Professional Documents
Culture Documents
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
U AND R ON
PODOMORO PARK
ANDUN NDON A
MARK N
A R
2
PODOMORO PARK - U D OR
20
DRA N
N
Indonesia COVER
O
22 JUN 2020
A0.01
OR
DRAWN BY PROJECT NO
2018008
SHEET INDEX Arch 22o2
GLOBAL DESIGN STUDIO
0. GENERAL INFORMATION OF PROJECT XII. MISCELLANEOUS EXTERIOR DETAILS PTE.LTD
A0.01 COVER NTS A10.07.01 EXTERIOR DETAIL (DETAIL DECORATIVE PARAPET - PLAN) 1:100
A0.02 SHEET INDEX NTS EXTERIOR DETAIL (DETAIL DECORATIVE PARAPET 1:20
NOTICE
A0.03 LEGEND NTS SECTION & ELEVATION) Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
A10.07.02 EXTERIOR DETAIL (DETAIL DECORATIVE PARAPET - PLAN) 1:100 and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
I. SITEPLAN EXTERIOR DETAIL (DETAIL DECORATIVE PARAPET constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
A1.01 SITE PLAN 1:600 SECTION & ELEVATION) relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
A1.02 BLOCK - ROOF PLAN 1:600 A10.07.03 EXTERIOR DETAIL (DETAIL SKYLIGHT - PLAN) 1:150 on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
EXTERIOR DETAIL (DETAIL SKYLIGHT - SECTION & DETAIL) 1:100 portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
II. GENERAL PLAN A10.07.04 EXTERIOR DETAIL (DETAIL ROOF WATER TANK) 1:100, 1:50, 1:20 specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
A2.01 BASEMENT FLOOR PLAN 1:300 A10.07.05 EXTERIOR DETAIL (DETAIL SCREEN) 1:50, 1:25 © ARCH 22o2, all rights reserved.
A2.02 GROUND FLOOR PLAN 1:300 A10.07.06 EXTERIOR DETAIL (DETAIL DECORATIVE GATE WALL) 1:50, 1:25
A2.03 2nd FLOOR MEZZANINE & ROOF PLAN 1:300 A10.07.07 EXTERIOR DETAIL
(DETAIL FLAGPOLE) 1:25
A10.07.08 EXTERIOR DETAIL
(DETAIL COLUMN 1) 1:400, 1:100, 1:20
III. ENLARGED FLOOR PLAN A10.07.09 EXTERIOR DETAIL
(DETAIL COLUMN 2) 1:500, 1:75, 1:50, 1:20
A2.11 ENLARGED PLAN GF 1:150 A10.07.10 EXTERIOR DETAIL
(DETAIL COLUMN 3) 1:50, 1:20
A2.12 ENLARGED PLAN GF 1:150 A10.07.11 EXTERIOR DETAIL
(DETAIL COLUMN DROP-OFF) 1:500, 1:75, 1:20
A10.07.12 EXTERIOR DETAIL
(DETAIL PLANTER & STAIR - 1:50
IV. ELEVATIONS PLAN & SECTION)
A3.01 FRONT & REAR ELEVATION 1:300 A10.07.13 EXTERIOR DETAIL (DETAIL PLANTER & STAIR - 1:50, 1:20
A3.02 SIDE ELEVATION 1:300 SECTION & DETAIL)
A3.03 REAR & SIDE ELEVATION 1:300 A10.07.14 EXTERIOR DETAIL (DETAIL COLUMN 4) 1:50, 1:20
A3.04 MATERIAL BOARD
A3.05 MATERIAL BOARD XIII. VERTICAL CIRCULATION
A3.11 ENLARGED ELEVATION 1 1:50 A11.01 RAMP 1 DETAIL 1:100
A3.12 ENLARGED ELEVATION 2 1:50
A3.13 ENLARGED ELEVATION 3 1:50 A12.01 STAIR DETAIL 1 - PLAN ( BASEMENT & GROUND FLOOR ) 1:50
A3.14 ENLARGED ELEVATION 4 1:50 A12.02 STAIR DETAIL 1 - SECTION 1:50
A3.15 ENLARGED ELEVATION 5 1:50 A12.03 STAIR DETAIL 1:10
A3.16 ENLARGED ELEVATION 6 1:50
A3.17 ENLARGED ELEVATION 7, 8 1:50 A12.04 STAIR DETAIL 2 - PLAN 1:50
A3.18 ENLARGED ELEVATION 9, 10 1:50 A12.05 STAIR DETAIL 2 - SECTION & DETAIL 1:10, 1:50
22 JUN 2020
A0.02
OR
DRAWN BY PROJECT NO
2018008
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
ABBREVIATIONS REFERENCES MATERIALS drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
12
12
P-1
P-1
HT-1
U AND R ON
PODOMORO PARK
ANDUN NDON A
MARK N
A R
2
U D OR
20
OR ON RU ON
A
DRA N
N
DRA
LEGEND
N
O
SCALE DATE NO
NA
22 JUN 2020
A0.03
OR
DRAWN BY PROJECT NO
2018008
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
LIMIT OF and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
CONSTRUCTION works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
PROPERTY
LINE NOTE :
ALL SPOT ELEVATIONS SHOWN
RI HERE ARE FINISH FLOOR FINISH
VE SURFACE UNLESS NOTED
R OTHERWISE
SHOW UNIT
LINE OF ±0.00 = +670.052
BY OTHERS
BASEMENT -0.65 = +669.402
LEVEL
BELOW -0.80 = +669.252
-1.50 = +668.552
0
2 05
50
19
5 0
39
0 0
30
-0.05 20
50
0 0
30
50
39
50
19
50
20
pp-screen
00
33
-0.02
VOID
R1
-0.15 FD FD
16
08
0 STRUKTUR YANG SUDAH ADA DI
-0.04 LAPANGAN
R1
ET
NS
GE 2. REVISI DINDING MENGGUNAKAN
U
RD -0.02
GA LN DINDING GYPSUM
P -0.10
-0.02 -0.02
-0.04
R1 UP
-0.65
-0.80
PEDESTRIAN
MARK N
1
A R
2
A10.07.07
IN OUT
IN U D OR
20
-1.50 U T OR ON RU ON
O
A
1 : 600
DRA
SITE PLAN
0
O
PROPOSED SIGNAGE
3
N
SCALE DATE NO
NA
BY LANDSCAPE
W A1.01
OR
DRAWN BY PROJECT NO
OUT IN
O
2018008
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
MM MM AM NA D A
ON A UM NUM K RAM M NOTICE
KK
LIMIT OF Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
CONSTRUCTION and levels are to be checked on site by contractors and inconsistencies reported
ON PA N D O O M A ROO immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
RAM M control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
PROPERTY to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
LINE GALTECTO
ROOF NOTE :
RI
VE ±0.00 = +670.052
R
AC OUTDOOR
AC OUTDOOR UNITS
UNITS RE : MEP 5 0
RE : MEP 19
50
20
50
39
00
ROOFDRAIN PIPE 20
50
30
RE MEP 30
00
50
39
50
19
5 0
20
pp-screen
00
33
CONCRETE
TOP FLAT +12.55
ROOF R
TTE
GU
R1
1500
16
ET +6.70 LAPANGAN
NS
GE
U
RD
GA LN +4.75 +4.75
P
RIV
ER
UP
1
GUTTER A10.07.03
R1 U AND R ON
WATER TANK
+ AC UNIT BELOW
ROOF
PODOMORO PARK
ANDUN NDON A
MARK N
A R
IN
2
U T U D OR
O
20
OR ON RU ON
A
DRA N
BLOCK - ROOF PLAN
N
1 1 : 600
DRA
BLOCK PLAN
3 0
O
N
SCALE DATE NO
W
NA
22 JUN 2020
OUT IN A1.02
O
OR
DRAWN BY PROJECT NO
2018008
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
1 2
A4.01 LINE OF
A4.01
BUILDING NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
ABOVE and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
PROPERTY specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
LINE © ARCH 22o2, all rights reserved.
