFX: 5000013183
MAY 2023.
PRELIMINARIES
CONTRACTUAL MATTERS
EXECUTION PROCEDURES
OFFSITE WORKS
Presentation of Method Statement and Work Program for approval by the Engineer
Supply of reinforced precast ground beam for new wall made of class 40 concrete
300mmx500mm.
ONSITE WORKS
SITE SETUP
Carrying out fine finish on the entire area making them look well.
Training of the employer’s stuff on the operation and maintenance of the crane.
Suppling the employer with the operation menu for easier operation of the crane.
Carrying out electrical linkage between the existing crane and the new crane.
PROJECT TERMINATION