You are on page 1of 59

Name of the Project : Vertex Kingston Park

Name of the Contractor : M/s. MERGE STONES


Nature of Work : Supply & Laying of Marble Flooring /Cladding works at Vertex Kingston Park.
Work Order No : VHPL/Kingston Park/ H/ H6/ I / 05
Material
S. NO. Advance Recovery Balance Adv W.O Bill Value Retention Holding Debit Notes Total Recovery Net Amount
Recovery
Description Bill No Bill Date
Ref 1 2 3=1-2 4 5 6=4+5 7 8 9 10 11=7+8+9+10 A=3+6-11

GST/
- Bill Value Total Amount 5%
(CGST+SGST)

Supply & Laying of Marble


1 Flooring /Cladding works at RA1 50,043,701 50,043,701 - - - - 50,043,701
Vertex Kingston Park.

2 "" RA2 29-Mar-23 1,291,858 48,751,843 6,151,704 1,107,307 7,259,011 307,585 307,585 5,659,568
3 "" RA3 31-Mar-23 123,433 48,628,410 587,778 105,800 693,578 29,389 29,389 540,756
4 "" RA4 5-May-23 771,442 47,856,968 5,934,169 1,068,150 7,002,319 296,708 296,708 5,934,169
5 "" RA5 11-May-23 721,978 47,134,990 5,553,677 999,662 6,553,339 277,684 277,684 5,553,677
6 "" RA6 12-May-23 500,000 47,634,990 - - - - - 500,000
7 "" RA7 16-Jun-23 804,713 46,830,277 4,470,630 804,713 5,275,343 223,532 223,532 4,247,098
8 "" RA8 14-Jul-23 46,830,277 1,551,257 279,226 1,830,483 77,563 77,563 1,752,920
9 "" RA9 15-Jul-23 250,000 46,580,277 4,582,527 824,855 5,407,382 229,126 229,126 4,928,256
10 "" RA10 15-Jul-23 370,000 46,210,277 2,958,614 532,551 3,491,165 147,931 147,931 2,973,234
11 "" RA11 28-Jul-23 100,000 46,110,277 547,407 98,533 645,940 27,370 27,370 518,570
12 "" RA12 450,000 45,660,277 3,560,022 640,804 4,200,826 178,001 178,001 3,572,825
13 "" RA13 1-Aug-23 720,000 44,940,277 5,261,421 947,056 6,208,477 263,071 263,071 5,225,406
14 "" RA14 14-Aug-23 944,298 43,995,979 6,941,815 1,249,527 8,191,342 347,091 347,091 6,899,953
15 "" RA15 31-Aug-23 43,995,979 790,516 142,293 932,809 39,526 39,526 893,283
16 "" RA16 1-Sep-23 43,995,979 525,250 94,545 619,795 26,263 26,263 593,532
17 "" RA17 20-Sep-23 2,087,448 41,908,531 14,019,097 2,523,437 16,542,534 700,955 700,955 13,754,131
18 "" RA18 5-Oct-23 1,151,655 40,756,876 8,460,313 1,522,856 9,983,169 423,016 423,016 8,408,498
19 "" RA19 6-Oct-23 1,046,867 39,710,009 7,690,521 1,384,294 9,074,815 384,526 384,526 7,643,421
20 "" RA20 27-Oct-23 495,000 39,215,009 3,636,315 654,537 4,290,852 181,816 181,816 3,614,036
21 "" RA21 2-Nov-23 1,446,774 37,768,235 10,628,389 1,913,110 12,541,499 531,419 531,419 10,563,306
22 "" RA22 4-Dec-23 2,120,672 35,647,563 15,578,922 2,804,206 18,383,128 778,946 778,946 15,483,510
23 "" RA23 13-Dec-23 79,961 35,567,602 589,850 106,173 696,023 29,493 29,493 586,569
24 "" RA24 26-Dec-23 1,334,353 34,233,249 9,790,893 1,762,361 11,553,254 489,545 489,545 9,729,356
25 "" RA25 2-Jan-24 1,334,354 32,898,895 9,810,533 1,765,896 11,576,429 490,527 490,527 9,751,548
26 "" RA26 20-Jan-24 202,175 32,696,720 1,479,085 266,235 1,745,320 73,954 73,954 1,469,191
27 "" RA27 2-Feb-24 200,000 32,496,720 1,440,181 259,233 1,699,414 72,009 72,009 1,427,405
28 "" RA28 14-Feb-24 32,496,720 1,530,052 275,409 1,805,461 76,503 76,503 1,728,958
29 "" RA29 16-Feb-24 5,748,993 26,747,727 6,588,631 1,185,954 7,774,585 329,432 329,432 1,696,160
29 "" RA30 1-Mar-24 277,991 26,469,736 1,641,542 295,478 1,937,020 82,077 82,077 1,576,952

Total Amount 50,543,701 24,073,966 26,747,727 142,301,111 25,614,200 167,915,311 7,115,058 - - - 7,115,058 187,269,989

Previous Bill Cummulative Balance Amount in


S.NO W.O Value This Bill Value Remarks
Value Value W.O

1 414,773,907 185,693,037 1,576,952 187,269,989 227,503,918


Payment Advice

Vertex Homes Pvt Ltd


Vertex Kingston Park
Payment Advice
Client : Vertex kingston park
Vertex Corporate Office ,4th floor, Plot no 8,9 opp Hitex Entrance ,
Jubilee Enclave ,Hyderabad-500082
M/s. MERGE STONES
Contractor : PLOT NO-271/A, ROAD NO-12, MLA COLONY, BANJARA HILLS, Hyderabad, Telangana, 500034.
PAN :ABEFM3509R Mobile :9959126126 GST No:36ABEFM3509R1ZS
Natura of work : Supply & Laying of Marble Flooring /Cladding works at Vertex Kingston Park.
Work Order No. VHPL/Kingston Park/ H/ H6/ I / 05 Invoice details:-
Work Order Value 351,503,311 RA Bill No 30
GST-18% 63,270,596 Bill date 1-Mar-24
Total Contract Value 414,773,907 Payadvice No. Arc.Fin-0195

Sl No. Description Previous Present Total


1 VALUE OF WORK DONE
1.1 Certified Gross Amount 140,659,569 1,641,542 142,301,111
1.2 Advance 50,043,701 50,043,701
A Stands Adv 500,000 500,000
1.3 CGST @ 9% 12,659,361 147,739 12,807,100
1.4 SGST @ 9% 12,659,361 147,739 12,807,100
1.5 IGST @ 18% -

Total payable amount (A) 216,521,992 1,937,020 218,459,012


2 Deductions
2.1 Advance @ 100% 23,795,974 277,991 24,073,965
2.2 CGST @ 9% - -
2.3 SGST @ 9% - -
2.4 Retention money @ 5% 7,032,978 82,077 7,115,055
2.5 Quality Hold -
2.6 Debit Bills -
Total Deductions (B) 30,828,952 360,068 31,189,020
Net Payable Amount (A - B) 185,693,040 1,576,952 187,269,992
We hereby certify an amount of INR 15,76,952/- Fifteen Lakhs Seventy Six Thousand Nine Hundred and Fifty Two

Prepared By Checked By Certified By Verified By Approved By

Designation: Engg QS Designation: QS Consultant Designation: DGM Designation: VP


Date : Date : Date : Date : Date :

Note
1 TDS as applicable shall be deducted.
2 Accounts Team to Check for Payments made till date by way of Cheque/ Cash etc. or in any other form.
Sub Contractor M/s. MERGE STONES ABSTRACT BILL FORM SITE KINGSTON PARK PROJECT
Supply & Laying of Marble Flooring
Name of Work /Cladding works at Vertex Kingston VERTEX HOMES Pvt.Ltd. BILL NO. 30
Park.
W.O.No./P.O. No VHPL/Kingston Park/ H/ H6/ I / 05 Vertex Corporate ,4th Floor,Plot No.8&9,Jubliee Enclave,Madhapur,Hyd-500081 DATE 3/1/2024
Work Order Date 01-02-2023 Bill Period From Invoice required PAN ABEFM3509R
Bank details Bill Period To Invoice required Mobile No. 9959126126
GST No 36ABEFM3509R1ZS Received invoice
As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks
1 OTTOMAN BEIGE 16 mm Thick: - - - - -

Marble Characteristics: Beige based marble


having no white, yellow and red streaks or patches.
Almost nil pitting cracks and unequal
I - - - - -
patches/colours.
All marble slabs shall be resin filled on both sides
and protected by fibre mesh on the rear side.

Marble Flooring: Supplying & Laying of Marble


flooring as per the approved shop drawings, set in
CM (1:5) 50 thk. or as required at site. Scope
includes unloading ,shifting ,lifting, laying, pouring of
white cement slurry at the rate of 0.5kg/sft levelling,
lining, matching the stone patterns, polishing, laying
of protection sheet, curing ,wastage etc. complete
as per the drawings and as directed by
Architects/Engineer in charge.
(Mode of measurement: Shall be as per area laid
and approved shop drawings )
i.) Preparation and submission of shop drawings.
1a ii) 4 coats of polishing, resin filling in pits and joints SFT 462,953 386 178,699,871 - - - - - OB
with tenax or equivalent brand.
iii) Disposal of broken/cutting marble, polishing
residue etc. at a specified allotted area.
And all other activities complete for the finished
item of work
iv) Protection of marble with Supreme Dura
protector XF or equivalent 4mm thk and handing
over for other activities.
v) On instructions of engineer, removal of protection
sheet and proceeding with balance coats of polish
that includes 3 coats of tinoxide polish and sealer
coat.

Delivery of marble 70% 270.20 - 196,514.01 53,098,086 6,075 1,641,542 202,589.30 54,739,628 OB
Laying of marble 12.50% 48.25 - 49,688.28 2,397,460 - - 49,688.28 2,397,460
Polishing with resin filling 5% 19.30 - 31,403.61 606,090 - - 31,403.61 606,090
Handing Over 12.50% 48.25 - - - - - -
As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks

Marble Skirting: Supplying & Laying of 100 mm


wide marble skirting as per the approved shop
drawings flush in backing in CM (1:3) 20 thk. or as
required at site. Scope includes fixing of PVC profile stone patterns,
polishing, laying of protection sheet,
curing ,wastage etc. as mentioned in item I.a
1b RFT 1,367 130.8 178,859 - - - - -
complete as per the drawings and as directed by
Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in Rft )
with smooth finished edge at corners, unloading
,shifting ,lifting, laying, levelling, lining, matching the

Laying of marble 50% 65.4 - 2,251.82 147,269 - - 2,251.82 147,269


3 Coats of Polishing with resin filling , Protection sheet laying 20% 26.16 - 1,392.72 36,434 - - 1,392.72 36,434
Balance 4 Coats of Polishing with resin filling 20% 26.16 - - - - - -
Handing Over 10% 13.08 - - - - - -
Staircase Flooring at midlanding: Supplying &
Laying of staircase Marble flooring as per the
approved shop drawings, set in CM (1:5) 50 thk. or
as required at site. Scope includes unloading,
shifting, lifting, laying, and pouring of white cement
slurry at the rate of 0.5kg /sft. levelling, lining,
1c matching the stone patterns, polishing, laying of Sft 22,997 386 8,876,856 - - - - - OB
protection sheet, curing ,wastage etc. as mentioned
in item I.a. complete as per the drawings and as
directed by Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in sft )

Delivery of marble 70% 270.2 - - - - - - OB


Laying of marble 12.50% 48.25 - 1,466.32 70,750 - - 1,466.32 70,750
Polishing with resin filling 5% 19.3 - 811.24 15,657 - - 811.24 15,657
Handing Over 12.50% 48.25 - - - - - -

Marble Riser: Supplying of laying of marble riser of


height 150mm or below for staircase as per
approved shop drawings backing in CM (1.3) of 20
thk. or as required at site. Scope includes unloading
,shifting ,lifting, laying, levelling, lining, matching the
1d stone patterns, polishing, laying of protection sheet, RFT 2,201 146.6 322,661 - - - - -
curing ,wastage etc. as mentioned in item I.a.
complete as per the drawings and as directed by
Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings Rft)

Laying of marble 50% 73.3 - 989.04 72,496 - - 989.04 72,496


3 Coats of Polishing with resin filling , Protection sheet laying 20% 29.32 - 535.61 15,704 - - 535.61 15,704
Balance 4 Coats of Polishing with resin filling 20% 29.32 - - - - - -
Handing Over 10% 14.66 - - - - - -
As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks

Marble Tread: Supplying and laying of Marble tread


of size 300mm or below width for staircase as per
the approved shop drawings with overlapping of
50mm on riser as double patti with a pencil round
and mitre joint at the corner set in CM (1:5) 50 thk.or
as required at site. Scope includes unloading
,shifting ,lifting, laying, pouring of white cement slurry
1e RFT 2,254 361.6 814,916 - - - - -
at the rate of 0.5kg/sft, levelling, lining, matching the
stone patterns, polishing, laying of protection sheet,
curing ,wastage etc. as mentioned in item I.a.
complete as per the drawings and as directed by
Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in length of tread Rft)

Laying of marble 50% 180.8 - 865.41 156,466 - - 865.41 156,466


3 Coats of Polishing with resin filling , Protection sheet laying 20% 72.32 - 468.66 33,893 - - 468.66 33,893
Balance 4 Coats of Polishing with resin filling 20% 72.32 - - - - - -
Handing Over 10% 36.16 - - - - - -

Staircase Skirting 01: Supply and laying of 100 mm


height/width marble skirting as per the approved
shop drawings flush in backing in CM (1:3) 20 thk.or
as required at site. Scope includes fixing of PVC
profile unloading ,shifting ,lifting, laying, levelling,
lining, matching the stone patterns, polishing, laying
1f RFT 2,274 130.8 297,479 - - - - -
of protection sheet, curing ,wastage etc. as
mentioned in item I.a. complete as per the drawings
and as directed by Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in RFT with the centreline method
measurement)

Laying of marble 50% 65.4 - 610.92 39,954 - - 610.92 39,954


3 Coats of Polishing with resin filling , Protection sheet laying 20% 26.16 - 334.70 8,756 - - 334.70 8,756
Balance 4 Coats of Polishing with resin filling 20% 26.16 - - - - - -
Handing Over 10% 13.08 - - - - - -

Staircase Skirting 02: Supply and laying of 100 mm


height/width marble skirting as per the approved
shop drawings flush in backing in CM (1:3) 20 thk. or
required at site. Scope includes mitre joint at corner
with pencil round with smooth finish edges,
unloading ,shifting ,lifting, laying, levelling, lining,
1g matching the stone patterns, polishing, laying of RFT 3,413 180.4 615,692 - - - - -
protection sheet, curing ,wastage etc. as mentioned
in item I.a. complete as per the drawings and as
directed by Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in RFT with the centreline method
measurement)
As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks
Laying of marble 50% 90.2 - 401.71 36,234 - - 401.71 36,234
3 Coats of Polishing with resin filling , Protection sheet laying 20% 36.08 - 218.07 7,868 - - 218.07 7,868
Balance 4 Coats of Polishing with resin filling 20% 36.08 - - - - - -
Handing Over 10% 18.04 - - - - - -

Marble Window Sill inside: Supplying & laying


Marble sill (inside) of 130mm or below width as per
the approved shop drawings preparing the surface
set in CM (1:5) bedding or backing, to the required the rate of 0.5kg /sft.
levelling, lining, matching the
stone patterns, polishing, laying of protection sheet,
curing, wastage etc. as mentioned in item I.a.
1h complete as per the drawings and as directed by RFT 400 146.6 58,640 - - - - -
Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in RFT )
level with 5mm pencil round for both top and bottom
of marble edges with a projection of marble 5mm
from face of wall. Scope includes unloading, shifting,
lifting, laying, and pouring of white cement slurry at

Laying of marble 50% 73.3 - - - - - -


3 Coats of Polishing with resin filling , Protection sheet laying 20% 29.32 - - - - - -
Balance 4 Coats of Polishing with resin filling 20% 29.32 - - - - - -
Handing Over 10% 14.66 - - - - - -