NOTE :
A 4A 4A 4A 4A
3A
4A
014
FURNITURES SHOWN ON
3250
013
015
4A
3A 3A 015
3A 3A 012 012 3A WALL
B 3A 3A
FFL - 3.27 3A
3A' 3A
4A 3A
3A'
FFL - 3.32 3A 007 3A 009 3A' 3A'
3A 008 016
OFFICES LAYOUT CEO
ROOM
3A'
HALF PARTITION
3A 3A 3A 3A'
BY APL 006 017
C 3A'
008
011 FFL - 3.27
004 3A
4A 3A
004 3A'
3A' 3A 3A' 1A WALL TYPE SYMBOL
003 010 3A'
3A' 3A' RE: A10.02.11
003 FFL - 3.27 005 3A
7500
3A
006 MEETING
3A'
002 3A
ROOM
3A'
DOOR TYPE SYMBOL
002 3A 005 3A 3A R1 010 124A
3A
028
3A 3A 018 RE: A10.01.11 - A10.01.12
4A
FFL - 3.27 R1
001
3A
032
3A 3A 3A 3A' WINDOW TYPE SYMBOL
1B' 1B'
030 3A'
3A' 124A
RE: A10.01.11 - A10.01.12
D DF
3A FFL - 3.27
3A
FD
4000
FFL -3.22 3A
DF FD
2 E' 037B
3A 3A 3A 3A' 025 3A' 3A 3A
F
1500 2000
4A 4A
024 023
3A
4A
FFL - 3.27 LAPANGAN
036
E'' 4A' RUANG
SEWAGE
TP-2 TP-1
P.FILTER-2
P.FILTER-1
2. PERGESERAN PARTISI GYPSUM
SEWAGE PIT
1A''
00
20 sqm
4500
038 1A''
F FFL - 3.30
2 00
1A'' FFL - 3.20
041
7
8'
039
TP-2
6000
041B
4A' 039 1A''
1A'' 4A'
OUT GOING 1
PLN
INCOMMING
6145
PODOMORO PARK
BANDUNG, INDONESIA
6000 6000 6000 7000 7000 8000 7000 4619
1 2 3A 4 5 6 7 7' MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm
B GALLERY
ISSUED FOR
FOR CONSTRUCTIONS
DRAWINGS
SHEET TITLE
BASEMENT FLOOR PLAN
1 1 : 300
BASEMENT FLOOR PLAN
N
SCALE DATE SHEET NO
22 UN 2020
DRAWN BY PROJECT NO
2018008 A2.01
Arch 22o2
GLOBAL DESIGN STUDIO
40
PTE.LTD
50
MARKETING GALLERY -020 A HVAC VERTICAL DUCT
AREA BY I.D
11
00
33
50
( NOT IN CONTRACT ) 2 NOTICE
.0 2 2050 Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
A4 0
60
32
and levels are to be checked on site by contractors and inconsistencies reported
5 1 immediately to CA prior to works being undertaken. Contractors are to ensure that all
70
19
0
works under their responsibility or the responsibility of their sub-contractors are
0
03
0
55
constructed in accordance with local statutory authority requirements, local building
30 . control requirements and all relevant codes of practice. This drawing is to be read in
39
50 B A4 conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
20
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
50
so forth prepared by others and which are relevant to the project or projects identified
00 on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
00 21
30
out rods to fully illustrate methods of construction of all specialist millwork, design
19
portion & subcontractor elements of the construction. These drawings should include
45
50
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
PORCH
50 structural steelwork, M&E services, case goods, cabinetry, joinery work and other
1 20FFL -0.05
00
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
39
15
50
SCREEN &
50 MIC CONTROL ROOM NOTE :
00
PROPERTY LINE 1 39 119
.02 1950
19
4 FURNITURES SHOWN ON
50
A
50
60
20
pp-screen
THIS PLAN ARE INDICATIVE
20
00
& FOR COORDINATION
50
LINE OF BASEMENT 00
33
LEVEL BELOW 21
00 D ONLY ( NOT IN CONTRACT )
32
70
-0.20 WALL
A
21
3250
FUNCTION HALL
50
FFL -015 FFL ± 0.00
SFL -045 644 sqm 99
20 3 GYPSUM PARTITION
120
VOID
A' BY I.D A10.07.09
21
2750
00
1 2
19
B
50
A4.01 A4.01
E
20
50
6000
14
35
27
2
68 1
A10.07.14 A10.07.06
1500
2000 3490 1995 14000 7600
FFL -0050 FFL -0.05 VIP ROOM
C WUDHU
7 sqm
13 sqm
118
60
0 0
OUTDOOR BY I.D CR ON DUTY
111
14
LOUNGE SALES 122
0
08
FD FD
MUSHOLLA 112
103
203 sqm BY I.D
12 sqm
110
BY I.D
COUNTER
PANTRY 60 R1
13
SAD & LEGAL 121
102 1. REVISI TANGGA MENYESUAIKAN
BY TENANT
R1 117
00
BY I.D
108 2. REVISI DINDING MENGGUNAKAN
RECEPTIONIST
DISABLE
5 sqm FEMALE 20 sqm
60
11
TOILET
0
E' F
104 107 DINDING GYPSUM
19 80
106
BY I.D BY I.D BY I.D
2 2 0
1500 2000
FFL -0.02
0 43 00
CORRIDOR
45 0 60
A4.03 7
3075
105
E BY I.D
R1 BY I.D 0
29
300 10
40 70 40
E'' 302 sqm
101
8200
29 34
BY TENANT 10500
0
7 C
4500
FFL -0.65
8' 9' LINE OF EXPANSION JOINT
F
FFL -0.80
ARCHITECTURE
A10.07.08
LINE OF 8
13 sqm
SKYLIGHT ROOF PODOMORO PARK
G BANDUNG, INDONESIA
800
ABOVE
TOP TAMAN LEVEL TOP TANGGA LEVEL
FFL -3.15
-0.100 -0.100
1
PALMSCAPE
A2.11
3-4
A10.07.11
3-4
A10.07.11
LINE OF MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm
CANOPY ABOVE
GALLERY
6000 6000 6000 7000 7000 8000 7000 4619
ISSUED FOR
±0.00 = +670.052
GROUND FLOOR PLAN
N
SCALE DATE SHEET NO
1 1 : 300 22 UN 2020
DRAWN BY PROJECT NO
2018008 A2.02
D
WATER TANK & AC
OUTDOOR UNITS
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
4000
E' NOTICE
15002000
ROOF SPACE ROOF Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
SPACE immediately to CA prior to works being undertaken. Contractors are to ensure that all
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
FJ 2"
GV 1/2"
A
BP.2
BP.1
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
ST 2"
GV 2"
FJ 2"
CV 2"
GV 2"
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
F
© ARCH 22o2, all rights reserved.
2
ROOF SPACE . 02 2050 NOTE :
A4
60
50 1
6000
00
19
.03
A4 FURNITURES SHOWN ON
39
50 B THIS PLAN ARE INDICATIVE
00
& FOR COORDINATION
G 30
C ONLY ( NOT IN CONTRACT )
45
50
20
00
00
C'
30
15
6000 6000 6000
00
50
1 39
PROPERTY LINE 02
1 2 3 4 A4
.
19
50
60
50
20
pp-screen
00
2nd FLOOR MEZZANINE 33
00
D
1 1 : 300
+12.55
A
3250
WATER TANK + AC
6000
AC OUTDOOR
E R1
6000
16
08
0
14
7500
000
FLAT ROOF FLAT ROOF FLAT ROOF 6
+4.75 +6.70 +4.75 13
00
D
60 D
12
4000
0 00
6
E' F 1 2
11
1500 2000
A10.07.02 00
A4.03 60 U AND R ON
E
00
300 10
E'' 32
PODOMORO PARK
C
4500
UP
200 9 ANDUN NDON A
7
8' 9'
10000
F +10.639 MARK N
SKYLIGHT
A R
6000
2
8
U D OR
20
G OR ON RU ON
3000
A
DRA N
N
DRA
1 2 3 4 5 6 7 7'
N
NO
A B SCALE DATE
NA
22 JUN 2020
ROOF PLAN
OR
2 1 : 300
DRAWN BY PROJECT NO
2018008 A2.03
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
1500
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
C
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
WUDHU structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
7 sqm to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
1 © ARCH 22o2, all rights reserved.
111
FD FD
SALES
OUTDOOR NOTE :
PROMOTION
LOUNGE 25 sqm
1A FURNITURES SHOWN ON
FFL -0.02 112
7500
10
1
CORRIDOR
10 10 A
E R1
FFL -0.04
R1
101 LAPANGAN
302 sqm
6000
10 120A
101 101P
6000
U AND R ON
101 101O
PODOMORO PARK
ANDUN NDON A
G
MARK N
FFL -1.86 FFL -3.30
A R
2
U D OR
20
OR ON RU ON
A
1 2 3 4 5 6 7 7'
ENLARGED PLAN
O
DRAWN BY PROJECT NO
2018008 A2.11
MARKETING GALLERY
AREA BY I.D
( NOT IN CONTRACT )
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
PORCH works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
FFL -0.05 conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
3300 2050 1950 3950 3000 2050
12 3000 3950 1950 2050 so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
120 120D 120 120 120 to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
NOTE :
FURNITURES SHOWN ON
THIS PLAN ARE INDICATIVE
& FOR COORDINATION
ONLY ( NOT IN CONTRACT )
WALL TYPE/PARTITION
1A SYMBOL
120 120 RE: A10.02.11
DOOR TYPE SYMBOL
11 12 A
1 RE: A10.01.11 - A10.01.12
JANITOR 10 11
108
108 SERVICE &
DISABLE MIXER ROOM COUNTER
11 120K
5 sqm 1 12 sqm SAD & LEGAL 120 120J
10 11
FILLING 11 122
10 BY I.D
11 CR ON DUTY
11
10 122
FFL -0.02 FEMALE 11 122A
CORRIDOR U AND R ON
10 10 TOILET FILLING
20 sqm 11 CPG
10 BY I.D 121
10 A
11 PODOMORO PARK
ANDUN NDON A
PANTRY
121
MARK N
A R
2
U D OR
20
12 16080 OR ON RU ON
0A
A
ENLARGED PLAN
O
DRAWN BY PROJECT NO
2018008 A2.12
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
A2.04
1
R1
5890
5430
( PT-1 )
FFL -0.02
4
2 A11.01
A11.01
1 2 1 ALUMINIUM
A4.12 A4.12 A4.16
WINDOW
EX ALLURE
1 2 1
A4.11
3 4 5 6 7 8 10 12 13 14
PAINTED PLASTER GRC PEDESTAL
1
A4.13
DECORATIVE WALL ( PT-3 )
DECORATIVE & DOWNLIGHT 11 STONE FINISH (ST-2)
CUSTOM PAINTED RE: MEP & SPECIALIST LIGHTING
POWDER COATING ALUMINIUM STEEL CONSOLE (PS-1)
9 HT WET CLADDING
WALL SYSTEM (ST-3)
WINDOW EX ALLURE
9'
FRONT ELEVATION PEDESTAL VIEW IN ANGLE
1 1 : 300
STONE FINISH (ST-2) R1
LAPANGAN
DECORATIVE 40mmx20mm
HOLLOW ON 40mmx40mm PAINTED PLASTER GRC GALTECTO PAINTED SKYLIGHT
STEEL HOLLOW FRAME DECORATIVE PARAPET ROOF (RF-1) 6MM + 6MM LAMINATED GLASS ON GALTECTO
PAINTED DUCO FINISH ( PT-3 ) POWDER COATING SKYLIGHT FRAME ROOF (RF-1)
FINISH GOOD SYSTEM EX ALLURE
KALSI PLANK ON PAINTED HOLLOW METAL ROOF
PAINTED FINISH FRAME SYSTEM.
