DELIVERY MANAGEMENT
EQUATION OF OUTPUTS IN CONSTRUCTION
• IN A GIVEN SET OF CONDITIONS AND THE SKILL LEVELS OF THE EMPLOYEES, THE
OUTPUTS IN CONSTRUCTION ARE DEPENDANT ON TIMELY AVAILABILITY OF THE
PHYSICAL INPUTS LIKE FRONTS,MATERIALS, MACHINERY,DRAWINGS & INSTRUCTIONS
AND SO ON. DELAYS IN PROVIDING THE ABOVE INPUTS WOULD LIMIT THE OUTCOMES.
• IMMEDIATE IMPROVEMENTS IN PRODUCTIVITIES IN THE ‘AS IT IS AS IT IS BASIS’ CAN
THEREFORE BE ACHIEVED JUST BY AVERTING THE DELAYS WITH PROACTIVE PRE-
PLANNING ON THE DAY PREVIOUS AND BY REAL TIME COORDINATION OF THE
ACTIVITIES DURING THE DAY. AND IN THE EVENT OF UNAVOIDABLE AND UNFORESEEN
HAPENINGS,MITIGATING THE EFFECTS OF THESE DELAYS TO THE EXTENT POSSIBLE
THRU’ STRETCHED OUT EFFORTS AND GREATER COLLABORATION OF THE FRONT LINE
PLAYERS. MY PROCESS OF DELIVERY MANAGEMENT PROVIDES THE
SYSTEMS,PROCESSES,MECHANISMS AND METRICS TO ACHIEVE THIS.
• THE NEXT LEVEL IMPROVEMENTS CAN COME FROM TRAINING FOR UPSKILLING THE
TRADE SKILLS AND THE MANGERIAL COMPETENCIES OF THE EMPLOYEES TO TURN OUT
BETTER OUTCOMES.THIS CAN ALSO BE ADMINISTERED IN A TARGETTED WAY BY THE
NEED ANALYSIS ARRIVED THROUGH THE WORK TRACKING SYSTEM.
• THE THIRD LEVEL OF IMPROVEMENTS CAN COME FROM ADVANCED TECHNOLOGIES
AND WORK METHODS, WHICH CAN ALSO BE IDENTIFIED THROUGH THE DELIVERY
MANAGEMENT & WORK TRACKING PROCESSES FOR OPTIMUN INVESTMENTS IN THESE
AREAS.
DELIVERY MANAGEMENT FLOW CHART