HANOI POWER CORPORATION SOCIALIST REPUBLIC OF VIET NAM
HANOI POWER GRID PROJECT Independence – Freedom – Happiness
MANAGEMENT BOARD No.: 267/EVNHANOIPMB-KHVT Subject: The anticipated date for handing over the Cau Giay, January 29th, 2024 S10 station infrastructure under the Hanoi Pilot Light Metro Line Project, section Nhon – Hanoi station
To: Hyundai E&C – Ghella Joint Venture (HGU)
Hanoi Power Grid Project Management Board (PMB) would like to extend respectful greetings to HGU. Pursuant to the meeting on November 16, 2021 between Hanoi Metropolitan Railway Management Board (MRB), PMB and HGU on the resolution of the conflict at the location of the station S10 between the Hanoi Pilot Light Metro Line Project, section Nhon – Hanoi station and the undergrounding of transmission line 110V Thanh Cong - Giam project. Pursuant to Letter No. HGU-MLT-00524-23-V dated July 14, 2023 from the Contractor responding to letter No. 1230/EVNHANOIPMB-KHVT dated June 20, 2023 from the Project Management Board. Accordingly, HGU, the contractor, intends to finish soil treatment at both ends of station S10 by the end of April 2024 and the suitable timeframe for the Project Management Board to proceed with the undergrounding of the Thanh Cong - Giam 110kV line is anticipated to be after the completion of the soil treatment. The Project management board (PMB) is currently taking preparations to commence the undergrounding of transmission line 110kV Thanh Cong - Giam project (scheduled to begin in the second quarter of 2024.) For safety assurance of the undergrounding of transmission line 110kV project and relevant infrastructure connection, PMB requests HGU’s opinion on the anticipated date of handing over the S10 station infrastructure to facilitate the PMB in proceeding with the undergrounding of the 110kV Thanh Cong - Giam transmission line project. PMB looks forward to receiving HGU’s attention and assistance. For further information, please contact: Hanoi power grid project management board. Address: No. 159 To Hieu, Nghia Do Ward, Cau Giay District, Hanoi City. - Mr. Duong Anh Tung - Deputy Head of Material Planning Department - Tel: 0971 518 499; - Mr. Nguyen Van Thang - Department of Material Planning - Tel: 0974 935 902. Sincerely./.
Receivers: FOR DIRECTOR
- As above; DEPUTY DIRECTOR - Department of material planning (02 hard copies) - Filing: At office, Department of Material Planning. (signed and stamped)
Legislative Council Panel On Transport Subcommittee On Matters Relating To Railways Progress Update of The Construction of The Shatin To Central Link (As at 30 September 2016)
Policy Guidelines On Surveying With Network Survey Vehicle (NSV) For All The Projects Involving Development of 2-4-6-8 - Lane, Expressway, Strengthening DT 13-11-19 PDF