4749
A3.17
1
A3.18
FFL +5.89
PODOMORO PARK
2
A3.17 ANDUN NDON A
10639
R1
MARK N
5890
FFL ±0.00
A R
2
PEDESTAL 8000 7000 7000 6000 6000 6000 DECORATIVE WALL ( PT-3 )
PAINTED FINISH ( PT-4 )
STONE FINISH
(ST-2)
2 2 OR ON RU ON
A
A4.17 A4.11
DRA N
14 13 12 10 9 8 7 6 5 4 3 2 1
N
2 1 : 300
RE: MEP & SPECIALIST LIGHTING
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A3.01
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
ROOF (RF-1) HOLLOW ON 40mmx40mm specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
STEEL HOLLOW FRAME to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
PAINTED DUCO FINISH KALSI PLANK
PAINTED FINISH
NOTE :
GALTECTO
FFL ±10.639 ROOF (RF-1) FOR MATERIAL BOARD
SEE DRAWING : A3.05
4749
±0.00 = +670.052
FFL +5.89
10639
1
1 4
A3.13
A11.01 A11.01
HT WET CLADDING
6000 4500 15002000 4000 7500 6000 2750 3250 WALL SYSTEM (ST-1) PEDESTAL
STONE FINISH (ST-2)
G F E'' E E' D C B A' A
GRC COLUMN COVER HT WET CLADDING
PAINTED FINISH ( PT-4 ) WALL SYSTEM (ST-3)
SIDE ELEVATION
1 1 : 300
CONCRETE ROOF
WITH SCREED &
WATER PROOFING
PAINTED PLASTER GRC
DECORATIVE PARAPET ( PT-3 )
GALTECTO
GRC DECORATIVE 40mmx20mm ROOF (RF-1)
CONSOLE PAINTED HOLLOW ON 40mmx40mm
FINISH ( PT-4 ) STEEL HOLLOW FRAME PAINTED PLASTER GRC
PAINTED DUCO FINISH DECORATIVE PARAPET
( PT-3 )
FFL ±10.639
U AND R ON
PAINTED PLASTER GRC
DECORATIVE WALL ( PT-3 )
4749
PODOMORO PARK
FFL +5.89 ANDUN NDON A
10639
GRC COLUMN COVER
PAINTED FINISH ( PT-4 )
MARK N
5890
POWDER COATING ALUMINIUM
WINDOW EX ALLURE
A R
2
FFL -0.02
U D OR
20
POWDER COATING
HT WET CLADDING
ALUMINIUM
DOOR & WINDOW
WALL SYSTEM (ST-1) SIDE ELEVATION
VIEW IN ANGLE EX ALLURE
O
SIDE ELEVATION NO
2 SCALE DATE
NA
DRAWN BY PROJECT NO
2018008 A3.02
PAINTED PLASTER GRC KALSI PLANK
DECORATIVE PARAPET ( PT-3 )
GALTECTO
ROOF (RF-1)
PAINTED SKYLIGHT
6MM + 6MM LAMINATED GLASS ON
DECORATIVE 40mmx20mm
HOLLOW ON 40mmx40mm
STEEL HOLLOW FRAME
PAINTED FINISH
11730
147 147
portion & subcontractor elements of the construction. These drawings should include
315
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
140 140
20
20
315
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
HT WET CLADDING © ARCH 22o2, all rights reserved.
GRC
11730
CONSOLE PAINTED
FINISH ( PT-4 )
FFL -0.02
6000 6000 6000 6000 6000 10775 PAINTED PLASTER HT WET CLADDING PAINTED
PEDESTAL
WALL FINISH (PT-1) WALL SYSTEM (ST-1) STONE FINISH PLASTER GRC
1
1 1
(ST-2) DECORATIVE
14 13 12 A4.15
11 A4.14
10 9 8 A4.17
WALL ( PT-3 )
POWDER COATING VIEW IN ANGLE
PAINTED PLASTER GRC
DECORATIVE GATE WALL ALUMINIUM
REAR ELEVATION ( PT-1 ) DOOR & WINDOW HT WET CLADDING
2 1 : 300
2
A4.14 EX ALLURE WALL SYSTEM
(ST-1)
GALTECTO
PAINTED SKYLIGHT
6MM + 6MM LAMINATED GLASS ON
ROOF (RF-1) PODOMORO PARK
POWDER COATING SKYLIGHT FRAME ANDUN NDON A
FINISH GOOD SYSTEM EX ALLURE
ON PAINTED HOLLOW METAL ROOF PAINTED PLASTER GRC
FFL +11.73 DECORATIVE PARAPET
FRAME SYSTEM.