Marble Window Sill (full width): Supplying & laying


of Marble sill 270mm or below width as per the
approved shop drawings. Marble shall be placed in
CM (1:5) with slope towards outside. Marble shall be
be made even and flat by grinding and polishing the
material up to 2mm. pencil round for both top and
bottom of marble edges with a projection of marble
5mm from face of wall on either sides. Scope
1i includes unloading, shifting, lifting, laying, and RFT 1,918 293.4 562,817 - - - - -
pouring of white cement slurry at the rate of 0.5kg
/sft. levelling, lining, matching the stone patterns,
polishing, laying of protection sheet, curing, wastage
etc. as mentioned in item I.a. complete as per the
drawings and as directed by Architects/Engineer in
charge.
(Mode of measurement: As per approved shop
drawings in RFT)

Laying of marble 50% 146.7 - 577.57 84,729 - - 577.57 84,729


3 Coats of Polishing with resin filling , Protection sheet laying 20% 58.68 - 140.66 8,254 - - 140.66 8,254
Balance 4 Coats of Polishing with resin filling 20% 58.68 - - - - - -
Handing Over 10% 29.34 - - - - - -
As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks

Marble Coping at balcony’s: Supplying & laying of


160mm or below width Marble coping as per the
approved shop drawings preparing the surface set in
CM (1:5) bedding or backing, to the required level
with 5mm pencil round for both top and bottom of
marble edges with a projection of marble 5mm from
face of wall/tile on either sides. Scope includes
unloading, shifting, lifting, laying, and pouring of
1j
white cement slurry at the rate of 0.5kg /sft.
RFT -354 149.75 -53,028 - - - - -
Levelling, lining, matching the stone patterns,
polishing, laying of protection sheet, curing, wastage
e.t.c. as mentioned in item I.a. complete as per the
drawings and as directed by Architects/Engineer in
charge.
(Mode of measurement: As per approved shop
drawings in RFT)

Laying of marble 50% 74.875 - 490.83 36,751 - - 490.83 36,751


3 Coats of Polishing with resin filling , Protection sheet laying 20% 29.95 - 137.00 4,103 - - 137.00 4,103
Balance 4 Coats of Polishing with resin filling 20% 29.95 - - - - - -
Handing Over 10% 14.975 - - - - - -
Marble Coping at balcony GRC area: Supplying &
laying of 40mm or below width Marble coping with a
base granite strip of 25mm fixed with adhesive at
either sides of balcony as per the approved shop
drawings preparing the surface set in adhesive
bedding or backing, to the required level with 5mm
pencil round for both top and bottom of marble edges
with a projection of marble 5mm from face of the
wall/tile on either sides. Scope includes unloading,
1k shifting, lifting, laying, Levelling, lining, matching the RFT 1,640 459.8 754,072 - - - - -
stone patterns, polishing, laying of protection sheet,
curing, wastage etc. as mentioned in item I.a.
complete as per the drawings and as directed by
Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in RFT)

Laying of marble 50% 229.9 - - - - - -


3 Coats of Polishing with resin filling , Protection sheet laying 20% 91.96 - - - - - -
Balance 4 Coats of Polishing with resin filling 20% 91.96 - - - - - -
Handing Over 10% 45.98 - - - - - -
As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks

Marble Coping at Pooja Room: Supplying & laying


of 250mm or below width Marble coping as per the
approved shop drawings preparing the surface set in
CM (1:5) bedding or backing, to the required level
with 5mm pencil round for both top and bottom of
marble edges with a projection of marble 5mm from
face of the wall for both cutout as well as pooja side.
Scope includes unloading, shifting, lifting, laying,
1l and pouring of white cement slurry at the rate of RFT 266 194 51,529 - - - - -
0.5kg /sft. Levelling, lining, matching the stone
patterns, polishing, laying of protection sheet, curing,
wastage etc. as mentioned in item I.a. complete as
per the drawings and as directed by
Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in RFT)

Laying of marble 50% 97 - 17.01 1,650 - - 17.01 1,650


3 Coats of Polishing with resin filling , Protection sheet laying 20% 38.8 - 10.27 399 - - 10.27 399
Balance 4 Coats of Polishing with resin filling 20% 38.8 - - - - - -
Handing Over 10% 19.4 - - - - - -

Marble Flooring at Entrance: Supplying and laying


of Marble flooring as per the approved shop
drawings with an overlapping of 50mm on riser as
double patti with mitre joint at the corner and pencil
round at both top and bottom of double patti set in
CM (1:5) 50 thk.or as required at site. Scope
includes unloading, shifting, lifting, laying, pouring of
1m SFT 7,427 386 2,866,909 - - - - - OB
white cement slurry at the rate of 0.5kg/sft, levelling,
lining, matching the stone patterns, polishing, laying
of protection sheet, curing, wastage etc. as
mentioned in item I.a. complete as per the drawings
and as directed by Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in sft )

Delivery of marble 70% 270.2 - - - - - - OB


Laying of marble 12.50% 48.25 - 148.41 7,161 - - 148.41 7,161
Polishing with resin filling 5% 19.3 - 74.21 1,432 - - 74.21 1,432
Handing Over 12.50% 48.25 - - - - - -
As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks

Marble Skirting at Entrance: Supplying & laying of


100 mm wide marble skirting at entrance area as per
the approved shop drawings flush in backing in CM
(1:3) 20 thk. or as required at site. Scope includes
fixing of PVC profile with smooth finished edge at
corners, unloading, shifting ,lifting, laying, levelling,
1n RFT 150 130.8 19,572 - - - - -
lining, matching the stone patterns, polishing, laying
of protection sheet, curing ,wastage etc. as
mentioned in item I.a complete as per the drawings
and as directed by Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in Rft ).

Laying of marble 50% 65.4 - 10.77 704 - - 10.77 704


3 Coats of Polishing with resin filling , Protection sheet laying 20% 26.16 - 5.38 141 - - 5.38 141
Balance 4 Coats of Polishing with resin filling 20% 26.16 - - - - - -
Handing Over 10% 13.08 - - - - - -

Marble Tread at Entrance: Supplying and laying of


Marble tread of size 320mm or below width for
entrance steps as per the approved shop drawings
with overlapping of 50mm on riser as double patti as per approved shop
drawings in Rft )
with a pencil round and mitre joint at the corner set
in CM (1:5) 50 thk.or as required at site. Scope
1o RFT 222 361.6 80,400 - - - - -
includes unloading ,shifting ,lifting, laying, pouring of
white cement slurry at the rate of 0.5kg/sft, levelling,
lining, matching the stone patterns, polishing, laying
of protection sheet, curing ,wastage etc. as
mentioned in item I.a. complete as per the drawings
and as directed by Architects/Engineer in charge
(Mode of measurement:

Laying of marble 50% 180.8 - 11.52 2,084 - - 11.52 2,084


3 Coats of Polishing with resin filling , Protection sheet laying 20% 72.32 - 5.76 417 - - 5.76 417
Balance 4 Coats of Polishing with resin filling 20% 72.32 - - - - - -
Handing Over 10% 36.16 - - - - - -

Marble Riser at Entrance: Supplying & Laying of


Marble riser of 170mm or below height at entrance
as per the approved shop drawings, set in CM (1:3)
20 thk. or required at site. Scope includes unloading,
shifting, lifting, laying, Levelling, lining, matching the
1p stone patterns, polishing, laying of protection sheet, RFT 333 147 49,012 - - - - -
curing, wastage etc. as mentioned in item I.a.
complete as per the drawings and as directed by
Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in Rft )

Laying of marble 50% 73.5 - 17.29 1,271 - - 17.29 1,271


3 Coats of Polishing with resin filling , Protection sheet laying 20% 29.4 - 8.64 254 - - 8.64 254
Balance 4 Coats of Polishing with resin filling 20% 29.4 - - - - - -
As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks
Handing Over 10% 14.7 - - - - - -

Entrance marble coping/cladding: Supplying &


laying of Marble coping up to 150mm wide with a
pencil round and mitre joint at corners on either sides
as per the approved shop drawings. Marble shall be (Mode of
measurement: As per approved shop
drawings in RFT)
1q fixed using Adhesive as per clause 4c. Scope RFT 113 252 28,456 - - - - -
includes unloading, shifting, lifting, laying, Levelling,
lining, matching the stone patterns, polishing, laying
of protection sheet, curing, wastage etc.as
mentioned in item I.a. complete as per the drawings
and as directed by Architects/Engineer in charge.

Laying of marble 50% 126 - 8.60 1,083 - - 8.60 1,083


3 Coats of Polishing with resin filling , Protection sheet laying 20% 50.4 - 4.30 217 - - 4.30 217
Balance 4 Coats of Polishing with resin filling 20% 50.4 - - - - - -
Handing Over 10% 25.2 - - - - - -

Entrance Step Side Marble cladding: Supplying &


laying of Marble cladding with pencil round and mitre
joint at corners as per the approved shop drawings
preparing the surface and fixing the marble using
adhesive as per clause 4c., Scope includes
unloading, shifting, lifting, laying, levelling, lining,
1r SFT 3,135 386 1,210,044 - - - - - OB
matching the stone patterns, polishing, laying of
protection sheet, curing, wastage etc. as mentioned
in item I.a. complete as per the drawings and as
directed by Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in SFT)

Delivery of marble 70% 270.2 - - - - - - OB


Laying of marble 12.50% 48.25 - 61.61 2,973 - - 61.61 2,973
Polishing with resin filling 5% 19.3 - 30.81 595 - - 30.81 595
Handing Over 12.50% 48.25 - - - - - -
As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks
Giorgio Armani 16 mm Thick
Marble Characteristics: Dark grey based having
white streaks Almost nil pitting cracks and unequal
patches/colours.
Finish: For flooring marble shall be pre polished with
antique finish and all other activities other than
flooring shall be only pre polished.
All marble slabs shall be resin filled on both sides
and protected by fibre mesh on the rear side.
i) Preparation and submission of shop drawings.
ii) Joint filling with Tenax or Jelly.
II iii) Protection of marble with Dura protector XF or - - - - - -
equivalent 4mm thk and handing over for other
activities..
iv) On instructions of engineer, removal of
protection sheet and proceeding with balance
activities including joint filling by tenax.
v) Disposal of broken/cutting marble, polishing
residue etc. at a specified allotted area.
And all other activities complete for the finished item
of work.

Toilet Marble Flooring: Supplying & Laying of pre


polished (antique finish) Marble flooring for toilets set
in CM (1:5) 50 thk. or required at site ,.preferably
single slab at shower area with an overlap of 10mm
at a joint of shower and dry area making pencil
round, edge polish at shower face of the marble as
per the approved shop drawings. For marble
IIa between toilet entrance and bedroom a tile drop of SFT 96,772 513.75 49,716,609 - - - - - AG
9mm shall be maintained. Scope includes unloading,
shifting, lifting, laying, levelling, lining, matching the
stone patterns, laying of protection sheet, curing,
wastage etc. complete as per the drawings and as
directed by Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in SFT).

Delivery of marble 60% 308.25 - 49,663.16 15,308,669 - - 49,663.16 15,308,669 AG


Laying of marble 20% 102.75 - 11,296.71 1,160,737 - - 11,296.71 1,160,737
Grouting ,Protection Sheet laying 10% 51.375 - 6,538.16 335,898 - - 6,538.16 335,898
Handing Over 10% 51.375 - - - - - -
Ledge wall coping: Supplying & laying of 150mm
or below width pre polished marble coping as per
the approved shop drawings preparing the surface
set in CM (1:5) 50mm thk or as required at site
bedding or backing, consists of 5mm pencil round
and a mitre at corner connecting with the marble
cladding . Scope includes unloading, shifting, lifting,
IIb laying. Levelling, lining, matching the stone RFT 581 177 102,858 - - - - -
patterns, laying of protection sheet, curing, wastage
etc. as mentioned in item II.a. Complete as per the
drawings and as directed by Architects/Engineer in
charge.
(Mode of measurement: As per approved shop
drawings in RFT)

Laying of marble 50% 88.5 - 97.61 8,638 - - 97.61 8,638


As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks
Grouting ,Protection Sheet laying/ Resin filling 20% 35.4 - 63.65 2,253 - - 63.65 2,253
Final Finishing and cleaning 20% 35.4 - - - - - -
Handing Over 10% 17.7 - - - - - -
Ledge wall cum sill coping: Supplying & laying of
250mm or below width pre polished marble coping
for sill cum ledge wall as per the approved shop
drawings preparing the surface set set in CM (1:5) lifting, laying.
Levelling, lining, matching the stone
patterns, laying of protection sheet, curing, wastage
etc. as mentioned in item II.a. Complete as per the
IIc drawings and as directed by Architects/Engineer in RFT 308 227.1 69,833 - - - - -
charge.
(Mode of measurement: As per approved shop
drawings in RFT)

50mm thk as required at site consists of 5mm pencil


round and a mitre at corner connecting with the
marble cladding. Scope includes unloading, shifting,
Laying of marble 50% 113.55 - - - - - - -
Grouting ,Protection Sheet laying/ Resin filling 20% 45.42 - - - - - -
Final Finishing and cleaning 20% 45.42 - - - - - -
Handing Over 10% 22.71 - - - - - -

Ledge wall marble cladding: Supplying & laying of


pre polished marble cladding as per the approved
shop drawings preparing the surface and fixing the
marble using adhesive as per clause 4c. Consists
of 5mm pencil round and mitre joint at the corner
connecting with ledge wall coping. Scope includes
unloading, shifting, lifting, and laying. Levelling,
IId SFT 6,913 543 3,753,943 - - - - - AG
lining, matching the stone patterns, laying of
protection sheet, curing, wastage etc. as mentioned
in item II.a complete as per the drawings and as
directed by Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in SFT)

Delivery of marble 60% 325.8 - - - - - - AG


Laying of marble 20% 108.6 - 4,259.93 462,628 - - 4,259.93 462,628
Grouting ,Protection Sheet laying 10% 54.3 - 2,525.85 137,154 - - 2,525.85 137,154
Handing Over 10% 54.3 - - - - - -
As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks

Ventilator Jambs: Supplying & laying of 140mm or


below width pre polished marble jambs all-round the
ventilator as per approved shop drawings preparing
the surface and fixing the marble using adhesive as
per clause 4c.Consists of 5mm pencil round for both
edges of marble with 5mm marble projection from
the face of tile cladding all-round the ventilator.
IIe Scope includes unloading, shifting, lifting, and RFT 2,010 129.6 260,466 - - - - -
laying. Levelling, lining, matching the stone patterns,
laying of protection sheet, curing, wastage etc. as
mentioned in item II.a. Complete as per the drawings
and as directed by Architects/Engineer in charge.
(Mode of measurement: As per approved shop
drawings in RFT with the centreline method
measurement)

Laying of marble 50% 64.8 - 391.99 25,401 - - 391.99 25,401


Grouting ,Protection Sheet laying/ Resin filling 20% 25.92 - 247.86 6,424 - - 247.86 6,424
Final Finishing and cleaning 20% 25.92 - - - - - -
Handing Over 10% 12.96 - - - - - -

Door Jambs: Supplying & laying of 90mm or below width pre polished
marble jambs all-round the door as per the approved shop drawings
preparing the surface and fixing the marble using adhesive as per clause
4c. Consists of 5mm pencil round for both edges of marble with 5mm
marble projection from the face of tile cladding all-round the door. Scope
IIf RFT 1,427 134.4 191,744 - - - - -
includes unloading, shifting, lifting, laying. Levelling, lining, matching the
stone patterns, laying of protection sheet, curing, wastage etc. as
mentioned in item II.a. Complete as per the drawings and as directed by
Architects/Engineer in charge. (Mode of measurement: As per approved
shop drawings in RFT with the centreline method measurement)

Laying of marble 50% 67.2 - 868.33 58,352 - - 868.33 58,352


Grouting ,Protection Sheet laying/ Resin filling 20% 26.88 - 524.28 14,093 - - 524.28 14,093
Final Finishing and cleaning 20% 26.88 - - - - - -
Handing Over 10% 13.44 - - - - - -

Marble Grating: Supplying & fixing of 100mm or below width pre


polished Marble inlay in SS gratings with adhesive as per Clause 4c.
Consists of smooth finished edge at corners of the marble as per the
approved shop drawings. Scope includes unloading, shifting, lifting, and
IIg RFT 179 182.4 32,666 - - - - -
laying. Levelling, lining, matching the stone patterns, laying of protection
sheet, curing, wastage etc. Complete as per the drawings and as directed
by Architects/Engineer in charge. (Mode of measurement: As per
approved shop drawings in RFT)

Laying of marble 50% 91.2 - - - - - -


Grouting ,Protection Sheet laying/ Resin filling 20% 36.48 - - - - - -
Final Finishing and cleaning 20% 36.48 - - - - - -
Handing Over 10% 18.24 - - - - - -
As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks

Rome Traventine 16 mm Thick Marble Characteristics: Beige color-


based stone. Entire marble shall be color less resin filled, polished and
protected by fibre mesh on the rear side. i) Preparation and submission of
shop drawings. ii) Joint filling shall be done with color less UV resistant
III joint filler of reputed brand. iii) Wherever joining of two pieces are - - - - - -
required epoxy-based adhesive which is UV resistant and colourless shall
be used. iv) Disposal of broken/cutting marble, polishing residue etc. at a
specified allotted area. And all other activities complete for the finished
item of work.

