Date: 15/03/2024
1.PSV
ELECTRICAL SYSTEM
MECHANICAL SYSTEM
CIVIL
ANM
ELECTRICAL SYSTEM
CIVIL
RGC
MECHANICAL SYSTEM
RGC-FAHU-1 IS ON
But the filters are dirty.
ELECTRICAL SYSTEM
CIVIL
Heat exchanger inlet pipe have leakage near the wall
The floor near AHU have grove needs to be repaired
RCB
MECHANICAL SYSTEM
Heat exchanger tertiary pump 1 is off and second is running in manual condition
All AHUS are in on position except AHU-KIT-1
KFAHU AND AHU KITCHEN aluminum filter dusty condition.
Water feature circulation pumps off
Filtration system is off.
All thermostats are working.
There is no access to thermostat of bedroom RB-G13.
RCB-AHU1,2,3 all filters are dirty.
Somebody changed the set points of thermostat.
ELECTRICAL SYSTEM
PMV
ELECTRICAL SYSTEM
Main power supply is on.
Visually checked the SMDB, DB, SOCKETS and SWITCHES.
Emergency exit lights are working.
Wire pulling in a conduit pipe but no connection near AHU-3.
All DB’s are charged.
DBA-PMV-G2 2 breakers off for exercise hall and app recline personal.
UDBA-PMV-B, 1 breaker is in off condition, for Xray machine.
DB-PMV-FAC door handle not working properly
Wire pulling without any connection near Water Heater 2
Power socket cover not fixed in cinema hall
Isolator of AHU is not fixed just lying on the ground
SMDB-PMV-B, 2 breakers are off (ISP-PMV-B1 and ISP-PMV-G2) ISP panel is not installed
yet.
Industrial socket damaged in mechanical area near heat exchanger.
SMDB-PMV-AHU all breakers on.
ISP-PMV Panel 1 tag is wrong i.e. ISP-PSV.
One of the ceiling lights is not working, above AHU-2.
CIVIL
Construction team cut gypsum board near heat exchanger still not rectified.
Door lock not working in kitchen basement area.
Mech area floor slope is not proper for drain.
DTV
NO ACCESS
BOH
FMV