( PT-3 ) MARK N
CONCRETE ROOF
WITH SCREED &
KALSI PLANK A R
2
PAINTED FINISH
WATER PROOFING
DECORATIVE 40mmx20mm
U D OR
HOLLOW ON 40mmx40mm
20
11730
STEEL HOLLOW FRAME
FFL +4.750
PAINTED DUCO FINISH OR ON RU ON
A
HT WET CLADDING
WALL SYSTEM (ST-1)
DRA N
N
2150
22 JUN 2020
PAINTED PLASTER GRC
PAINTED PLASTER WALL
OR
NOTE :
PT-3
RF-1
PT-4
PT-3 PT-4
PT-2
ST-3
PT-4
PT-3
ST-5
ST-2
PODOMORO PARK
BANDUNG, INDONESIA
MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm
GALLERY
ISSUED FOR
FOR CONSTRUCTIONS
DRAWINGS
SHEET TITLE
MATERIAL BOARD
DRAWN BY PROJECT NO
2018008 A3.04
PT 1 PT-4 Arch 22o2
PAINTED PLASTER FINISH GRC PAINTED FINISH
COLOR : WINTER WALK PAINTED FINISH : EX SKK WOODY SMILE / setara
EX. DULUX / PROPAN / JOTUN www.grcboard.com NOTICE
/ NIPON / MOWILEX / setara (www.skk.com) Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
PT 2
PAINTED PLASTER FINISH ST-3
COLOR : ELEPHANT TAIL NATURAL STONE WALL MARBLE
EX. DULUX / PROPAN / JOTUN TYPE : DTRAVERTINE CREMA
/ NIPON / MOWILEX / setara EX. ROMAN / VALENTINO GRESS /
SANDIMAS / NIRO / INDOGRESS /
setara
PT 3
PAINTED PLASTER FINISH ST-5
WEATHERSHIELD & INTERIOR BASALTO HITAM
COLOR : WONDERLAND WHITE TYPE : 20mm THICK BASALTO HITAM
EX. DULUX / PROPAN / JOTUN FINISH : HONED
/ NIPON / MOWILEX / setara EX. PUMARIN / JAYA ABADI / BNB / setara
RF-1
GALTECTO ROOF CT-2
EX. GALTECTO ROOF / setara TYPE : ROCK TILE ANTHRACTE
TYPE : GT3. FINISH : UNPOLISHED
COLOR : SHADE BLACK/SHADE BROWN EX. ROMAN / VALENTINO GRESS /
(http://www.igkogyo.co.jp) SANDIMAS / NIRO / INDOGRESS / setara
ST-1
STONE CLADDING WALL PODOMORO PARK
TYPE : D'NALI STONE BANDUNG, INDONESIA
EX. ROMAN
MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm
GALLERY
ISSUED FOR
ST-2
FOR CONSTRUCTIONS
STONE PEDESTAL DRAWINGS
TYPE : 20mm THICK ANDESIT SHEET TITLE
FINISH : FLAMED
EX. PUMARIN / JAYA ABADI / BNB / setara MATERIAL BOARD
DRAWN BY PROJECT NO
2018008 A3.05
DECORATIVE WALL ( PT-3 )
±0.00 = +670.052
GRC COLUMN COVER
ALUMINIUM WINDOW
POWDER COATING
PTE.LTD
PAINTED PLASTER
FINISH ( PT-2 )
FINISH ( PT-3 )
FINISH ( PT-2 )
STONE FINISH
NOTE :
(8mm GLASS)
ROOF ( RF-1)
KALSI PLANK
NOTICE
EX ALLURE
GALTECTO
Do not scale this drawing, use figured dimensions only. This drawing has been
PEDESTAL
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
( PT-3 )
( ST-5 )
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
1400 to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
250
150 100 700 200
400
250
600
500
700
450 150
800
3
FRONT ELEVATION
FFL ±10.639
FFL +5.89
FFL ±0.00
7000
6000
ENLARGED ELEVATION 1
1
0.5
0
U AND R ON
PODOMORO PARK
ANDUN NDON A
2
800
MARK N
1 : 50
450 150
A R
2
1
400
250
600
500
700
U D OR
20
OR ON RU ON
A
250
DRA
4749 5890
1400
FFL -0.02
GF
10639
ENLARGED ELEVATION
LISTPLANK
ROOF TOP
FFL +10.639
O
FFL +5.89
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A3.11
CONSOLE PAINTED
WATER PROOFING
WATER PROOFING
COATING SKYLIGHT
CONCRETE ROOF
CONCRETE ROOF
PAINTED SKYLIGHT
LAMINATED GLASS
GOOD SYSTEM EX
PAINTED HOLLOW
±0.00 = +670.052
FRAME SYSTEM.
Arch 22o2
FINISH ( PT-4 )
CUSTOM GRC
GRC PROFILE
FRAME FINISH
METAL ROOF
ON POWDER
ALLURE ON
6MM + 6MM
NOTE :
PTE.LTD
DECORATIVE UPLIGHT & DOWNLIGHT
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
RE: MEP & SPECIALIST LIGHTING
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
POWDER COATING ALUMINIUM
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
PAINTED FINISH ( PT-4 )
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
GRC COLUMN COVER
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
WINDOW EX ALLURE
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
WALL FINISH (PT-3)
PAINTED PLASTER
PAINTED PLASTER
CONCRETE ROOF
(8mm GLASS)
(8mm GLASS)
7
PAINTED
2
5
FRONT ELEVATION
1
FFL -0.02
FFL -0.52
FFL -0.14
FFL -0.27
FFL -0.39
FFL -0.65
3500
OPEN
ENLARGED ELEVATION 2
1
8000
0.5
0
3800
5950
ENLARGED ELEVATION 3
1
U AND R ON
1 : 50
0.5
PODOMORO PARK
1
ANDUN NDON A
0
4100
FFL -0.02
GF
4750 MARK N
A R
FFL +4.75
6
2
270
U D OR
20
80 OR ON RU ON
480
A
4100
DRA N
1 : 50
N
300
DRA
200
2
190 100 150 ENLARGED ELEVATION
FFL -0.02
GF
O
230 150
2750 4750
FFL +7.50
FFL +4.75
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A3.12
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
G CONCRETE ROOF
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
WITH SCREED & constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
WATER PROOFING relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
PAINTED SKYLIGHT portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
FFL +7.50 6MM + 6MM structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
LAMINATED GLASS to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
500
ON POWDER
FFL +7.00 COATING SKYLIGHT
100 150
FRAME FINISH
230 150
GOOD SYSTEM EX
ALLURE ON
PAINTED HOLLOW 1
190
METAL ROOF
80
FRAME SYSTEM.
