You are on page 1of 71

Arch 22o2

GLOBAL DESIGN STUDIO


PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

U AND R ON

PODOMORO PARK
ANDUN NDON A

MARK N
A R
2

PODOMORO PARK - U D OR
20

MARKETING GALLERY & OFFICES OR ON RU ON


A

DRA N
N

Bandung - Jawa Barat


DRA

Indonesia COVER
O

FOR CONSTRUCTIONS DRAWINGS SCALE DATE NO


NA

22 JUN 2020

A0.01
OR

DRAWN BY PROJECT NO
2018008
SHEET INDEX Arch 22o2
GLOBAL DESIGN STUDIO
0. GENERAL INFORMATION OF PROJECT XII. MISCELLANEOUS EXTERIOR DETAILS PTE.LTD
A0.01 COVER NTS A10.07.01 EXTERIOR DETAIL (DETAIL DECORATIVE PARAPET - PLAN) 1:100
A0.02 SHEET INDEX NTS EXTERIOR DETAIL (DETAIL DECORATIVE PARAPET 1:20
NOTICE
A0.03 LEGEND NTS SECTION & ELEVATION) Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions

A10.07.02 EXTERIOR DETAIL (DETAIL DECORATIVE PARAPET - PLAN) 1:100 and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
I. SITEPLAN EXTERIOR DETAIL (DETAIL DECORATIVE PARAPET constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
A1.01 SITE PLAN 1:600 SECTION & ELEVATION) relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
A1.02 BLOCK - ROOF PLAN 1:600 A10.07.03 EXTERIOR DETAIL (DETAIL SKYLIGHT - PLAN) 1:150 on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design

EXTERIOR DETAIL (DETAIL SKYLIGHT - SECTION & DETAIL) 1:100 portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
II. GENERAL PLAN A10.07.04 EXTERIOR DETAIL (DETAIL ROOF WATER TANK) 1:100, 1:50, 1:20 specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
A2.01 BASEMENT FLOOR PLAN 1:300 A10.07.05 EXTERIOR DETAIL (DETAIL SCREEN) 1:50, 1:25 © ARCH 22o2, all rights reserved.

A2.02 GROUND FLOOR PLAN 1:300 A10.07.06 EXTERIOR DETAIL (DETAIL DECORATIVE GATE WALL) 1:50, 1:25
A2.03 2nd FLOOR MEZZANINE & ROOF PLAN 1:300 A10.07.07 EXTERIOR DETAIL
(DETAIL FLAGPOLE) 1:25
A10.07.08 EXTERIOR DETAIL
(DETAIL COLUMN 1) 1:400, 1:100, 1:20
III. ENLARGED FLOOR PLAN A10.07.09 EXTERIOR DETAIL
(DETAIL COLUMN 2) 1:500, 1:75, 1:50, 1:20
A2.11 ENLARGED PLAN GF 1:150 A10.07.10 EXTERIOR DETAIL
(DETAIL COLUMN 3) 1:50, 1:20
A2.12 ENLARGED PLAN GF 1:150 A10.07.11 EXTERIOR DETAIL
(DETAIL COLUMN DROP-OFF) 1:500, 1:75, 1:20
A10.07.12 EXTERIOR DETAIL
(DETAIL PLANTER & STAIR - 1:50
IV. ELEVATIONS PLAN & SECTION)
A3.01 FRONT & REAR ELEVATION 1:300 A10.07.13 EXTERIOR DETAIL (DETAIL PLANTER & STAIR - 1:50, 1:20
A3.02 SIDE ELEVATION 1:300 SECTION & DETAIL)
A3.03 REAR & SIDE ELEVATION 1:300 A10.07.14 EXTERIOR DETAIL (DETAIL COLUMN 4) 1:50, 1:20
A3.04 MATERIAL BOARD
A3.05 MATERIAL BOARD XIII. VERTICAL CIRCULATION
A3.11 ENLARGED ELEVATION 1 1:50 A11.01 RAMP 1 DETAIL 1:100
A3.12 ENLARGED ELEVATION 2 1:50
A3.13 ENLARGED ELEVATION 3 1:50 A12.01 STAIR DETAIL 1 - PLAN ( BASEMENT & GROUND FLOOR ) 1:50
A3.14 ENLARGED ELEVATION 4 1:50 A12.02 STAIR DETAIL 1 - SECTION 1:50
A3.15 ENLARGED ELEVATION 5 1:50 A12.03 STAIR DETAIL 1:10
A3.16 ENLARGED ELEVATION 6 1:50
A3.17 ENLARGED ELEVATION 7, 8 1:50 A12.04 STAIR DETAIL 2 - PLAN 1:50
A3.18 ENLARGED ELEVATION 9, 10 1:50 A12.05 STAIR DETAIL 2 - SECTION & DETAIL 1:10, 1:50

V. SECTIONS XIV. GENSET ROOM


A4.01 SECTION - A, B 1:200 A14.01 GENSET ROOM - PLAN 1:50
A4.02 SECTION - C, D 1:200 A14.02 GENSET ROOM - SECTION 1:50
A4.03 SECTION - E, F 1:200 A14.03 GENSET ROOM - ELEVATION 1:50
A4.11 WALL SECTION A & B 1:50
A4.12 WALL SECTION C & D 1:50
A4.13 WALL SECTION E & F 1:50
A4.14 WALL SECTION G & H 1:50
A4.15 WALL SECTION I & J 1:50
A4.16 WALL SECTION K & L 1:50
A4.17 WALL SECTION M & N 1:50
A4.18 WALL SECTION O 1:50

VI. MISCELLANEOUS INTERIOR DETAIL


A5.04 DETAIL TOILET - BASEMENT 1:50
A5.05 SANITARY SCHEDULE NTS

VII. REFLECTING CEILING PLAN


U AND R ON
A7.01 CEILING PLAN - BASEMENT 1:200
A7.02 CEILING PLAN - GROUND FLOOR 1:200

VIII. DOOR & WINDOW, & LOUVERS SCHEDULES


PODOMORO PARK
ANDUN NDON A
A10.01.11 DOOR & WINDOW TYPES 1:100
DETAIL DOOR TYPES 1:5
A10.01.12 DOOR & WINDOW SCHEDULE NTS
A10.01.13 HARDWARE GROUP NTS
MARK N
A R
2

IX. MISCELLANEOUS INTERIOR DETAIL


A10.02.11 DETAIL WALL TYPES 1:10
A10.02.13 INTERIOR DETAIL MUSHOLA - PLAN 1:50 U D OR
20

A10.02.14 INTERIOR DETAIL MUSHOLA - SECTION & ELEVATION 1:50 OR ON RU ON


A

X. FLOOR PATTERN PLAN DRA N


N

A10.04.01 FLOOR FINISH PLAN - BASEMENT 1:300


DRA

A10.04.02 FLOOR FINISH PLAN - GROUND FLOOR 1:300

XI. FINISHES SCHEDULE


SHEET INDEX
O

A10.04.03 ROOM FINISH SCHEDULE NTS


A10.04.04 MATERIAL SCHEDULE NTS
SCALE DATE NO
NA

22 JUN 2020

A0.02
OR

DRAWN BY PROJECT NO
2018008
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This

ABBREVIATIONS REFERENCES MATERIALS drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

12

12

P-1

P-1

HT-1

U AND R ON

PODOMORO PARK
ANDUN NDON A

MARK N
A R
2

U D OR
20

OR ON RU ON
A

DRA N
N
DRA

LEGEND
N
O

SCALE DATE NO
NA

22 JUN 2020

A0.03
OR

DRAWN BY PROJECT NO
2018008
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
LIMIT OF and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all

CONSTRUCTION works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
PROPERTY
LINE NOTE :
ALL SPOT ELEVATIONS SHOWN
RI HERE ARE FINISH FLOOR FINISH
VE SURFACE UNLESS NOTED
R OTHERWISE
SHOW UNIT
LINE OF ±0.00 = +670.052
BY OTHERS
BASEMENT -0.65 = +669.402
LEVEL
BELOW -0.80 = +669.252
-1.50 = +668.552
0
2 05
50
19

5 0
39

0 0
30

-0.05 20
50

0 0
30

50
39

50
19
50
20
pp-screen

00
33

-0.02

VOID

R1

-0.05 1. REVISI TANGGA MENYESUAIKAN


1500

2000 3490 1995 14000

-0.15 FD FD

16
08
0 STRUKTUR YANG SUDAH ADA DI

-0.04 LAPANGAN
R1
ET
NS
GE 2. REVISI DINDING MENGGUNAKAN
U
RD -0.02
GA LN DINDING GYPSUM
P -0.10
-0.02 -0.02

-0.04
R1 UP

-0.65

-0.80

TOP TAMAN LEVEL


-0.100
TOP TANGGA LEVEL
-0.100 -3.15 -0.10

DRAIN PIPE GARDEN & PARKING


U AND R ON
TO (E) RIVER BY LANDSCAPE

UNDER GROUND PODOMORO PARK


SEPTICTANK ANDUN NDON A

PEDESTRIAN
MARK N
1
A R
2

A10.07.07

IN OUT
IN U D OR
20

-1.50 U T OR ON RU ON
O
A

SITE PLAN FLAGPOLE DRA N


1
N

1 : 600
DRA

SITE PLAN

0
O

PROPOSED SIGNAGE
3

N
SCALE DATE NO
NA

MONUMENT 22 JUN 2020

BY LANDSCAPE

W A1.01
OR

DRAWN BY PROJECT NO
OUT IN
O
2018008
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

MM MM AM NA D A
ON A UM NUM K RAM M NOTICE

KK
LIMIT OF Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions

CONSTRUCTION and levels are to be checked on site by contractors and inconsistencies reported

ON PA N D O O M A ROO immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building

RAM M control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
PROPERTY to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

LINE GALTECTO
ROOF NOTE :
RI
VE ±0.00 = +670.052
R

AC OUTDOOR
AC OUTDOOR UNITS
UNITS RE : MEP 5 0
RE : MEP 19
50
20

50
39

00
ROOFDRAIN PIPE 20
50
30

RE MEP 30
00

50
39

50
19
5 0
20
pp-screen

00
33

CONCRETE
TOP FLAT +12.55
ROOF R
TTE
GU

R1
1500

2000 3490 1995 14000

1. PERUBAHAN UKURAN SKYLIGHT


0
08
FD FD

16

YANG MENGIKUTI UKURAN DI

ET +6.70 LAPANGAN
NS
GE
U
RD
GA LN +4.75 +4.75
P
RIV
ER

UP

DRAIN PIPE +10.639


TO (E) RIVER
RE : MEP

1
GUTTER A10.07.03

R1 U AND R ON
WATER TANK
+ AC UNIT BELOW
ROOF
PODOMORO PARK
ANDUN NDON A

MARK N
A R
IN
2

U T U D OR
O
20

OR ON RU ON
A

DRA N
BLOCK - ROOF PLAN
N

1 1 : 600
DRA

BLOCK PLAN

3 0
O

N
SCALE DATE NO

W
NA

22 JUN 2020

OUT IN A1.02
O
OR

DRAWN BY PROJECT NO
2018008
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
1 2
A4.01 LINE OF
A4.01
BUILDING NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
ABOVE and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other

PROPERTY specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
LINE © ARCH 22o2, all rights reserved.

NOTE :

A 4A 4A 4A 4A
3A
4A
014
FURNITURES SHOWN ON
3250

MEETING 3A 014 THIS PLAN ARE INDICATIVE


ROOM
FFL - 3.32 013 & FOR COORDINATION
A' 3A ONLY ( NOT IN CONTRACT )
2750

013
015
4A
3A 3A 015
3A 3A 012 012 3A WALL
B 3A 3A
FFL - 3.27 3A

007 3A' 3A'


009
011
GYPSUM PARTITION
6000

3A' 3A
4A 3A
3A'
FFL - 3.32 3A 007 3A 009 3A' 3A'
3A 008 016
OFFICES LAYOUT CEO
ROOM
3A'
HALF PARTITION
3A 3A 3A 3A'
BY APL 006 017

C 3A'

008
011 FFL - 3.27
004 3A
4A 3A
004 3A'
3A' 3A 3A' 1A WALL TYPE SYMBOL
003 010 3A'
3A' 3A' RE: A10.02.11
003 FFL - 3.27 005 3A
7500

3A
006 MEETING
3A'
002 3A
ROOM
3A'
DOOR TYPE SYMBOL
002 3A 005 3A 3A R1 010 124A
3A
028
3A 3A 018 RE: A10.01.11 - A10.01.12
4A
FFL - 3.27 R1
001
3A
032
3A 3A 3A 3A' WINDOW TYPE SYMBOL
1B' 1B'
030 3A'
3A' 124A
RE: A10.01.11 - A10.01.12
D DF

TOILET TOILET 032


FFL - 3.27
019

3A FFL - 3.27
3A
FD
4000

FFL -3.22 3A
DF FD

001 FFL -3.22


1C 028 021
3A 030 3A 3A' 020 R1
3A
DF DF

1B' 035 034 3A'


3A' 019
1. REVISI TANGGA MENYESUAIKAN

2 E' 037B
3A 3A 3A 3A' 025 3A' 3A 3A
F
1500 2000

1A'' 1A'' 040 033 029 027 026 022


035 034 025 3A 022 STRUKTUR YANG SUDAH ADA DI
FFL - 3.20 037C 1B'
3A 033 3A
A4.03 RUANG 027
E CONTROL
040
1A''
036
JANITOR FFL - 3.20
4A
3A
031
029 3A

4A 4A
024 023
3A
4A
FFL - 3.27 LAPANGAN
036
E'' 4A' RUANG
SEWAGE
TP-2 TP-1
P.FILTER-2
P.FILTER-1
2. PERGESERAN PARTISI GYPSUM
SEWAGE PIT

1A''
00
20 sqm
4500

1A'' 037 30CM UNTUK SIRKULASI


038 3 5
RUANG
9'
FFL - 3.20 RUANG
041A POMPA 4A'
4A' UTILITY 40.86m 2

038 1A''

F FFL - 3.30
2 00
1A'' FFL - 3.20
041
7
8'
039
TP-2
6000

RUANG FFL - 3.20


LVMDP
TP-1

041B
4A' 039 1A''
1A'' 4A'
OUT GOING 1
PLN
INCOMMING

4A' 4A' 4A' 4A'


8
G 037A

6145

TOP TAMAN LEVEL


-0.100
TOP TANGGA LEVEL
-0.100
ISSUES AND REVISIONS

PODOMORO PARK
BANDUNG, INDONESIA
6000 6000 6000 7000 7000 8000 7000 4619

1 2 3A 4 5 6 7 7' MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm

B GALLERY
ISSUED FOR

FOR CONSTRUCTIONS
DRAWINGS
SHEET TITLE
BASEMENT FLOOR PLAN
1 1 : 300
BASEMENT FLOOR PLAN

N
SCALE DATE SHEET NO
22 UN 2020

DRAWN BY PROJECT NO
2018008 A2.01
Arch 22o2
GLOBAL DESIGN STUDIO

40
PTE.LTD

50
MARKETING GALLERY -020 A HVAC VERTICAL DUCT
AREA BY I.D

11
00
33

50
( NOT IN CONTRACT ) 2 NOTICE

.0 2 2050 Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions

A4 0

60
32
and levels are to be checked on site by contractors and inconsistencies reported
5 1 immediately to CA prior to works being undertaken. Contractors are to ensure that all

70
19

0
works under their responsibility or the responsibility of their sub-contractors are
0
03

0
55
constructed in accordance with local statutory authority requirements, local building

30 . control requirements and all relevant codes of practice. This drawing is to be read in

39
50 B A4 conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,

20
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and

50
so forth prepared by others and which are relevant to the project or projects identified
00 on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
00 21
30
out rods to fully illustrate methods of construction of all specialist millwork, design

19
portion & subcontractor elements of the construction. These drawings should include

45
50
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
PORCH
50 structural steelwork, M&E services, case goods, cabinetry, joinery work and other
1 20FFL -0.05

00
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior

00 to producing shop and setting out drawings.


30
C'
A2.12 © ARCH 22o2, all rights reserved.

39

15
50
SCREEN &
50 MIC CONTROL ROOM NOTE :

00
PROPERTY LINE 1 39 119

.02 1950

19
4 FURNITURES SHOWN ON

50
A
50

60
20
pp-screen
THIS PLAN ARE INDICATIVE

20

00
& FOR COORDINATION

50
LINE OF BASEMENT 00
33
LEVEL BELOW 21
00 D ONLY ( NOT IN CONTRACT )

32
70
-0.20 WALL
A

21
3250

FUNCTION HALL

50
FFL -015 FFL ± 0.00
SFL -045 644 sqm 99
20 3 GYPSUM PARTITION
120
VOID
A' BY I.D A10.07.09

21
2750

00
1 2

19
B

50
A4.01 A4.01
E

20
50
6000

14
35

27
2
68 1
A10.07.14 A10.07.06

1500
2000 3490 1995 14000 7600
FFL -0050 FFL -0.05 VIP ROOM

C WUDHU
7 sqm
13 sqm
118
60
0 0
OUTDOOR BY I.D CR ON DUTY
111

14
LOUNGE SALES 122
0
08
FD FD

FFL -0.02 PROMOTION


60 sqm 25 sqm 16
00
7500

MUSHOLLA 112
103
203 sqm BY I.D
12 sqm
110
BY I.D
COUNTER
PANTRY 60 R1

13
SAD & LEGAL 121
102 1. REVISI TANGGA MENYESUAIKAN
BY TENANT
R1 117

00 STRUKTUR YANG SUDAH ADA DI


FFL -0.04
MALE
SERVICE & FILLING
CPG 60 D
D TOILET 109
12 sqm JANITOR
MIXER ROOM
12 sqm
113
114
FILLING
116
12 LAPANGAN
BY I.D 1 sqm 115
4000

00
BY I.D
108 2. REVISI DINDING MENGGUNAKAN
RECEPTIONIST
DISABLE
5 sqm FEMALE 20 sqm
60
11
TOILET
0
E' F
104 107 DINDING GYPSUM
19 80
106
BY I.D BY I.D BY I.D
2 2 0
1500 2000

FFL -0.02
0 43 00
CORRIDOR
45 0 60
A4.03 7
3075

105
E BY I.D
R1 BY I.D 0
29
300 10
40 70 40
E'' 302 sqm
101
8200
29 34
BY TENANT 10500
0
7 C
4500

Xref \\Server-pc\kantor\2018002-Podomoro Park\Active\CAD\XREF\Xref 1 Lantai\X - Site New.dwg


2
A10.07.10
29 8 0 9
68
UP

FFL -0.65
8' 9' LINE OF EXPANSION JOINT
F
FFL -0.80
ARCHITECTURE

3 ISSUES AND REVISIONS


6000

A10.07.08

LINE OF 8
13 sqm
SKYLIGHT ROOF PODOMORO PARK
G BANDUNG, INDONESIA
800

ABOVE
TOP TAMAN LEVEL TOP TANGGA LEVEL
FFL -3.15
-0.100 -0.100

1
PALMSCAPE

A2.11
3-4
A10.07.11
3-4
A10.07.11
LINE OF MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm

CANOPY ABOVE
GALLERY
6000 6000 6000 7000 7000 8000 7000 4619
ISSUED FOR

1 2 3 4 5 6 7 7' FOR CONSTRUCTIONS


A B DRAWINGS
LAYOUT & FIT OUT BY LAYOUT & FIT OUT BY SHEET TITLE
TENANT TENANT

GROUND FLOOR PLAN


NOTE :

±0.00 = +670.052
GROUND FLOOR PLAN

N
SCALE DATE SHEET NO
1 1 : 300 22 UN 2020

DRAWN BY PROJECT NO
2018008 A2.02
D
WATER TANK & AC
OUTDOOR UNITS
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
4000

E' NOTICE
15002000

ROOF SPACE ROOF Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
SPACE immediately to CA prior to works being undertaken. Contractors are to ensure that all

E works under their responsibility or the responsibility of their sub-contractors are


constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,

E'' Support Canal-C 100x50mm


relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
ROOF ROOF on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
4500

+7.94 Pressure Tank


out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
SPACE SPACE
Kap. 200 Lt Control Panel

but not be limited to stone work, paneling, metal work, roofing, windows, drainage,

CABLE NYY 4 x 4 mm2


ST 2"
GV 2"

FJ 2"
GV 1/2"

A
BP.2

BP.1
structural steelwork, M&E services, case goods, cabinetry, joinery work and other

ST 2"
GV 2"

FJ 2"
CV 2"
GV 2"
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.