Elevation cladding: Supplying & laying of pre polished marble cladding as


per approved shop drawings, having projection 10-20mm from the face of
the marble and mitre joint at every corner. Marble shall be fixed using
Adhesive as per Clause 4 C. Marble shall be made free of dust and
IIIa complying to manufactures requirement prior to application of adhesive - - - - - -
both on wall and marble. After cutting of marble any pores /gaps shall be
filled with colourless resin prior to fixing of marble. Stones will be
required to be fixed by additional stone strips of size 16mmx30mm as per
design. The same will be paid under separate item in Rft basis. Scope
includes unloading, shifting, lifting, and laying. Levelling, lining,
matching the stone patterns, curing, wastage etc. complete as per the
drawings and as directed by Architects/Engineer in charge. (Mode of
measurement: As per approved shop drawings in SFT & RFT)
1 1) Marble fixed with 3-5mm thk adhesive. SFT 49,810 637 31,728,731 - - - - - RT

Delivery of marble 60% 382.2 - 61,866.00 23,645,185 - 61,866 23,645,185 RT


Laying of marble 25% 159.25 - 35,786.29 5,698,967 - - 35,786.29 5,698,967
Grouting ,Protection Sheet laying 5% 31.85 - 9,231.32 294,018 - - 9,231.32 294,018
Handing Over 10% 63.7 - - - - - -
2 2) Marble fixed up to 15mm thk adhesive SFT 14,563 637 9,276,729 - - - - - RT

Delivery of marble 60% 382.2 - 18,204.00 6,957,569 - 18,204 6,957,569 RT


Laying of marble 25% 159.25 - - - - - -
Grouting ,Protection Sheet laying 5% 31.85 - - - - - -
Handing Over 10% 63.7 - - - - - -
3 3) Marble fixed up to 25mm thk adhesive SFT 14,215 637 9,055,092 - - - - - RT

Delivery of marble 60% 382.2 - 13,624.16 5,207,154 - - 13,624 5,207,154 RT


Laying of marble 25% 159.25 - - - - - -
Grouting ,Protection Sheet laying 5% 31.85 - - - - - -
Handing Over 10% 63.7 - - - - - -

4) Cutting and fixing of marble strips behind above marble using approved
4 RFT 5,188 122.1 633,394 - - - - -
adhesive

Laying of marble 50% 61.05 - - - - - -


Grouting ,Protection Sheet laying/ Resin filling 20% 24.42 - - - - - -
Final Finishing and cleaning 20% 24.42 - - - - - -
Handing Over 10% 12.21 - - - - - -
As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks
5) Window Sill jambs: Supplying & laying window Marble jambs
(outside) of 130mm or required width all-round the window as per the
approved shop drawings preparing the surface set in Adhesive as per
Clause 4 C to the required level with a mitre joint and pencil round
meeting external marble cladding level. Scope includes unloading,
5 shifting, lifting, laying, levelling, lining, matching the stone patterns, RFT 1,032 210.3 217,121 - - - - -
curing, wastage etc. as mentioned in item III. complete as per the drawings
and as directed by Architects/Engineer in charge. (Mode of measureement:
As per approved shop
drawings in RFT )

Laying of marble 50% 105.15 - 417.69 43,920 - - 417.69 43,920


Grouting ,Protection Sheet laying/ Resin filling 20% 42.06 - - - - - -
Final Finishing and cleaning 20% 42.06 - - - - - -
Handing Over 10% 21.03 - - - - - -

6)Marble Termination: Supplying & laying Marble end termination of


section 55xx50mm U shaped as per the approved shop drawings preparing
the surface fill in Adhesive as per Clause 4 c , to the required level with a
pencil round and mitre joint at corner.. Scope includes unloading, shifting,
6 RFT 123 482.4 59,152 - - - - -
lifting, laying, levelling, lining, matching the stone patterns, curing,
wastage etc. as mentioned in item III. complete as per the drawings and as
directed by Architects/Engineer in charge. (Mode of measurement: As per
approved shop drawings in RFT )

Laying of marble 50% 241.2 - 174.89 42,182 - - 174.89 42,182


Grouting ,Protection Sheet laying/ Resin filling 20% 96.48 - - - - - -
Final Finishing and cleaning 20% 96.48 - - - - - -
Handing Over 10% 48.24 - - - - - -

Marino Traventine 16 mm Thick Marble Characteristics: Beige color-


based stone. Entire marble shall be color less resin filled, polished and
protected by fibre mesh on the rear side. i) Preparation and submission of
shop drawings. ii) Joint filling shall be done with colour less UV resistant
IV joint filler of reputed brand. iii) Wherever joining of two pieces are - - - - - -
required epoxy-based adhesive which is UV resistant and colourless shall
be used. iv) Disposal of broken/cutting marble, polishing residue etc. at a
specified allotted area. And all other activities complete for the finished
item of work.
As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks

Elevation cladding: Supplying & laying of pre polished marble cladding as


per approved shop drawings, having projection 10-20mm from the face of
the marble and mitre joint at every corner. Marble shall be fixed using
Adhesive as per Clause 4 C.. Marble shall be made free of dust and
complying to manufactures requirement prior to application of adhesive
both on wall and marble. After cutting of marble any pores /gaps shall be
Iva filled with colourless resin prior to fixing of marble. Stones will be - - - - - -
required to be fixed by additional stone strips of size 16mmx30mm as per
design. The same will be paid under separate item in Rft basis. Scope
includes unloading, shifting, lifting, and laying. Levelling, lining,
matching the stone patterns, curing, wastage etc. complete as per the
drawings and as directed by Architects/Engineer in charge. (Mode of
measurement: As per approved shop drawings in SFT)

1) Marble fixed with 3-5mm thk adhesive. SFT 49,810 637 31,728,731 - - - - - MT

Delivery of marble 60% 382.2 - 49,809.62 19,037,238 - 49,809.62 19,037,238 MT


Laying of marble 25% 159.25 - - - - - -
Grouting ,Protection Sheet laying 5% 31.85 - - - - - -
Handing Over 10% 63.7 - - - - - -
2) Marble fixed up to15mm thk adhesive SFT 14,563 637 9,276,729 - - - - - MT

Delivery of marble 60% 382.2 - 13,908.31 5,315,756 - - 13,908.31 5,315,756 MT


Laying of marble 25% 159.25 - - - - - -
Grouting ,Protection Sheet laying 5% 31.85 - - - - - -
Handing Over 10% 63.7 - - - - - -
3) Marble fixed up to 25mm thk adhesive. SFT 14,215 637 9,055,092 - - - - - MT

Delivery of marble 60% 382.2 - - - - - - MT


Laying of marble 25% 159.25 - - - - - -
Grouting ,Protection Sheet laying 5% 31.85 - - - - - -
Handing Over 10% 63.7 - - - - - -

4) Cutting and fixing of marble strips behind above marble using approved
RFT 5,188 122.1 633,394 - - - - -
adhesive.

Laying of marble 50% 61.05 - - - - - -


Grouting ,Protection Sheet laying/ Resin filling 20% 24.42 - - - - - -
Final Finishing and cleaning 20% 24.42 - - - - - -
Handing Over 10% 12.21 - - - - - -
As per Work Order Up to Previous Bill This Bill Cummulative Remarks
Sl. No DESCRIPTION Units
Quantity Rate Amount Qty Amount Qty Amount Qty Amount Remarks

5) Window Sill jambs: Supplying & laying window Marble jambs


(outside) of 130mm or required width all-round the window as per the
approved shop drawings preparing the surface set in Adhesive as per
Clause 4 C to the required level with a mitre joint and pencil round
meeting external marble cladding level. Scope includes unloading, RFT 1,032 210.3 217,121 - - - - -
shifting, lifting, laying, levelling, lining, matching the stone patterns,
curing, wastage etc. as mentioned in item IV. Complete as per the
drawings and as directed by Architects/Engineer in charge. (Mode of
measurement: As per approved shop drawings in RFT )

Laying of marble 50% 105.15 - - - - - -


Grouting ,Protection Sheet laying/ Resin filling 20% 42.06 - - - - - -
Final Finishing and cleaning 20% 42.06 - - - - - -
Handing Over 10% 21.03 - - - - - -

6)Marble Termination: Supplying & laying Marble end termination of


section 55xx50mm U shaped as per the approved shop drawings preparing
the surface fill in fill in Adhesive as per Clause 4 c to the required level
with a pencil round and mitre joint at corner.. Scope includes unloading,
RFT 123 482.4 59,152 - - - - -
shifting, lifting, laying, levelling, lining, matching the stone patterns,
curing, wastage etc. as mentioned in item IV.. Complete as per the
drawings and as directed by Architects/Engineer in charge. (Mode of
measurement: As per approved shop drawings in RFT )

Laying of marble 50% 241.2 - - - - - -


Grouting ,Protection Sheet laying/ Resin filling 20% 96.48 - - - - - -
Final Finishing and cleaning 20% 96.48 - - - - - -
Handing Over 10% 48.24 - - - - - -
Grand Total 351,503,311 140,659,569 1,641,542 142,301,111

Enclosures: - Measurement Sheets


is Attached Contractor Prepared Checked Accepted Accountant Project Incharge
V_163 V_164 V_165 V_166 V_106 V_124 V_125 V_126 V_154 V_155 V_167 V_187 V_189
Sl. No DESCRIPTION Units
W1 W1 W1 W1 W2 W2 W2 W2 W2 W2 W2 W2 W2

A OTTOMAN BEIGE 16 mm Thick: - - - - -

1a Marble Flooring SFT 1,271.55 1,271.55 1,271.55 1,271.55 1,506.42 - - 1,506.42 1,506.42 1,506.42 1,506.42 1,506.42

1b Skirting RFT 260.53 260.53 260.53 260.53 268.24 - - 268.24 268.24 268.24 268.24 268.24

1c Staircase Flooring at midlanding Sft 45.21 45.21 45.21 45.21 45.21 - - - 45.21 45.21

1d Marble Riser: 150mm RFT 157.44 157.44 157.44 157.44 157.44 - - - 157.44 157.44

1e Marble Tread: RFT 137.76 137.76 137.76 137.76 137.76 - - - 137.76 137.76

1f Staircase Skirting 01 RFT 94.99 94.99 94.99 94.99 94.99 - - - 94.99 94.99

1g Staircase Skirting 02 RFT 63.76 63.76 63.76 63.76 63.76 - - - 63.76 63.76

1h Marble Window Sill inside: 130 mm RFT - - - - - - - - - -

1i Marble Window Sill (full width): RFT 23.78 23.78 23.78 23.78 71.34 - - - 71.34 71.34

1j Marble Coping at balcony’s: RFT 49.00 49.00 49.00 49.00 49.00 - - - 49.00 49.00

1k Marble Coping at balcony GRC area: RFT - - - - - - - -

1l Marble Coping at Pooja Room: RFT 6.92 6.92 6.92 6.92 6.92 - 6.92 6.92
V_163 V_164 V_165 V_166 V_106 V_124 V_125 V_126 V_154 V_155 V_167 V_187 V_189
Sl. No DESCRIPTION Units
W1 W1 W1 W1 W2 W2 W2 W2 W2 W2 W2 W2 W2

1m Marble Flooring at Entrance: SFT

1n Marble Skirting at Entrance: RFT

1o Marble Tread at Entrance: 320mm RFT

1p Marble Riser at Entrance: 170mm RFT

1q Entrance marble coping/cladding: 150mm RFT

1r Entrance Step Side Marble cladding: SFT

B Giorgio Armani 16 mm Thick - - - - - - -

IIa Toilet Marble Flooring: SFT 257.80 257.80 257.80 257.80 288.69 288.69 288.69 288.69 288.69 288.69 288.69

IIb Ledge wall coping RFT 14.86 14.86 14.86 14.86 12.86 12.86 12.86 12.86 12.86 12.86 12.86

IIc Ledge wall cum sill coping RFT - - - - - - - - - - -

IId Ledge wall marble cladding: SFT 114.96 114.96 114.96 114.96 112.48 112.48 112.48 112.48 112.48 112.48 112.48

IIe Ventilator Jambs: 140 mm RFT 47.23 47.23 47.23 47.23 12.30 12.30 12.30 12.30 12.30 12.30 12.30

IIf Door Jambs: 90mm RFT 91.02 91.02 91.02 91.02 91.02 91.02 91.02 91.02 91.02 91.02 91.02

IIg Marble Grating: RFT -

C Rome Traventine 16 mm Thick Marble - - - - - -

III External Cladding Rome Traventine 16 mm Sft 685.35 685.35 685.35 717.50 717.50 717.50 717.50

4 4) Cutting and fixing of marble strips behind above marble RFT - - - - - -

5 5) Window Sill jambs: RFT 39.37 39.37 39.37 39.37 39.37 39.37 39.37

6 6)Marble Termination: 55xx50mm U RFT 10.70 10.70 10.70 10.70 10.70 10.70 10.70
V_08 V_23 V_152 V_114 V_115 V_174 V_216 V_101 V_102 V_103 V_104 V_02 V_03 V_05
Sl. No DESCRIPTION
W3 W3 W5 E2 E2 E2 E3 E11 E11 E10 E14 E18 E18 E18

A OTTOMAN BEIGE 16 mm Thick: - - - - - - - -

1a Marble Flooring 1,961.74 1,520.74 1,371.87 1,371.87 1,371.87 2,035.90 1,089.86 1,089.86 829.37 856.60 2,111.57 2,111.57 2,111.57

1b Skirting 451.85 329.25 419.58 419.58 419.58 414.69 327.21 327.21 231.24 205.13 427.61 427.61 427.61

1c Staircase Flooring at midlanding 46.07 46.07 45.21 45.21 44.99 44.99 68.46 55.11 47.79 47.79 47.79

1d Marble Riser: 150mm 157.44 157.44 157.44 157.44 157.44 157.44 157.44 141.70 157.44 157.44 157.44

1e Marble Tread: 137.76 137.76 137.76 137.76 137.76 137.76 137.76 123.98 137.76 137.76 137.76

1f Staircase Skirting 01 97.78 97.78 94.99 94.99 116.87 116.87 103.91 99.97 91.38 91.38 91.38

1g Staircase Skirting 02 63.76 63.76 63.76 63.76 63.76 63.76 63.76 63.76 63.76 63.76 63.76

1h Marble Window Sill inside: 130 mm - - - - - - - - -

1i Marble Window Sill (full width): 22.14 - 78.23 78.23 62.98 61.01 - 103.81

1j Marble Coping at balcony’s: 55.04 - 62.25 62.25 61.73 56.12 - 60.09

1k Marble Coping at balcony GRC area: - - - - - - -

1l Marble Coping at Pooja Room: 8.63 - - - - - - -


V_08 V_23 V_152 V_114 V_115 V_174 V_216 V_101 V_102 V_103 V_104 V_02 V_03 V_05
Sl. No DESCRIPTION
W3 W3 W5 E2 E2 E2 E3 E11 E11 E10 E14 E18 E18 E18

1m Marble Flooring at Entrance: 41.23 41.23

1n Marble Skirting at Entrance: 14.96 14.96

1o Marble Tread at Entrance: 320mm 16.01 16.01

1p Marble Riser at Entrance: 170mm 24.01 24.01

1q Entrance marble coping/cladding: 150mm 11.94 11.94

1r Entrance Step Side Marble cladding: 17.11 17.11

B Giorgio Armani 16 mm Thick - - - - - -

IIa Toilet Marble Flooring: 328.19 328.19 278.79 301.82 301.82 301.82 281.59 281.59 233.04 190.74 382.66 382.66 382.66

IIb Ledge wall coping 24.50 24.50 21.68 3.21 3.21 3.21 5.81 5.81 11.51 10.00 5.71 5.71 5.71