2250
GRC PROFILE
PAINTED FINISH
GRC CONSOLE
PAINTED FINISH D A ON
GRC COLUMN
COVER
PAINTED FINISH
BUILDING BEHIND ( PT-4 )
6250
4750
U AND R ON
GF
FFL -0.02
LANDSCAPE -0.15
-0.30
-0.20 PODOMORO PARK
DROP OFF -0.40 ANDUN NDON A
MARK N
A R
2
ENLARGED ELEVATION 4 U D OR
1
20
1 : 50 0 0.5 1
OR ON RU ON
A
DRA N
N
DRA
±0.00 = +670.052
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A3.13
PAINTED FINISH ( PT-4 )
ON 40mmx40mm STEEL
CUSTOM SIGNAGE
HT WET CLADDING
PAINTED PLASTER
GRC DECORATIVE
Arch 22o2
WATER PROOFING
CONCRETE ROOF
PARAPET ( PT-3 )
±0.00 = +670.052
HOLLOW FRAME
PAINTED FINISH
SYSTEM (ST-1)
WITH BACKLIT
KALSI PLANK
DECORATIVE
PTE.LTD
WINDOW)
NOTE :
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
1
900
150 450 150
150
700
A ON
150 100 700 200
9
250
RON
1400
9830
6000
ENLARGED ELEVATION 5
1
0.5
U AND R ON
PODOMORO PARK
0
ANDUN NDON A
MARK N
A R
2
U D OR
20
1 : 50
OR ON RU ON
A
DRA N
1
N
DRA
FFL -0.02
GF
O
TOP ROOF
FFL +11.73
FFL +6.89
FFL +4.75
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A3.14
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
14 13
6000 NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
GALTECTO © ARCH 22o2, all rights reserved.
ROOF (RF-1)
1
GUTTER
GRC CONSOLE
PAINTED FINISH ( PT-4 )
HT WET CLADDING
WALL SYSTEM (ST-1)
1840
600
GRC PROFILE PAINTED
300
FINISH ( PT-4 )
600
PAINTED PLASTER GRC
6890
6mm GLASS
4200
U AND R ON
PAINTED PLASTER GRC
DECORATIVE GATE WALL ( PT-1 )
200
-0.20
U D OR
20
FINISH (ST-2)
2700 DRA N
N
DRA
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A3.15
13 12 11
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
6000 6000
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
GALTECTO works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
ROOF (RF-1) conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
DECORATIVE 40mmx20mm
HOLLOW ON 40mmx40mm
1600
GRC CONSOLE
PAINTED FINISH ( PT-4 )
R AR A ON
600
MATERIAL BOARD SEE : A3:05
PAINTED PLASTER GRC
600
300
DECORATIVE GATE WALL
(PT-1)
300
1840
HT WET CLADDING
WALL SYSTEM (ST-1)
6mm GLASS
6890
4940
(8mm GLASS ON DOOR)
2353
4250
4200
PAINTED PLASTER
GRC DECORATIVE
WALL ( PT-4 )
150
STONE FINISH
75
(ST-5)
PEDESTAL STONE U AND R ON
875
FINISH ( ST-2 )
GF
FFL -0.02 PAINTED PLASTER
GRC DECORATIVE PODOMORO PARK
GATE WALL ( PT-1 ) ANDUN NDON A
400 3800 400 400 200 487,5 400 1900 400 487,5 200 400
4600 4875 MARK N
A R
2
U D OR
20
OR ON RU ON
A
DRA N
ENLARGED ELEVATION 7
N
1 1 : 50 0 0.5 1
DRA
NOTE :
ENLARGED ELEVATION
±0.00 = +670.052
O
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A3.16
COATING SKYLIGHT
PAINTED SKYLIGHT
LAMINATED GLASS
CONSOLE PAINTED
GOOD SYSTEM EX
WATERPROOFING
PAINTED HOLLOW
CONCRETE ROOF
CONCRETE ROOF
WATERPROOFING
FRAME SYSTEM.
CONCRETE ROOF
Arch 22o2
WITH SCREED &
±0.00 = +670.052
FRAME FINISH
FLOOR FINISH
FINISH ( PT-3 )
CUSTOM GRC
METAL ROOF
ON POWDER
DECORATIVE
DOWNLIGHT
ALLURE ON
6MM + 6MM
SPECIALIST
UPLIGHT &
LIGHTING
PAINTED
PTE.LTD
NOTE :
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
WINDOW EX ALLURE
WALL FINISH (PT-3)
PAINTED PLASTER
CONCRETE ROOF
WATER PROFING
7
(6mm GLASS)
2
PAINTED
REAR ELEVATION
1750
3000 200
OPEN
8000
3500
600
500
1750
5
ENLARGED ELEVATION 9
1
ENLARGED ELEVATION 8
1
U AND R ON
0.5
0.5
5950 PODOMORO PARK
0
ANDUN NDON A
0
4100 4100
FFL -0.02
GF
4750 MARK N
A R
FFL +4.75
6
2
270
U D OR
20
OR ON RU ON
1 : 50
80
480
A
DRA N
1 : 50
300
N
2
DRA
200
1
190 100 150 ENLARGED ELEVATION
FFL -0.02
GF
O
230 150
2750 4750
FFL +7.50
FFL +4.75
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A3.17
PAINTED FINISH ( PT-4 )
Arch 22o2
WALL SYSTEM (ST-1)
±0.00 = +670.052
WINDOW EX ALLURE
HT WET CLADDING
PAINTED PLASTER
PAINTED PLASTER
PAINTED PLASTER
PAINTED PLASTER
PAINTED PLASTER
POWDER COATING
GRC DECORATIVE
GRC DECORATIVE
CONCRETE ROOF
WITH SCREED &
NOTE :
DOWNLIGHT
LIGHTING
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
275
1375
A ON
400
3
R AR
600
6000
5600
3000
ENLARGED ELEVATION 10
600
1
U AND R ON
0.5
PODOMORO PARK
ANDUN NDON A
0
400
MARK N
4
A R
2
U D OR
20
OR ON RU ON
1 : 50
A
DRA N
N
1
DRA
ENLARGED ELEVATION
CONCRETE ROOF
O
670 4080
NO
FFL -0.02
GF
4750 SCALE DATE
NA
FFL +4.75
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A3.18
G F E'' E E' D
37500
C B A' A Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
6000 2750 3250
1
A4.11 GALVALUMNE METAL ROOF NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
CONCRETE ROOF WITH SCREED & and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
WATERPROOFING works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
10mm PAINTED PRECAST GRC WITH HOLLOW METAL conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
FFL +10.639 LINEAR STRIP LIGHTING PER PRECAST FABRICTOR ON STEEL STRUCTURE (GR-1) drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
RE: MEP & SPECIALIST LIGHTING METAL GRILL on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
WATER TANK, RE:MEP but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
GALTECTO ROOF (RF-1) specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
IWF STEEL STRUCTURE to producing shop and setting out drawings.