F
© ARCH 22o2, all rights reserved.

2
ROOF SPACE . 02 2050 NOTE :
A4

60
50 1
6000

00
19
.03
A4 FURNITURES SHOWN ON
39
50 B THIS PLAN ARE INDICATIVE
00
& FOR COORDINATION
G 30
C ONLY ( NOT IN CONTRACT )

45
50
20

00
00
C'
30

15
6000 6000 6000

00
50
1 39
PROPERTY LINE 02
1 2 3 4 A4
.
19
50

60
50
20
pp-screen

00
2nd FLOOR MEZZANINE 33
00
D
1 1 : 300

+12.55
A
3250

WATER TANK + AC
6000

OUTDOOR UNITS BELOW


A'
CONCRETE ROOF WITH AC OUTDOOR
1 2 UNITS RE: MEP
SREED &
B A4.01 WATERPROOFING A4.01

AC OUTDOOR
E R1
6000

1. PERUBAHAN UKURAN SKYLIGHT


UNITS RE: MEP
YANG MENGIKUTI UKURAN DI
-005
2000 3490 1995 14000 1500 LAPANGAN
C 00
60
FD FD

16
08
0
14
7500

000
FLAT ROOF FLAT ROOF FLAT ROOF 6
+4.75 +6.70 +4.75 13
00
D
60 D
12
4000

0 00
6

E' F 1 2
11
1500 2000

A10.07.02 00
A4.03 60 U AND R ON
E
00
300 10
E'' 32
PODOMORO PARK
C
4500

UP
200 9 ANDUN NDON A
7
8' 9'
10000

F +10.639 MARK N
SKYLIGHT
A R
6000
2

8
U D OR
20

G OR ON RU ON
3000
A

DRA N
N
DRA

R1 2nd MEZZANINE FLOOR


6000 6000 6000 7000 7000 8000 7000 4619
& ROOF PLAN
O

1 2 3 4 5 6 7 7'

N
NO
A B SCALE DATE
NA

22 JUN 2020

ROOF PLAN
OR

2 1 : 300
DRAWN BY PROJECT NO
2018008 A2.03
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

102 102 102D 102 102 10 112 NOTICE


Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all

1500
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building

2000 3490 1995 14000


control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified

C
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
WUDHU structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates

7 sqm to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
1 © ARCH 22o2, all rights reserved.
111
FD FD
SALES
OUTDOOR NOTE :
PROMOTION
LOUNGE 25 sqm
1A FURNITURES SHOWN ON
FFL -0.02 112
7500

MUSHOLLA THIS PLAN ARE INDICATIVE


203 sqm 60 sqm 12 sqm BY I.D & FOR COORDINATION
102 R1 10 110 ONLY ( NOT IN CONTRACT )
102A
102 BY TENANT A BY I.D 1A 102
1 WALL TYPE/PARTITION
11 1A SYMBOL
101 101A
RE: A10.02.11
101
FFL -0.04 BY I.D 1
1A 1 SERVICE & DOOR TYPE SYMBOL
12 A
MALE 10 10 MIXER ROOM RE: A10.01.11 - A10.01.12
D TOILET 12 sqm
12 sqm JANITOR WINDOW TYPE SYMBOL
101 11 12 A
1 sqm 108 RE: A10.01.11 - A10.01.12
BY I.D
108
101
1 DISABLE 1
RECEPTIONIST
6000

5 sqm FEMALE 20 sqm


A 10 10 TOILET
10 10
101D BY I.D BY I.D BY I.D 10

10
1
CORRIDOR
10 10 A
E R1
FFL -0.04
R1

1. REVISI TANGGA MENYESUAIKAN


BY I.D
STRUKTUR YANG SUDAH ADA DI

101 LAPANGAN
302 sqm
6000

2. REVISI DINDING MENGGUNAKAN


101
101R
BY TENANT 10 A 10
DINDING GYPSUM
UP
101 101

10 120A

101 101P
6000

U AND R ON

101 101O
PODOMORO PARK
ANDUN NDON A

G
MARK N
FFL -1.86 FFL -3.30
A R
2

101 101J 101K 101 101M 101N

U D OR
20

OR ON RU ON
A

6000 6000 6000 7000 7000 8000 7000


DRA N
N
DRA

1 2 3 4 5 6 7 7'
ENLARGED PLAN
O

ENLARGED PLAN GF N SCALE DATE NO


1
NA

1 : 150 22 JUN 2020


OR

DRAWN BY PROJECT NO
2018008 A2.11
MARKETING GALLERY
AREA BY I.D
( NOT IN CONTRACT )
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all

PORCH works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
FFL -0.05 conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
3300 2050 1950 3950 3000 2050
12 3000 3950 1950 2050 so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
120 120D 120 120 120 to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

NOTE :

FURNITURES SHOWN ON
THIS PLAN ARE INDICATIVE
& FOR COORDINATION
ONLY ( NOT IN CONTRACT )

WALL TYPE/PARTITION
1A SYMBOL
120 120 RE: A10.02.11
DOOR TYPE SYMBOL
11 12 A
1 RE: A10.01.11 - A10.01.12

WINDOW TYPE SYMBOL


12 A
RE: A10.01.11 - A10.01.12
11 MAKET MAKET
1 2 RUMAH RUMAH
118A 118
WUDHU SCREEN &
120A AREA MAKET
FD 7 sqm MIC CONTROL ROOM
111 AREA EVENT
MAKET MASTERPLAN STAGE 11
BY I.D AREA DEALING
687.57 M²
MUSHOLLA
FD
FUNCTION HALL
12 sqm MAKET MAKET FFL ± 0.00
110 SALES RUMAH RUMAH 644 sqm 11
VIP ROOM
BY I.D PROMOTION 120 pp-
scr
25 sqm 13 sqm een
1 BY I.D
112 118
BY I.D BY I.D
MALE 120
TOILET 118
102 1A
12 sqm 10 1

JANITOR 10 11
108
108 SERVICE &
DISABLE MIXER ROOM COUNTER
11 120K
5 sqm 1 12 sqm SAD & LEGAL 120 120J
10 11
FILLING 11 122
10 BY I.D
11 CR ON DUTY
11
10 122
FFL -0.02 FEMALE 11 122A
CORRIDOR U AND R ON
10 10 TOILET FILLING
20 sqm 11 CPG
10 BY I.D 121
10 A
11 PODOMORO PARK
ANDUN NDON A

PANTRY
121
MARK N
A R
2

U D OR
20

12 16080 OR ON RU ON
0A
A

120 120 120D DRA N


N
DRA

ENLARGED PLAN
O

ENLARGED PLAN GF SCALE DATE NO


1
NA

1 : 150 22 JUN 2020


OR

DRAWN BY PROJECT NO
2018008 A2.12
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

PAINTED PLASTER GRC NOTICE


DECORATIVE PARAPET Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
GALTECTO conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
ROOF (RF-1) GRC COLUMN COVER drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
PAINTED SKYLIGHT PAINTED FINISH WP-1 PAINTED PLASTER GRC on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
6MM + 6MM LAMINATED GLASS ON DECORATIVE PARAPET ( PT-3 ) portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
POWDER COATING SKYLIGHT FRAME structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
1 FINISH GOOD SYSTEM EX ALLURE GALTECTO KALSI PLANK to site conditions is not guaranteed. The contractor must verify all site dimensions prior
A3.11 to producing shop and setting out drawings.
ON PAINTED HOLLOW METAL ROOF ROOF (RF-1) PAINTED FINISH HT WET CLADDING © ARCH 22o2, all rights reserved.

FRAME SYSTEM. WALL SYSTEM (ST-1)


NOTE :
CONCRETE ROOF
PAINTED PLASTER WALL WITH SCREED & DECORATIVE 40mmx20mm
FFL ±10.639 FOR MATERIAL BOARD
FINSIH ( PT-2 ) PAINTED PLASTER WATER PROOFING HOLLOW ON 40mmx40mm SEE DRAWING : A3.05
WALL FINISH (PT-3) 2 STEEL HOLLOW FRAME
A3.12
5000 PAINTED DUCO FINISH
±0.00 = +670.052
4749

GRC COLUMN COVER


1
PAINTED FINISH ( PT-4 )
FFL +5.89 A3.12
10639

A2.04

1
R1
5890

5430

PAINTED PLASTER GRC


DECORATIVE GATE WALL
3200

( PT-1 )
FFL -0.02
4
2 A11.01

6000 6000 6000 7000 7000 1


8000 POWDER COATING
A4.12

A11.01
1 2 1 ALUMINIUM
A4.12 A4.12 A4.16
WINDOW
EX ALLURE
1 2 1
A4.11
3 4 5 6 7 8 10 12 13 14
PAINTED PLASTER GRC PEDESTAL
1
A4.13
DECORATIVE WALL ( PT-3 )
DECORATIVE & DOWNLIGHT 11 STONE FINISH (ST-2)
CUSTOM PAINTED RE: MEP & SPECIALIST LIGHTING
POWDER COATING ALUMINIUM STEEL CONSOLE (PS-1)
9 HT WET CLADDING
WALL SYSTEM (ST-3)
WINDOW EX ALLURE
9'
FRONT ELEVATION PEDESTAL VIEW IN ANGLE
1 1 : 300
STONE FINISH (ST-2) R1

1. PERUBAHAN UKURAN SKYLIGHT

YANG MENGIKUTI UKURAN DI

LAPANGAN

PAINTED PLASTER GRC


DECORATIVE PARAPET ( PT-3 )
PAINTED PLASTER
WALL FINISH KALSI PLANK
PAINTED FINISH

DECORATIVE 40mmx20mm
HOLLOW ON 40mmx40mm PAINTED PLASTER GRC GALTECTO PAINTED SKYLIGHT
STEEL HOLLOW FRAME DECORATIVE PARAPET ROOF (RF-1) 6MM + 6MM LAMINATED GLASS ON GALTECTO
PAINTED DUCO FINISH ( PT-3 ) POWDER COATING SKYLIGHT FRAME ROOF (RF-1)
FINISH GOOD SYSTEM EX ALLURE
KALSI PLANK ON PAINTED HOLLOW METAL ROOF
PAINTED FINISH FRAME SYSTEM.

HT WET CLADDING CONCRETE ROOF WITH FFL ±10.639


WALL SYSTEM (ST-1) SCREED & WATER U AND R ON
PROOFING
5000 1

4749
A3.17

1
A3.18
FFL +5.89
PODOMORO PARK
2
A3.17 ANDUN NDON A

10639
R1
MARK N

5890
FFL ±0.00
A R
2

GRC COLUMN COVER PAINTED PLASTER GRC U D OR


20

PEDESTAL 8000 7000 7000 6000 6000 6000 DECORATIVE WALL ( PT-3 )
PAINTED FINISH ( PT-4 )
STONE FINISH
(ST-2)
2 2 OR ON RU ON
A

A4.17 A4.11

DRA N
14 13 12 10 9 8 7 6 5 4 3 2 1
N

PAINTED PLASTER GRC


DRA

11 POWDER COATING ALUMINIUM


DECORATIVE GATE WALL
DOOR & WINDOW EX ALLURE
VIEW IN ANGLE
( PT-1 ) FRONT & REAR
ELEVATION
O

REAR ELEVATION DECORATIVE & DOWNLIGHT

2 1 : 300
RE: MEP & SPECIALIST LIGHTING
SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008 A3.01
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

CONCRETE ROOF PAINTED PLASTER GRC


WITH SCREED & DECORATIVE PARAPET NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
WATER PROOFING prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
PAINTED SKYLIGHT works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
6MM + 6MM LAMINATED GLASS ON POWDER control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
COATING SKYLIGHT FRAME FINISH GOOD relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
SYSTEM EX ALLURE ON PAINTED HOLLOW so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
METAL ROOF FRAME SYSTEM. PAINTED PLASTER GRC
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include

GALTECTO DECORATIVE 40mmx20mm DECORATIVE PARAPET ( PT-3 )


but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other

ROOF (RF-1) HOLLOW ON 40mmx40mm specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
STEEL HOLLOW FRAME to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
PAINTED DUCO FINISH KALSI PLANK
PAINTED FINISH
NOTE :
GALTECTO
FFL ±10.639 ROOF (RF-1) FOR MATERIAL BOARD
SEE DRAWING : A3.05

4749
±0.00 = +670.052

FFL +5.89
10639

POWDER COATING ALUMINIUM


DOOR EX ALLURE
5890

PAINTED PLASTER GRC


DECORATIVE GATE WALL
FFL -0.02
( PT-1 )

1
1 4
A3.13
A11.01 A11.01

HT WET CLADDING
6000 4500 15002000 4000 7500 6000 2750 3250 WALL SYSTEM (ST-1) PEDESTAL
STONE FINISH (ST-2)
G F E'' E E' D C B A' A
GRC COLUMN COVER HT WET CLADDING
PAINTED FINISH ( PT-4 ) WALL SYSTEM (ST-3)

COSTUM PAINTED VIEW IN ANGLE


GRC. FINISH ( PT-4 )

SIDE ELEVATION
1 1 : 300

CONCRETE ROOF
WITH SCREED &
WATER PROOFING
PAINTED PLASTER GRC
DECORATIVE PARAPET ( PT-3 )
GALTECTO
GRC DECORATIVE 40mmx20mm ROOF (RF-1)
CONSOLE PAINTED HOLLOW ON 40mmx40mm
FINISH ( PT-4 ) STEEL HOLLOW FRAME PAINTED PLASTER GRC
PAINTED DUCO FINISH DECORATIVE PARAPET
( PT-3 )

FFL ±10.639
U AND R ON
PAINTED PLASTER GRC
DECORATIVE WALL ( PT-3 )

4749
PODOMORO PARK
FFL +5.89 ANDUN NDON A

10639
GRC COLUMN COVER
PAINTED FINISH ( PT-4 )

MARK N

5890
POWDER COATING ALUMINIUM
WINDOW EX ALLURE
A R
2

FFL -0.02

U D OR
20

PAINTED PLASTER GRC


PEDESTAL
DECORATIVE GATE WALL
( PT-4 ) STONE FINISH OR ON RU ON
A

3250 2750 6000 7500 4000 20001500 4500 6000 (ST-2)


GRC COLUMN COVER DRA N
N

PAINTED FINISH ( PT-4 )


A A' B C D E' E E'' F G
DRA

POWDER COATING
HT WET CLADDING
ALUMINIUM
DOOR & WINDOW
WALL SYSTEM (ST-1) SIDE ELEVATION
VIEW IN ANGLE EX ALLURE
O

SIDE ELEVATION NO
2 SCALE DATE
NA

1 : 300 22 JUN 2020


OR

DRAWN BY PROJECT NO
2018008 A3.02
PAINTED PLASTER GRC KALSI PLANK
DECORATIVE PARAPET ( PT-3 )
GALTECTO
ROOF (RF-1)
PAINTED SKYLIGHT
6MM + 6MM LAMINATED GLASS ON
DECORATIVE 40mmx20mm
HOLLOW ON 40mmx40mm
STEEL HOLLOW FRAME
PAINTED FINISH

PAINTED PLASTER GRC


GALTECTO
ROOF (RF-1)
Arch 22o2
GLOBAL DESIGN STUDIO
POWDER COATING SKYLIGHT FRAME DECORATIVE PARAPET PTE.LTD
FINISH GOOD SYSTEM EX ALLURE PAINTED DUCO FINISH
1
( PT-3 )
ON PAINTED HOLLOW METAL ROOF A3.14

FRAME SYSTEM. FFL +11.73


NOTICE
GRC Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
CONSOLE PAINTED and levels are to be checked on site by contractors and inconsistencies reported
CONCRETE ROOF immediately to CA prior to works being undertaken. Contractors are to ensure that all
FINISH ( PT-4 ) works under their responsibility or the responsibility of their sub-contractors are
WITH SCREED & constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
WATER PROOFING conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
5700 on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
1900 1900 1900
out rods to fully illustrate methods of construction of all specialist millwork, design

11730
147 147
portion & subcontractor elements of the construction. These drawings should include
315

but not be limited to stone work, paneling, metal work, roofing, windows, drainage,

140 140
20

20
315

structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
HT WET CLADDING © ARCH 22o2, all rights reserved.

WALL SYSTEM (ST-1)


NOTE :

FOR MATERIAL BOARD


FFL -0.02
SEE DRAWING : A3.05

PAINTED PLASTER GRC POWDER COATING ALUMINIUM PEDESTAL


DECORATIVE WALL ( PT-3 ) WINDOW EX ALLURE ±0.00 = +670.052
STONE FINISH
(ST-2)
FRONT ELEVATION
1 1 : 300
GRC COLUMN COVER
PAINTED FINISH ( PT-4 ) HT WET CLADDING PAINTED PLASTER GRC
WALL SYSTEM (ST-3) DECORATIVE GATE WALL
VIEW IN ANGLE ( PT-1 )
PAINTED PLASTER GRC
DECORATIVE PARAPET
KALSI PLANK PAINTED SKYLIGHT ( PT-3 )
PAINTED PLASTER GRC PAINTED FINISH
DECORATIVE PARAPET 6MM + 6MM LAMINATED GLASS ON GALTECTO
( PT-3 ) POWDER COATING SKYLIGHT FRAME ROOF (RF-1)
GRC COLUMN COVER FINISH GOOD SYSTEM EX ALLURE
PAINTED FINISH ( PT-4 ) ON PAINTED HOLLOW METAL ROOF
FRAME SYSTEM.
600 150 150 150 600
3890 3890 3890
1
A3.16 3890 GALTECTO
ROOF (RF-1)
FFL +11.73
DECORATIVE 40mmx20mm
HOLLOW ON 40mmx40mm CONCRETE ROOF
1
A3.15 STEEL HOLLOW FRAME WITH SCREED &
PAINTED DUCO FINISH WATER PROOFING

GRC
11730

CONSOLE PAINTED
FINISH ( PT-4 )

FFL -0.02

6000 6000 6000 6000 6000 10775 PAINTED PLASTER HT WET CLADDING PAINTED
PEDESTAL
WALL FINISH (PT-1) WALL SYSTEM (ST-1) STONE FINISH PLASTER GRC
1
1 1
(ST-2) DECORATIVE
14 13 12 A4.15
11 A4.14
10 9 8 A4.17
WALL ( PT-3 )
POWDER COATING VIEW IN ANGLE
PAINTED PLASTER GRC
DECORATIVE GATE WALL ALUMINIUM
REAR ELEVATION ( PT-1 ) DOOR & WINDOW HT WET CLADDING

2 1 : 300
2
A4.14 EX ALLURE WALL SYSTEM
(ST-1)

GRC COLUMN COVER U AND R ON


PAINTED FINISH ( PT-4 )

GALTECTO
PAINTED SKYLIGHT
6MM + 6MM LAMINATED GLASS ON
ROOF (RF-1) PODOMORO PARK
POWDER COATING SKYLIGHT FRAME ANDUN NDON A
FINISH GOOD SYSTEM EX ALLURE
ON PAINTED HOLLOW METAL ROOF PAINTED PLASTER GRC
FFL +11.73 DECORATIVE PARAPET
FRAME SYSTEM.
( PT-3 ) MARK N
CONCRETE ROOF
WITH SCREED &
KALSI PLANK A R
2

PAINTED FINISH
WATER PROOFING
DECORATIVE 40mmx20mm
U D OR
HOLLOW ON 40mmx40mm
20

11730
STEEL HOLLOW FRAME
FFL +4.750
PAINTED DUCO FINISH OR ON RU ON
A

HT WET CLADDING
WALL SYSTEM (ST-1)
DRA N
N

GRC COLUMN COVER


DRA

2150

PAINTED FINISH ( PT-4 )


FFL -0.02 REAR & SIDE
PEDESTAL
1000 STONE FINISH (ST-2) ELEVATION
GRC
O

CONSOLE PAINTED 6000 1500 4500 6000 POWDER COATING ALUMINIUM


SIDE ELEVATION FINISH ( PT-4 ) DOOR EX ALLURE
3 1 : 300 VIEW IN ANGLE D C' C B A SCALE DATE NO
NA

22 JUN 2020
PAINTED PLASTER GRC
PAINTED PLASTER WALL
OR

DECORATIVE GATE WALL DRAWN BY PROJECT NO


VIEW IN ANGLE ( PT-1 ) 2018008 A3.03
Arch 22o2
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.