IIc Ledge wall cum sill coping - - - - - - - - - - - - -

IId Ledge wall marble cladding: 101.72 101.72 74.59 115.93 115.93 115.93 96.88 96.88 55.54 73.41 152.96 152.96 152.96

IIe Ventilator Jambs: 140 mm 70.85 70.85 59.04 47.23 47.23 47.23 59.04 59.04 59.04 47.23 70.85 70.85 70.85

IIf Door Jambs: 90mm 109.22 109.22 91.02 91.02 91.02 91.02 91.02 91.02 91.02 72.82 109.22 109.22 109.22

IIg Marble Grating:

C Rome Traventine 16 mm Thick Marble - - - - - - - - - -

III External Cladding Rome Traventine 16 mm 730.36 730.36 347.20 498.69 328.79 328.79 350.79 499.15 499.15 499.15

4 4) Cutting and fixing of marble strips behind above marble - - - - - - - -

5 5) Window Sill jambs: 35.43 35.43 14.76 15.75 14.76 14.76 14.76 15.75 15.75 15.75

6 6)Marble Termination: 55xx50mm U 10.83 10.83 10.83 10.83 NA NA NA 10.83 10.83 10.83
Certified
V_105 RR Qty_1 Qty_2
Sl. No DESCRIPTION Total Qty
E21 90% % RR SS

A OTTOMAN BEIGE 16 mm Thick: -

1a Marble Flooring 933.78 31,403.61 100% 31,403.61 31,403.61

1b Skirting 257.64 6,963.62 20% 1,392.72 5,570.90

1c Staircase Flooring at midlanding 45.42 811.24 100% 811.24 811.24

1d Marble Riser: 150mm 157.44 2,678.05 20% 535.61 2,142.44

1e Marble Tread: 137.76 2,343.30 20% 468.66 1,874.64

1f Staircase Skirting 01 97.22 1,673.49 20% 334.70 1,338.79

1g Staircase Skirting 02 63.76 1,090.35 20% 218.07 872.28

1h Marble Window Sill inside: 130 mm - - 20% - -

1i Marble Window Sill (full width): 65.93 703.31 20% 140.66 562.65

1j Marble Coping at balcony’s: 60.58 684.98 20% 137.00 547.99

1k Marble Coping at balcony GRC area: - - 20% - -

1l Marble Coping at Pooja Room: - 51.36 20% 10.27 41.09


Certified
V_105 RR Qty_1 Qty_2
Sl. No DESCRIPTION Total Qty
E21 90% % RR SS
1m Marble Flooring at Entrance: 74.21 100% 74.21 74.21

1n Marble Skirting at Entrance: 26.92 20% 5.38 21.54

1o Marble Tread at Entrance: 320mm 28.81 20% 5.76 23.05

1p Marble Riser at Entrance: 170mm 43.22 20% 8.64 34.57

1q Entrance marble coping/cladding: 150mm 21.49 20% 4.30 17.19

1r Entrance Step Side Marble cladding: 30.81 100% 30.81 30.81

B Giorgio Armani 16 mm Thick - - -

IIa Toilet Marble Flooring: 237.02 6,538.16 100% 6,538.16 6,538.16

IIb Ledge wall coping 2.89 254.61 25% 63.65 190.96

IIc Ledge wall cum sill coping - - 25% - -

IId Ledge wall marble cladding: 151.88 2,525.85 100% 2,525.85 2,525.85

IIe Ventilator Jambs: 140 mm 47.23 991.43 25% 247.86 743.57

IIf Door Jambs: 90mm 72.82 2,097.10 25% 524.28 1,572.83

IIg Marble Grating: - - -

C Rome Traventine 16 mm Thick Marble - - - -

III External Cladding Rome Traventine 16 mm 518.55 9,231.32 100% 9,231.32 9,231.32

4 4) Cutting and fixing of marble strips behind above marble - - 25% - -

5 5) Window Sill jambs: 30.51 449.14 25% 112.28 336.85

6 6)Marble Termination: 55xx50mm U NA 135.60 25% 33.90 101.70


V_39 V_123 V_163 V_164 V_165 V_166 V_35 V_37 V_106 V_107 V_108 V_124 V_125
Sl. No DESCRIPTION Units
W1 W1 W1 W1 W1 W1 W2 W2 W2 W2 W2 W2 W2

A OTTOMAN BEIGE 16 mm Thick: - - - -

1a Marble Flooring SFT 1,271.55 1,271.55 1,271.55 1,271.55 1,506.42 1,506.42 1,506.42

1b Skirting RFT 260.53 260.53 260.53 260.53 268.24 268.24 268.24

1c Staircase Flooring at midlanding Sft 45.21 45.21 45.21 45.21 45.21 45.21 45.21

1d Marble Riser: 150mm RFT 157.44 157.44 157.44 157.44 157.44 157.44 157.44

1e Marble Tread: RFT 137.76 137.76 137.76 137.76 137.76 137.76 137.76

1f Staircase Skirting 01 RFT 94.99 94.99 94.99 94.99 94.99 94.99 94.99

1g Staircase Skirting 02 RFT 63.76 63.76 63.76 63.76 63.76 63.76 63.76

1h Marble Window Sill inside: 130 mm RFT - - - - - - -

1i Marble Window Sill (full width): RFT 23.78 23.78 23.78 23.78 71.34 71.34 71.34

1j Marble Coping at balcony’s: RFT 49.00 49.00 49.00 49.00 49.00 49.00 49.00

1k Marble Coping at balcony GRC area: RFT - - - - - -

1l Marble Coping at Pooja Room: RFT 6.92 6.92 6.92 6.92 6.92
V_39 V_123 V_163 V_164 V_165 V_166 V_35 V_37 V_106 V_107 V_108 V_124 V_125
Sl. No DESCRIPTION Units
W1 W1 W1 W1 W1 W1 W2 W2 W2 W2 W2 W2 W2

1m Marble Flooring at Entrance: SFT

1n Marble Skirting at Entrance: RFT

1o Marble Tread at Entrance: 320mm RFT

1p Marble Riser at Entrance: 170mm RFT

1q Entrance marble coping/cladding: 150mm RFT

1r Entrance Step Side Marble cladding: SFT

B Giorgio Armani 16 mm Thick - - - -

IIa Toilet Marble Flooring: SFT 257.80 257.80 257.80 257.80 288.69 288.69 288.69 288.69 288.69

IIb Ledge wall coping RFT 14.86 14.86 14.86 14.86 12.86 12.86 12.86 12.86 12.86

IIc Ledge wall cum sill coping RFT - - - - - - - - -

IId Ledge wall marble cladding: SFT 114.96 114.96 114.96 114.96 112.48 112.48 112.48 112.48 112.48

IIe Ventilator Jambs: 140 mm RFT 47.23 47.23 47.23 47.23 12.30 12.30 12.30 12.30 12.30

IIf Door Jambs: 90mm RFT 91.02 91.02 91.02 91.02 91.02 91.02 91.02 91.02 91.02

IIg Marble Grating: RFT

C Rome Traventine 16 mm Thick Marble - - - - - - -

III External Cladding Rome Traventine 16 mm Sft 685.35 685.35 685.35 685.35 685.35 717.50 717.50 717.50 717.50

4 4) Cutting and fixing of marble strips behind above marble RFT - - - - - - -

5 5) Window Sill jambs: RFT 39.37 39.37 39.37 39.37 39.37 39.37 39.37 39.37 39.37

6 6)Marble Termination: 55xx50mm U RFT 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70
V_126 V_154 V_155 V_167 V_170 V_183 V_184 V_186 V_187 V_188 V_189 V_190 V_191 V_192
Sl. No DESCRIPTION
W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2

A OTTOMAN BEIGE 16 mm Thick: -

1a Marble Flooring 1,506.42 1,506.42 1,506.42 1,506.42 1,506.42 1,506.42 1,506.42 1,506.42

1b Skirting 268.24 268.24 268.24 268.24 268.24 268.24 268.24 268.24

1c Staircase Flooring at midlanding 45.21 45.21 45.21 45.21 45.21 45.21 45.21 45.21

1d Marble Riser: 150mm 157.44 157.44 157.44 157.44 157.44 157.44 157.44 157.44

1e Marble Tread: 137.76 137.76 137.76 137.76 137.76 137.76 137.76 137.76

1f Staircase Skirting 01 94.99 94.99 94.99 94.99 94.99 94.99 94.99 94.99

1g Staircase Skirting 02 63.76 63.76 63.76 63.76 63.76 63.76 63.76 63.76

1h Marble Window Sill inside: 130 mm - - - - - - - -

1i Marble Window Sill (full width): 71.34 71.34 71.34 71.34 71.34 71.34 71.34 71.34 71.34 71.34

1j Marble Coping at balcony’s: 49.00 49.00 49.00 49.00 49.00 49.00 49.00 49.00 49.00 49.00

1k Marble Coping at balcony GRC area: - - - - - -

1l Marble Coping at Pooja Room: 6.92 6.92 6.92 6.92 6.92


V_126 V_154 V_155 V_167 V_170 V_183 V_184 V_186 V_187 V_188 V_189 V_190 V_191 V_192
Sl. No DESCRIPTION
W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2

1m Marble Flooring at Entrance:

1n Marble Skirting at Entrance:

1o Marble Tread at Entrance: 320mm

1p Marble Riser at Entrance: 170mm

1q Entrance marble coping/cladding: 150mm

1r Entrance Step Side Marble cladding:

B Giorgio Armani 16 mm Thick - - - -

IIa Toilet Marble Flooring: 288.69 288.69 288.69 288.69 288.69 288.69 288.69 288.69 288.69

IIb Ledge wall coping 12.86 12.86 12.86 12.86 12.86 12.86 12.86 12.86 12.86

IIc Ledge wall cum sill coping - - - - - - - - -

IId Ledge wall marble cladding: 112.48 112.48 112.48 112.48 112.48 112.48 112.48 112.48

IIe Ventilator Jambs: 140 mm 12.30 12.30 12.30 12.30 12.30 12.30 12.30 12.30

IIf Door Jambs: 90mm 91.02 91.02 91.02 91.02 91.02 91.02 91.02 91.02

IIg Marble Grating: -

C Rome Traventine 16 mm Thick Marble - - - - - - - -

III External Cladding Rome Traventine 16 mm 717.50 717.50 717.50 717.50 717.50 717.50 717.50 717.50 717.50

4 4) Cutting and fixing of marble strips behind above marble - - - - - - - - -

5 5) Window Sill jambs: 39.37 39.37 39.37 39.37 39.37 39.37 39.37 39.37 39.37

6 6)Marble Termination: 55xx50mm U 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70
V_07 V_08 V_09 V_210 V_211 V_212 V_21 V_22 V_24 V_29 V_55 V_198 V_199 V_200
Sl. No DESCRIPTION
W3 W3 W3 W3 W3 W3 W3 W3 W8 E1 W2 E2 E2 E2

A OTTOMAN BEIGE 16 mm Thick: -

1a Marble Flooring 1,961.74 1,961.74 1,961.74

1b Skirting 451.85 451.85 451.85

1c Staircase Flooring at midlanding 46.07 46.07 46.07

1d Marble Riser: 150mm 157.44 157.44 157.44

1e Marble Tread: 137.76 137.76 137.76

1f Staircase Skirting 01 97.78 97.78 97.78

1g Staircase Skirting 02 63.76 63.76 63.76

1h Marble Window Sill inside: 130 mm - - -

1i Marble Window Sill (full width): 22.14 22.14 22.14 22.14

1j Marble Coping at balcony’s: 55.04 55.04 55.04 55.04 55.04

1k Marble Coping at balcony GRC area: - -

1l Marble Coping at Pooja Room: 8.63 8.63


V_07 V_08 V_09 V_210 V_211 V_212 V_21 V_22 V_24 V_29 V_55 V_198 V_199 V_200
Sl. No DESCRIPTION
W3 W3 W3 W3 W3 W3 W3 W3 W8 E1 W2 E2 E2 E2

1m Marble Flooring at Entrance:

1n Marble Skirting at Entrance:

1o Marble Tread at Entrance: 320mm

1p Marble Riser at Entrance: 170mm

1q Entrance marble coping/cladding: 150mm

1r Entrance Step Side Marble cladding:

B Giorgio Armani 16 mm Thick -

IIa Toilet Marble Flooring: 328.19 328.19

IIb Ledge wall coping 24.50 24.50

IIc Ledge wall cum sill coping - -

IId Ledge wall marble cladding: 101.72 101.72

IIe Ventilator Jambs: 140 mm 70.85 70.85

IIf Door Jambs: 90mm 109.22 109.22

IIg Marble Grating:

C Rome Traventine 16 mm Thick Marble - - -

III External Cladding Rome Traventine 16 mm 730.36 730.36 730.36 730.36 730.36 730.36 730.36 368.66 717.50 347.20 347.20 347.20

4 4) Cutting and fixing of marble strips behind above marble - - - - - - - - - - - -

5 5) Window Sill jambs: 35.43 35.43 35.43 35.43 35.43 35.43 35.43 14.76 39.37 14.76 14.76 14.76

6 6)Marble Termination: 55xx50mm U 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.89 10.70 10.83 10.83 10.83
V_201 V_129 V_130 V_132 V_133 V_134 V_135 V_136 V_137 V_141 V_142 V_143 V_144 V_148
Sl. No DESCRIPTION
E2 E4 E4 E2 E2 E1 E1 E1 E1 W5 W2 W2 W2 E2

A OTTOMAN BEIGE 16 mm Thick:

1a Marble Flooring 1,315.79

1b Skirting 405.31

1c Staircase Flooring at midlanding

1d Marble Riser: 150mm

1e Marble Tread:

1f Staircase Skirting 01

1g Staircase Skirting 02

1h Marble Window Sill inside: 130 mm -

1i Marble Window Sill (full width): 85.12 85.12 72.82

1j Marble Coping at balcony’s: 61.07 61.07 61.07

1k Marble Coping at balcony GRC area:

1l Marble Coping at Pooja Room:


V_201 V_129 V_130 V_132 V_133 V_134 V_135 V_136 V_137 V_141 V_142 V_143 V_144 V_148
Sl. No DESCRIPTION
E2 E4 E4 E2 E2 E1 E1 E1 E1 W5 W2 W2 W2 E2

1m Marble Flooring at Entrance:

1n Marble Skirting at Entrance:

1o Marble Tread at Entrance: 320mm

1p Marble Riser at Entrance: 170mm

1q Entrance marble coping/cladding: 150mm

1r Entrance Step Side Marble cladding:

B Giorgio Armani 16 mm Thick

IIa Toilet Marble Flooring:

IIb Ledge wall coping

IIc Ledge wall cum sill coping

IId Ledge wall marble cladding:

IIe Ventilator Jambs: 140 mm

IIf Door Jambs: 90mm

IIg Marble Grating:

C Rome Traventine 16 mm Thick Marble

III External Cladding Rome Traventine 16 mm 347.20 347.20 347.20 368.66 368.66 368.66 368.66 717.50 717.50 717.50 347.20

4 4) Cutting and fixing of marble strips behind above marble - - - - - - - -

5 5) Window Sill jambs: 14.76 14.76 14.76 14.76 14.76 14.76 14.76 39.37 39.37 39.37 14.76

6 6)Marble Termination: 55xx50mm U 10.83 10.83 10.83 10.89 10.89 10.89 10.89 10.70 10.70 10.70 10.83
V_149 V_150 V_151 V_23 V_127 V_152 V_213 V_161 V_176 V_177 V_178 V_179 V_31 V_33
Sl. No DESCRIPTION
E2 E2 E2 W3 W4 W5 W9 E1 E2 E1 E1 E1 E2 E2

A OTTOMAN BEIGE 16 mm Thick:

1a Marble Flooring 1,371.87 1,961.74 1,599.32 1,520.74 1,315.79 1,371.87

1b Skirting 419.58 451.85 439.16 329.25 405.31 419.58

1c Staircase Flooring at midlanding 46.07 45.42 45.42 45.21 45.21

1d Marble Riser: 150mm 157.44 157.44 157.44 157.44 157.44

1e Marble Tread: 137.76 137.76 137.76 137.76 137.76

1f Staircase Skirting 01 97.78 97.78 97.78 94.99 94.99

1g Staircase Skirting 02 63.76 63.76 63.76 63.76 63.76

1h Marble Window Sill inside: 130 mm - - - - -

1i Marble Window Sill (full width): 72.82 72.82 22.14 24.80 64.94 85.12 85.12 85.12 85.12 72.82