DAK T:13CM
4709
© ARCH 22o2, all rights reserved.
RE : STRUCTURE
2
CAST IRON A12.03
NOTE :
GUTTER
ROOF DRAIN
RE : MEP ±0.00 = +670.052
SCREED & WATERPROOFING
10619
2150
BASEMENT R. CONTROL R. POMPA STAFF
FFL - 3.27 FFL +3.20 FFL +3.20 FFL +3.27
SECTION A
1 1 : 200 3
R1
PAINTED SKYLIGHT
6MM + 6MM LAMINATED GLASS ON POWDER
COATING SKYLIGHT FRAME FINISH GOOD
SYSTEM EX ALLURE ON PAINTED HOLLOW METAL
ROOF FRAME SYSTEM.
AFF+4.10
2
5990
HCS RE : STRUCTURE
GF OUTDOOR LOUNGE OR ON RU ON
A
3250
DRA
2750
BASEMENT
FFL - 3.27 FFL -3.27 FFL -3.30 SECTION A & B
O
SCALE DATE NO
SECTION B
NA
2 1 : 200 0 1 3
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A4.01
Arch 22o2
STEEL STRUCTURE RE: STRUCTURE
4860
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
CAST IRON SCREED & WATERPROOFING to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
ROOF DRAIN
RE : MEP
NOTE :
12542
DECORATIVE 40mmx20mm 2
11730
PAINTED PLASTER
6920
SECTION C
1 1 : 200 0 1 3
DUCTING RE : MEP
A4.14
IRON CAST
ROOF DRAIN U AND R ON
RE : MEP GUTTER
12542
PODOMORO PARK
11780
OR ON RU ON
A
DRA N
N
DRA
SECTION C & D
O
SCALE DATE NO
SECTION D
NA
2 1 : 200 0 1 3
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A4.02
STEEL STRUCTURE RE: STRUCTURE
10mm PAINTED PRECAST GRC WITH HOLLOW METAL
9'
PER PRECAST FABRICTOR ON STEEL STRUCTURE
(GR-1)
ASPHALT SHINGLE ROOF (RF-1)
Arch 22o2
GLOBAL DESIGN STUDIO
9 10 11 12 13 14 PTE.LTD
IWF STEEL STRUCTURE RE : STRUCTURE
30000 STEEL CATWALK &
ROOF TOP 300 6000 6000 6000 6000 6000 BALUSTRADE RE : STRUCTURE
+12.65 DUCTING
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
RE : MEP and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
PAINTED STEEL LADDER works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
1 UP TO CATWALK ABOVE control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
A4.14 drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
5780
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
IRON CAST to producing shop and setting out drawings.
RE : MEP
GRC CONSOLE
PAINTED FINISH NOTE :
11780
CEILING BY I.D
12650
BASEMENT
FFL -3.27
SECTION E
2 1 : 200 0 1 3
R1
R1
AFF +4.10 AFF +4.10 MARK N
5910
CEILING BY ID
AFF +3.20
A R
2
GF
RECEPTIONIST & U D OR
20
DRA N
3270
N
BASEMENT R. SEWAGE R. UTILITY JANITOR SERVER LEGAL MARKETING MKT CR & OM CR & OM PROMOTION
DRA
FFL - 3.27 FFL - 3.20 FFL - 3.30 FFL - 3.20 FFL - 3.27 MGR LEGAL STORAGE SAD STORAGE SAD MGR GM MGR MGR STORAGE STORAGE
SECTION E & F
O
SCALE DATE NO
NA
DRAWN BY PROJECT NO
2018008 A4.03
170
Arch 22o2
1
SLOPE
WALL SECTION B
FFL+ 4.75
0.5
PTE.LTD
350
NOTICE
0
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
LINEAR UPLIGHT
immediately to CA prior to works being undertaken. Contractors are to ensure that all
3270 works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
1 : 50
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
REAR ELEVATION
D
2
FFL-1.54
1
BASEMENT
FFL -0.02
BOARD CEILING FINISH
CAST IRON WITH ROOF
DRAIN PIPE RE : MEP
STEEL STRUCTURE
RE : STRUCTURE
GYPSUM COLUMN
COVER PAINTED FNISH
GALTECTO ROOF RF1
CONCRETE COLUMN
WALL FINISH (PT-3)
PAINTED PLASTER
A RPROO N
GF
PAINTED FINISH
R D
PAINTED PLASTER
IWF STRUCTURE
RE : STRUCTUR
MULTIPLEX BOARD
GUTTER
STEEL GORDING
PAINTED KALSI
KALSI PLANK
FRONT ELEVATION
RE : STRUCTURE
FLOOR SLAB
OP
±0.00 = +670.052
NOTE :
N
170
A
350
N AR R P
P
BASEMENT
FFL - 3.27
N
R M P
5890
PAINTED GRC
3270
460 800 1380 3200
FINISH
170 300
U AND R ON
SLOPE
PODOMORO PARK
ANDUN NDON A
G
AFF+3.20
MARK N
A R
FFL-0.02
FFL-3.27
1
2
WALL SECTION A
U D OR
0.5
20
OR ON RU ON
STEEL GORDING
FLOOR SLAB
RE STRUCTURE
A
PAINTED FINISH ON
RETAINING WALL
DRA N
FLOOR FINISH
SEE FINISH
A10.04.02
A 02
CONCRETE COLUMN
RE : STRUCTURE
GRC PAINTED FINISH (PT3)
DECORATIVE WALL
CAST IRON WITH ROOF
DRAIN PIPE RE : MEP
CONCRETE STRUCTURE
RE : STRUCTURE
IWF STRUCTURE