NOTE :

FOR MATERIAL BOARD


SEE DRAWING : A3.05

PT-3

RF-1

PT-4
PT-3 PT-4

PT-2
ST-3
PT-4

PT-3

ST-5

ST-2

ISSUES AND REVISIONS

PODOMORO PARK
BANDUNG, INDONESIA

MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm

GALLERY
ISSUED FOR

FOR CONSTRUCTIONS
DRAWINGS
SHEET TITLE

MATERIAL BOARD

SCALE DATE SHEET NO


15 APR 2020

DRAWN BY PROJECT NO
2018008 A3.04
PT 1 PT-4 Arch 22o2
PAINTED PLASTER FINISH GRC PAINTED FINISH
COLOR : WINTER WALK PAINTED FINISH : EX SKK WOODY SMILE / setara
EX. DULUX / PROPAN / JOTUN www.grcboard.com NOTICE

/ NIPON / MOWILEX / setara (www.skk.com) Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.

PT 2
PAINTED PLASTER FINISH ST-3
COLOR : ELEPHANT TAIL NATURAL STONE WALL MARBLE
EX. DULUX / PROPAN / JOTUN TYPE : DTRAVERTINE CREMA
/ NIPON / MOWILEX / setara EX. ROMAN / VALENTINO GRESS /
SANDIMAS / NIRO / INDOGRESS /
setara

PT 3
PAINTED PLASTER FINISH ST-5
WEATHERSHIELD & INTERIOR BASALTO HITAM
COLOR : WONDERLAND WHITE TYPE : 20mm THICK BASALTO HITAM
EX. DULUX / PROPAN / JOTUN FINISH : HONED
/ NIPON / MOWILEX / setara EX. PUMARIN / JAYA ABADI / BNB / setara

RF-1
GALTECTO ROOF CT-2
EX. GALTECTO ROOF / setara TYPE : ROCK TILE ANTHRACTE
TYPE : GT3. FINISH : UNPOLISHED
COLOR : SHADE BLACK/SHADE BROWN EX. ROMAN / VALENTINO GRESS /
(http://www.igkogyo.co.jp) SANDIMAS / NIRO / INDOGRESS / setara

ISSUES AND REVISIONS

ST-1
STONE CLADDING WALL PODOMORO PARK
TYPE : D'NALI STONE BANDUNG, INDONESIA
EX. ROMAN

MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm

GALLERY
ISSUED FOR

ST-2
FOR CONSTRUCTIONS
STONE PEDESTAL DRAWINGS
TYPE : 20mm THICK ANDESIT SHEET TITLE

FINISH : FLAMED
EX. PUMARIN / JAYA ABADI / BNB / setara MATERIAL BOARD

SCALE DATE SHEET NO


15 APR 2020

DRAWN BY PROJECT NO
2018008 A3.05
DECORATIVE WALL ( PT-3 )

DECORATIVE WALL ( PT-3 )

DECORATIVE WALL ( PT-3 )


Arch 22o2
PAINTED PLASTER WALL

PAINTED PLASTER WALL

PAINTED PLASTER WALL


PAINTED PLASTER GRC

PAINTED PLASTER GRC

PAINTED PLASTER GRC

PAINTED PLASTER GRC


DECORATIVE PARAPET

PAINTED FINISH ( PT-4 )


PAINTED FINISH ( PT-4 )

±0.00 = +670.052
GRC COLUMN COVER

ALUMINIUM WINDOW

GLOBAL DESIGN STUDIO

STONE FINISH (ST-2)


WALL FINISH (PT-2)

POWDER COATING

PTE.LTD
PAINTED PLASTER

FINISH ( PT-2 )

FINISH ( PT-3 )

FINISH ( PT-2 )
STONE FINISH

NOTE :
(8mm GLASS)
ROOF ( RF-1)

KALSI PLANK

NOTICE
EX ALLURE
GALTECTO

Do not scale this drawing, use figured dimensions only. This drawing has been

PEDESTAL
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
( PT-3 )

works under their responsibility or the responsibility of their sub-contractors are

( ST-5 )
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
1400 to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
250
150 100 700 200
400
250
600
500

700

450 150
800
3

FRONT ELEVATION
FFL ±10.639

FFL +5.89

FFL ±0.00
7000
6000

ENLARGED ELEVATION 1
1
0.5
0
U AND R ON
PODOMORO PARK
ANDUN NDON A
2

800
MARK N

1 : 50
450 150
A R
2

1
400
250
600
500

700
U D OR
20

OR ON RU ON
A

150 100 700 200


DRA N
N

250
DRA

4749 5890
1400

FFL -0.02
GF
10639
ENLARGED ELEVATION

LISTPLANK
ROOF TOP
FFL +10.639
O

FFL +5.89
SCALE DATE NO
NA

22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A3.11
CONSOLE PAINTED
WATER PROOFING

WATER PROOFING
COATING SKYLIGHT

CONCRETE ROOF

CONCRETE ROOF
PAINTED SKYLIGHT

LAMINATED GLASS

GOOD SYSTEM EX

PAINTED HOLLOW

WITH SCREED &

WITH SCREED &


PAINTED FINISH

±0.00 = +670.052
FRAME SYSTEM.

Arch 22o2
FINISH ( PT-4 )
CUSTOM GRC
GRC PROFILE
FRAME FINISH

METAL ROOF
ON POWDER

ALLURE ON
6MM + 6MM

GLOBAL DESIGN STUDIO

NOTE :
PTE.LTD
DECORATIVE UPLIGHT & DOWNLIGHT

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
RE: MEP & SPECIALIST LIGHTING

immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
POWDER COATING ALUMINIUM

POWDER COATING ALUMINIUM

constructed in accordance with local statutory authority requirements, local building


control requirements and all relevant codes of practice. This drawing is to be read in
DOOR & WINDOW EX ALLURE

conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
PAINTED FINISH ( PT-4 )

portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
GRC COLUMN COVER

structural steelwork, M&E services, case goods, cabinetry, joinery work and other
WINDOW EX ALLURE

specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
WALL FINISH (PT-3)

WALL FINISH (PT-3)


WATER PROOFING

PAINTED PLASTER

PAINTED PLASTER

to producing shop and setting out drawings.


CONCRETE ROOF

CONCRETE ROOF

© ARCH 22o2, all rights reserved.


WITH SCREED &

(8mm GLASS)

(8mm GLASS)

7
PAINTED

2
5

FRONT ELEVATION
1
FFL -0.02

FFL -0.52
FFL -0.14
FFL -0.27
FFL -0.39
FFL -0.65
3500

OPEN
ENLARGED ELEVATION 2
1

8000
0.5
0
3800
5950

ENLARGED ELEVATION 3
1
U AND R ON

1 : 50

0.5
PODOMORO PARK

1
ANDUN NDON A

0
4100

FFL -0.02
GF
4750 MARK N
A R
FFL +4.75

6
2

270
U D OR
20

80 OR ON RU ON

480
A

4100
DRA N

1 : 50
N

300
DRA

200

2
190 100 150 ENLARGED ELEVATION

FFL -0.02
GF
O

230 150
2750 4750

FFL +7.50

FFL +4.75
SCALE DATE NO
NA

22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A3.12
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been

G CONCRETE ROOF
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are

WITH SCREED & constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
WATER PROOFING relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
PAINTED SKYLIGHT portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
FFL +7.50 6MM + 6MM structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
LAMINATED GLASS to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
500

ON POWDER
FFL +7.00 COATING SKYLIGHT
100 150

FRAME FINISH
230 150

GOOD SYSTEM EX
ALLURE ON
PAINTED HOLLOW 1
190

METAL ROOF
80

FRAME SYSTEM.
2250

GRC PROFILE
PAINTED FINISH

GRC CONSOLE
PAINTED FINISH D A ON

FFL +4.75 ( PT-4 )


MATERIAL BOARD SEE : A3:05

GRC COLUMN
COVER
PAINTED FINISH
BUILDING BEHIND ( PT-4 )

6250
4750

U AND R ON
GF
FFL -0.02
LANDSCAPE -0.15
-0.30
-0.20 PODOMORO PARK
DROP OFF -0.40 ANDUN NDON A

MARK N
A R
2

ENLARGED ELEVATION 4 U D OR
1
20

1 : 50 0 0.5 1
OR ON RU ON
A

DRA N
N
DRA

NOTE : ENLARGED ELEVATION


O

±0.00 = +670.052

SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008 A3.13
PAINTED FINISH ( PT-4 )

ON 40mmx40mm STEEL

PAINTED DUCO FINISH

DOOR ,6mm GLASS ON


ANODIZED ALUMINIUM
40mmx20mm HOLLOW
GRC COLUMN COVER

WALL SYSTEM (ST-3)

YKK (8mm GLASS ON


DOOR & WINDOW EX
HT CLADDING WALL

CUSTOM SIGNAGE
HT WET CLADDING
PAINTED PLASTER
GRC DECORATIVE

Arch 22o2
WATER PROOFING
CONCRETE ROOF
PARAPET ( PT-3 )

±0.00 = +670.052
HOLLOW FRAME
PAINTED FINISH

WITH SCREED &

SYSTEM (ST-1)

WITH BACKLIT
KALSI PLANK

DECORATIVE

GLOBAL DESIGN STUDIO


ROOF (RF-1)
GALTECTO

PTE.LTD

WINDOW)

NOTE :
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

1
900
150 450 150
150
700

A ON
150 100 700 200
9

250

RON
1400

9830
6000

ENLARGED ELEVATION 5
1
0.5
U AND R ON
PODOMORO PARK

0
ANDUN NDON A
MARK N
A R
2

U D OR
20

1 : 50
OR ON RU ON
A

DRA N

1
N
DRA

1600 650 4100 ENLARGED ELEVATION

FFL -0.02
GF
O

4843 2140 4750

TOP ROOF
FFL +11.73

FFL +6.89

FFL +4.75
SCALE DATE NO
NA

22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A3.14
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

14 13
6000 NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
GALTECTO © ARCH 22o2, all rights reserved.

ROOF (RF-1)

1
GUTTER

LISTPLANK KALSI PLANK


FFL +6.89 PAINTED FINISH
DECORATIVE 40mmx20mm HOLLOW
ON 40mmx40mm STEEL HOLLOW
FRAME PAINTED DUCO FINISH
R AR A ON
1600

PAINTED STEEL MATERIAL BOARD SEE : A3:05


TUBE FRAMING

GRC CONSOLE
PAINTED FINISH ( PT-4 )

HT WET CLADDING
WALL SYSTEM (ST-1)
1840

600
GRC PROFILE PAINTED

300
FINISH ( PT-4 )
600
PAINTED PLASTER GRC
6890

300 DECORATIVE GATE WALL ( PT-1 )

6mm GLASS

POWDER COATING ALUMINIUM


DOOR EX ALLURE
(8mm GLASS ON DOOR)
2353

4200

GRC COLUMN COVER


PAINTED FINISH ( PT-4 )
3800

U AND R ON
PAINTED PLASTER GRC
DECORATIVE GATE WALL ( PT-1 )

POWDER COATING ALUMINIUM


PODOMORO PARK
ANDUN NDON A
DOOR & WINDOW EX ALLURE
(8mm GLASS ON DOOR,
1100

6mm GLASS ON WINDOW)


MARK N
GF STONE FINISH
-0.05 FFL -0.02 ( ST-5 ) A R
2

200

-0.20
U D OR
20

400 1900 400


PEDESTAL STONE OR ON RU ON
A

FINISH (ST-2)
2700 DRA N
N
DRA

ENLARGED ELEVATION 6 NOTE :


1 1 : 50 0 0.5 1 ±0.00 = +670.052
ENLARGED ELEVATION
O

SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008 A3.15
13 12 11
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

6000 6000
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all

GALTECTO works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
ROOF (RF-1) conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

LISTPLANK KALSI PLANK


FFL +6.89 PAINTED FINISH 1

DECORATIVE 40mmx20mm
HOLLOW ON 40mmx40mm
1600

STEEL HOLLOW FRAME


PAINTED DUCO FINISH

GRC CONSOLE
PAINTED FINISH ( PT-4 )
R AR A ON
600
MATERIAL BOARD SEE : A3:05
PAINTED PLASTER GRC
600

300
DECORATIVE GATE WALL
(PT-1)

300
1840

HT WET CLADDING
WALL SYSTEM (ST-1)

6mm GLASS
6890

GRC COLUMN COVER


PAINTED FINISH ( PT-4 )

POWDER COATING ALUMINIUM


DOOR EX ALLURE

4940
(8mm GLASS ON DOOR)
2353

4250
4200

PAINTED PLASTER
GRC DECORATIVE
WALL ( PT-4 )
150

STONE FINISH
75

(ST-5)
PEDESTAL STONE U AND R ON
875

FINISH ( ST-2 )
GF
FFL -0.02 PAINTED PLASTER
GRC DECORATIVE PODOMORO PARK
GATE WALL ( PT-1 ) ANDUN NDON A

400 3800 400 400 200 487,5 400 1900 400 487,5 200 400
4600 4875 MARK N
A R
2

U D OR
20

OR ON RU ON
A

DRA N
ENLARGED ELEVATION 7
N

1 1 : 50 0 0.5 1
DRA

NOTE :
ENLARGED ELEVATION
±0.00 = +670.052
O

SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008 A3.16
COATING SKYLIGHT
PAINTED SKYLIGHT

LAMINATED GLASS

CONSOLE PAINTED
GOOD SYSTEM EX

WATERPROOFING
PAINTED HOLLOW

CONCRETE ROOF

CONCRETE ROOF
WATERPROOFING
FRAME SYSTEM.

CONCRETE ROOF

WITH SCREED &

Arch 22o2
WITH SCREED &

±0.00 = +670.052
FRAME FINISH

FLOOR FINISH
FINISH ( PT-3 )
CUSTOM GRC
METAL ROOF
ON POWDER

DECORATIVE

DOWNLIGHT
ALLURE ON
6MM + 6MM

SPECIALIST
UPLIGHT &

GLOBAL DESIGN STUDIO


RE: MEP &

LIGHTING
PAINTED

PTE.LTD

NOTE :
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all

DECORATIVE UPLIGHT & DOWNLIGHT


works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This

RE: MEP & SPECIALIST LIGHTING


drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified

POWDER COATING ALUMINIUM


on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
CONCRETE ROOF WITH

PAINTED FINISH ( PT-4 )


© ARCH 22o2, all rights reserved.

GRC COLUMN COVER

WINDOW EX ALLURE
WALL FINISH (PT-3)

WALL FINISH (PT-3)


PAINTED PLASTER

PAINTED PLASTER
CONCRETE ROOF
WATER PROFING
7

(6mm GLASS)

2
PAINTED

REAR ELEVATION
1750
3000 200
OPEN
8000

3500
600
500

1750
5

ENLARGED ELEVATION 9
1
ENLARGED ELEVATION 8
1
U AND R ON

0.5
0.5
5950 PODOMORO PARK

0
ANDUN NDON A

0
4100 4100

FFL -0.02
GF
4750 MARK N
A R

FFL +4.75
6
2

270
U D OR
20

OR ON RU ON

1 : 50
80

480
A

DRA N

1 : 50
300
N

2
DRA

200

1
190 100 150 ENLARGED ELEVATION

FFL -0.02
GF
O

230 150
2750 4750

FFL +7.50

FFL +4.75
SCALE DATE NO
NA

22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A3.17
PAINTED FINISH ( PT-4 )

PAINTED FINISH ( PT-4 )

DECORATIVE UPLIGHT &


GRC COLUMN COVER

GRC COLUMN COVER

Arch 22o2
WALL SYSTEM (ST-1)

WALL FINISH ( PT-2 )

±0.00 = +670.052
WINDOW EX ALLURE

RE: MEP & SPECIALIST


ALUMINIUM DOOR &
WALL FINISH (PT-2)

WALL FINISH (PT-3)

GATE WALL ( PT-1 )


WATER PROOFING

HT WET CLADDING
PAINTED PLASTER

PAINTED PLASTER

PAINTED PLASTER

PAINTED PLASTER

PAINTED PLASTER
POWDER COATING

GRC DECORATIVE

GRC DECORATIVE
CONCRETE ROOF
WITH SCREED &

GLOBAL DESIGN STUDIO


PTE.LTD
WALL ( PT-3 )
(8mm GLASS)

NOTE :
DOWNLIGHT

LIGHTING

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
275
1375

A ON
400
3

R AR
600
6000

5600
3000

ENLARGED ELEVATION 10
600

1
U AND R ON

0.5
PODOMORO PARK
ANDUN NDON A

0
400
MARK N
4

A R
2

U D OR
20

OR ON RU ON

1 : 50
A

DRA N
N

1
DRA

ENLARGED ELEVATION

CONCRETE ROOF
O

670 4080
NO

FFL -0.02
GF
4750 SCALE DATE
NA

FFL +4.75
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A3.18
G F E'' E E' D
37500
C B A' A Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
6000 2750 3250
1
A4.11 GALVALUMNE METAL ROOF NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
CONCRETE ROOF WITH SCREED & and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
WATERPROOFING works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
10mm PAINTED PRECAST GRC WITH HOLLOW METAL conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
FFL +10.639 LINEAR STRIP LIGHTING PER PRECAST FABRICTOR ON STEEL STRUCTURE (GR-1) drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
RE: MEP & SPECIALIST LIGHTING METAL GRILL on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
WATER TANK, RE:MEP but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
GALTECTO ROOF (RF-1) specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
IWF STEEL STRUCTURE to producing shop and setting out drawings.
DAK T:13CM

4709
© ARCH 22o2, all rights reserved.
RE : STRUCTURE
2
CAST IRON A12.03
NOTE :
GUTTER
ROOF DRAIN
RE : MEP ±0.00 = +670.052
SCREED & WATERPROOFING
10619

PAINTED PLASTER WALL FINISH ( PT-3 )


+4.75
PAINTED PLASTERED GRC DECORATIVE GATE ( PT-1 )
AFF+4.10
5910

PAINTED PLASTER WALL FINISH ( PT-3 )


AFF+3.20

FLOOR FINISH BY I.D


GF
FFL -0.02 FFL-0.05 FFL-0.15
FFL-0.45
3250

2150
BASEMENT R. CONTROL R. POMPA STAFF
FFL - 3.27 FFL +3.20 FFL +3.20 FFL +3.27

SECTION A
1 1 : 200 3

R1

1. PERUBAHAN UKURAN SKYLIGHT

YANG MENGIKUTI UKURAN DI

G F E'' E E' D C B A' A LAPANGAN


37500
6000 4500 1500 2000 4000 7500 6000 2750 3250

PAINTED SKYLIGHT
6MM + 6MM LAMINATED GLASS ON POWDER
COATING SKYLIGHT FRAME FINISH GOOD
SYSTEM EX ALLURE ON PAINTED HOLLOW METAL
ROOF FRAME SYSTEM.

