TJMEP

MEP Design, Engineer, Construction


& Quantity Surveyor
Gianyar, 08 Desember 2023

No : 11/TJ/XI/2023
Lamp :1
Subject : Villa
Re : Fee Proposal for MEP Bill of Quantity

To : Mr/Mrs

Dear client,
Together with this we offer Bill of Quantity include Unit Rate Analysis MEP for Magonia Ocean View Club Lombok reffer the master plan schematic
MEP Drawing & the my experience at the construction scope.

The Detail of BoQ List:


1. Electrical System (Lighting, Power Outlet & Etc)
2. Genzet System
2. Lightning Ptotection System
4. Clean Water System
5. Hot Water System
6. Sewage, Waste & Vent System
7. Rain Water System
8. IT Electronic System (Data, Telephone, TV)
8. Fire Alarm System
9. Fire Protection System (Apar)
10. VAC System (Air Conditioning, Exhaust, Fresh Air System)

Refer the drawing plan, I submit the price as follow :

NO AREA LUAS BANGUNAN BIAYA PER/M2 TOTAL


1 Building & MEP Infrastructure 6883 7,000 48,181,000

TOTAL 48,181,000
As for payment schejule that is :
* Down Payment 30% After approval the proposal
** Next Payment 50% When the initial BoQ is completed / R-0 BoQ
*** Next Payment 10% When First Revision BoQ Completed
**** Final Payment 10% When Second Revison BoQ Completed/Final Revision.

Completion time for the BoQ is 1 month after the Down Payment receipt

The Thus the design bid proposal is submitted to be well received, and thank you for your attention and cooperation.

Gianyar, 08 Desember 2023


Yours faithfully

I Wayan Agus Teja Baskara, ST