1j Marble Coping at balcony’s: 61.07 61.07 55.04 48.64 53.56 61.07 61.07 61.07 61.07 61.07

1k Marble Coping at balcony GRC area: - -

1l Marble Coping at Pooja Room: 8.04 -


V_149 V_150 V_151 V_23 V_127 V_152 V_213 V_161 V_176 V_177 V_178 V_179 V_31 V_33
Sl. No DESCRIPTION
E2 E2 E2 W3 W4 W5 W9 E1 E2 E1 E1 E1 E2 E2

1m Marble Flooring at Entrance:

1n Marble Skirting at Entrance:

1o Marble Tread at Entrance: 320mm

1p Marble Riser at Entrance: 170mm

1q Entrance marble coping/cladding: 150mm

1r Entrance Step Side Marble cladding:

B Giorgio Armani 16 mm Thick - -

IIa Toilet Marble Flooring: 328.19 278.79 279.00 279.00 279.00 279.00

IIb Ledge wall coping 24.50 21.68 3.21 3.21 3.21 3.21

IIc Ledge wall cum sill coping - - - - - -

IId Ledge wall marble cladding: 101.72 74.59 115.93 115.93 115.93 115.93

IIe Ventilator Jambs: 140 mm 70.85 59.04 47.23 47.23 47.23 47.23

IIf Door Jambs: 90mm 109.22 91.02 91.02 91.02 91.02 91.02

IIg Marble Grating:

C Rome Traventine 16 mm Thick Marble - - - - - -

III External Cladding Rome Traventine 16 mm 347.20 347.20 347.20 730.36 368.66 368.66 368.66 368.66 347.20 347.20

4 4) Cutting and fixing of marble strips behind above marble - - - - - - - - -

5 5) Window Sill jambs: 14.76 14.76 14.76 35.43 14.76 14.76 14.76 14.76 14.76 14.76

6 6)Marble Termination: 55xx50mm U 10.83 10.83 10.83 10.83 10.89 10.89 10.89 10.89 10.83 10.83
V_48 V_49 V_51 V_113 V_114 V_115 V_159 V_160 V_173 V_174 V_175 V_14 V_15 V_215
Sl. No DESCRIPTION
E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E3 E3 E3

A OTTOMAN BEIGE 16 mm Thick: - - - - -

1a Marble Flooring 1,371.87 1,371.87 1,371.87 2,035.90

1b Skirting 419.58 419.58 419.58 414.69

1c Staircase Flooring at midlanding 45.21 45.21 45.21 47.68

1d Marble Riser: 150mm 157.44 157.44 157.44 157.44

1e Marble Tread: 137.76 137.76 137.76 137.76

1f Staircase Skirting 01 94.99 94.99 94.99 94.99

1g Staircase Skirting 02 63.76 63.76 63.76 63.76

1h Marble Window Sill inside: 130 mm - - - -

1i Marble Window Sill (full width): 72.82 72.82 72.82 102.83 102.83

1j Marble Coping at balcony’s: 61.07 61.07 61.07 61.07 61.07

1k Marble Coping at balcony GRC area: - - -

1l Marble Coping at Pooja Room: - - -


V_48 V_49 V_51 V_113 V_114 V_115 V_159 V_160 V_173 V_174 V_175 V_14 V_15 V_215
Sl. No DESCRIPTION
E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E3 E3 E3

1m Marble Flooring at Entrance:

1n Marble Skirting at Entrance:

1o Marble Tread at Entrance: 320mm

1p Marble Riser at Entrance: 170mm

1q Entrance marble coping/cladding: 150mm

1r Entrance Step Side Marble cladding:

B Giorgio Armani 16 mm Thick - - - -

IIa Toilet Marble Flooring: 301.82 301.82 301.82 301.82 301.82 417.97

IIb Ledge wall coping 3.21 3.21 3.21 3.21 3.21 5.71

IIc Ledge wall cum sill coping - - - - - -

IId Ledge wall marble cladding: 115.93 115.93 115.93 115.93 115.93 150.80

IIe Ventilator Jambs: 140 mm 47.23 47.23 47.23 47.23 47.23 70.85

IIf Door Jambs: 90mm 91.02 91.02 91.02 91.02 91.02 109.22

IIg Marble Grating:

C Rome Traventine 16 mm Thick Marble - - - - -

III External Cladding Rome Traventine 16 mm 347.20 347.20 347.20 347.20 347.20 347.20 347.20 347.20 347.20 498.69 498.69

4 4) Cutting and fixing of marble strips behind above marble - - - - - - - - - - -

5 5) Window Sill jambs: 14.76 14.76 14.76 14.76 14.76 14.76 14.76 14.76 14.76 15.75 15.75

6 6)Marble Termination: 55xx50mm U 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83
V_216 V_217 V_219 V_162 V_01 V_13 V_103 V_101 V_102 V_104 V_02 V_03 V_04 V_05
Sl. No DESCRIPTION
E3 E3 E3 E5 E7 E7 E10 E11 E11 E14 E18 E18 E18 E18

A OTTOMAN BEIGE 16 mm Thick: - - - - - -

1a Marble Flooring 2,035.90 829.37 1,089.86 1,089.86 856.60 2,111.57 2,111.57

1b Skirting 414.69 231.24 327.21 327.21 205.13 427.61 427.61

1c Staircase Flooring at midlanding 47.68 68.46 44.99 44.99 55.11 47.79 47.79

1d Marble Riser: 150mm 157.44 157.44 157.44 157.44 141.70 157.44 157.44

1e Marble Tread: 137.76 137.76 137.76 137.76 123.98 137.76 137.76

1f Staircase Skirting 01 94.99 103.91 116.87 116.87 99.97 91.38 91.38

1g Staircase Skirting 02 63.76 63.76 63.76 63.76 63.76 63.76 63.76

1h Marble Window Sill inside: 130 mm - - - - - - -

1i Marble Window Sill (full width): 102.83 102.83 62.98 78.23 78.23 61.01 103.81 103.81

1j Marble Coping at balcony’s: 61.07 61.07 61.73 62.25 62.25 56.12 60.09 60.09

1k Marble Coping at balcony GRC area: - - - - -

1l Marble Coping at Pooja Room: - - - - -


V_216 V_217 V_219 V_162 V_01 V_13 V_103 V_101 V_102 V_104 V_02 V_03 V_04 V_05
Sl. No DESCRIPTION
E3 E3 E3 E5 E7 E7 E10 E11 E11 E14 E18 E18 E18 E18

1m Marble Flooring at Entrance: 41.23 41.23 41.23

1n Marble Skirting at Entrance: 14.96 14.96 14.96

1o Marble Tread at Entrance: 320mm 16.01 16.01 16.01

1p Marble Riser at Entrance: 170mm 24.01 24.01 24.01

1q Entrance marble coping/cladding: 150mm 11.94 11.94 11.94

1r Entrance Step Side Marble cladding: 17.11 17.11 17.11

B Giorgio Armani 16 mm Thick - - -

IIa Toilet Marble Flooring: 417.97 233.04 281.59 281.59 190.74 382.66 382.66 382.66 382.66

IIb Ledge wall coping 5.71 11.51 5.81 5.81 10.00 5.71 5.71 5.71 5.71

IIc Ledge wall cum sill coping - - - - - - - - -

IId Ledge wall marble cladding: 150.80 55.54 96.88 96.88 73.41 152.96 152.96 152.96 152.96

IIe Ventilator Jambs: 140 mm 70.85 59.04 59.04 59.04 47.23 70.85 70.85 70.85 70.85

IIf Door Jambs: 90mm 109.22 91.02 91.02 91.02 72.82 109.22 109.22 109.22 109.22

IIg Marble Grating:

C Rome Traventine 16 mm Thick Marble - - - - - - - - - - -

III External Cladding Rome Traventine 16 mm 498.69 498.69 498.69 585.12 585.12 350.79 328.79 328.79 499.15 499.15 499.15 499.15

4 4) Cutting and fixing of marble strips behind above marble - - - - - - - - - -

5 5) Window Sill jambs: 15.75 15.75 15.75 15.75 15.75 14.76 14.76 14.76 15.75 15.75 15.75 15.75

6 6)Marble Termination: 55xx50mm U 10.83 10.83 10.83 10.83 10.83 NA NA NA 10.83 10.83 10.83 10.83
Certified
V_06 V_105 RR Qty_1 Qty_2
Sl. No DESCRIPTION Total Qty
E18 E21 90% % RR SS

A OTTOMAN BEIGE 16 mm Thick: -

1a Marble Flooring 933.78 49,688.28 100% 49,688.28 49,688.28

1b Skirting 257.64 11,259.11 20% 2,251.82 9,007.28

1c Staircase Flooring at midlanding 45.42 1,466.32 100% 1,466.32 1,466.32

1d Marble Riser: 150mm 157.44 4,945.19 20% 989.04 3,956.15

1e Marble Tread: 137.76 4,327.04 20% 865.41 3,461.63

1f Staircase Skirting 01 97.22 3,054.61 20% 610.92 2,443.69

1g Staircase Skirting 02 63.76 2,008.54 20% 401.71 1,606.83

1h Marble Window Sill inside: 130 mm - - 20% - -

1i Marble Window Sill (full width): 65.93 2,887.83 20% 577.57 2,310.26

1j Marble Coping at balcony’s: 60.58 2,454.17 20% 490.83 1,963.33

1k Marble Coping at balcony GRC area: - - 20% - -

1l Marble Coping at Pooja Room: - 85.05 20% 17.01 68.04


Certified
V_06 V_105 RR Qty_1 Qty_2
Sl. No DESCRIPTION Total Qty
E18 E21 90% % RR SS
1m Marble Flooring at Entrance: 41.23 148.41 100% 148.41 148.41

1n Marble Skirting at Entrance: 14.96 53.84 20% 10.77 43.08

1o Marble Tread at Entrance: 320mm 16.01 57.62 20% 11.52 46.10

1p Marble Riser at Entrance: 170mm 24.01 86.43 20% 17.29 69.15

1q Entrance marble coping/cladding: 150mm 11.94 42.98 20% 8.60 34.38

1r Entrance Step Side Marble cladding: 17.11 61.61 100% 61.61 61.61

B Giorgio Armani 16 mm Thick - - -

IIa Toilet Marble Flooring: 237.02 11,296.71 100% 11,296.71 11,296.71

IIb Ledge wall coping 2.89 390.43 25% 97.61 292.82

IIc Ledge wall cum sill coping - - 25% - -

IId Ledge wall marble cladding: 151.88 4,259.93 100% 4,259.93 4,259.93

IIe Ventilator Jambs: 140 mm 47.23 1,567.95 25% 391.99 1,175.97

IIf Door Jambs: 90mm 72.82 3,473.32 25% 868.33 2,604.99

IIg Marble Grating: - - -

C Rome Traventine 16 mm Thick Marble - - - - -

III External Cladding Rome Traventine 16 mm 499.15 518.55 35,786.29 100% 35,786.29 35,786.29

4 4) Cutting and fixing of marble strips behind above marble - - - 25% - -

5 5) Window Sill jambs: 15.75 30.51 1,670.75 25% 417.69 1,253.06

6 6)Marble Termination: 55xx50mm U 10.83 NA 699.54 25% 174.89 524.66


Vertex Homes Pvt Ltd
Villa Elevation Cladding Works (JMR)

8/17/2023
L2_Mtrs/
S:No Description UOM Ele Nos L1_Mtrs L3_Mtrs Qty Remarks
Co-eff
W1 Type