FRAMELESS GLASS 5mm

ROOFDRAIN PIPE U AND R ON


IRON CAST RE MEP COVERED STRUCTURAL BEAM
ROOF DRAIN GRC CONSOLE
1
SCREED & WATERPROOFING
RE : MEP A4.16
PAINTED FINISH
+7.50 PLASTERED PAINTED PODOMORO PARK
800

+6.70 DECORATIVE GRC PROFILE ANDUN NDON A


1530

PAINTED KALSI BOARD CEILING FINISH


+6.00
GRC COLUMN COVER PAINTED FINISH ( PT-4 )
AFF+5.97 AFF+5.97
R1 MARK N
A R
6720

AFF+4.10
2

5990

FLOOR FINISH BY I.D


U D OR
20

HCS RE : STRUCTURE
GF OUTDOOR LOUNGE OR ON RU ON
A

FFL -0.02 FFL -0.02


DROP OFF
FFL-0.80 FFL-0.65
FFL-0.15
FFL-0.45 DRA N
N

3250
DRA

2750
BASEMENT
FFL - 3.27 FFL -3.27 FFL -3.30 SECTION A & B
O

SCALE DATE NO
SECTION B
NA

2 1 : 200 0 1 3
22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008 A4.01
Arch 22o2
STEEL STRUCTURE RE: STRUCTURE

A B C C' D 10mm PAINTED PRECAST GRC WITH HOLLOW METAL


PER PRECAST FABRICTOR ON STEEL STRUCTURE (GR-1) GLOBAL DESIGN STUDIO
PTE.LTD
18000 ASPHALT SHINGLE ROOF (RF-1)

6000 4500 1500 6000 IWF STEEL STRUCTURE RE : STRUCTURE


NOTICE
STEEL CATWALK & Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
ROOF TOP BALUSTRADE RE : STRUCTURE and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
+11.73 DUCTING RE : MEP
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
GUTTER out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include

4860
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior

CAST IRON SCREED & WATERPROOFING to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

ROOF DRAIN
RE : MEP
NOTE :
12542

DECORATIVE 40mmx20mm 2
11730

HOLLOW ON 40mmx40mm CEILING BY I.D A4.18


±0.00 = +670.052
STEEL HOLLOW FRAME
WALL FINISH BY I.D FFL +4.75
PAINTED DUCO FINISH

PAINTED PLASTER
6920

WALL FINISH (PT-1)


4800

POWDER COATED ALUMINIUM WINDOW EX


OOR N D ALLURE(6mm GLASS ON WINDOW)
GF FUNCTION HALL
FFL -0.02 FFL -0.15 FFL -0.05 FFL-0.02

SECTION C
1 1 : 200 0 1 3

STEEL STRUCTURE RE: STRUCTURE


10mm PAINTED PRECAST GRC WITH HOLLOW METAL
A B C C' D PER PRECAST FABRICTOR ON STEEL STRUCTURE (GR-1)
ASPHALT SHINGLE ROOF (RF-1)

18000 IWF STEEL STRUCTURE


ROOF TOP 6000 4500 1500 6000 STEEL CATWALK &
+12.55 BALUSTRADE RE : STRUCTURE

DUCTING RE : MEP

IWF STEEL STRUCTURE RE : STRUCTURE


1
4860

A4.14

IRON CAST
ROOF DRAIN U AND R ON
RE : MEP GUTTER
12542

PODOMORO PARK
11780

DECORATIVE 40mmx20mm CEILING BY I.D


HOLLOW ON 40mmx40mm
STEEL HOLLOW FRAME WALL FINISH BY I.D GRC CONSOLE PAINTED FINISH ANDUN NDON A
PAINTED DUCO FINISH
6920

PAINTED PLASTER GRC


DECORATIVE GATE WALL
MARK N
POWDER COATED ALUMINIUM WINDOW EX A R
2

GF OOR N D ALLURE(6mm GLASS ON WINDOW)


FUNCTION HALL PORCH
FFL -0.02 FFL-0.05 FFL-0.02 FFL -0.05 U D OR
FFL-0.15
20

OR ON RU ON
A

DRA N
N
DRA

SECTION C & D
O

SCALE DATE NO
SECTION D
NA

2 1 : 200 0 1 3
22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008 A4.02
STEEL STRUCTURE RE: STRUCTURE
10mm PAINTED PRECAST GRC WITH HOLLOW METAL

9'
PER PRECAST FABRICTOR ON STEEL STRUCTURE
(GR-1)
ASPHALT SHINGLE ROOF (RF-1)
Arch 22o2
GLOBAL DESIGN STUDIO
9 10 11 12 13 14 PTE.LTD
IWF STEEL STRUCTURE RE : STRUCTURE
30000 STEEL CATWALK &
ROOF TOP 300 6000 6000 6000 6000 6000 BALUSTRADE RE : STRUCTURE
+12.65 DUCTING
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
RE : MEP and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
PAINTED STEEL LADDER works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
1 UP TO CATWALK ABOVE control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
A4.14 drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified

5780
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
IRON CAST to producing shop and setting out drawings.

ROOF DRAIN GUTTER © ARCH 22o2, all rights reserved.

RE : MEP
GRC CONSOLE
PAINTED FINISH NOTE :
11780

CEILING BY I.D
12650

WALL FINISH BY I.D DECORATIVE 40mmx20mm HOLLOW ±0.00 = +670.052


ON 40mmx40mm STEEL HOLLOW
FRAME PAINTED DUCO FINISH

6920 PAINTED PLASTER GRC


DECORATIVE GATE WALL
POWDER COATED
ALUMINIUM WINDOW EX
SCREEN ALLURE(6mm GLASS ON
MIC WINDOW)
GF FUNCTION HALL CONTROL FLOOR FINISH BY I.D
FFL -0.02 FFL -0.15 FFL -0.02 ROOM FFL -0.15
3273

BASEMENT
FFL -3.27

SECTION E
2 1 : 200 0 1 3
R1

1. PERUBAHAN UKURAN SKYLIGHT

YANG MENGIKUTI UKURAN DI


1 2 3 4 5 6 7 7'
47000 LAPANGAN

6000 6000 6000 7000 7000 8000 7000


GALVALUMNE METAL ROOF
METAL GRILL
CONCRETE ROOF WITH SCREED
& WATERPROOFING
CAST IRON
ROOF DRAIN
RE : MEP
PAINTED SKYLIGHT
10mm PAINTED PRECAST GRC WITH HOLLOW METAL
FFL +10.639 6MM + 6MM LAMINATED GLASS ON POWDER COATING
PER PRECAST FABRICTOR ON STEEL STRUCTURE (GR-1)
SKYLIGHT FRAME FINISH GOOD SYSTEM EX ALLURE
WATER TANK, RE:MEP ON PAINTED HOLLOW METAL ROOF FRAME SYSTEM.
GALTECTO ROOF (RF-1)
IWF STEEL STRUCTURE U AND R ON
4709

5000 SCREED & WATERPROOFING


1 PLASTERED PAINTED DECORATIVE GRC PROFILE
PAINTED KALSI BOARD CEILING FINISH A10.07.03

GRC COLUMN COVER PODOMORO PARK


PAINTED FINISH (WPC-1) ANDUN NDON A
10619

SCREED & WATERPROOFING


AFF +5.95
FFL+4.75 CEILING BY ID FFL+4.75

R1
AFF +4.10 AFF +4.10 MARK N
5910

CEILING BY ID
AFF +3.20
A R
2

GF
RECEPTIONIST & U D OR
20

FFL -0.02 WAITING ROOM


OR ON RU ON
A

DRA N
3270
N

BASEMENT R. SEWAGE R. UTILITY JANITOR SERVER LEGAL MARKETING MKT CR & OM CR & OM PROMOTION
DRA

FFL - 3.27 FFL - 3.20 FFL - 3.30 FFL - 3.20 FFL - 3.27 MGR LEGAL STORAGE SAD STORAGE SAD MGR GM MGR MGR STORAGE STORAGE

SECTION E & F
O

SCALE DATE NO
NA

SECTION F 22 JUN 2020


1 1 : 200 0 1 3
OR

DRAWN BY PROJECT NO
2018008 A4.03
170
Arch 22o2

1
SLOPE

WALL SECTION B
FFL+ 4.75

GLOBAL DESIGN STUDIO


RE: MEP & SPECIALIST LIGHTING

0.5
PTE.LTD
350

NOTICE

0
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
LINEAR UPLIGHT

immediately to CA prior to works being undertaken. Contractors are to ensure that all
3270 works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,

1 : 50
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

REAR ELEVATION
D

2
FFL-1.54

FFL - 3.27 FFL-3.27

1
BASEMENT
FFL -0.02
BOARD CEILING FINISH
CAST IRON WITH ROOF
DRAIN PIPE RE : MEP

STEEL STRUCTURE
RE : STRUCTURE

GYPSUM COLUMN
COVER PAINTED FNISH
GALTECTO ROOF RF1

CONCRETE COLUMN
WALL FINISH (PT-3)
PAINTED PLASTER
A RPROO N

GF
PAINTED FINISH
R D

WALL FINISH (PT-3)

WALL FINISH (PT-3)


PAINTED PLASTER

PAINTED PLASTER
IWF STRUCTURE
RE : STRUCTUR
MULTIPLEX BOARD

GUTTER
STEEL GORDING

PAINTED KALSI

KALSI PLANK

FRONT ELEVATION
RE : STRUCTURE
FLOOR SLAB
OP

±0.00 = +670.052
NOTE :
N

170
A

350
N AR R P
P

BASEMENT
FFL - 3.27
N
R M P

5890

PAINTED GRC
3270
460 800 1380 3200

FINISH
170 300
U AND R ON

SLOPE
PODOMORO PARK
ANDUN NDON A

G
AFF+3.20
MARK N
A R

FFL-0.02

FFL-3.27

1
2

WALL SECTION A
U D OR

0.5
20

OR ON RU ON

GALTECTO ROOF RF1

STEEL GORDING

(6mm GLASS ON WINDOW)

FLOOR SLAB
RE STRUCTURE
A

PAINTED FINISH ON
RETAINING WALL
DRA N

FLOOR FINISH
SEE FINISH
A10.04.02
A 02

CONCRETE COLUMN
RE : STRUCTURE
GRC PAINTED FINISH (PT3)
DECORATIVE WALL
CAST IRON WITH ROOF
DRAIN PIPE RE : MEP

CONCRETE STRUCTURE
RE : STRUCTURE
IWF STRUCTURE

IWF STRUCTURE

0
RE : STRUCTUR

RE : STRUCTUR
A
N

40mmx40mm

AS REQUIRED
STEEL HOLLOW

ALUMINIUM WINDOW
N

A
DRA

POWDER COATED
GUTTER

P
N

NDO UP
N AR UP
WALL SECTION A & B

N
R M P

EX ALLURE

N
R M P
O

1 : 50
SCALE DATE NO
NA

22 JUN 2020

1
OR
DRAWN BY PROJECT NO
2018008 A4.11
170
Arch 22o2

1
SLOPE

WALL SECTION D
GLOBAL DESIGN STUDIO

0.5
PTE.LTD

BASEMENT
350

RE: MEP & SPECIALIST LIGHTING

FFL - 3.27
5890 NOTICE

0
Do not scale this drawing, use figured dimensions only. This drawing has been
LINEAR STRIP LIGHTING

prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
3270 works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
460 800 1380 3200 conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,

1 : 50
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

FRONT ELEVATION
SLOPE

D
FFL-3.27
AFF+3.20

FFL-0.02

2
1
RE : STRUCTURE
FLOOR SLAB
PAINTED FINISH ON
PAINTED FINISH (PT-4)
GRC COLUMN COVER

RETAINING WALL
CEILING FINISH
PAINTED KALSI BOARD
CAST IRON WITH ROOF
DRAIN PIPE RE : MEP

CONCRETE COLUMN

FINISH
RE : STRUCTURE

PAINTED PLASTER
FLOOR FINISH
SEE FINISH
A10.04.02

RE : STRUCTURE
CONCRETE STRUCTURE
WALL FINISH (PT-3)
PAINTED PLASTER
GUTTER

WALL FINISH (PT-4)


PAINTED PLASTER
GALTECTO ROOF (RF1)

STEEL GORDING

A 02
MULTIPLEX BOARD

IWF STEEL STRUCTURE


RE : STRUCTURE
IWF STRUCTURE

1
RE : STRUCTUR

ADD N

N
M

±0.00 = +670.052
ON
A

NOTE :
SLOPE

170
350

RE: MEP & SPECIALIST LIGHTING

BASEMENT
FFL - 3.27
FFL -0.02
GF
5890
LINEAR STRIP LIGHTING

PAINTED GRC
3270
460 800 1380 3200

FINISH
U AND R ON

SLOPE
PODOMORO PARK
ANDUN NDON A

G
FFL-0.02
MARK N
A R

AFF+3.20

FFL-3.27

1
2

WALL SECTION C
U D OR

0.5
20

OR ON RU ON

FLOOR SLAB
RE : STRUCTURE
A

PAINTED FINISH ON
RETAINING WALL
DRA N

CONCRETE COLUMN
RE : STRUCTURE

FINISH
PAINTED PLASTER
CONCRETE STRUCTURE
RE : STRUCTURE
A10 0 02

0
A 02
GUTTER
GALTECTO ROOF (RF1)

STEEL GORDING

IWF STRUCTURE
CAST IRON WITH ROOF
MULTIPLEX BOARD

DRAIN PIPE RE : MEP


PAINTED KALSI BOARD

RE : STRUCTUR
N

IWF STEEL STRUCTURE


RE : STRUCTURE

WALL FINISH (PT-3)


PAINTED PLASTER
IWF STRUCTURE
RE : STRUCTUR

PAINTED FINISH
(PT4)
KALSI PLANK

OOR N
N
DRA

CEILING FINISH

N
WALL SECTION C & D
O

1 : 50
SCALE DATE NO
NA

22 JUN 2020

1
OR
DRAWN BY PROJECT NO
2018008 A4.12
280
Arch 22o2
350

GLOBAL DESIGN STUDIO

BASEMENT
PTE.LTD

FFL - 3.27
SPECIALIST LIGHTING

FFL -0.02
GF
WINDOW UPLIGHT

NOTICE
PAINTED GRC

Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
RE: MEP &

and levels are to be checked on site by contractors and inconsistencies reported


immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
FINISH

control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting

1
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,

WALL SECTION F
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior

0.5
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
2328

FRONT ELEVATION
0
1 : 50
AFF+3.20

FFL-3.20

1
FLOOR SLAB
RE : STRUCTURE
FLOOR FINISH
CONCRETE COLUMN
RE : STRUCTURE
WALL FINISH (PT-4)
PAINTED PLASTER
WINDOW EX ALLURE

,6mmGLASS ON WINDOW)

RE : STRUCTURE
HCS FLOOR SLAB
WALL FINISH (PT-4)
PAINTED PLASTER

POWDER COATED
ALUMINIUM DOOR &

(8mm GLASS ON DOOR


IWF STRUCTURE
RE : STRUCTUR
GALTECTO ROOF (RF1)

A10 0 02
STEEL GORDING
IWF STEEL STRUCTURE
RE : STRUCTURE

IWF STRUCTURE
RE : STRUCTUR

A 02
N

OOR N
N

2
A

N
N AR R P
P
N
R M P

±0.00 = +670.052
BASEMENT
280
SLOPE

FFL - 3.27
5890

NOTE :
350

3270
4730 1160
U AND R ON
PODOMORO PARK
ANDUN NDON A

G
MARK N
A R

1
AFF+3.20

FFL -0.02
GF

FFL-3.27
2

WALL SECTION E
0.5
U D OR
20

OR ON RU ON
A

DRA N

PAINTED FINISH

FLOOR SLAB
RE : STRUCTURE
(PT4)

A10 0 02
A 02
KALSI PLANK

0
MULTIPLEX BOARD

AS REQUIRED
IWF STRUCTURE

PAINTED FINISH (PT4)

STRUCTURE
GALTECTO ROOF (RF1)

GRC COLUMN COVER

ON 40mm METAL HOLLOW


RE : STRUCTUR

CONCRETE COLUMN PER


STEEL GORDING
IWF STEEL STRUCTURE
RE : STRUCTURE

GUTTER

PAINTED FINISH ON
RE : STRUCTURE
CAST IRON WITH ROOF

HCS FLOOR SLAB


DRAIN PIPE RE : MEP

PAINTED KALSI BOARD

RETAINING WALL
N

CEILING FINISH (PT 4)

ROOF DRAIN PIPE


RE MEP

OOR N
N
DRA

A
UP
N
WALL SECTION E & F

P
O

1 : 50
M P
SCALE DATE NO
NA

22 JUN 2020

1
R
OR
DRAWN BY PROJECT NO
2018008 A4.13
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
GALTECTO GALTECTO drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified

ROOF ( RF-1) ROOF ( RF-1) on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other

STEEL GORDING STEEL GORDING specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

IWF STRUCTURE IWF STRUCTURE


RE: STRUCTURE RE: STRUCTURE
IWF STRUCTURE
RE: STRUCTURE

350 CAST IRON WITH ROOF 350 CAST IRON WITH ROOF
DRAIN PIPE RE : MEP SLOPE
DRAIN PIPE RE : MEP
SLOPE
KALSI PLANK

170
170
KALSI PLANK PAINTED FINISH ( PT-4 )
PAINTED FINISH ( PT-4 ) PAINTED KALSI
PAINTED KALSI BOARD CEILING FINISH BOARD CEILING
BY I.D BY I.D FINISH
GRC CONSOLE
PAINTED FINISH ( PT-4 ) CEILING BY I.D
CEILING BY I.D

1600
DECORATIVE 40mmx20mm
1600

DECORATIVE 40mmx20mm HOLLOW ON 40mmx40mm


HOLLOW ON 40mmx40mm STEEL HOLLOW FRAME 1 2
STEEL HOLLOW FRAME PAINTED DUCO FINISH
FFL + 5.240
PAINTED DUCO FINISH
FFL + 5.240 REAR ELEVATION
COLUMN UPLIGHT
RE: MEP & SPECIALIST
COLUMN UPLIGHT
LIGHTING
RE: MEP & SPECIALIST
LIGHTING WALL FINISH BY I.D

GRC CONSOLE
PAINTED FINISH ( PT-4 )

FFL + 3.800
STONE WALL FINISH
(ST-1)
HT WET CLADDING
PA N D P A R WALL SYSTEM (ST-1)
R D ORA
A A P 1

POWDER COATING WALL FINISH BY I.D


ALUMINIUM DOOR & WINDOW
EX ALLURE (8mm GLASS)
GRC COLUMN COVER
PAINTED FINISH ( PT-4 )
U AND R ON

ON N
ON N
PODOMORO PARK
P D A ANDUN NDON A
P D A ON N 2
ON N 2
MARK N

1100
1100

FLOOR FINISH BY I.D FLOOR FINISH BY I.D


GF
WPC DECK (WPC-4)
GF A R
2

FFL -0.02 FFL -0.02 WPC DECK (WPC-4)

WINDOW UPLIGHT U D OR
20

RE : MEP & SPECIALIST LIGHTING FLOOR SLAB


PER STRUCTURE
OR ON RU ON
A

FLOOR SLAB DRA N


PER STRUCTURE
N

D WALL SECTION G D WALL SECTION H


1 2
DRA

1 : 50 0 0.5 1 1 : 50 0 0.5 1

WALL SECTION G & H


NOTE :
O

±0.00 = +670.052
SCALE DATE NO
NA

-0.65 = +669.402 22 JUN 2020


-0.80 = +669.252
OR

DRAWN BY PROJECT NO
-1.50 = +668.552 2018008 A4.14
IWF STRUCTURE
Arch 22o2
GLOBAL DESIGN STUDIO
RE: STRUCTURE PTE.LTD

GALTECTO GALTECTO ROOF ( RF-1) NOTICE

ROOF ( RF-1) STEEL GORDING Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
STEEL GORDING IWF STRUCTURE works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in

IWF STRUCTURE RE: STRUCTURE conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and

RE: TRUCTURE STEEL TURE


so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
RE: STRUCTURE but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
PAINTED KALSI to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.

PAINTED KALSI BOARD CEILING FINISH BOARD CEILING FINISH © ARCH 22o2, all rights reserved.

350 KALSI PLANK 350 KALSI PLANK


SLOPE
PAINTED FINISH SLOPE PAINTED FINISH ( PT-4 )

170
170
60 CAST IRON WITH ROOF CAST IRON WITH ROOF
DRAIN PIPE RE : MEP DRAIN PIPE RE : MEP
BY I.D BY I.D
CEILING BY I.D
CEILING BY I.D
DECORATIVE PA N D R ON O

1600
40mmx20mm HOLLOW ON O R P
40mmx40mm STEEL
COLUMN UPLIGHT
HOLLOW FRAME
RE: MEP & SPECIALIST
PAINTED DUCO FINISH 1 2
LIGHTING
1130
3100

REAR ELEVATION
PA N DP A R

490
A P 1
PA N D P A R
R D ORA
A A P 1 GRC PAINTED FINISH
( PT-4 )
LINEAR UPLIGHT
RE: MEP & SPECIALIST KEYPLAN
LIGHTING

6mm GLASS ROOFDRAIN PIPE

6900
RE MEP
POWDER COATING 50mm X 50mm ANGLE IRON
ALUMINIUM DOOR & WINDOW AS REQUIRED
EX ALLURE (8mm GLASS) RE : STRUCTURE
5240
5290

8mm GLASS A N D
PAINTED PLASTER
DECORATIVE WALL ( PT-4 )

PA N D P A R
3800

R D ORA COLUMN UPLIGHT


A A P 1 RE: MEP & SPECIALIST
LIGHTING
POWDER COATING
ALUMINIUM DOOR & WINDOW
EX ALLURE (8mm GLASS) U AND R ON

STONE FINISH WALL


FLOOR FINISH BY I.D

1100
WINDOW UPLIGHT
(ST-2) PODOMORO PARK
GF GF ANDUN NDON A
FFL -0.02 RE : MEP & SPECIALIST FLOOR FINISH BY I.D
POR 00 FFL -0.02 POR 00
LIGHTING

FLOOR SLAB FLOOR SLAB


MARK N
PER STRUCTURE PER STRUCTURE A R
2

D D
WALL SECTION I WALL SECTION J U D OR
20

1 1 : 50 0 0.5 1 2 1 : 50 0 0.5 1
OR ON RU ON
A

DRA N
N
DRA

WALL SECTION I & J


NOTE :
O

±0.00 = +670.052
-0.65 = +669.402 SCALE DATE NO
NA

22 JUN 2020
-0.80 = +669.252
OR

DRAWN BY PROJECT NO
-1.50 = +668.552 2018008 A4.15
COVERED
STRUCTURAL BEAM Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

SCREED &
WATERPROOFING NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
A RON ROO prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported

DRA N R M P immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
+6.77 constructed in accordance with local statutory authority requirements, local building

150 170
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
PLASTERED PAINTED relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
DECORATIVE GRC on this drawing. Contractor to supply, for comment by CA, shop drawings and setting

350
out rods to fully illustrate methods of construction of all specialist millwork, design

PROFILE ( PT-4 ) portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other

70150
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

PAINTED KALSI SCREED &


BOARD CEILING FINISH WATERPROOFING

900
FFL +4.80

270
30

800
A RON ROO

500
PAINTED PALASTER
DRA N R M P

970
WALL FINISH (PT-1)

PAINTED KALSI
AFF+4.10 BOARD CEILING
FINISH 1
PAINTED KALSI
BOARD CEILING
FINISH
HT WET CLADDING
WALL SYSTEM (ST-3)

GRC COLUMN COVER

4120
PAINTED FINISH ( PT-4 )
FRONT ELEVATION
4200

FLOOR FINISH
FLOOR FINISH GF
FFL ±0.00 FFL +0.05 GARDEN BY
FFL -0.10 LANDSCAPE
OUTDOOR LOUNGE
FFL ±0.00
-0.15 FLOOR SLAB
PER STRUCTURE
-0.45

CONCRETE STRUCTURE U AND R ON

PODOMORO PARK
3300

PAINTED PLASTER FINISH


(PT-1) WALL SECTION L ANDUN NDON A
2 1 : 50 0 0.5 1

COULMN
2150

PER STRUCTURE MARK N


A R
2

FLOOR SLAB
BASEMENT U D OR
PER STRUCTURE
20

FFL - 3.30
OR ON RU ON
A

DRA N
N
DRA

WALL SECTION K & L


C
O

NOTE :

WALL SECTION K ±0.00 = +670.052


NO
1 SCALE DATE
NA

1 : 50 0 0.5 -0.65 = +669.402 22 JUN 2020

-0.80 = +669.252
OR

DRAWN BY PROJECT NO
-1.50 = +668.552 2018008 A4.16
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

R D NOTICE
O A Do not scale this drawing, use figured dimensions only. This drawing has been

A RPROO N prepared based upon survey and other information supplied by others. All dimensions

2904 2000 100 and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
A RON A RON ROO constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in

ROO DRA N R M P 100 DRA N R M P


conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
TOP FLAT ROOF O A TOP FLAT ROOF so forth prepared by others and which are relevant to the project or projects identified

FFL + 4.75 FFL + 4.75 R D on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design

FFL - 4.75 100 FFL - 4.75 A RPROO N


portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior

800
800
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

PA N D P A R RU UR
ON R R RU UR

430
PAINTED KALSI PA N DP A R
1925
BOARD CEILING A N P 1
2600
FINISH
PAINTED KALSI
RU UR
BOARD CEILING
R RU UR
FINISH
PP OOR DRA N POWDER COATING
R M P ALUMINIUM WINDOW
4750

4750
2
R AR A ON
GRC COLUMN COVER EX ALLURE
4100 PAINTED FINISH ( PT-4 ) (8mm GLASS)

4100

3700
UP & DOWNLIGHT
RE: MEP & SPECIALIST
LIGHTING FLOOR SLAB
PER STRUCTURE
FLOOR FINISH BY I.D RON A ON 1

FLOOR SLAB FLOOR FINISH


GF PER STRUCTURE GF BY I.D
FFL ± 0.00 CORRIDOR FFL ± 0.00
FFL -0.02 FFL -0.02
FFL -0.05
FFL -0.15
-0.30 GARDEN O
CONCRETE FFL -0.45 A R PROO
STRUCTURE
ON R
RU UR
CONCRETE COLUMN PA N D P A R
PER STRUCTURE A N P 1
3300

3300
CONCRETE COLUMN
PER STRUCTURE
2450

2450

2550
2050
RETAINING WALL
PAINTED FINISH
FLOOR FINISH
U AND R ON

CURB CURB
BASEMENT
FFL - 3.30
BASEMENT
FFL - 3.20
BASEMENT
FFL - 3.30 FFL - 3.20 BASEMENT PODOMORO PARK
FFL - 3.30 ANDUN NDON A
FLOOR SLAB
PER STRUCTURE
MARK N
A R
2

E" C U D OR
20

OR ON RU ON
WALL SECTION M WALL SECTION N
A

1 1 : 50 0 0.5 1 2 1 : 50 0 0.5 DRA N


N
DRA

NOTE : WALL SECTION M & N


O

±0.00 = +670.052

SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008 A4.17
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
GALTECTO relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
ROOF ( RF-1) on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.

KALSI PLANK © ARCH 22o2, all rights reserved.

PAINTED FINISH ( PT-4 )

PAINTED PLASTER WALL ( PT-2 )


WITH PAINTED STEEL TUBE FRAMING

GRC CONSOLE PAINTED


FINISH ( PT-4 )
PAINTED METAL D A ON
SCREEN FRAMING 1
R D
A RPROO N
A RON
2000 ROO DRA N R M P
TOP FLAT ROOF
FFL + 4.75 O A
FFL - 4.75 770 100

PA N D P A R
ON R

PAINTED KALSI
1915 BOARD CEILING
FINISH

STONE CLADDING
WALL SYSTEM (ST-3)
4750

GRC COLUMN COVER


4130

PAINTED FINISH ( PT-4 )

STONE FINISH ( ST-5 )

PEDESTAL U AND R ON
STONE FINISH (ST-2)

GF
FFL ± 0.00 PANTRY
PORCH
FLOOR FINISH PODOMORO PARK
FFL -0.02 BY I.D ANDUN NDON A
FFL -0.05
FLOOR SLAB
PER STRUCTURE
MARK N
A R
2

U D OR
20

OR ON RU ON
11
A

DRA N
WALL SECTION O
N

1
DRA

1 : 50 0 0.5 1

NOTE : WALL SECTION O


O

±0.00 = +670.052

SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008 A4.18
3 2

D
A5.04 A5.04

2&3
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
A5.04
DF

HT-3 HT-3 NOTICE

825

825
Do not scale this drawing, use figured dimensions only. This drawing has been

HT-4 prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all

HT-4 HT-4 MOISTURE works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
FD RESISTANCE control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,

GYPSUM BOARD PAINTED PLASTER MOUNTED relating to the project or projects for which this drawing has been prepared. This
DF FD drawing is also to be read in conjunction with drawings, specifications, schedules and
HT-3 HT-3 SINGLE FAUCET
HT-3
E CEILING PAINTED 3 WALL FINISH (PT-2) so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
850

850
FINISH ( PT-5 ) portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
HT-3 structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates

GF GF to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
1B"
4000

FFL±0.00 FFL -0.02 FFL±0.00 FFL -0.02


© ARCH 22o2, all rights reserved.

1B' DF DF
1
825

875
MEETING
ROOM

CEO
ROOM

AFF +2.80 PAINTED AFF +2.80 MEETING


ROOM

PLASTER
DF

FD

DF FD

DF DF

WALL FINISH
RUANG
CONTROL

MALE FEMALE
P.FILTER-2
TP-2 TP-1 P.FILTER-1

SEWAGE PIT
RUANG RUANG
POMPA
UTILITY 2

(PT-2 )
40.86m

1630

1630
TOILET TOILET

TP-2
RUANG
LVMDP

TP-1
OUT GOING 1
INCOMMING
PLN
008
6145

TOP TAMAN LEVEL TOP TANGGA LEVEL

009
-0.100 -0.100

MOUNTED

3200

3200
FFL-3.22 FFL-3.22 PT-1 SINGLE PT-1 KEYPLAN - BASEMENT
ST-7
FAUCET
E' HT-1 HT-1
NOTE :
ST-7
FOR MATERIAL
008 009 SEE DRAWING : A10.04.04

900

900
FOR SANITARY SCHEDULE
CT-1 CT-1 SEE DRAWING : A5.09
1B'
2000

B BASEMENT BASEMENT
4 FFL -3.20 FFL -3.22 FFL -3.20 FFL -3.22

300

300
A5.04 FFL-3.20

HT-2 WATER WATER


010 JANITOR PROOFING PROOFING
E 010 WALL 200mm WALL 200mm
FFL-3.22
JANITOR - SECTION C JANITOR - SECTION D
5 CT-1 4 1 : 50 5 1 : 50

A5.04

C 4&5 A
DETAIL TOILET - PLAN 3 A5.04
1 1 : 50

FFL
-0.02
GF
FFL±0.00
D 4000
E' FFL GF D 4000
E' ISSUES AND REVISIONS
MOISTURE -0.02 FFL±0.00
RESISTANCE
GYPSUM BOARD
CEILING PAINTED
FINISH ( PT-5 )
PODOMORO PARK
BANDUNG, INDONESIA
AFF +2.80 AFF +2.80
HT-3
MIRROR HT-3
MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm

1520 1520
HT-3
TOILET URINAL GALLERY
PARTITION PARTITION HT-3
1200

1200
3200

3200

URINAL 825 850 ISSUED FOR


CLOSET
FOR CONSTRUCTIONS
2250

2250
WASTAFEL
150

DRAWINGS

150
HT-4 STONE FINISH
200

200
( ST-7 ) SHEET TITLE
900

900
BASEMENT WATER BASEMENT DETAIL TOILET
FFL -3.20 FFL -3.22 HT-3 PROOFING FFL -3.20 FFL -3.22 HT-3 FFL -3.20 BASEMENT
WATER
PROOFING 200mm SCALE DATE SHEET NO
22 UN 2020

TOILET - SECTION A TOILET - SECTION B


2 1 : 50 3 1 : 50
DRAWN BY PROJECT NO
2018008 A5.04
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

U AND R ON

PODOMORO PARK
ANDUN NDON A

MARK N
A R
2

U D OR
20

OR ON RU ON
A

DRA N
N
DRA

SANITARY
SCHEDULE
O

SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008 A5.05
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
LINE OF
BUILDING
NOTICE
ABOVE Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other

PROPERTY specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
LINE © ARCH 22o2, all rights reserved.

EXPOSED
MEETING
AFF+2.750
ROOM
LEGENDS
EXPOSED EXPOSED
PT6
AFF+2.750 AFF+2.750
DOWNLIGHT
PT6 PT6

E DOWNLIGHT EMERGENCY
DOWNLIGHT ADJUSTABLE

EXPOSED
TL
EXPOSED AFF+2.750 EXPOSED E
EXPOSED
AFF+2.750 AFF+2.750 PT6
AFF+3.000 TL EMERGENCY
EXPOSED
PT6 PT6
PT6 AFF+3.000
CEO
ROOM RM
EXPOSED PT6
AFF+2.750
SEE MEP FOR EXACT LIGHT
PT6
PT6 EXPOSED PT6
FIXTURE TYPE & SPECS.
PT6 AFF+2.750
EXPOSED
EXPOSED
AFF+3.000 PT6
AFF+3.000
PT6
MEETING
PT6 ROOM

PT6

PT6 EXPOSED
AFF+3.000
EXPOSED
EXPOSED DF
AFF+3.000 PT6
AFF+3.000 EXPOSED PT6
FD

DF FD
EXPOSED EXPOSED
PT6 GYPSUM GYPSUM AFF+3.000 AFF+3.000 AFF+3.000
DF
BOARD BOARD
DF

AFF+2.800 PT6 PT6 PT6


AFF+2.800 EXPOSED
PT5 AFF+3.000
PT5
EXPOSED PT6
EXPOSED AFF+3.000
PT6 AFF+3.000
PT6 PT6
RUANG PT6
PT6
CONTROL

P.FILTER-2
TP-2 TP-1 P.FILTER-1
EXPOSED
SEWAGE PIT

AFF+3.000
PT6
EXPOSED
RUANG RUANG
AFF+3.000
POMPA 2
EXPOSED
UTILITY 40.86m
AFF+3.000 PT6
PT6

EXPOSED
TP-2

RUANG
AFF+3.000
LVMDP
TP-1

PT6 EXPOSED
AFF+3.000
OUT GOING 1
INCOMMING
PLN

PT5

6145

TOP TAMAN LEVEL TOP TANGGA LEVEL


-0.100 -0.100

ISSUES AND REVISIONS

PODOMORO PARK
BANDUNG, INDONESIA

MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm

GALLERY
ISSUED FOR

FOR CONSTRUCTIONS
DRAWINGS
SHEET TITLE

REFLECTED CEILING PLAN CEILING PLAN


BASEMENT BASEMENT
1 1 : 200

N
SCALE DATE SHEET NO
22 UN 2020

DRAWN BY PROJECT NO
20 8008 A7.01
STEEL CATWALK RE :
STRUCTURE
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
-0.20 A
PAINTED STEEL LADDER
50 UP TO CATWALK ABOVE NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
20

60
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
50

00
immediately to CA prior to works being undertaken. Contractors are to ensure that all
19 works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building

B
control requirements and all relevant codes of practice. This drawing is to be read in
50 conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
39 ROOF relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified

00 ACCESS HATCH on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
30 out rods to fully illustrate methods of construction of all specialist millwork, design

45
portion & subcontractor elements of the construction. These drawings should include

50
C but not be limited to stone work, paneling, metal work, roofing, windows, drainage,

00
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
20 specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
00 to producing shop and setting out drawings.
30
C'
© ARCH 22o2, all rights reserved.

15
00
PROPERTY LINE 39
50 LEGENDS

19
50 DOWNLIGHT

60
50
20
pp-screen

DOWNLIGHT EMERGENCY

00
LINE OF BASEMENT 00
33
LEVEL BELOW D DOWNLIGHT ADJUSTABLE
TL
D
A A 0
-0.20
TL EMERGENCY
3250

FFL -0.15
SFL -0.45
RM
A' SEE MEP FOR EXACT LIGHT
2750

FIXTURE TYPE & SPECS.

B
6000

PORCH
FFL -0.05
R

1500
R
2000 3490 1995 14000
P A 100 P A 100

C A
D
200 6 000
P
FD FD

D 16
08
0
14
A 200
0
7500

P UM 0
A
D
0
OARD D D
00 60
20
A 200 A 200

13
A 200
N NAN
P
A 2 800

0 0
D
A
D
200
60
D A 200
A
D
200
12
4000

D
00
D A 200 60
A 200
D
11

20
E' D A 200
1500 2000

00
00
A 200

6 0
D
E A 200
300 10
00
E'' 32
2900

N NAN
4500

A 2 800
UP
2 00 9
7
8' 9' LINE OF EXPANSION JOINT
F
FFL -1.20
U AND R ON
6000

8
PODOMORO PARK
G ANDUN NDON A

D
A 0
MARK N
A R
2

6000 6000 6000 7000 7000 8000 7000 4619


U D OR
20

1 2 3 4 5 6 7 7' OR ON RU ON
A

DRA N
N
DRA

CEILING PLAN
REFLECTED CEILING PLAN GROUND FLOOR
O

GROUND FLOOR

N
NO
1 SCALE DATE
NA

1 : 200 22 JUN 2020


OR

DRAWN BY PROJECT NO
2018008 A7.02
1. DOOR TYPES

Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

AS SCHEDULE
NOTICE
AS SCHEDULE

AS SCHEDULE

AS SCHEDULE

AS SCHEDULE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
AS SCHEDULE AS SCHEDULE AS SCHEDULE AS SCHEDULE AS SCHEDULE portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
ALUMINUM GLASS DOOR ALUMINUM GLASS DOOR ALUMINUM DOOR STEEL DOOR STEEL DOOR structural steelwork, M&E services, case goods, cabinetry, joinery work and other
TYPE A1 TYPE A2 TYPE A4 TYPE D1 TYPE D3 specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

2. FRAME TYPES

RE : DOOR SIZE (AS SCHEDULE)

RE : DOOR SIZE (AS SCHEDULE) 3800

RE : WINDOW SIZE (AS SCHEDULE)


50 50 50 50 900 50 875 50 875 50 900 50
50

50
1000
50

50
RE : DOOR SIZE (AS SCHEDULE) RE : DOOR SIZE (AS SCHEDULE) RE : DOOR SIZE (AS SCHEDULE) RE : DOOR SIZE (AS SCHEDULE) RE : DOOR SIZE (AS SCHEDULE)
50 50 50 50
RE : DOOR SIZE (AS SCHEDULE)

50 800 50 450 50 50 50 50 50 50 50
50

50

50

50

50
50
RE : DOOR SIZE (AS SCHEDULE)

RE : DOOR SIZE (AS SCHEDULE)

RE : DOOR SIZE (AS SCHEDULE)

RE : DOOR SIZE (AS SCHEDULE)

RE : DOOR SIZE (AS SCHEDULE)


3800

2650

2020
2150
450

80
50
1000 1800 1000 1400
SINGLE DOOR DOUBLE DOOR DOUBLE DOOR SINGLE DOOR & WINDOW SINGLE DOOR DOUBLE DOOR
ALUMINUM FRAME ALUMINUM FRAME ALUMINUM FRAME DOUBLE DOOR & WINDOW SINGLE DOOR & WINDOW ALUMINIUM FRAME STEEL FRAME STEEL FRAME
TYPE 1 TYPE 2 ALUMINUM FRAME ALUMINIUM FRAME TYPE 7 TYPE 1B TYPE 2B
TYPE 3
TYPE 4 TYPE 5

3. WINDOW TYPES 4. DETAIL DOOR TYPES SCALE 1:5

RE: WINDOW SIZE (AS SCHEDULE)


RE: WINDOW SIZE (AS SCHEDULE)
RE: WINDOW SIZE (AS SCHEDULE)
50 50 50 50
50

5mm GROOVE LINE 15 35


RE : WINDOW SIZE (AS SCHEDULE)
3575

AS SCHEDULE

5mm
GROOVE
LINE
U AND R ON
STEEL
ASTRAGAL
DOOR
50
100

1512
ALUMINUM ALUMINUM GLASS WINDOW
AS SCHEDULE
PODOMORO PARK
GLASS WINDOW TYPE 1F MATERIAL : ALUMINUM MATERIAL : STEEL ANDUN NDON A
TYPE 1A
M1 M2
FROSTED SEAL
GLASS RUBBER
MARK N
15 35 15
RE : WINDOW SIZE (AS SCHEDULE) RE : WINDOW SIZE (AS SCHEDULE) RE : WINDOW SIZE (AS SCHEDULE) RE : WINDOW SIZE (AS SCHEDULE)
5mm GROOVE LINE
A R
2

RE : WINDOW SIZE (AS SCHEDULE)

RE : WINDOW SIZE (AS SCHEDULE)

RE : WINDOW SIZE (AS SCHEDULE)

RE : WINDOW SIZE (AS SCHEDULE)

U D OR
20

OR ON RU ON
A

5mm
DRA N
N

GROOVE
LINE
DRA

DOOR & WINDOW


900

900

900

200

TYPE
ALUMINUM ALUMINUM ALUMINUM
O

ALUMINUM
GLASS WINDOW GLASS WINDOW GLASS WINDOW GLASS WINDOW
TYPE 1B TYPE 1C TYPE 1D TYPE 1E
MATERIAL : STEEL
M3 SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008
A10.01.11
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

U AND R ON

PODOMORO PARK
ANDUN NDON A

MARK N
A R
2

U D OR
20

OR ON RU ON
A

DRA N
N
DRA

DOOR & WINDOW


SCHEDULE
O

SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008
A10.01.12
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

U AND R ON

PODOMORO PARK
ANDUN NDON A

MARK N
A R
2

U D OR
20

OR ON RU ON
A

DRA N
N
DRA

HARDWARE GROUP
O

SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008
A10.01.13
FLOOR SLAB FLOOR SLAB FLOOR SLAB FLOOR SLAB
ABOVE
AERATED
ABOVE
AERATED
ABOVE
AERATED
ABOVE
AERATED
Arch 22o2
GLOBAL DESIGN STUDIO
CONCRETE (AAC) CONCRETE (AAC) CONCRETE (AAC) CONCRETE (AAC) PTE.LTD
100mm 100mm 100mm 100mm
PAINTED
PAINTED GYPSUM PLASTER WALL PAINTED GYPSUM PAINTED GYPSUM NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
BOARD CEILING UNLESS MORTAR 25mm BOARD CEILING BOARD CEILING prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
UNLESS DESIGNED DESIGNED UNLESS DESIGNED UNLESS DESIGNED works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building