A Cladding

1 South L Shape Sft 1 1 0.89 10.764 11.64 111.51 Full Ht

2 North L Shape Sft 1 1 0.85 10.764 4.17 38.15 2F Lvl

3 West Side Sft 1 1 6.7 10.764 4.17 300.74 2F Lvl

W6 Sft 1 -1 1.8 10.764 1.5 -29.06

4 Planter Sft 1 1 3.06 10.764 0.57 18.77 2F Lvl

5 West Side Sft 1 1 2.79 10.764 3.6 108.11 1F Lvl

6 West Side Sft 1 1 4.46 10.764 3.26 156.50 GF Lvl

W4 Sft 1 -1 1.2 10.764 1.5 -19.38 685.35

B Termination Patti

1 GF__Lvl Mtrs 1 1 3.26 3.281 10.70 10.70

C Window Sides -

1 W6 Mtrs 1 1 6.6 3.281 21.65

2 W4 Mtrs 1 1 5.4 3.281 17.72 39.37

W2 Type

A Cladding

1 South L Shape Sft 1 1 0.89 10.764 11.5 110.17 Full Ht

2 North L Shape Sft 1 1 0.85 10.764 4.17 38.15 2F Lvl

3 West Side Sft 1 1 7.25 10.764 4.17 325.42 2F Lvl

W6 Sft 1 -1 1.8 10.764 1.5 -29.06

4 Planter Sft 1 1 3.17 10.764 0.57 19.45 2F Lvl

5 West Side Sft 1 1 2.9 10.764 3.6 112.38 1F Lvl

6 West Side Sft 1 1 4.57 10.764 3.26 160.36 GF Lvl

W4 Sft 1 -1 1.2 10.764 1.5 -19.38 717.50

B Termination Patti

1 GF__Lvl Mtrs 1 1 3.26 3.281 10.70 10.70

C Window Sides -

1 W6 Mtrs 1 1 6.6 3.281 21.65

2 W4 Mtrs 1 1 5.4 3.281 17.72 39.37


L2_Mtrs/
S:No Description UOM Ele Nos L1_Mtrs L3_Mtrs Qty Remarks
Co-eff
W3 Type

A Cladding

1 South L Shape Sft 1 1 0.85 10.764 11.5 105.22 Full Ht

2 North L Shape Sft 1 1 0.82 10.764 4.17 36.81 2F Lvl

3 West Side Sft 1 1 5.88 10.764 4.17 263.93 2F Lvl

W6 Sft 1 -1 1.2 10.764 1.5 -19.38

4 Planter Sft 1 1 3.61 10.764 0.57 22.15 2F Lvl

5 West Side Sft 1 1 3.41 10.764 3.6 132.14 1F Lvl

6 West Side Sft 1 1 5.88 10.764 3.3 208.86 GF Lvl

W4 Sft 1 -1 1.2 10.764 1.5 -19.38 730.36

B Termination Patti

1 GF__Lvl Mtrs 1 1 3.3 3.281 10.83 10.83

C Window Sides -

1 W4 Mtrs 2 1 5.4 3.281 35.43 35.43

E1 Type

A Cladding

1 South L Shape Sft 1 1 0.99 10.764 8.18 87.17 Full Ht

2 Parapet Lvl Sft 1 1 3.76 10.764 0.66 26.71 2F Lvl

3 Planter Lvl Sft 1 1 2.76 10.764 0.56 16.64 2F Lvl

4 East Sft 1 1 2.53 10.764 3.6 98.04 1F Lvl

5 East Sft 1 1 4.3 10.764 3.32 153.67 GF Lvl

Kw3 Sft 1 -1 1.05 10.764 1.2 -13.56 GF Lvl

- 368.66

B Termination Patti

1 GF__Lvl Mtrs 1 1 3.32 3.281 10.89 10.89

C Window Sides -

1 Kw3 Mtrs 1 1 4.5 3.281 14.76 14.76


L2_Mtrs/
S:No Description UOM Ele Nos L1_Mtrs L3_Mtrs Qty Remarks
Co-eff
E2 Type

A Cladding

1 South L Shape Sft 1 1 0.81 10.764 8.2 71.49 Full Ht

2 Parapet Lvl Sft 1 1 3.8 10.764 0.5 20.45 2F Lvl

3 Planter Lvl Sft 1 1 2.69 10.764 0.74 21.43 2F Lvl

4 East Sft 1 1 2.47 10.764 3.6 95.71 1F Lvl

5 East Sft 1 1 4.27 10.764 3.3 151.68 GF Lvl

Kw3 Sft 1 -1 1.05 10.764 1.2 -13.56 GF Lvl

347.20

B Termination Patti

1 GF__Lvl Mtrs 1 1 3.3 3.281 10.83 10.83

C Window Sides -

1 Kw3 Mtrs 1 1 4.5 3.281 14.76 14.76

E3 Type

A Cladding

1 South L Shape Sft 1 1 0.91 10.764 8.17 80.03 Full Ht

2 Parapet Lvl Sft 1 1 5.33 10.764 0.68 39.01 2F Lvl

3 Planter Lvl Sft 1 1 4.23 10.764 0.57 25.95 2F Lvl

4 East Sft 1 1 4 10.764 3.6 155.00 1F Lvl

5 East Sft 1 1 6.03 10.764 3.3 214.19 GF Lvl

Kw4 Sft 1 -1 1.2 10.764 1.2 -15.50 GF Lvl

498.69

B Termination Patti

1 GF__Lvl Mtrs 1 1 3.3 3.281 10.83 10.83

C Window Sides -

1 Kw3 Mtrs 1 1 4.8 3.281 15.75 15.75


L2_Mtrs/
S:No Description UOM Ele Nos L1_Mtrs L3_Mtrs Qty Remarks
Co-eff
E7 Type

A Cladding

1 South L Shape Sft 1 1 1.04 10.764 8.1 90.68 Full Ht

2 Parapet Lvl Sft 1 1 6.52 10.764 0.68 47.72 2F Lvl

3 Planter Lvl Sft 1 1 5.02 10.764 0.57 30.80 2F Lvl

4 East Sft 1 1 4.79 10.764 3.6 185.61 1F Lvl

5 East Sft 1 1 6.92 10.764 3.3 245.81 GF Lvl

Kw4 Sft 1 -1 1.2 10.764 1.2 -15.50 GF Lvl

585.12

B Termination Patti

1 GF__Lvl Mtrs 1 1 3.3 3.281 10.83 10.83

C Window Sides -

1 Kw3 Mtrs 1 1 4.8 3.281 15.75 15.75

E10 Type

A Cladding

1 South L Shape Sft 1 1 0.92 10.764 8.2 81.20 Full Ht

2 Parapet Lvl Sft 1 1 3.01 10.764 0.68 22.03 2F Lvl

3 Planter Lvl Sft 1 1 2.59 10.764 0.57 15.89 2F Lvl

4 East Sft 1 1 2.36 10.764 3.6 91.45 1F Lvl

5 East Sft 1 1 4.29 10.764 3.33 153.77 GF Lvl

KW3 Sft 1 -1 1.05 10.764 1.2 -13.56 GF Lvl

350.79

B Termination Patti

1 Not Applicable Mtrs 1 1 0 3.281 - -

C Window Sides -

1 Kw3 Mtrs 1 1 4.5 3.281 14.76 14.76


L2_Mtrs/
S:No Description UOM Ele Nos L1_Mtrs L3_Mtrs Qty Remarks
Co-eff
E11 Type

A Cladding

1 South L Shape Sft 1 1 0.96 10.764 8.16 84.32 Full Ht

2 Parapet Lvl Sft 1 1 2.39 10.764 0.68 17.49 2F Lvl

3 Planter Lvl Sft 1 1 1.94 10.764 0.57 11.90 2F Lvl

4 East Sft 1 1 1.71 10.764 3.6 66.26 1F Lvl

5 East Sft 1 1 4.53 10.764 3.33 162.37 GF Lvl

KW3 Sft 1 -1 1.05 10.764 1.2 -13.56 GF Lvl

328.79

B Termination Patti

1 Not Applicable Mtrs 1 1 0 3.281 - -

C Window Sides -

1 Kw3 Mtrs 1 1 4.5 3.281 14.76 14.76

E18 Type

A Cladding

1 South L Shape Sft 1 1 1.02 10.764 8.17 89.70 Full Ht

2 Parapet Lvl Sft 1 1 5.14 10.764 0.68 37.62 2F Lvl

3 Planter Lvl Sft 1 1 4.04 10.764 0.57 24.79 2F Lvl

4 East Sft 1 1 3.81 10.764 3.6 147.64 1F Lvl

5 East Sft 1 1 6.05 10.764 3.3 214.90 GF Lvl

KW4 Sft 1 -1 1.2 10.764 1.2 -15.50 GF Lvl

499.15

B Termination Patti

1 GF_Lvl Mtrs 1 1 3.3 3.281 10.83 10.83

C Window Sides -

1 Kw3 Mtrs 1 1 4.8 3.281 15.75 15.75

E21 Type

A Cladding

1 South L Shape Sft 1 1 0.96 10.764 8.2 84.73 Full Ht

2 Parapet Lvl Sft 1 1 3.97 10.764 0.68 29.06 2F Lvl

3 Planter Lvl Sft 1 1 3.58 10.764 0.57 21.97 2F Lvl

4 East Sft 1 1 3.35 10.764 3.6 129.81 1F Lvl

5 East Sft 1 1 7.94 10.764 3.3 282.04 GF Lvl

KW4 Sft 1 -1 1.2 10.764 1.2 -15.50 GF Lvl

KW3 Sft 1 -1 1.05 10.764 1.2 -13.56 518.55

B Termination Patti

1 Not Applicable Mtrs 1 0 3.3 3.281 - -

C Window Sides -

1 KW4 Mtrs 1 1 4.8 3.281 15.75

2 Kw3 Mtrs 1 1 4.5 3.281 14.76 30.51


Merge Stones Qty Sheet
Excess / Balance
S:NO DESCRIPTION WO Qty De Scope Qty Final WO Qty Supplied Qty
Qty

1 ARMANI GEORGIA 118,067 -21,295 96,772 49,663.16 47,109


2 OTTMAN BEIGE 550,429 -53,917 496,512 196,514.01 299,998
3 ROME TRAVERTINE 97,790 -19,202 78,588 93,694.16 -15,106
4 MARINO TRAVERTINE 97,790 -19,202 78,588 63,717.93 14,870

"-ve sign" Indicate Excess Supplied Qty.