BY I.D BY I.D BY I.D BY I.D


control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
PAINTED relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
PLASTER WALL MORTAR 25mm MORTAR 25mm MORTAR 25mm on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design

UNLESS PAINTED PLASTER portion & subcontractor elements of the construction. These drawings should include

WALL UNLESS HOMOGENEOUS HOMOGENEOUS but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
DESIGNED PAINTED PLASTER specialist finishes and features. The dimensional accuracy of this drawing as it relates

DESIGNED BY I.D PAINTED TILE UNLESS PAINTED TILE UNLESS to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
BY I.D WALL UNLESS © ARCH 22o2, all rights reserved.
PLASTER WALL DESIGNED BY I.D PLASTER WALL DESIGNED BY I.D
DESIGNED BY I.D
UNLESS UNLESS
FINISH SCHEDULE FINISH SCHEDULE DESIGNED FINISH SCHEDULE DESIGNED FINISH SCHEDULE
RE: A10.04.04 RE: A10.04.04 BY I.D RE: A10.04.04 BY I.D RE: A10.04.04
HT-2 FINISH LINE OF FLOOR LINE OF FLOOR HT-2 FINISH LINE OF FLOOR HT-2 FINISH LINE OF FLOOR

25 100 25 25 100 25 25 100 25 25 100 25

1 WALL TYPE 1A SCALE 1 : 10 2 WALL TYPE 1A" SCALE 1 : 10 3 WALL TYPE 1B SCALE 1 : 10 4 WALL TYPE 1B' SCALE 1 : 10

FLOOR SLAB FLOOR SLAB FLOOR SLAB


ABOVE ABOVE ABOVE

TOP WOOD TRIM


FINISH

150
PAINTED GYPSUM PAINTED GYPSUM
BOARD CEILING BOARD CEILING
METAL METAL UNLESS DESIGNED
HOLLOW HOLLOW BY I.D
STUD STUD
1200

PAINTED GYPSUM PAINTED GYPSUM PAINTED


BOARD UNLESS BOARD UNLESS CONCRETE
METAL WALL FINISH
DESIGNED BY I.D DESIGNED BY I.D
HOLLOW
STUD
76mm PAINTED GYPSUM
BOARD 9mm LINE OF FLOOR
LINE OF FLOOR LINE OF FLOOR LINE OF FLOOR
HT-2 FINISH HT-2 FINISH
HT-2 FINISH

9 76 9 9 9 9 76 9 250

5 PARTITION TYPE 3A SCALE 1 : 10 6 PARTITION TYPE 3A' SCALE 1 : 10 7 PARTITION TYPE 3B SCALE 1 : 10 8 WALL TYPE 4A SCALE 1 : 10

FLOOR SLAB
U AND R ON
ABOVE

PODOMORO PARK
ANDUN NDON A

MARK N
A R
2

U D OR
20

PAINTED
CONCRETE OR ON RU ON
A

WALL FINISH
DRA N
N
DRA

LINE OF FLOOR

DETAIL WALL TYPES


O

250
SCALE DATE NO
NA

22 JUN 2020

A10.02.11
OR

DRAWN BY PROJECT NO
9 WALL TYPE 4A' SCALE 1 : 10 2018008
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.

A A
© ARCH 22o2, all rights reserved.

7 7
1200 1210 1200 1200 1210 1200

1500
C C
FD FD

PT-4
P UM
OARD
A 200
WUDHU C C KEYPLAN

2150
2150

3 FFL +0.080 FFL -0.020 FFL +0.080 3 P 1 : 400


A10.02.14
PT-4 A10.02.14
HT-6

1060 1060
PT-4
FD FD FD FD

BATAS SUCI
PT-4

2
B 2
B
A10.02.14 A10.02.14

MUSHOLA P UM
OARD

3870
3870

FFL+0.100
PT-4 PT-4 A 200
HT-6
P

PT-4

U AND R ON

PODOMORO PARK
ANDUN NDON A

1 1
A10.02.14 A10.02.14
MARK N
A R
2

U D OR
FLOOR PLAN CEILING PLAN
20

1 1 : 50 2 1 : 50 OR ON RU ON
A

DRA N
N
DRA

INTERIOR DETAIL
MUSHOLA
O

SCALE DATE NO
NA

22 JUN 2020

A10.02.13
OR

DRAWN BY PROJECT NO
2018008
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
PAINTED GYPSUM PAINTED GYPSUM and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
BOARD CEILING BOARD CEILING works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
AFF +3.200 AFF +3.200 AFF +3.200 AFF +3.200 so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
PAINTED PLASTER PAINTED PLASTER structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
WALL FINISH WALL FINISH to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

WINDOW
PT-4

WOOD PLANK
PT-4 ATTACHED ON WALL PT-4 PT-4
400 600 950
MOUNTED SINGLE
FAUCET

RAM
HT-6 A N

MUSHOLA WUDHU MUSHOLA MUSHOLA


FFL+0.100 FFL +0.080 FFL+0.100 FFL+0.100
FFL -0.020

3850 2360 1283 1060 1268

C 7

SECTION A SECTION B
1 1 : 50 2 1 : 50

PAINTED GYPSUM
BOARD CEILING

AFF +3.200 AFF +3.200

PAINTED PLASTER
WALL FINISH
1890

PT-4 PT-4
WOOD PLANK U AND R ON
ATTACHED ON WALL

MOUNTED SINGLE PODOMORO PARK


FAUCET ANDUN NDON A
980

MARK N
915

WATERPROOFING A R
2

200

FFL +0.080
290

-0.01 FFL -0.020 U D OR


20

OR ON RU ON
A

1283 1060 1268


DRA N
N

7
DRA

INTERIOR DETAIL
SECTION C MUSHOLA
3
O

1 : 50

SCALE DATE NO
NA

22 JUN 2020

A10.02.14
OR

DRAWN BY PROJECT NO
2018008
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

LINE OF
BUILDING NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
ABOVE and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other

PROPERTY specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
LINE © ARCH 22o2, all rights reserved.

NOTE :

014 FOR MATERIAL


013
CC-2
MEETING
HT-2
ROOM
CT-2
FLOOR FINISH PLAN
SEE DRAWING : A10.04.03

015
CT-1

012
HT-2

07
HT-2

CC-2
08
HT-2
HT-2
09
HT-2 CEO 016
ROOM HT-2

005 017
HT-2 CT-1
004 HT-5
003 HT-2 006 011
HT-2 HT-2 HT-2
HT-2

MEETING
ROOM 010
HT-2 018
002 HT-2
HT-2

HT-2

028
DF
HT-2
001 HT-2
TOILET TOILET FD

CT-1 DF

FFL -3.22
FD

032 021 020


HT-2 FFL -3.22 030 019
HT-2
HT-2 HT-2 CT-1
DF
035 034 DF
HT-2
HT-1 HT-1

025
026 HT-2
040 HT-2 033 027
FFL - 3.20 029 024 023 022
RUANG
CC-1 HT-2
HT-2 HT-2
HT-2
HT-2
HT-2 HT-2
CONTROL 036 031
CT-1 HT-2

P.FILTER-2
TP-2 TP-1 P.FILTER-1
SEWAGE PIT

037
038
CC-1
CC-1
RUANG RUANG
POMPA
UTILITY 40.86m 2

041
CC-1
TP-2

RUANG
LVMDP
TP-1

039
CC-1
OUT GOING 1
PLN
INCOMMING

6145

TOP TAMAN LEVEL


-0.100
TOP TANGGA LEVEL
-0.100
ISSUES AND REVISIONS

PODOMORO PARK
BANDUNG, INDONESIA

MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm

GALLERY
ISSUED FOR

FOR CONSTRUCTIONS
DRAWINGS
SHEET TITLE
BASEMENT FLOOR PLAN
1 1 : 300
FLOOR FINISH PLAN

N
SCALE DATE SHEET NO
22 UN 2020

DRAWN BY PROJECT NO
20 8008
A10.04.01
Arch 22o2
GLOBAL DESIGN STUDIO

34
PTE.LTD

51
MARKETING GALLERY -0.20 A HVAC VERTICAL DUCT
AREA BY I.D

10
00
( NOT IN CONTRACT ) 0
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been

205 prepared based upon survey and other information supplied by others. All dimensions

60
and levels are to be checked on site by contractors and inconsistencies reported
50 immediately to CA prior to works being undertaken. Contractors are to ensure that all
19

0
works under their responsibility or the responsibility of their sub-contractors are
50

0
constructed in accordance with local statutory authority requirements, local building
05 control requirements and all relevant codes of practice. This drawing is to be read in
3
39
50 B conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
WPC-4 on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
00
30
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include

45
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
PORCH
50 structural steelwork, M&E services, case goods, cabinetry, joinery work and other
20FFL -0.05

00
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior

00 to producing shop and setting out drawings.


30
C'
© ARCH 22o2, all rights reserved.

15
50

00
PROPERTY LINE 39
GENSET - EXHAUST NOTE :
50
19
50 FOR MATERIAL

60
20
pp-screen

FLOOR FINISH PLAN

00
LINE OF BASEMENT 00 SEE DRAWING : A10.04.03
33
D

50
LEVEL BELOW

00
-0.20
A

10
3250

00
FFL -0.15
SFL -0.45

A'
2750

FLOOR FINISH CT-2

BY I.D
B
6000

WPC-4

PORCH
FFL -0.05

1500
2000 3490 1995 14000

C HT-6 60
0 0

14
HT-5
0
08
FD FD

16
00
7500

HT-6
60
FLOOR FINISH
BY TENANT 13
00
60
D 12
4000

00
60

E' 11
1500 2000

00
60
E 30
0
10
0 0
E'' FLOOR FINISH
32
4500

BY TENANT
0 0 9
72
UP

8' 9' LINE OF EXPANSION JOINT


F
FFL -1.20
U AND R ON
6000

8 GARDEN & PARKING


BY LANDSCAPE PODOMORO PARK
G ANDUN NDON A

LINE OF MARK N
CANOPY
A R
2

6000 6000 6000 7000 7000 8000 7000 4619


U D OR
20

1 2 3 4 5 6 7 7' OR ON RU ON
A

DRA N
N

FLOOR FINISH
DRA

TO MATCH DROP-OFF
TERRACE RE : LANDSCAPE FLOOR FINISH PLAN
O

GROUND FLOOR PLAN

N
SCALE DATE NO
1
NA

1 : 300 22 JUN 2020


OR

DRAWN BY PROJECT NO
2018008
A10.04.02
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

U AND R ON

PODOMORO PARK
ANDUN NDON A

MARK N
A R
2

U D OR
20

OR ON RU ON
A

DRA N
N
DRA

ROOM FINISH SCHEDULE


O

SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008
A10.04.03
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

U AND R ON

PODOMORO PARK
ANDUN NDON A

MARK N
A R
2

U D OR
20

OR ON RU ON
A

DRA N
N
DRA

MATERIAL
SCHEDULE
O

SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008
A10.04.04
ASPHALT
SHINGLE ROOF
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all

150
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting

1960
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include

D C B A
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
4mm ACP WITH HOLLOW METAL
PER PRE FABRICTOR ON STEEL
200

STRUCTURE
COLOR : GREY/SUB SILVER
520 3900 150 3900 150 3900 150 3900 520 600
500
6 5 4 3 4mm ACP WITH HOLLOW METAL 400
2 PER PRE FABRICTOR ON STEEL 638
A10.07.01 A10.07.01 A10.07.01 A10.07.01
STRUCTURE
A10.07.01
4mm ACP WITH HOLLOW METAL COLOR : GREY/SUB SILVER

150
PER PRE FABRICTOR ON STEEL
DECORATIVE PARAPET PLAN STRUCTURE
1 1 : 100 COLOR : GREY/SUB SILVER
KEYPLAN - ROOF PLAN

250
D C B A

100
150
250

ASPHALT
SHINGLE ROOF
150 100

760
R4 REVISI PLAN PENAMBAHAN
NOTASI ATAP
09-09-19

PENAMBAHAN DUDUKAN
LAMPU
410

220
125 150

STEEL

200
STRUCTURE
RE: STRUCUTURE
600
220

700

6 5 4 3
SECTION D
A10.07.01 A10.07.01 A10.07.01 A10.07.01 6 1 : 20 A DR O

4mm ACP WITH HOLLOW METAL


ELEVATION 200 200 200
PODOMORO PARK
2 1 : 20
PER PRE FABRICTOR ON STEEL
STRUCTURE A D DO A
LINEAR BACKLIGHT
150

COLOR : GREY/SUB SILVER

150
BALUSTRADE
RE : MEP &
LIGHTING SPECIALIST LINEAR BACKLIGHT
MARK
BALUSTRADE A R
410

RE : MEP &

410
865

10mm PAINTED GRC WITH LIGHTING SPECIALIST


HOLLOW METAL PER PRE D OR
FABRICTOR ON STEEL ASPHALT OR
STRUCTURE SHINGLE ROOF O R O
160

DRA

275
280

EXTERIOR DETAIL
STEEL STRUCTURE STEEL STRUCTURE (DETAIL DECORATIVE
RE: STRUCUTURE RE: STRUCUTURE
PARAPET)
200

200

200
SCALE DATE O

SECTION A SECTION B SECTION C 20 APR 2020

5
D C B A
4mm ACP WITH
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
HOLLOW METAL PER PRE
FABRICTOR ON STEEL 4mm ACP WITH
STRUCTURE HOLLOW METAL PER PRE
NOTICE
COLOR : GREY/SUB SILVER FABRICTOR ON STEEL Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions

STRUCTURE and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
COLOR : GREY/SUB SILVER constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
200 relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
40mm x40mm © ARCH 22o2, all rights reserved.

STEEL HOLLOW
RE: STRUCUTURE

750
LINEAR BACKLIGHT
BALUSTRADE
RE : MEP &
LIGHTING SPECIALIST

280
KEYPLAN - ROOF PLAN
STEEL STRUCTURE

200
RE: STRUCUTURE
6 5 4 3
A10.07.02 ELEVATION A10.07.02 A10.07.02 A10.07.02
2 1 : 20

SECTION A
3 1 : 20
700 7420 700 ROOF DRAIN
RE: MEP

600 4mm ACP WITH


4mm ACP WITH HOLLOW METAL 500 HOLLOW METAL PER PRE
700

700

PER PRE FABRICTOR ON STEEL FABRICTOR ON STEEL


400 STRUCTURE
STRUCTURE
250 COLOR : GREY/SUB SILVER
COLOR : GREY/SUB SILVER

150
LINEAR BACKLIGHT
BALUSTRADE

250
RE : MEP &
LIGHTING SPECIALIST
200

100
200

150
7420

7420

40mm x40mm A DR O
STEEL HOLLOW
RE: STRUCUTURE
410
750

750

750
PODOMORO PARK
A D DO A
150

MARK

180 100
A R
280

280
2

700

700

D OR
OR
20

STEEL STRUCTURE
200

200

200
O R O
A

RE: STRUCUTURE
DRA
700 7420 700
DRA

STEEL STRUCTURE EXTERIOR DETAIL


RE: STRUCUTURE
(DETAIL DECORATIVE
PARAPET)
O

DECORATIVE PARAPET PLAN SECTION B SECTION C SECTION D SCALE DATE O


A

1 1 : 100 4 1 : 20
5 1 : 20 6 1 : 20
20 APR 2020
OR

DRAWN BY PROJECT NO
2018008
A10.07.02
B
G F E" E E' D C Arch 22o2
GLOBAL DESIGN STUDIO
6000 4500 1500 2000 4000 7500 PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
ROOF DRAIN immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building

6 control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
FLAT CONCRETE ROOF so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 WITH WATERPROOFING out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
PAINTED SKYLIGHT to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
6MM + 6MM LAMINATED GLASS ON
POWDER COATING SKYLIGHT FRAME
A 2
FINISH GOOD SYSTEM EX ALLURE ON
8000

5000

PAINTED HOLLOW METAL ROOF FRAME


SYSTEM. 1
FFL +6.70 A10.07.03

15000

7 ROOF PLAN
R1

DETAIL SKYLIGHT - PLAN 3


1 1 : 150 A10.07.03 PAINTED SKYLIGHT
6MM + 6MM LAMINATED GLASS ON POWDER COATING COVERED
PLASTERED
SKYLIGHT FRAME FINISH GOOD SYSTEM EX ALLURE STRUCTURAL FRAMELESS GLASS 5mm FLAT CONCRETE ROOF
PAINTED DECORATIVE
ON PAINTED HOLLOW METAL ROOF FRAME SYSTEM. BEAM WITH WATERPROOFING
GRC PROFILE

G PLASTERED PAINTED
F E" E E' D C R1

GYPSUM CEILING
6000 4500 1500 2000 4000 7500 1. PERUBAHAN UKURAN SKYLIGHT

YANG MENGIKUTI UKURAN DI

LAPANGAN

FFL +6.70 FFL +6.70 FFL +6.70 2. PERUBAHAN METAL SCREEN

MENJADI FRAMELESS GLASS


R1

1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000

SECTION A
2 1 : 100 5 7
7 A10.07.03
U AND R ON
FLAT CONCRETE ROOF
4
6 7 PAINTED SKYLIGHT
6MM + 6MM LAMINATED GLASS
WITH WATERPROOFING BEAM PER
STRUCTURE
8000 A10.07.03

220 300 150


ON POWDER COATING SKYLIGHT
FFL +6.70 PLASTERED PAINTED PODOMORO PARK

150
FRAME FINISH GOOD SYSTEM DECORATIVE GRC PROFILE
EX ALLURE ON PAINTED HOLLOW CEILING BY I.D ANDUN NDON A
METAL ROOF FRAME SYSTEM.
BEAM PER
5000 STEEL STRUCTURE STRUCTURE GLASS FRAME,
RE: STRUCTURE RE : STRUCTURE
MARK N

80
FLAT CONCRETE ROOF CEILING BY I.D
FFL +6.70 FFL +6.70 WITH WATERPROOFING 6MM FRAMELESS GLASS A R

950
2

4485 6MM FRAMELESS GLASS


PLASTERED PAINTED
DECORATIVE GRC PROFILE U D OR
20

WOOD PLASTIC COMPOSITE WOOD PLASTIC COMPOSITE


CEILING BY I.D COLUMN COVER COLUMN COVER OR ON RU ON
250
A

FFL +4.75
FFL +4.75 R1 FFL +4.75 SCREED & R1
SCREED &
WATERPROOFING
DRA N
N

WATERPROOFING 50 50
DRA

SLOPE TO DRAIN

EXTERIOR DETAIL
140 (DETAIL SKYLIGHT)
O

SCREED &
WATERPROOFING

SECTION B DETAIL 1 DETAIL 2 SCALE DATE NO


NA

3 1 : 100 4 1 : 50 5 1 : 20
22 JUN 2020
OR

DRAWN BY PROJECT NO
R1
2018008
A10.07.03
10mm PAINTED GRC
WITH HOLLOW METAL
PER PRE FABRICTOR
ON STEEL STRUCTURE
ROOF DRAIN
RE: MEP
GALVALUMNE
METAL ROOF
GALTECTO
ROOF (RF-1)
10mm PAINTED GRC
WITH HOLLOW METAL
GALVALUMNE
METAL ROOF
ROOF DRAIN
RE: MEP
Arch 22o2
GLOBAL DESIGN STUDIO
700 7420 700 PER PRE FABRICTOR PTE.LTD
ON STEEL STRUCTURE

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been

A 3000
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all

E' works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
700

700
2000

so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

E SLOPE SLOPE

4000 A
1500

60
00
B

45
00
C'

15
00
60
00
D

3250
6000
A'

E''
B

6000
ALUMINUM GRILL LOUVER C
60
0 0

14

7500
0 0
60
13
00
60
D
12

4000
00
60

E' 11

1500 2000
00
60

CONCRETE ROOF WITH


E
03
00 10
E'' 320

4500
00 9
72
8' 9'
F

SCREED & WATERPROOFING

6000
8
G
4000
7420

7420
6000 6000 6000 7000 7000 8000 7000 4619

1 2 3 4 5 6 7 7'

IWF STEEL STRUCTURE


RE: STRUCTURE
4500

KEYPLAN - ROOF PLAN


4500 1500

3
A10.07.04
F E" E

F B
700

700
2 SECTION A
2 1 : 50
A10.07.04

700 7420 700

6000

2 3 10mm PAINTED GRC


GALVALUMNE
WITH HOLLOW METAL
METAL ROOF ROOF DRAIN
PER PRE FABRICTOR
ROOF PLAN - WATER TANK RE: MEP
1 1 : 100
ON STEEL STRUCTURE

4
A10.07.04 3000

U AND R ON

GALVALUMNE
METAL ROOF
PODOMORO PARK
SLOPE SLOPE ANDUN NDON A
ALUMINUM
GRILL LOUVER
MARK N
740

ALUMINUM GRILL LOUVER


CONCRETE ROOF WITH
SCREED & WATERPROOFING
A R
2

CONCRETE ROOF WITH


SCREED & WATERPROOFING
150

U D OR
20

SLOPE IWF STEEL STRUCTURE IWF STEEL STRUCTURE


RE: STRUCTURE RE: STRUCTURE OR ON RU ON
A

6000
DRA N
N
DRA

2 3 EXTERIOR DETAIL
(DETAIL ROOF
DETAIL 1 WATER TANK)
O

4 1 : 20
SCALE DATE NO
NA

SECTION B 22 JUN 2020

3 1 : 50
OR

DRAWN BY PROJECT NO
2018008
A10.07.04
11 12
6000

5670
D
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

DECORATIVE LASER CUT METAL SCREEN


PAINTED DUCO FINISH ON 40mm x 40mm HOLLOW NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
STEEL. GENERAL CONTRACTOR & METAL prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported

D SCREEN FABRICTOR TO PROVIDE SUPPORT & immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
FRAME, APPROVAL, BRACKET, ETC AS REQUIRED control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
PROVIDE SHOP DRAWINGS FOR OWNER/ARCH drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified

1900 1900 1900 RE : STRUCTURE on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

GRC CONSOLE
PAINTED FINISH 5
( PT-4 ) A10.07.05

PAINTED PLASTER GRC CONSOLE


2 3 GRC DECORATIVE PAINTED KALSI PAINTED FINISH ( PT-4 )
GATE WALL ( PT-1 )
PLAN - SCREEN A10.07.05 A10.07.05 BOARD CEILING

1600
1 1 : 50 FINISH GRC COLUMN COVER
40mm x 40mm PAINTED FINISH
4
11 12 STEEL HOLLOW
6000 A10.07.05 KALSI PLANK STRUCTURE GRC CONSOLE
PAINTED FINISH PAINTED FINISH
( PT-4 )
DECORATIVE LASER CUT METAL SCREEN
PAINTED DUCO FINISH ON 40mm x 40mm HOLLOW
STEEL. GENERAL CONTRACTOR & METAL
SCREEN FABRICTOR TO PROVIDE SUPPORT &
FRAME, APPROVAL, BRACKET, ETC AS REQUIRED
1600

PROVIDE SHOP DRAWINGS FOR OWNER/ARCH


RE : STRUCTURE

GRC CONSOLE
PAINTED FINISH
( PT-4 )

PAINTED PLASTER
GRC DECORATIVE
GATE WALL ( PT-1 )
SECTION
3 1 : 50
ELEVATION
2 1 : 50

U AND R ON

PAINTED KALSI
BOARD CEILING
PODOMORO PARK
160

FINISH
ANDUN NDON A
DECORATIVE LASER CUT METAL SCREEN
PAINTED DUCO FINISH ON 40mm x 40mm HOLLOW
140

147 STEEL. GENERAL CONTRACTOR & METAL


SCREEN FABRICTOR TO PROVIDE SUPPORT &
GRC COLUMN COVER MARK N
PAINTED FINISH
140

A R

1600
315 FRAME, APPROVAL, BRACKET, ETC AS REQUIRED
PROVIDE SHOP DRAWINGS FOR OWNER/ARCH
2

RE : STRUCTURE
U D OR
20

GRC CONSOLE
OR ON RU ON
A

PAINTED FINISH DRA N


N

( PT-4 )
DRA

160

315 EXTERIOR DETAIL


(DETAIL SCREEN)
O

40
SCALE DATE NO
NA

DETAIL 1 DETAIL 2 22 JUN 2020

4 5
OR

DRAWN BY PROJECT NO
1 : 25 1 : 25
2018008
A10.07.05
11
6000
12 11
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

4 DOWN PIPE
ROOF DRAIN
A8.01.01 A B RE : MEP NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions

50 50 200
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
GRC COLUMN works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
COVER PAINTED conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,

50
relating to the project or projects for which this drawing has been prepared. This
FINISH ( PT-4 ) drawing is also to be read in conjunction with drawings, specifications, schedules and
DOWN PIPE so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
ROOF DRAIN out rods to fully illustrate methods of construction of all specialist millwork, design
RE : MEP PEDESTAL portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
GRC COLUMN to site conditions is not guaranteed. The contractor must verify all site dimensions prior

1265
to producing shop and setting out drawings.

350
COVER PAINTED © ARCH 22o2, all rights reserved.
PAINTED PLASTER GRC
FINISH ( PT-4 )
DECORATIVE GATE WALL

815
PEDESTAL ( PT-1 )

1265
PAINTED PLASTER GRC 40mm x 40mm STEEL
DECORATIVE GATE WALL HOLLOW STRUCTURE
2 ( PT-1 )
A10.07.06

50
40mm x 40mm STEEL

50
HOLLOW STRUCTURE

254 1086 400 1900 400 1086 254 400 100100 485 100100100100
5380 1485
PAINTED PLASTER GRC
DETAIL DECORATIVE 3 4
DETAIL 1
DECORATIVE GATE WALL
( PT-1 )
GATE WALL - PLAN A10.07.06 A10.07.06 4 1 : 25
1 1 : 50

11 12 D DECORATIVE 40mmx20mm D
HOLLOW ON 40mmx40mm
6000 STEEL HOLLOW FRAME
DECORATIVE 40mmx20mm PAINTED DUCO FINISH
HOLLOW ON 40mmx40mm
STEEL HOLLOW FRAME
PAINTED DUCO FINISH
40mm x 40mm STEEL
1265 HOLLOW STRUCTURE 1265

PAINTED PLASTER GRC


DECORATIVE GATE WALL
( PT-1 ) PAINTED PLASTER GRC
DECORATIVE GATE WALL
( PT-1 )

350

HT WET CLADDING
WALL SYSTEM (ST-1)

PAINTED PLASTER GRC


( PT-4)

GRC COLUMN COVER


PAINTED FINISH ( PT-4 )
5340

5340

5340
U AND R ON

PAINTED PLASTER GRC PAINTED PLASTER GRC


4255

4252
DECORATIVE GATE WALL DECORATIVE GATE WALL
( PT-1 ) ( PT-1 ) PODOMORO PARK
ANDUN NDON A

1
A8.01.01 MARK N
A A R
POWDER COATING ALUMINIUM
2

DOOR & WINDOW


EX ALLURE
U D OR
20

OR ON RU ON
A

PEDESTAL
STONE FINISH
(ST-2)
DRA N
N
DRA

EXTERIOR DETAIL
250 870 145 1120 145 (DETAIL DECORATIVE
287 400 200 487,5 400 1900 400 487,5 200 400 287 GATE WALL)
O

1265 1265
4875
SCALE DATE NO
NA

ELEVATION SECTION A SECTION B 22 JUN 2020

2 3 4
OR

DRAWN BY PROJECT NO
1 : 50 1 : 50 1 : 50
2018008
A10.07.06
Arch 22o2
STAINLESS STEEL

CONCRETE BASE
BRUSHED FINISH
60mm FLAGPOLE

GLOBAL DESIGN STUDIO


PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
500

portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
50
20
50
19
50
1000

39
00
30
50
20
00
30
50
39
50
19
50 pp-screen
20
00
33

1500
2000 3490 1995 14000
FD FD
0
08
16
A5.07

ET
NS
GE
U
RD
GA LN
2

P
UP
1
1000

GROUND FLOOR PLAN


500

PLAN

60mm STAINLESS

60mm STAINLESS
STEEL BRUSHED

STEEL BRUSHED

CONCRETE BASE
1 : 50

600
1

FINISH

FINISH
150

500
7000

1000
8000
U AND R ON
PODOMORO PARK
ANDUN NDON A
MARK N
A R

1000
2

ELEVATION
7000 U D OR
20

OR ON RU ON
A

DRA N
N
DRA

1 : 25
500
EXTERIOR DETAIL
(DETAIL SCREEN)
O

2
SCALE DATE NO
NA

22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008
A10.07.07
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

4 NOTICE
A10.07.08 Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in

1 DOWN PIPE
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
ROOF DRAIN out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
RE : MEP structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.

ROOF DRAIN PIPE © ARCH 22o2, all rights reserved.

5 820 PAINTED RE: MEP


A10.07.08 PLASTER WALL
650
WF
STEEL PAINTED KALSI BOARD
Ø 4" CEILING FINISH

250
STRUCTURE
COLUMN UPLIGHT GRC COLUMN
100 RE: MEP & COVER PAINTED

800
100
SPECIALIST FINISH ( PT-4 )
LIGHTING

250
4x4 HOLLOW
3 4x4 HOLLOW
1 A10.07.08 STEEL FRAME
STEEL FRAME
STRUCTURE
A STRUCTURE
GRC COLUMN
6 COVER PAINTED IWF STRUCTURE
550
A10.07.08 FINISH ( PT-4 ) RE : STRUCTUR

KEYPLAN -
COLUMN 1 SECTION @ B.O.H COLUMN 1 PLAN A DETAIL 2
1 1 : 100 3 1 : 20 0 0.5 1 5 1 : 20 0 0.5 1

ROO RU UR A O
1 ROO R 1
A10.07.08
R RU UR

U R GRC COLUMN
R M P COVER PAINTED
FINISH ( PT-4 )
350 350 ROO N 4x4 HOLLOW
R M P N STEEL FRAME
P A STRUCTURE
SLOPE ROOF DRAIN PIPE
A AN DM A U AND R ON
UPPOR RA K M P RE: MEP
170

N P A
IWF STRUCTURE PODOMORO PARK
CAST IRON WITH ROOF RE : STRUCTUR ANDUN NDON A
DRAIN PIPE RE : MEP
350

N ON
KALSI PLANK MARK N
PAINTED FINISH ( PT-4 )
A R
2

STONE PEDESTAL
PAINTED KALSI BOARD
( ST-2 ) U D OR
CEILING FINISH
20

OR ON RU ON
A

DRA N
N
DRA

KEYPLAN - ROOF PLAN DETAIL 1 DETAIL 3


2 1 : 400 4 1 : 20 0 0.5 1 6 1 : 20 0 0.5 1
COLUMN 1 DETAIL
O

SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008
A10.07.08
1
A10.07.09
GRC COVER
1
A10.07.09 Arch 22o2
GLOBAL DESIGN STUDIO
5 PAINTED FINISH ( PT-4 ) PTE.LTD
A10.07.09 DECORATIVE HOLLOW
50MM X 50MM METAL SCREEN
ANGLE IRON AS REQUIRED NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been

1 RE STRUCTURE prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified

GRC COLUMN COVER on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
PAINTED FINISH but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

GRC COVER
4 PAINTED FINISH ( PT-4 )
A10.07.09

300

300
B 6 50MM X 50MM

450

450
A10.07.09 ANGLE IRON AS REQUIRED

50

50
COLUMN UPLIGHT RE STRUCTURE
RE: MEP & SPECIALIST

200
50
2 600
LIGHTING

40
GRC COVER
25 200 25 PAINTED CONSOLE
600 FINISH ( PT-4 )

DOWN PIPE
DOWN PIPE ROOF DRAIN
ROOF DRAIN RE : MEP
3 RE : MEP
A10.07.09

A COLUMN 2 PLAN A COLUMN 2 PLAN B


3 1 : 50 3 1 : 50

KEYPLAN -
COLUMN 2 SECTION @ FUNCTION HALL
1 1 : 75 0 0.5 1

IWF STRUCTURE
1 RE : STRUCTUR
A10.07.09
GALTECTO
ROOF (RF-1)
PAINTED FINISH GRC
ROOF LIGHTING CONSOLE ON 40mm
RE: MEP & LIGHTING METALHOLLOW ( PT-4 ) ISSUES AND REVISIONS
SPECIALIST
GUTTER
RE : MEP ROOFDRAIN PIPE PODOMORO PARK
RE MEP BANDUNG, INDONESIA
350 GALVANIZED METAL
350 SUPPORT BRACKET MEP &
SLOPE
LIGHTING SPECIALIST
40mm x 40mm STEEL MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm

170

25 HOLLOW STRUCTURE
CAST IRON WITH ROOF
DRAIN PIPE RE : MEP
GALLERY
KALSI PLANK ISSUED FOR

285
PAINTED FINISH ( PT-4 )
FOR CONSTRUCTIONS
PAINTED KALSI BOARD
160 DRAWINGS
CEILING FINISH
GRC COLUMN SHEET TITLE
COVER PAINTED
PAINTED FINISH GRC FINISH ( PT-4 )
CONSOLE ON 40mm COLUMN 2 DETAIL
METALHOLLOW ( PT-4 )
KEYPLAN - ROOF PLAN DETAIL 1 DETAIL 2
2 1 : 500 0 5 10 5 1 : 20 6 1 : 20 SCALE DATE SHEET NO
22 UN 2020

DRAWN BY PROJECT NO
201 00
A10.07.09
6 E"

Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
GRC COLUMN
COVER PAINTED

930
NOTICE
FINISH ( PT-4 ) Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building

930
CONCRETE ROOF GRC COLUMN control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,

WITH SCREED & COVER PAINTED relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
5 FINISH ( PT-4 )
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
WATERPROOFING out rods to fully illustrate methods of construction of all specialist millwork, design

970
portion & subcontractor elements of the construction. These drawings should include
A10.07.10 but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

970
WF STEEL
STRUCTURE
PAINTED
RE: STRUCTURE
CONCRETE ROOF

CEILING FINISH
BY ID
5950

650
GRC COLUMN GRC COLUMN

5950
COVER PAINTED COVER PAINTED 200 300 150
FINISH ( PT-4 ) FINISH ( PT-4 )
4050

GRC COLUMN
COVER PAINTED
2 WF STEEL FINISH ( PT-4 )

4050
STRUCTURE
A10.07.10
RE: STRUCTURE WF STEEL
STRUCTURE
RE: STRUCTURE
STAIR FLOOR
FINISH BY ID CONCRETE PEDESTAL CONCRETE PEDESTAL
RE: STRUCTURE RE: STRUCTURE
4

100
FFL -0.02 A10.07.10
R1 PERUBAHAN PEDESTAL

PAINTED PLASTER FFL -0.02


FFL -0.65 BOX FINISH ( PT-3 ) R1
850

KEYPLAN -
COLUMN SECTION SECTION
1 3
1 : 50 1 : 50
DETAIL 1
4 1 : 20
3 6 650
A10.07.10 200 300 150

WF STEEL
600 STRUCTURE U AND R ON
RE: STRUCTURE
CONCRETE PEDESTAL
175 50 175
RE: STRUCTURE GRC COLUMN
PODOMORO PARK
50

COVER PAINTED
ANDUN NDON A
FINISH ( PT-4 )
WF STEEL
STRUCTURE
E'' RE: STRUCTURE MARK N
650
850

WF STEEL A R
2

GRC COLUMN STRUCTURE


COVER PAINTED RE: STRUCTURE
U D OR
FINISH ( PT-4 )
20

CEILING FINISH OR ON RU ON
400 BY ID
A

STAIR FLOOR DRA N


N

FINISH BY ID AFF +4.10 AFF +4.10


GRC COLUMN
DRA

COVER PAINTED
200 300 150 FINISH ( PT-4 ) EXTERIOR DETAIL
650
( DETAIL COLUMN 3 )
O

COLUMN PLAN DETAIL 2 SCALE DATE NO


NA

2 1 : 20 5 1 : 20
22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008
A10.07.10
G G
G 910 910
100 710 100
PAINTED FINISH GRC
CONSOLE ON 40mm
METALHOLLOW ( PT-4 )
100 710 100 Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
PEDESTAL
RE: STRUCTURE

100 175 50 175 100


100 175 50 175 100
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are

DOWN PIPE constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,

600
ROOF DRAIN

600
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
RE : MEP on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include

WF STEEL STRUCTURE but not be limited to stone work, paneling, metal work, roofing, windows, drainage,

4 structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates

A10.07.11
RE : STRUCTUR to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

B GRC COLUMN
50 50
50 50 COVER PAINTED
FINISH ( PT-4 )

COLUMN UPLIGHT COLUMN UPLIGHT


RE: MEP & SPECIALIST RE: MEP & SPECIALIST
6370

LIGHTING LIGHTING
6 COLUMN PLAN A COLUMN PLAN B
A10.07.11 3 1 : 20 4 1 : 20

3
A10.07.11

A
5
A10.07.11
400

2 GRC COLUMN
COVER PAINTED
FINISH ( PT-4 ) G

KEYPLAN -
PAINTED FINISH GRC
COLUMN SECTION DROP-OFF
1 1 : 75 0 0.5 1
CONSOLE ON 40mm x 40mm
METAL HOLLOW ( PT-4 )

G
WF STEEL STRUCTURE
1
RE : STRUCTUR
A10.07.11

N AR UP
R M P P A N
1500

3490 1995 14000

FD FD

GRC COLUMN U AND R ON


COVER PAINTED
FINISH ( PT-4 )
PODOMORO PARK
ANDUN NDON A

CONCRETE PEDESTAL

UP
RE: STRUCTURE ( PT-6 ) MARK N
A R
2

U D OR
400
20

OR ON RU ON
A

DRA N
N
DRA

100 710 100 710 COLUMN DROP-OFF


910
O

KEYPLAN - GROUND FLOOR PLAN DETAIL 1 DETAIL 2 SCALE DATE NO


NA

2 1 : 500 0 5 10 5 1 : 20 6 1 : 20
22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008
A10.07.11
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

6 7
8000 FLOOR STAIR NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
FINISH BY ID prepared based upon survey and other information supplied by others. All dimensions

C B and levels are to be checked on site by contractors and inconsistencies reported


immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
WF STEEL STRUCTURE relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
RE : STRUCTUR on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
E'' structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
FFL -0.02 GRC COLUMN
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
5 © ARCH 22o2, all rights reserved.

COVER PAINTED
4 FINISH ( PT-4 )

900
3
CONCRETE PEDESTAL
2 RE: STRUCTURE
A
1
2

2225
A10.07.12

1550

1250
FFL -0.65 PAINTED PLANTER
BOX FINSIH ( PT-3 )

800 7200 800

2 1
A10.07.13 A10.07.13

DETAIL PLANTER & STAIR - PLAN


1 1 : 50

6 7
8000

GRC COLUMN
COVER PAINTED
FINISH ( PT-4 )
U AND R ON

8800
800 7200 800 CONCRETE PEDESTAL PODOMORO PARK
RE: STRUCTURE ANDUN NDON A
FFL -0.02
5
4
MARK N
126

3
630

FLOOR STAIR
2
FFL -0.65 FINISH BY ID
1 A R
2

U D OR
PAINTED PLANTER
20

3 BOX FINSIH ( PT-3 ) OR ON RU ON


A

A10.07.13 DRA N
N
DRA

EXTERIOR DETAIL
( DETAIL PLANTER
& STAIR )
O

SECTION A
2 1 : 50 SCALE DATE NO
NA

12 JUN 2020
OR

DRAWN BY PROJECT NO
2018008
A10.07.12
E'' Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

GRC COLUMN
WF STEEL STRUCTURE NOTICE

COVER PAINTED Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
RE : STRUCTUR and levels are to be checked on site by contractors and inconsistencies reported
FINISH ( PT-4 ) immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in

800 CONCRETE PEDESTAL conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
GRC COLUMN FFL -0.02 RE: STRUCTURE
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
COVER PAINTED out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include

FINISH ( PT-4 ) but not be limited to stone work, paneling, metal work, roofing, windows, drainage,

100
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
2355 to site conditions is not guaranteed. The contractor must verify all site dimensions prior

PAINTED PLANTER to producing shop and setting out drawings.

CONCRETE PEDESTAL © ARCH 22o2, all rights reserved.