S:No Inv No Inv Dt Description Qty - Sqft

1 MS-289/22-23 2/16/2023 ARMANI GEORGIA 1,960.07

2 MS-290/22-23 2/16/2023 ARMANI GEORGIA 1,945.43

3 MS-293/22-23 2/22/2023 OTTMAN BEIGE 1,991.23

4 MS-294/22-23 2/22/2023 OTTMAN BEIGE 1,094.73

MS-294/22-23 2/22/2023 ARMANI GEORGIA 957.05

5 MS-303/22-23 3/2/2023 OTTMAN BEIGE 2,270.22

6 MS-304/22-23 3/2/2023 OTTMAN BEIGE 2,295.70

7 MS-309/22-23 3/7/2023 OTTMAN BEIGE 1,034.30

MS-309/22-23 3/7/2023 ARMANI GEORGIA 984.51

8 MS-310/22-23 3/7/2023 ARMANI GEORGIA 1,594.93

9 MS-312/22-23 3/13/2023 ROME TRAVERTINE 2,067.79 ###

10 MS-313/22-23 3/13/2023 ROME TRAVERTINE 1,064.56

MS-313/22-23 3/13/2023 ARMANI GEORGIA 1,017.11

11 MS-326/22-23 3/23/2023 ARMANI GEORGIA 1,906.82

13 MS-002/23-24 4/4/2023 ARMANI GEORGIA 1,929.88

14 MS-010/23-24 4/10/2023 ARMANI GEORGIA 1,994.38

15 MS-016/23-24 4/19/2023 ARMANI GEORGIA 1,895.44

16 MS-017/23-24 4/19/2023 ARMANI GEORGIA 1,474.36

17 MS-019/23-24 4/20/2023 ROME TRAVERTINE 2,165.61

18 MS-020/23-24 4/20/2023 ROME TRAVERTINE 1,596.49

19 MS-024/23-24 4/29/2023 ROME TRAVERTINE 2,328.72

20 MS-029/23-24 5/2/2023 ROME TRAVERTINE 1,725.25

21 MS-030/23-24 5/2/2023 ROME TRAVERTINE 1,827.49

22 MS-035/23-24 5/5/2023 ARMANI GEORGIA 1,986.826

23 MS-036/23-24 5/5/2023 ARMANI GEORGIA 1,225.389

OTTMAN BEIGE 998.646

24 MS-037/23-24 5/6/2023 OTTMAN BEIGE 1,798.847

25 MS-038/23-24 5/6/2023 OTTMAN BEIGE 2,112.806

26 MS-040/23-24 5/8/2023 ARMANI GEORGIA 2,197.611

27 MS-041/23-24 5/8/2023 ARMANI GEORGIA 1,201.215

ROME TRAVERTINE 936.007

28 MS-042/23-24 5/8/2023 ROME TRAVERTINE 2,141.278

29 MS-045/23-24 5/10/2023 ROME TRAVERTINE 1,217.035

30 MS-046/23-24 5/10/2023 ROME TRAVERTINE 1,433.208

31 MS-059/23-24 5/26/2023 OTTMAN BEIGE 2,280.118

32 MS-060/23-24 5/26/2023 OTTMAN BEIGE 1,609.424

33 MS-061/23-25 5/29/2023 OTTMAN BEIGE 554.819


ROME TRAVERTINE 1,760.021

34 MS-062/23-24 5/29/2023 OTTMAN BEIGE 2,086.715

35 MS-064/23-24 6/1/2023 ROME TRAVERTINE 1,552.556

36 MS-085/23-24 6/14/2023 ROME TRAVERTINE 1,902.278

37 MS-086/23-25 6/14/2023 ROME TRAVERTINE 1,150.097

ARMANI GEORGIA 886.451

38 MS-090/23-24 6/19/2023 OTTMAN BEIGE 2,110.306

39 MS-091/23-24 6/19/2023 OTTMAN BEIGE 1,830.146

40 MS-111/23-24 7/1/2023 ROME TRAVERTINE 2,157.333

41 MS-112/23-24 7/1/2023 ARMANI GEORGIA 2,545.271

42 MS-118/23-24 7/8/2023 OTTMAN BEIGE 1,805.333

43 MS-119/23-24 7/9/2023 OTTMAN BEIGE 2,560.017

44 MS-120/23-24 7/9/2023 OTTMAN BEIGE 2,698.693

45 MS-098/23-24 6/21/2023 OTTMAN BEIGE 4,216.108

46 MS-122/23-24 7/10/2023 OTTMAN BEIGE 6,733.611

47 MS-133/23-24 7/18/2023 ROME TRAVERTINE 1,435.243

48 MS-134/23-24 7/18/2023 OTTMAN BEIGE 1,480.875

49 MS-144/23-24 7/22/2023 OTTMAN BEIGE 2,152.885

50 MS-145/23-24 7/22/2023 OTTMAN BEIGE 2,058.215

51 MS-149/23-24 7/24/2023 OTTMAN BEIGE 1,861.111

52 MS-150/23-24 7/24/2023 OTTMAN BEIGE 1,784.375

53 MS-152/23-24 7/25/2023 OTTMAN BEIGE 1,807.882

54 MS-156/23-24 7/28/2023 OTTMAN BEIGE 1,785.819

55 MS-157/23-24 7/28/2023 OTTMAN BEIGE 1,851.951

56 MS-159/23-24 7/28/2023 OTTMAN BEIGE 2,142.104

57 MS-164/23-24 7/30/2023 ROME TRAVERTINE 2,098.118

58 MS-165/23-24 7/30/2023 OTTMAN BEIGE 1,792.229

59 MS-166/23-24 7/30/2023 OTTMAN BEIGE 1,901.868

60 MS-167/23-24 7/30/2023 OTTMAN BEIGE 1,828.847

61 MS-168/23-24 7/30/2023 OTTMAN BEIGE 649.278

ARMANI GEORGIA 1,022.632

61 MS-170/23-24 7/31/2023 OTTMAN BEIGE 1,705.542

62 MS-171/23-24 7/31/2023 OTTMAN BEIGE 1,680.236

63 MS-183/23-24 8/3/2023 ROME TRAVERTINE 1,081.083

ARMANI GEORGIA 750.021

64 MS-184/23-24 8/3/2023 ARMANI GEORGIA 453.306

OTTMAN BEIGE 1,342.674

65 MS-186/23-24 8/5/2023 OTTMAN BEIGE 1,771.007

66 MS-187/23-24 8/5/2023 OTTMAN BEIGE 1,746.708

67 MS-189/23-24 8/7/2023 OTTMAN BEIGE 1,614.354

68 MS-190/23-24 8/7/2023 OTTMAN BEIGE 1,585.319

69 MS-193/23-24 8/8/2023 MARINO TRAVERTINE 1,581.562


70 MS-194/23-24 8/8/2023 ROME TRAVERTINE 2,246.625

71 MS-199/23-24 8/10/2023 ROME TRAVERTINE 1,873.674

72 MS-200/23-24 8/10/2023 ROME TRAVERTINE 1,654.563

OTTMAN BEIGE 455.708

73 MS-202/23-24 8/11/2023 OTTMAN BEIGE 1,832.069

74 MS-203/23-24 8/11/2023 OTTMAN BEIGE 574.000

OTTMAN BEIGE 1,461.854

75 MS-208/23-24 8/16/2023 OTTMAN BEIGE 1,913.958

76 MS-209/23-24 8/16/2023 OTTMAN BEIGE 948.986

ARMANI GEORGIA 1,071.688

77 MS-210/23-24 8/19/2023 ARMANI GEORGIA 2,166.590

78 MS-211/23-24 8/19/2023 OTTMAN BEIGE 1,575.417

79 MS-238/23-24 9/5/2023 ROME TRAVERTINE 1,719.194

80 MS-239/23-24 9/5/2023 ROME TRAVERTINE 1,856.313

81 MS-240/23-24 9/6/2023 ROME TRAVERTINE 2,020.063

82 MS-241/23-24 9/6/2023 ROME TRAVERTINE 2,137.368

83 MS-244/23-24 9/11/2023 ROME TRAVERTINE 1,746.594

84 MS-248/23-24 9/12/2023 ROME TRAVERTINE 1,262.351

MS-248/23-24 9/12/2023 ARMANI GEORGIA 861.852

85 MS-254/23-24 9/14/2023 OTTMAN BEIGE 1,946.701

86 MS-255/23-24 9/14/2023 OTTMAN BEIGE 2,115.708

87 MS-256/23-24 9/14/2023 ROME TRAVERTINE 2,074.813

88 MS-257/23-24 9/14/2023 ROME TRAVERTINE 1,886.694

89 MS-258/23-24 9/15/2023 OTTMAN BEIGE 2,294.257

90 MS-259/23-24 9/15/2023 OTTMAN BEIGE 2,035.819

91 MS-262/23-24 9/16/2023 OTTMAN BEIGE 1,834.257

92 MS-263/23-24 9/16/2023 OTTMAN BEIGE 605.528

ROME TRAVERTINE 1,196.424

93 MS-265/23-24 9/17/2023 OTTMAN BEIGE 3,145.451

9/17/2023 ROME TRAVERTINE 4,453.944

94 MS-271/23-24 9/20/2023 OTTMAN BEIGE 2,164.743

95 MS-272/23-24 9/20/2023 OTTMAN BEIGE 2,080.674

96 MS-273/23-24 9/20/2023 OTTMAN BEIGE 2,051.424

97 MS-274/23-24 9/20/2023 OTTMAN BEIGE 2,071.299

ROME TRAVERTINE 470.583


98 MS-278/23-24 9/22/2023 OTTMAN BEIGE 2,243.750

99 MS-279/23-24 9/22/2023 OTTMAN BEIGE 2,045.833

100 MS-281/23-24 9/22/2023 OTTMAN BEIGE 1,666.903

101 MS-282/23-24 9/22/2023 OTTMAN BEIGE 1,665.000

102 MS-284/23-24 9/23/2023 ROME TRAVERTINE 2,037.528

103 MS-285/23-24 9/25/2023 ARMANI GEORGIA 2,181.458

104 MS-286/23-24 9/25/2023 ARMANI GEORGIA 2,082.813

105 MS-288/23-24 9/26/2023 OTTMAN BEIGE 6,909.160

106 MS-289/23-24 9/28/2023 OTTMAN BEIGE 2,258.479

107 MS-290/23-24 9/28/2023 OTTMAN BEIGE 2,200.181

108 MS-295/23-24 9/30/2023 ROME TRAVERTINE 2,130.347

109 MS-297/23-24 9/30/2023 OTTMAN BEIGE 1,978.819

110 MS-298/23-24 9/30/2023 OTTMAN BEIGE 1,589.153

ROME TRAVERTINE 386.333

111 MS-300/23-24 10/1/2023 MARINO TRAVERTINE 4,970.028

ROME TRAVERTINE 2,944.104

112 MS-302/23-24 10/4/2023 MARINO TRAVERTINE 2,318.194

113 MS-303/23-24 10/4/2023 MARINO TRAVERTINE 1,398.736

ROME TRAVERTINE 299.472

114 MS-329/23-24 10/16/2023 OTTMAN BEIGE 6,546.868

115 MS-332/23-24 10/18/2023 OTTMAN BEIGE 1,816.958

116 MS-334/23-24 10/19/2023 OTTMAN BEIGE 2,031.125

117 MS-343/23-24 10/26/2023 MARINO TRAVERTINE 2,255.368

118 MS-344/23-24 10/26/2023 MARINO TRAVERTINE 1,971.764

119 MS-345/23-24 10/26/2023 MARINO TRAVERTINE 568.611

ROME TRAVERTINE 1,822.486

120 MS-346/23-24 10/26/2023 OTTMAN BEIGE 1,985.438

121 MS-355/23-24 10/29/2023 ROME TRAVERTINE 2,215.694

122 MS-356/23-24 10/29/2023 ROME TRAVERTINE 2,115.208

123 MS-357/23-24 10/29/2023 ROME TRAVERTINE 2,095.701

124 MS-358/23-24 10/29/2023 ROME TRAVERTINE 2,107.917

125 MS-359/23-24 10/29/2023 ROME TRAVERTINE 1,941.632

126 MS-360/23-24 10/29/2023 ROME TRAVERTINE 1,583.097

10/29/2023 MARINO TRAVERTINE 378.535

127 MS-385/23-24 11/8/2023 MARINO TRAVERTINE 398.021

128 MS-386/23-24 11/8/2023 ARMANI GEORGIA 2,213.479

129 MS-395/23-24 11/17/2023 ROME TRAVERTINE 4,321.611

130 OTTMAN BEIGE 1,718.771

131 MS-397/23-24 11/18/2023 OTTMAN BEIGE 2,470.590

132 MS-398/23-24 11/18/2023 MARINO TRAVERTINE 2,087.292

133 MS-406/23-24 11/23/2023 MARINO TRAVERTINE 2,389.417

134 MS-407/23-24 11/23/2023 MARINO TRAVERTINE 1,968.583


135 MS-410/23-24 11/25/2023 MARINO TRAVERTINE 2,031.146

136 MS-411/23-24 11/25/2023 MARINO TRAVERTINE 2,025.333

137 MS-412/23-24 11/25/2023 OTTMAN BEIGE 1,721.861

138 MS-416/23-24 11/27/2023 MARINO TRAVERTINE 2,061.059

139 MS-417/23-24 11/27/2023 MARINO TRAVERTINE 1,887.146

140 MS-421/23-24 11/28/2023 MARINO TRAVERTINE 1,748.800

141 MS-422/23-24 11/28/2023 MARINO TRAVERTINE 1,978.245

142 MS-423/23-24 11/29/2023 OTTMAN BEIGE 1,968.944

143 MS-424/23-24 11/29/2023 OTTMAN BEIGE 2,044.313

144 MS-425/23-24 11/29/2023 OTTMAN BEIGE 2,147.028

145 MS-426/23-24 11/29/2023 OTTMAN BEIGE 2,012.417

146 MS-427/23-24 11/29/2023 OTTMAN BEIGE 1,743.271

147 MS-428/23-24 11/29/2023 OTTMAN BEIGE 1,349.278

148 MS-431/23-24 11/30/2023 MARINO TRAVERTINE 2,004.299

149 MS-432/23-24 11/30/2023 MARINO TRAVERTINE 1,844.285

OTTMAN BEIGE 124.000

150 MS-448/23-24 12/7/2023 MARINO TRAVERTINE 2,263.188

151 MS-449/23-24 12/7/2023 MARINO TRAVERTINE 2,205.292

152 MS-451/23-24 12/8/2023 MARINO TRAVERTINE 2,309.264

153 MS-461/23-24 12/14/2020 ARMANI GEORGIA 1,652.201

MARINO TRAVERTINE 672.281

154 MS-463/23-24 12/15/2023 ARMANI GEORGIA 1,279.625

MARINO TRAVERTINE 697.125

155 MS-466/23-24 12/19/2023 MARINO TRAVERTINE 6,028.576

156 MS-467/23-24 12/20/2023 OTTMAN BEIGE 7,127.903

157 MS-468/23-24 12/20/2023 OTTMAN BEIGE 5,711.458

156 MS-478/23-24 12/23/2023 MARINO TRAVERTINE 2,031.146

157 MS-479/23-24 12/23/2023 OTTMAN BEIGE 1,965.708

158 MS-480/23-24 12/23/2023 OTTMAN BEIGE 1,795.153

159 MS-481/23-24 12/23/2023 OTTMAN BEIGE 1,954.753

160 MS-489/23-24 12/26/2023 MARINO TRAVERTINE 1,886.236

161 MS-490/23-24 12/26/2023 MARINO TRAVERTINE 1,934.528

162 MS-492/23-24 12/27/2023 MARINO TRAVERTINE 2,299.333

163 MS-493/23-24 12/27/2023 ARMANI GEORGIA 1,964.028

164 MS-494/23-24 12/27/2023 ARMANI GEORGIA 2,228.688

165 MS-497/23-24 12/28/2023 MARINO TRAVERTINE 2,088.146

166 MS-502/23-24 12/30/2023 ROME TRAVERTINE 1,937.764

167 MS-503/23-24 12/30/2023 ROME TRAVERTINE 2,238.778

168 MS-505/23-24 12/30/2023 ARMANI GEORGIA 2,032.028

169 MS-506/23-24 12/30/2023 ROME TRAVERTINE 2,191.597

1 MS-514/23-24 1/3/2024 OTTMAN BEIGE 1,761.826

2 MS-515/23-24 1/3/2024 OTTMAN BEIGE 1,353.583


3 MS-520/23-24 1/6/2024 ROME TRAVERTINE 2,107.181

4 MS-521/23-24 1/6/2024 ROME TRAVERTINE 978.333

5 MARINO TRAVERTINE 1,436.396

6 MS-541/23-24 1/17/2024 OTTMAN BEIGE 2,263.708

7 MS-543/23-24 1/17/2024 OTTMAN BEIGE 1,138.410

8 MS-561/23-24 1/22/2024 OTTMAN BEIGE 2,044.361

9 MS-562/23-24 1/22/2024 OTTMAN BEIGE 2,183.424

10 MS-563/23-24 1/22/2024 OTTMAN BEIGE 1,856.160

11 MS-564/23-24 1/22/2024 OTTMAN BEIGE 2,474.639

12 MS-576/23-24 1/27/2024 OTTMAN BEIGE 1,512.222

13 MS-579/23-24 1/27/2024 OTTMAN BEIGE 1,399.667

1 MS-592/23-24 2/3/2024 OTTMAN BEIGE 2,059.819

2 MS-615/23-24 2/9/2024 OTTMAN BEIGE 1,708.139

3 MS-616/23-24 2/9/2024 OTTMAN BEIGE 1,765.389

4 MS-645/23-24 2/20/2024 OTTMAN BEIGE 541.937

409,664.548
ARMANI GEORGIA 49,663.16
OTTMAN BEIGE 202,589.30
ROME TRAVERTINE 93,694.16
MARINO TRAVERTINE 63,717.93
Description Sum of Qty - Sqft
ARMANI GEORGIA 49,663.158 ARMANI GEORGIA
OTTMAN BEIGE 202,589.296 OTTMAN BEIGE
ROME TRAVERTINE 93,694.160 ROME TRAVERTINE
MARINO TRAVERTINE 63,717.934 MARINO TRAVERTINE
(empty)
Total Result 409,664.548
1 2 3 5 6 7 9 10 11 12 13 14 15 16
Sl. No DESCRIPTION Units
E1 E2 E3 E7 E10 E11 E14 E18 E21 W1 W2 W3 W4 W5

A OTTOMAN BEIGE 16 mm Thick:


1a Marble Flooring
SFT 1,315.79 1,371.87 2,035.90 2,301.67 829.37 1,089.86 856.60 2,111.57 933.78 1,271.55 1,506.42 1,961.74 1,599.32 1,520.74
1b Skirting
RFT 405.31 419.58 414.69 447.65 231.24 327.21 205.13 427.61 257.64 260.53 268.24 451.85 439.16 329.25
1c Staircase Flooring at midlanding
Sft 45.21 45.21 47.68 47.79 68.46 44.99 55.11 47.79 45.42 45.21 45.21 46.07 45.42 45.42
1d Marble Riser: Supplying of laying of marble riser of
height 150mm RFT 157.44 157.44 157.44 157.44 157.44 157.44 141.70 157.44 157.44 157.44 157.44 157.44 157.44 157.44
1e Marble Tread: Supplying and laying of Marble tread
of size 300mm) RFT 137.76 137.76 137.76 137.76 137.76 137.76 123.98 137.76 137.76 137.76 137.76 137.76 137.76 137.76

1f Staircase Skirting 01: Supply and laying of 100 mm


. RFT 94.99 94.99 94.99 94.99 103.91 116.87 99.97 91.38 97.22 94.99 94.99 97.78 97.78 97.78

1g Staircase Skirting 02: Supply and laying of 100 mm


RFT 63.76 63.76 63.76 63.76 63.76 63.76 63.76 63.76 63.76 63.76 63.76 63.76 63.76 63.76

1h Marble Window Sill inside: Supplying & laying


Marble sill (inside) of 130mm or below width as per
the approved shop drawings RFT - - - - - - - - - - - - - -

1i Marble Window Sill (full width): Supplying & laying


of Marble sill 270mm or below width as per the
approved shop drawings. RFT 85.12 72.82 102.83 29.68 62.98 78.23 61.01 103.81 65.93 23.78 71.34 22.14 24.80 64.94

1j Marble Coping at balcony’s: Supplying & laying of


160mm or below width Marble coping as per the
RFT 61.07 61.07 61.07 47.49 61.73 62.25 56.12 60.09 60.58 49.00 49.00 55.04 48.64 53.56
approved shop drawings

1k Marble Coping at balcony GRC area: Supplying &


laying of 40mm RFT - - - - - - - - - - - - - -

1l Marble Coping at Pooja Room: Supplying & laying


of 250mm or below width Marble coping as per the
approved shop drawings RFT - - - - - - - - - 6.92 6.92 8.63 8.36 8.04

1m Marble Flooring at Entrance: Supplying and laying


of Marble flooring as per the approved shop
drawings SFT 38.54 38.54 48.33 34.12 26.16 21.74 17.22 41.23 21.85 38.54 34.77 34.77 25.30 29.06

1n Marble Skirting at Entrance: Supplying & laying of


100 mm wide marble skirting at entrance area as per
the approved shop drawings RFT 15.19 15.19 74.99 13.97 14.17 13.35 10.82 14.96 56.18 15.19 14.20 14.20 11.71 12.86

1o Marble Tread at Entrance: Supplying and laying of


Marble tread of size 320mm or below width for
entrance steps as per the approved shop drawings RFT 15.15 15.15 68.53 16.01 10.63 9.97 10.50 16.01 39.32 15.15 15.15 15.15 15.42 13.12
-

1p Marble Riser at Entrance: Supplying & Laying of


Marble riser of 170mm or below height at entrance
as per the approved shop drawings RFT 22.73 22.73 102.80 24.01 15.94 14.96 15.74 24.01 58.98 22.73 22.73 22.73 23.12 19.68
1 2 3 5 6 7 9 10 11 12 13 14 15 16
Sl. No DESCRIPTION Units
E1 E2 E3 E7 E10 E11 E14 E18 E21 W1 W2 W3 W4 W5
1q Entrance marble coping/cladding: Supplying &
laying of Marble coping up to 150mm wide with a
pencil round and mitre joint at corners on either sides RFT 9.02 9.02 42.69 8.20 8.86 8.92 9.18 11.94 36.51 9.02 8.53 8.53 7.22 7.22
as per the approved shop drawings.

1r Entrance Step Side Marble cladding: Supplying &


laying of Marble cladding with pencil round and mitre
joint at corners as per the approved shop drawings SFT 17.76 17.76 19.59 16.15 17.44 17.55 14.21 17.11 16.79 17.76 16.79 16.79 14.85 16.47

B Giorgio Armani 16 mm Thick

IIa Toilet Marble Flooring: Supplying & Laying of pre


polished (antique finish) Marble flooring for toilets set
in CM (1:5) 50 thk. or required at site SFT 279.00 301.82 417.97 379.86 233.04 281.59 190.74 382.66 237.02 257.80 288.69 328.19 295.79 278.79

IIb Ledge wall coping


RFT 3.21 3.21 5.71 5.71 11.51 5.81 10.00 5.71 2.89 14.86 12.86 24.50 24.50 21.68
IIc Ledge wall cum sill coping RFT - - - - - - - - - - - - - -
IId Ledge wall marble cladding: Supplying & laying of
pre polished marble cladding as per the approved
shop drawings SFT 115.93 115.93 150.80 150.80 55.54 96.88 73.41 152.96 151.88 114.96 112.48 101.72 101.72 74.59

IIe Ventilator Jambs: Supplying & laying of 140mm or


below width pre polished marble jambs all-round the
ventilator as per approved shop drawings RFT 47.23 47.23 70.85 82.66 59.04 59.04 47.23 70.85 47.23 47.23 12.30 70.85 70.85 59.04

IIf Door Jambs: Supplying & laying of 90mm or below width pre polished marble
jambs all-round the door as per the approved shop drawings
RFT 91.02 91.02 109.22 127.43 91.02 91.02 72.82 109.22 72.82 91.02 91.02 109.22 109.22 91.02

IIg Marble Grating: Supplying & fixing of 100mm or below width pre polished
Marble inlay in SS gratings with adhesive as per Clause 4c.
RFT 8.53 8.53 10.50 10.50 8.53 8.53 8.53 10.50 8.53 8.53 8.53 10.50 10.50 8.53

C Rome Traventine 16 mm Thick Marble

III Rome Traventine 16 mm Thick Marble Characteristics: Beige color-based


stone Sft 368.66 347.20 498.69 585.12 350.79 328.79 499.15 518.55 685.35 717.50 730.36

4 4) Cutting and fixing of marble strips behind above marble using approved
adhesive RFT

5 5) Window Sill jambs: RFT 14.76 14.76 15.75 15.75 14.76 14.76 15.75 30.51 39.37 39.37 35.43
6 6)Marble Termination: Supplying & laying Marble end termination of section
55xx50mm U RFT 10.89 10.83 10.83 10.83 - - 10.83 - 10.70 10.70 10.83
OTTOMAN BEIGE 16 mm Thick:

QUANTITY for Marble


flooring
Qty in Sft
ITEM DESCRIPTION UNIT NO'S L B D Type of Finish Remarks
Sqm Sft
Ground Flooor 70.47
Entrance
Entrance Sqm/Sft 1 1 2.09 1.40 2.92 31.42 Flooring
Sqm/Sft 1 1 2.09 1.74 3.63 39.05 Flooring
Drawing Room 238.63 Flooring
Drawing Room Sqm/Sft 1 1 4.90 4.25 20.83 224.16 Flooring
Next to Full height wall Sqm/Sft 1 1 1.50 0.20 0.30 3.23 Flooring
FD-10 Sqm/Sft 1 1 3.00 0.20 0.60 6.46 Flooring
Entrance to Drawing Room Sqm/Sft 1 1 2.22 0.20 0.44 4.78 Flooring
Kitchen 170.29 Flooring
Kitchen Sqm/Sft 1 1 3.60 4.25 15.30 164.69 Flooring
UD Sqm/Sft 1 1 0.85 0.10 0.09 0.91 Flooring
SD Sqm/Sft 1 1 0.75 0.10 0.08 0.81 Flooring
Entrance to Kitchen Sqm/Sft 1 1 1.80 0.20 0.36 3.88 Flooring
Living/Dining 249.09 Flooring
Living/Dining Sqm/Sft 1 1 3.60 6.31 22.72 244.52 Flooring
FD-8 Sqm/Sft 1 1 2.40 0.10 0.24 2.58 Flooring
BD Sqm/Sft 1 1 1.00 0.10 0.10 1.08 Flooring
TD Sqm/Sft 1 1 0.85 0.10 0.09 0.91 Flooring
Lift opening Sqm/Sft 1 0 0.80 0.20 - - Flooring TBF
Foyer 134.40 Flooring
Foyer Sqm/Sft 1 1 2.33 4.31 10.02 107.86 Flooring
MD Sqm/Sft 1 1 1.68 0.20 0.34 3.61 Flooring
Step Landing Sqm/Sft 1 1 1.03 1.03 1.06 11.36 Flooring
Sqm/Sft 1 1 1.08 1.00 1.08 11.57 Flooring
Staircase Flooring 96.48 Flooring
Staircase Flooring Sqm/Sft 1 1 4.08 2.31 9.41 101.32 Flooring
Sqm/Sft -1 1 1.00 0.45 -0.45 -4.84 Flooring
Toilet-1 68.50 Flooring
Toilet-1 Sqm/Sft 1 1 2.15 2.96 6.36 68.50 Flooring
TD Sqm/Sft 0 1 0.85 0.10 - - Flooring
P.Room 23.79 Flooring
P.Room Sqm/Sft 1 1 1.70 1.30 2.21 23.79 Flooring
1st Floor level -
Pooja 101.79 Flooring
Pooja Sqm/Sft 1 1 2.13 1.85 3.93 42.32 Flooring
Wide Lobby Sqm/Sft 1 1 2.13 2.60 5.53 59.47 Flooring
Lobby 183.17 Flooring
Lobby Sqm/Sft 1 1 6.18 2.31 14.28 153.66 Flooring
BD Sqm/Sft 1 2 1.00 0.20 0.40 4.31 Flooring
HTD Sqm/Sft 1 1 1.05 0.20 0.21 2.26 Flooring
Step Landing Sqm/Sft 1 1 1.03 1.03 1.06 11.36 Flooring
Sqm/Sft 1 1 1.08 1.00 1.08 11.57 Flooring
Toilet-2 62.43 Flooring
Toilet-2 Sqm/Sft 1 1 2.90 2.00 5.80 62.43 Flooring
TD Sqm/Sft 0 1 0.85 0.10 - - Flooring
MBR Toilet 64.91 Flooring
MBR Toilet Sqm/Sft 1 1 2.90 2.05 5.94 63.99 Flooring
TD Sqm/Sft 1 1 0.85 0.10 0.09 0.91 Flooring
2nd Floor level - - -
Study Room 87.19 Flooring

Study Room Sqm/Sft 1 1 3.60 2.25 8.10 87.19 Flooring

Lobby 160.48 Flooring

Lobby Sqm/Sft 1 1 6.13 2.31 14.15 152.30 Flooring


BD Sqm/Sft 1 2 1.00 0.20 0.40 4.31 Flooring
FD-06 Sqm/Sft 1 1 1.80 0.20 0.36 3.88 Flooring
Toilet-2 63.41 Flooring
Toilet-2 Sqm/Sft 1 1 2.15 2.74 5.89 63.41 Flooring
TD Sqm/Sft 0 1 0.85 0.10 - -

Total Qty Sqm 164.90 1,775.02 1,775.02

Internal Flooring skirting Qty QTY--W2 TYPE--VILLA


QUANTITY for Marble
Skirting
Qty in ft
ITEM DESCRIPTION UNIT NO'S L B D Type of Finish Remarks
Rm Rft
Ground Flooor -
Drawing Room
43.03 Skirting
Drawing Room-X Rm/Rft 1 2 4.90 9.80 32.14 Skirting
Drawing Room-Y Rm/Rft 1 2 4.25 8.50 27.88 Skirting
C-4 Rm/Rft 1 1 0.20 0.20 0.66 Skirting
C-2 Rm/Rft 1 1 0.20 0.20 0.66 Skirting
Full ht wall sides Rm/Rft 1 2 0.20 0.40 1.31 Skirting
FD-10 Rm/Rft 1 2 0.20 0.40 1.31 Skirting
Open Rm/Rft -1 1 2.20 -2.20 -7.22 Skirting
Next to Full height wall Rm/Rft -1 1 1.18 -1.18 -3.87 Skirting
FD-10 Rm/Rft -1 1 3.00 -3.00 -9.84 Skirting
Kitchen
41.66 Skirting
Kitchen-X Rm/Rft 1 2 3.60 7.20 23.62 Skirting
Kitchen-Y Rm/Rft 1 2 4.25 8.50 27.88 Skirting
C-4/5 Rm/Rft 1 2 0.20 0.40 1.31 Skirting
Open Rm/Rft -1 1 1.80 -1.80 -5.90 Skirting
UD Rm/Rft -1 1 0.85 -0.85 -2.79 Skirting
SD Rm/Rft -1 1 0.75 -0.75 -2.46 Skirting
Rm/Rft
Living/Dining
31.19 Skirting
Living/Dining-X Rm/Rft 1 1 3.60 3.60 11.81 Skirting
Living/Dining-Y Rm/Rft 1 1 6.51 6.51 21.35 Skirting
Living/Dining-X Rm/Rft 1 1 2.00 2.00 6.56 Skirting
Living/Dining-Y Rm/Rft 1 1 2.00 2.00 6.56 Skirting
FD-8 Rm/Rft 1 2 0.20 0.40 1.31 Skirting
Lift Opening Rm/Rft -1 1 0.75 -0.75 -2.46 Skirting
BD Rm/Rft -1 1 1.00 -1.00 -3.28 Skirting
FD-8 Rm/Rft -1 1 2.40 -2.40 -7.87 Skirting
TD Rm/Rft -1 1 0.85 -0.85 -2.79 Skirting
Foyer
38.64 Skirting
Foyer-X Rm/Rft 1 1 2.33 2.33 7.63 Skirting
Foyer-Y Rm/Rft 1 1 2.00 2.00 6.56 Skirting
MD Rm/Rft 1 2 0.20 0.40 1.31 Skirting
MD Rm/Rft -1 1 1.68 -1.68 -5.49 Skirting
Staircase Flooring
Staircase Flooring-X Rm/Rft 1 2 4.08 8.15 26.73 Skirting
Staircase Flooring-Y Rm/Rft 1 1 2.31 2.31 7.58 Skirting
Step Rm/Rft -1 1 0.55 -0.55 -1.80 Skirting
Open Rm/Rft -1 1 1.18 -1.18 -3.87 Skirting
1st Floor level -
Pooja
36.16 Skirting
Pooja-X Rm/Rft 1 1 2.13 2.13 6.97 Skirting
Pooja-Y Rm/Rft 1 2 4.45 8.90 29.19 Skirting
Lobby
32.29 Skirting
Lobby-X Rm/Rft 1 2 6.18 12.36 40.54 Skirting
Lobby-Y Rm/Rft 1 1 2.31 2.31 7.58 Skirting
HTD Rm/Rft 1 2 0.20 0.40 1.31 Skirting
BD Rm/Rft 2 2 0.20 0.80 2.62 Skirting
Step Rm/Rft -1 1 0.10 -0.10 -0.33 Skirting
Open Rm/Rft -1 1 2.13 -2.13 -6.97 Skirting
BD Rm/Rft -2 1 1.00 -2.00 -6.56 Skirting
Lift Opening Rm/Rft -1 1 0.75 -0.75 -2.46 Skirting
HTD Rm/Rft -1 1 1.05 -1.05 -3.44 Skirting
2nd Floor level - - -
Study Room

26.57 Skirting

Study Room-X Rm/Rft 1 1 3.60 3.60 11.81 Skirting

Study Room-Y Rm/Rft 1 2 2.25 4.50 14.76 Skirting

Lobby
24.96
Lobby-X Rm/Rft 1 2 6.13 12.25 40.18 Skirting

Lobby-Y Rm/Rft 1 1 2.31 2.31 7.58 Skirting


BD Rm/Rft 2 2 0.20 0.80 2.62 Skirting
FD6 Rm/Rft 1 2 0.20 0.40 1.31 Skirting
BD Rm/Rft -2 1 1.00 -2.00 -6.56 Skirting

Open Rm/Rft -1 1 3.60 -3.60 -11.81 Skirting

Lift Opening Rm/Rft -1 1 0.75 -0.75 -2.46 Skirting

FD6 Rm/Rft -1 1 1.80 -1.80 -5.90 Skirting

Total Qty Rm/Rft 83.69 274.50 274.50

Internal staircase QTY--W2 TYPE--VILLA


QUANTITY for Marble
Skirting
Qty in ft
ITEM DESCRIPTION UNIT NO'S L B D Type of Finish Remarks
Rm Rft
Ground Flooor -
Staircase
Left Side 548.25 Skirting
Risers Rm/Rft 24 2 1.00 48.00 157.44 Skirting
Tread Rm/Rft 21 2 1.00 42.00 137.76 Skirting
Skriting --- Left side Skirting
Risers Rm/Rft 24 2 0.25 12.00 39.36 Skirting
Tread Rm/Rft 21 2 0.18 7.56 24.80 Skirting
Drawing room side open Rm/Rft
Risers Rm/Rft -4 1 0.25 -1.00 -3.28 Skirting
Tread Rm/Rft -4 1 0.18 -0.72 -2.36 Skirting
Step Landing Rm/Rft 1 2 4.03 8.06 26.44 Skirting
Skriting --- Right side Skirting
Risers Rm/Rft 24 2 0.15 7.20 23.62 Skirting
Tread Rm/Rft 21 2 0.22 9.24 30.31 Skirting
Entrance Steps
3 no 150mm
Risers Rm/Rft 1 5 2.09 10.43 34.19 ht, 2no 100mm
ht
Risers Rm/Rft 1 3 2.09 6.26 20.52 50mm ht
Tread Rm/Rft 1 3 2.09 6.26 20.52 300mm width
Entrance Left wall
Hz Rm/Rft 1 1 4.06 4.06 13.30 250mm width
3 no 150mm
Vt Rm/Rft 1 3 0.15 0.45 1.48 ht, 1no 100mm
ht
Rm/Rft 1 1 0.10 0.10 0.33
Rm/Rft 1 1 0.15 0.15 0.49
Entrance Skirting
Left Side Rm/Rft 1 1 2.61 2.61 8.58
Right Side Rm/Rft 1 1 4.51 4.51 14.78
Total Qty Rm/Rft 167.15 548.25 548.25

Internal staircase Grooves QTY--W2 TYPE--VILLA


QUANTITY for Marble
Skirting
Qty in ft
ITEM DESCRIPTION UNIT NO'S L B D Type of Finish Remarks
Rm Rft
Ground Flooor -
Staircase
464.45 Skirting
4mmX4mm Groove on Tread Rm/Rft 21 4 1.00 84.00 275.52 Skirting
Entrance Steps Rm/Rft 3 0 2.13 - -
4mm Grooves & Mitre joint on edge
Skirting
of tread & Riser
Rm/Rft 24 2 1.20 57.60 188.93 Skirting

Total Qty Rm/Rft 141.60 464.45 464.45

Internal Flooring Sill/Legde wallQTY--W2 TYPE--VILLA


QUANTITY Qty in Rft
ITEM DESCRIPTION UNIT NO'S L B D Type of Finish Remarks
Rmt Rft
Ground Flooor -
Drawing Room
W3F Rmt 1 2 1.05 2.10 6.89
Kitchen
KW4 Rmt 1 1 1.20 1.20 3.94
Maid Room
W2 Rmt 1 1 0.60 0.60 1.97
Toliet-1
V Rmt 1 1 0.60 0.60 1.97
Ledge wall Rmt 1 1 1.10 1.10 3.61
Bedroom-1
W2 Rmt 1 1 0.60 0.60 1.97
W4 Rmt 1 1 1.20 1.20 3.94
P Room Ledge wall
P Room Ledge wall Rmt 1 1 1.30 1.30 4.26
First Flooor
Pooja
Glass Railing Rmt 1 1 2.40 2.40 7.87
KW3 Rmt 1 1 1.05 1.05 3.44
W3F Rmt 1 1 1.05 1.05 3.44
Staircase
W4 Rmt 1 1 1.20 1.20 3.94
Bedroom-2
W4 Rmt 1 1 1.20 1.20 3.94
Toilet-2
V Rmt 1 1 0.60 0.60 1.97
Ledge wall Rmt 1 1 1.05 1.05 3.44
M.Toilet
V Rmt 1 1 0.60 0.60 1.97
Ledge wall Rmt 1 1 2.05 2.05 6.72
Master BedRoom
W4 Rmt 1 1 1.20 1.20 3.94
W6 Rmt 1 1 1.80 1.80 5.90
HomeTheatre
W4 Rmt 1 1 1.20 1.20 3.94
Sit-Out
Railing Rmt 1 1 5.95 5.95 19.52
Second Flooor
Study
W2 Rmt 1 1 0.60 0.60 1.97
Lobby
W2 Rmt 1 1 0.60 0.60 1.97
Staircase
W4 Rmt 1 1 1.20 1.20 3.94
Toilet-3
V Rmt 1 1 0.60 0.60 1.97
Ledge wall Rmt 1 1 1.00 1.00 3.28
Bedroom-3
W4 Rmt 1 1 1.20 1.20 3.94
W6 Rmt 1 1 1.80 1.80 5.90
Open Terrace
Railing Rmt 1 1 9.40 9.40 30.83

Total Qty Rmt 46.45 152.38 -

Chamfering and mould details QTY--W2 TYPE--VILLA


QUANTITY Qty in Rft
ITEM DESCRIPTION UNIT NO'S L B D Type of Finish Remarks
Rmt Rft
Ground Flooor -
Drawing Room
Inside half mould and
W3F Rmt 1 2 1.05 2.10 6.89
Outside half mould
Kitchen
Inside Full mould and
KW4 Rmt 1 1 1.20 1.20 3.94
Outside half mould
Maid Room

Inside Full mould and


W2 Rmt 1 1 0.60 0.60 1.97
Outside half mould
Toliet-1

Inside Full mould and


V Rmt 1 1 0.60 0.60 1.97
Outside half mould

Ledge wall Rmt 1 1 1.40 1.40 4.59 Ledge wall full mould
Bedroom-1

Inside Full mould and


W2 Rmt 1 1 0.60 0.60 1.97
Outside half mould

Inside Full mould and


W4 Rmt 1 1 1.20 1.20 3.94
Outside half mould
P Room Ledge wall

Ledge wall Rmt 1 1 1.30 1.30 4.26 Ledge wall full mould
First Flooor
Pooja

Inside half mould and


Glass Railing Rmt 1 1 2.40 2.40 7.87
Outside half mould

Inside Full mould and


KW3 Rmt 1 1 1.05 1.05 3.44
Outside half mould

Inside Full mould and


W3F Rmt 1 1 1.05 1.05 3.44
Outside half mould
Staircase

Inside Full mould and


W4 Rmt 1 1 1.20 1.20 3.94
Outside half mould
Bedroom-2

Inside Full mould and


W4 Rmt 1 1 1.20 1.20 3.94
Outside half mould
Toilet-2

Inside Full mould and


V Rmt 1 1 0.60 0.60 1.97
Outside half mould

Ledge wall Rmt 1 1 2.25 2.25 7.38 Ledge wall full mould
M.Toilet

Inside Full mould and


V Rmt 1 1 0.60 0.60 1.97
Outside half mould

Ledge wall Rmt 1 1 2.05 2.05 6.72 Ledge wall full mould
Master BedRoom

Inside Full mould and


W4 Rmt 1 1 1.20 1.20 3.94
Outside half mould

Inside Full mould and


W6 Rmt 1 1 1.80 1.80 5.90
Outside half mould
HomeTheatre
Inside Full mould and
W4 Rmt 1 1 1.20 1.20 3.94
Outside half mould
Sit-Out

Inside half mould and


Railing Rmt 1 1 5.95 5.95 19.52
Outside half mould
Second Flooor
Study

Inside Full mould and


W2 Rmt 1 1 0.60 0.60 1.97
Outside half mould
Lobby

Inside Full mould and


W2 Rmt 1 1 0.60 0.60 1.97
Outside half mould
Staircase

Inside Full mould and


W4 Rmt 1 1 1.20 1.20 3.94
Outside half mould
Toilet-3

Inside Full mould and


V Rmt 1 1 0.60 0.60 1.97
Outside half mould

Ledge wall Rmt 1 1 1.30 1.30 4.26 Ledge wall full mould
Bedroom-3

Inside Full mould and


W4 Rmt 1 1 1.20 1.20 3.94
Outside half mould

Inside Full mould and


W6 Rmt 1 1 1.80 1.80 5.90
Outside half mould
Open Terrace

Railing Rmt 1 1 9.40 9.40 30.83 Two Sides chamfering

Total Qty Rmt 48.25 158.28 -