126
BOX FINSIH ( PT-3 )
FFL -0.02 RE: STRUCTURE

630
HCS RE: STRUCTURE FLOOR STAIR

630
FINISH BY ID
FFL -0.65
FFL -0.80 FFL -0.65

SECTION B DETAIL 1
1 1 : 50 3 1 : 20

E''

GRC COLUMN
COVER PAINTED
FINISH ( PT-4 )
GRC COLUMN
COVER PAINTED CONCRETE PEDESTAL
FFL -0.02 RE: STRUCTURE
FINISH ( PT-4 )
FFL -0.14

126
2355
HCS RE: STRUCTURE
CONCRETE PEDESTAL FFL -0.27
FFL -0.02 RE: STRUCTURE 300
FFL -0.39 U AND R ON
5
4
3 HCS RE: STRUCTURE 300
FFL -0.52
630

FLOOR STAIR
FFL -0.65 1
2
FINISH BY ID PODOMORO PARK
FFL -0.80 FLOOR STAIR FFL -0.65 ANDUN NDON A
FINISH BY ID PAINTED PLANTER
BOX FINSIH ( PT-3 )
PAINTED PLANTER
BOX FINSIH ( PT-3 )
MARK N
4
A R
2

A10.07.12

U D OR
20

OR ON RU ON
A

DRA N
N

SECTION C DETAIL 2
DRA

2 1 : 50 4 1 : 20
EXTERIOR DETAIL
( DETAIL PLANTER
& STAIR )
O

SCALE DATE NO
NA

12 JUN 2020
OR

DRAWN BY PROJECT NO
2018008
A10.07.13
CAST IRON WITH ROOF
DRAIN PIPE RE : MEP Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
CONCRETE ROOF WITH
CONCRETE ROOF WITH SCREED & WATERPROOFING
SCREED & WATERPROOFING NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
400 and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
WF STEEL STRUCTURE constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in

RE: STRUCTURE conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
AFF+4.10 AFF+4.10 drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
GRC COLUMN COVER on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
PAINTED FINISH ( WP-1 ) 4 but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates

A10.07.14 CEILING FINISH to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.

BY ID © ARCH 22o2, all rights reserved.

PAINTED PLASTER DOWN PIPE


WALL FINISH ( PT-3 ) RE: MEP

4100 GRC COLUMN COVER

4100
PAINTED FINISH ( WP-1 )
POWDER COATING ALUMINIUM
WINDOW EX ALLURE
(6mm GLASS)
2 40mm x 40mm STEEL
A10.07.14 HOLLOW STRUCTURE

GRC COLUMN COVER


PAINTED FINISH ( WP-1 )

FFL -0.05 FFL -0.02

HCS RE: STRUCTURE


275

KEYPLAN -
COLUMN SECTION SECTION
1 1 : 50 3 1 : 50

3
A10.07.14 CONCRETE ROOF WITH
SCREED & WATERPROOFING

WF STEEL STRUCTURE
RE: STRUCTURE U AND R ON
FFL -0.02
PAINTED PLASTER
WALL FINISH ( PT-3 ) DOWN PIPE
275 RE: MEP PODOMORO PARK
ANDUN NDON A
DOWN PIPE
RE: MEP AFF+4.10 AFF+4.10 CEILING FINISH
275

BY ID
40mm x 40mm STEEL MARK N
FFL -0.05
HOLLOW STRUCTURE
175 50 175 GRC COLUMN COVER A R
2

PAINTED FINISH ( WP-1 )


400 GRC COLUMN COVER
U D OR
PAINTED FINISH ( WP-1 )
20

40mm x 40mm STEEL OR ON RU ON


A

HOLLOW STRUCTURE DRA N


N

COLUMN PLAN DETAIL 1


DRA

2 1 : 20 4 1 : 20
DETAIL COLUMN 4
O

SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008
A10.07.14
FLOOR FINISH BY ID

5
7000
6 Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

B NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all

E" works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
FFL -0.02 conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified

A on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design

960
portion & subcontractor elements of the construction. These drawings should include

2 but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior

FFL - 0.325 A11.01 to producing shop and setting out drawings.


© ARCH 22o2, all rights reserved.

960
UP
FFL - 0.65 NOTE :

±0.00 = +670.052
905 5920 1050

FLOOR FINISH TO
MATCH STONE DROP
OFF TERRACE BY
LANDSCAPE
DETAIL RAMP 1 - PLAN 3
1 1 : 100 A11.01

FLOOR FINISH TO MATCH STONE


DROP OFF BY LANDSCAPE 40MM STAINLESS STEEL PIPE RAIL &
POST BRUSHED FINISH
800

FFL - 0.02
FFL - 0.325

800
FFL - 0.65

905 5920

DETAIL RAMP 1 - SECTION A


2 1 : 50

40 U AND R ON
4 E"
A11.01
PODOMORO PARK
ANDUN NDON A
40 40MM STAINLESS STEEL PIPE RAIL &
40MM STAINLESS
POST BRUSHED FINISH
STEEL PIPE RAIL &
POST BRUSHED FINISH
MARK N

800
BASEPLATE BY
A R
800

RAILING SPECIALIST
2

FFL ± 0.02
180

FFL - 0.20 CONCRETRE ANCHOR U D OR


20

FFL - 0.40 100 BY RAILING SPECIALIST


OR ON RU ON
A

FFL STONE FLOOR


FINISH
DRA N
-0.20
N

960 200 960


DRA

RAMP 1 DETAIL
DETAIL RAMP 1 - SECTION B DETAIL
O

3 1 : 50 4 1 : 10
SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008 A11.01
1
Arch 22o2
MEETING
ROOM

A12.03
6 CEO
ROOM
GLOBAL DESIGN STUDIO
PTE.LTD
MEETING
ROOM

DF

FD

DF FD

DF DF

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
RUANG
prepared based upon survey and other information supplied by others. All dimensions
2000 CONTROL

TP-2 TP-1
P.FILTER-2
P.FILTER-1
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all

SEWAGE PIT
RUANG RUANG
works under their responsibility or the responsibility of their sub-contractors are
POMPA
UTILITY
constructed in accordance with local statutory authority requirements, local building
2
40.86m

control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,

TP-2
RUANG
LVMDP
relating to the project or projects for which this drawing has been prepared. This

TP-1
drawing is also to be read in conjunction with drawings, specifications, schedules and

OUT GOING 1
INCOMMING
PLN
so forth prepared by others and which are relevant to the project or projects identified

C on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
6145

TOP TAMAN LEVEL TOP TANGGA LEVEL


-0.100 -0.100

out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include

255
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other

LOCATION specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

LINE OF BEAM BELOW

1200
12 13 14 15 16 17 HT-2

2680
FFL -3.27

250
11 250
B
2 HT-5
A12.03

1200
UP

10 9 8 7 6 5 4 3 2 1

3650 LOKASI TEMBOK LAMA


1500

R1

R1

1. REVISI TANGGA MENYESUAIKAN

STRUKTUR YANG SUDAH ADA DI

LOKASI TEMBOK BARU


LAPANGAN

2. PERGESERAN PARTISI GYPSUM


STAIR PLAN - BASEMENT A R1 R1
1 1 : 50
30CM UNTUK SIRKULASI

1 6
A12.03

C ISSUES AND REVISIONS


255

PODOMORO PARK
BANDUNG, INDONESIA
1200

DN
12 13 14 15 16 17 18 19 20 21
MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm

FFL -0.02
250
GALLERY
250

11
B
2 HT-5 ISSUED FOR
A12.03
FOR CONSTRUCTIONS
1200

DRAWINGS
10 9 8 7 6 5 4 3 2 SHEET TITLE

STAIR DETAIL - PLAN

SCALE DATE SHEET NO


R1
STAIR PLAN - GROUND FLOOR 22 UN 2020

2 A DRAWN BY PROJECT NO
1 : 50
20 8008 A12.01
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include

C 6 but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

PAINTED GYPSUM
BOARD CEILING (PT-5)

50MM x 50MM. STAINLESS


STEEL RAIL & POST 401
BRUSHED FINISH

5MM + 5MM LAMINATED


GLASS CLEAR
2
A12.03
FLOOR FINISH
(HT-2)
900

900
GF
FFL ±0.00
FFL -0.02 21 FFL -0.02 R1

PAINTED EXPOSED 20 1. REVISI TANGGA MENYESUAIKAN


CONCRETE (PT-6) 19
18 STRUKTUR YANG SUDAH ADA DI
17
LAPANGAN
16
50MM x 50MM. STAINLESS 15
STEEL RAIL & POST 401 14
INTERMEDIATE BRUSHED FINISH INTERMEDIATE 13
LANDING LANDING 12
FFL -1.56 HOMOGENEOUS TILE FFL -1.72 11
10 FLOOR FINISH (HT-5) 10
9

2130
9
8 8
4 7 250 1200 5MM + 5MM LAMINATED 7
A12.03 6 GLASS CLEAR 6 250
5 PAINTED EXPOSED 5
4 CONCRETE (PT-6) 4
3 3

900
FLOOR FINISH 1

155
BASEMENT (HT-2) 300 2 U AND R ON
FFL -3.27 A12.03 1
FFL -3.27

1200
PODOMORO PARK
ANDUN NDON A

MARK N
SECTION A SECTION B R1 A R
1 2
2

R1
1 : 50 1 : 50
U D OR
20

OR ON RU ON
A

DRA N
N
DRA

STAIR DETAIL - SECTION


O

SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008 A12.02
50MM x 50MM. STAINLESS STEEL RAIL
& POST 401 BRUSHED FINISH Arch 22o2
GLOBAL DESIGN STUDIO

50
PTE.LTD

50 50MM x 50MM. STAINLESS STEEL RAIL NOTICE

& POST 401 BRUSHED FINISH Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
5MM + 5MM LAMINATED 5MM + 5MM LAMINATED
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other

GLASS CLEAR GLASS CLEAR


specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
3 to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

A12.03
50MM x 50MM. STAINLESS STEEL RAIL

900
& POST 401 BRUSHED FINISH
BASEPLATE BY
RAILING SPECIALIST

STAINLESS STEEL
250 BASEPLATE COVER
BASEPLATE BY BRUSHED FINISH BY
RAILING SPECIALIST RAILING SPECIALIST
STAINLESS STEEL FLOOR FINISH
BASEPLATE COVER ( HT-2 )
BRUSHED FINISH BY
155

RAILING SPECIALIST
HOMOGENEOUS TILE FLOOR
HOMOGENEOUS TILE FINISH ON HCS STRUCTURE
FLOOR FINISH (HT-5) RE : STRUCTURE
HCS RE STRUCTURE

CONCRETE ANCHOR
BY RAILING SPECIALIST
150 150
DETAIL 1 DETAIL 2
300 1 1 : 10 2 1 : 10 R1

1. REVISI DETAIL 1 MENYESUAIKAN

R1 TANGGA TERBARU

STAINLESS STEEL WALL PLATE


COVER BRUSHED FINISH
50 BY RAILING SPECIALIST
STAINLESS STEEL WALL RAIL
5MM + 5MM LAMINATED
GLASS CLEAR BRACKET BRUSHED FINISH BY

20
RAILING SPECIALIST
ANCHOR
WALL PLATE BY RAILING SPECIALIST
BY RAILING SPECIALIST
STAINLESS STEEL
50MM x 50MM. STAINLESS STEEL RAIL
BASEPLATE COVER
& POST 401 BRUSHED FINISH
BRUSHED FINISH BY
RAILING SPECIALIST
U AND R ON
150

GLASS SEALANT
18 18 BY RAILING SPECIALIST PAINTED PLASTER
WALL FINISH PODOMORO PARK
15

50MM x 50MM. STAINLESS STEEL RAIL


& POST 401 BRUSHED FINISH ANDUN NDON A
50

MARK N
15

10
HOMOGENEOUS TILE A R
150

FLOOR FINISH (HT-5)


2

80 HOMOGENEOUS TILE (HT-5)


FLOOR FINISH ON 20mm
U D OR
KALSIBOARD ON STEEL PLATE
20

OR ON RU ON
A

STAINLESS STEEL WALL RAIL DRA N


N

BRACKET BRUSHED FINISH BY


DRA

RAILING SPECIALIST

DETAIL RAILING
20

WALL PLATE BY RAILING SPECIALIST


O

STAINLESS STEEL WALL PLATE


50
COVER BRUSHED FINISH SCALE DATE NO
NA

BY RAILING SPECIALIST 22 JUN 2020


DETAIL 3 DETAIL 4
3 4
OR

DRAWN BY PROJECT NO
1:5 1 : 10
2018008 A12.03
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
50mmx50mm so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
50mmx50mm STAINLESS STEEL
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
STAINLESS STEEL PIPE RAIL & POST structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates

PIPE RAIL & POST HOMOGENEOUS TILE to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

SUMPIT FLOOR FINISH (WPC-4)


A RE: MEP A' HOMOGENEOUS TILE A A' HOMOGENEOUS TILE
FLOOR FINISH (CT-2) HOMOGENEOUS TILE FLOOR FINISH (CT-2)
FLOOR FINISH (CT-2)

280
280 815
280

1300 1300

1200

1200
INTERMEDIATE INTERMEDIATE
19 18 17 16 15 14 13 12 11 10 9 8 DECK 19 18 17 16 15 14 13 12 11 10 9 8
LANDING LANDING
A 2 3 4 5 6 7
FFL -2.070 A FFL -0.050
2 3
VOID
4 5 6 7
FFL -2.070
1 1

1200

1200
A12.05 A12.05

FFL -3.270

8' 8'
GARDEN
BY LANDSCAPE

MULTI - PURPOSE
LAWN BY LANDSCAPE

7' 7'

FLOOR FINISH PAINTED PLASTER 50mmx50mm


(CT-2) WALL FINISH STAINLESS STEEL
PIPE

U AND R ON

STAIR PLAN - BASEMENT STAIR PLAN - GROUND FLOOR


1 1 : 50 2 1 : 50 PODOMORO PARK
ANDUN NDON A

MARK N
A R
2

U D OR
20

OR ON RU ON
A

DRA N
N
DRA

STAIR DETAIL
O

SCALE DATE NO
NA

22 JUN 2020
OR

DRAWN BY PROJECT NO
2018008 A12.04
50mmx50mm

510
STAINLESS STELL
HAND RAIL Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
HOMOGENEOUS TILE
FLOOR FINISH (WPC-4)

300 370 360


1000

900
NOTICE
DECK Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions

FFL ±0.000 -0.050 HOMOGENEOUS TILE and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
-0.150 FLOOR FINISH (CT-2) works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
18

400
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
-0.450 17 -0.450 drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
16 on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
15
25mmx25mm but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
-0.600 14
STAINLESS STEEL to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
13 PIPE © ARCH 22o2, all rights reserved.

12

11
2 50mmx50mm
10
STAINLESS STEEL
3270

A12.05 INTERMEDIATE
9
PIPE RAIL & POST
8
LANDING
-2.070

2200
7

6
HOMOGENEOUS TILE
4 5
1300 FLOOR FINISH (CT-2)
A12.05 4

2 PAINTED PLASTER
BASEMENT
-3.270 1 -3.270 -3.300 FINISH WALL
FFL -3.270

FLOOR FINISH
(CT-2)

SUMPIT
RE: MEP
SECTION - A
1 1 : 50

125

25
25mmx25mm 25mmx25mm
50

50mmx50mm STAINLESS STEEL STAINLESS STEEL


STAINLESS STEEL
400

100

100
PIPE RAIL & POST PIPE RAIL & POST

80
PIPE RAIL & POST 25
50 25
9 25mmx25mm
125

50mmx50mm 50mmx50mm

25
STAINLESS STEEL
PIPE RAIL & POST STAINLESS STEEL STAINLESS STEEL
PIPE RAIL & POST PIPE RAIL & POST
ISSUES AND REVISIONS
50mmx50mm 13 13 13 13
8 STAINLESS STEEL
PIPE RAIL & POST
ANCHOR ANCHOR
BY RAILING SPECIALIST BY RAILING SPECIALIST ODOMORO ARK
280

3
80
50

80
50
BANDUNG, INDONESIA
A12.05 25mmx25mm STAINLESS STEEL STAINLESS STEEL
STAINLESS STEEL BASEPLATE COVER BASEPLATE COVER
PIPE RAIL & POST 50 BRUSHED FINISH BY 50 BRUSHED FINISH BY
25
80 RAILING SPECIALIST 80 RAILING SPECIALIST MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm

25

BASEPLATE BY
25
HOMOGENEOUS TILE HOMOGENEOUS TILE GALLERY
RAILING SPECIALIST FLOOR FINISH (CT-2) FLOOR FINISH (CT-2)
25

280 STAINLESS STEEL ISSUED FOR


BASEPLATE COVER 25mmx25mm
BRUSHED FINISH BY FOR CONSTRUCTIONS
100

STAINLESS STEEL
80

RAILING SPECIALIST PIPE RAIL & POST DRAWINGS


180

HOMOGENEOUS TILE SHEET TITLE

5
25

FLOOR FINISH (HT-5)


SECTION STAIR
CONCRETE ANCHOR
BY RAILING SPECIALIST
SCALE DATE SHEET NO
4 300 DETAIL 1 DETAIL 2 DETAIL 3
22 UN 2020

2 1 : 10 3 1:5 4 1:5
DRAWN BY PROJECT NO
A12.05
201 00
C
Arch 22o2
GLOBAL DESIGN STUDIO
2 2 PTE.LTD

900
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
400100 3500 100 750 1213 2425 1213 immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building

100
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,

1040
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.

A
© ARCH 22o2, all rights reserved.

4000

4000
1

100
A14.01

1850
B
1
A14.01

1 1

5000 5000

B A B A

1
FLOOR PLAN - GENSET ROOM CEILING PLAN - GENSET ROOM
1 1 : 50
A14.01 2 1 : 50

4000

ISSUES AND REVISIONS

ODOMORO ARK
BANDUNG, INDONESIA

MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm

GALLERY
1 ISSUED FOR

FOR CONSTRUCTIONS
DRAWINGS
5000 SHEET TITLE

B A
DETAIL GENSET ROOM

ROOF PLAN - GENSET ROOM SCALE DATE SHEET NO


3 1 : 50
22 UN 2020

DRAWN BY PROJECT NO
2018008 A14.01
ROOF DRAIN
RE: MEP
Arch 22o2
GLOBAL DESIGN STUDIO
3260 PTE.LTD

385
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
CONCRETE ROOF prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
RE: STRUCTURE works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building

850
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This

2100 drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
PAINTED PLASTER but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other

WALL FINISH specialist finishes and features. The dimensional accuracy of this drawing as it relates

3700

3700
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
3501

© ARCH 22o2, all rights reserved.

2200
1700
100
500 3700 650

5000 4000

B A 2 1

SECTION A SECTION C
1 1 : 50 3 1 : 50

ROOF DRAIN
RE: MEP

CONCRETE ROOF
RE: STRUCTURE

PAINTED PLASTER
WALL FINISH
3700
3501

ISSUES AND REVISIONS

ODOMORO ARK
BANDUNG, INDONESIA
2000

MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm

800

GALLERY
ISSUED FOR
500 900 3441
FOR CONSTRUCTIONS
DRAWINGS
5000 SHEET TITLE

B A DETAIL GENSET ROOM

SECTION B SCALE DATE SHEET NO


2 1 : 50
22 UN 2020

DRAWN BY PROJECT NO
2018008 A14.02
3260
CONCRETE ROOF
RE: STRUCTURE
3260
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD

385

385
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported

850
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
2100 relating to the project or projects for which this drawing has been prepared. This

560
drawing is also to be read in conjunction with drawings, specifications, schedules and
PIPE DRAIN so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting

RE: MEP out rods to fully illustrate methods of construction of all specialist millwork, design

3920
3900

portion & subcontractor elements of the construction. These drawings should include

3700
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,

3700
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.

3050
EXHAUST FAN
RE: MEP
2200

1970
PAINTED PLASTER
WALL FINISH

4000 4000

1 2 2 1

FRONT ELEVATION REAR ELEVATION


1 1 : 50 2 1 : 50

CONCRETE ROOF
RE: STRUCTURE
3260 3260

385
385

PAINTED PLASTER
WALL FINISH

PIPE DRAIN
3900

3900
3700

3700
RE: MEP
ISSUES AND REVISIONS

3050
3050

ODOMORO ARK
BANDUNG, INDONESIA
PLUG INLET SOLAR
RE: MEP

MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm

GALLERY
ISSUED FOR

FOR CONSTRUCTIONS
DRAWINGS
5000 5000
SHEET TITLE

B A A B
DETAIL GENSET ROOM

SIDE ELEVATION SIDE ELEVATION SCALE DATE SHEET NO


3 1 : 50 4 1 : 50
22 UN 2020

DRAWN BY PROJECT NO
2018008 A14.03

You might also like