IWF STRUCTURE
0
RE : STRUCTUR
RE : STRUCTUR
A
N
40mmx40mm
AS REQUIRED
STEEL HOLLOW
ALUMINIUM WINDOW
N
A
DRA
POWDER COATED
GUTTER
P
N
NDO UP
N AR UP
WALL SECTION A & B
N
R M P
EX ALLURE
N
R M P
O
1 : 50
SCALE DATE NO
NA
22 JUN 2020
1
OR
DRAWN BY PROJECT NO
2018008 A4.11
170
Arch 22o2
1
SLOPE
WALL SECTION D
GLOBAL DESIGN STUDIO
0.5
PTE.LTD
BASEMENT
350
FFL - 3.27
5890 NOTICE
0
Do not scale this drawing, use figured dimensions only. This drawing has been
LINEAR STRIP LIGHTING
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
3270 works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
460 800 1380 3200 conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
1 : 50
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
FRONT ELEVATION
SLOPE
D
FFL-3.27
AFF+3.20
FFL-0.02
2
1
RE : STRUCTURE
FLOOR SLAB
PAINTED FINISH ON
PAINTED FINISH (PT-4)
GRC COLUMN COVER
RETAINING WALL
CEILING FINISH
PAINTED KALSI BOARD
CAST IRON WITH ROOF
DRAIN PIPE RE : MEP
CONCRETE COLUMN
FINISH
RE : STRUCTURE
PAINTED PLASTER
FLOOR FINISH
SEE FINISH
A10.04.02
RE : STRUCTURE
CONCRETE STRUCTURE
WALL FINISH (PT-3)
PAINTED PLASTER
GUTTER
STEEL GORDING
A 02
MULTIPLEX BOARD
1
RE : STRUCTUR
ADD N
N
M
±0.00 = +670.052
ON
A
NOTE :
SLOPE
170
350
BASEMENT
FFL - 3.27
FFL -0.02
GF
5890
LINEAR STRIP LIGHTING
PAINTED GRC
3270
460 800 1380 3200
FINISH
U AND R ON
SLOPE
PODOMORO PARK
ANDUN NDON A
G
FFL-0.02
MARK N
A R
AFF+3.20
FFL-3.27
1
2
WALL SECTION C
U D OR
0.5
20
OR ON RU ON
FLOOR SLAB
RE : STRUCTURE
A
PAINTED FINISH ON
RETAINING WALL
DRA N
CONCRETE COLUMN
RE : STRUCTURE
FINISH
PAINTED PLASTER
CONCRETE STRUCTURE
RE : STRUCTURE
A10 0 02
0
A 02
GUTTER
GALTECTO ROOF (RF1)
STEEL GORDING
IWF STRUCTURE
CAST IRON WITH ROOF
MULTIPLEX BOARD
RE : STRUCTUR
N
PAINTED FINISH
(PT4)
KALSI PLANK
OOR N
N
DRA
CEILING FINISH
N
WALL SECTION C & D
O
1 : 50
SCALE DATE NO
NA
22 JUN 2020
1
OR
DRAWN BY PROJECT NO
2018008 A4.12
280
Arch 22o2
350
BASEMENT
PTE.LTD
FFL - 3.27
SPECIALIST LIGHTING
FFL -0.02
GF
WINDOW UPLIGHT
NOTICE
PAINTED GRC
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
RE: MEP &
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
1
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
WALL SECTION F
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
0.5
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
2328
FRONT ELEVATION
0
1 : 50
AFF+3.20
FFL-3.20
1
FLOOR SLAB
RE : STRUCTURE
FLOOR FINISH
CONCRETE COLUMN
RE : STRUCTURE
WALL FINISH (PT-4)
PAINTED PLASTER
WINDOW EX ALLURE
,6mmGLASS ON WINDOW)
RE : STRUCTURE
HCS FLOOR SLAB
WALL FINISH (PT-4)
PAINTED PLASTER
POWDER COATED
ALUMINIUM DOOR &
A10 0 02
STEEL GORDING
IWF STEEL STRUCTURE
RE : STRUCTURE
IWF STRUCTURE
RE : STRUCTUR
A 02
N
OOR N
N
2
A
N
N AR R P
P
N
R M P
±0.00 = +670.052
BASEMENT
280
SLOPE
FFL - 3.27
5890
NOTE :
350
3270
4730 1160
U AND R ON
PODOMORO PARK
ANDUN NDON A
G
MARK N
A R
1
AFF+3.20
FFL -0.02
GF
FFL-3.27
2
WALL SECTION E
0.5
U D OR
20
OR ON RU ON
A
DRA N
PAINTED FINISH
FLOOR SLAB
RE : STRUCTURE
(PT4)
A10 0 02
A 02
KALSI PLANK
0
MULTIPLEX BOARD
AS REQUIRED
IWF STRUCTURE
STRUCTURE
GALTECTO ROOF (RF1)
GUTTER
PAINTED FINISH ON
RE : STRUCTURE
CAST IRON WITH ROOF
RETAINING WALL
N
OOR N
N
DRA
A
UP
N
WALL SECTION E & F
P
O
1 : 50
M P
SCALE DATE NO
NA
22 JUN 2020
1
R
OR
DRAWN BY PROJECT NO
2018008 A4.13
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
GALTECTO GALTECTO drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
ROOF ( RF-1) ROOF ( RF-1) on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
STEEL GORDING STEEL GORDING specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
350 CAST IRON WITH ROOF 350 CAST IRON WITH ROOF
DRAIN PIPE RE : MEP SLOPE
DRAIN PIPE RE : MEP
SLOPE
KALSI PLANK
170
170
KALSI PLANK PAINTED FINISH ( PT-4 )
PAINTED FINISH ( PT-4 ) PAINTED KALSI
PAINTED KALSI BOARD CEILING FINISH BOARD CEILING
BY I.D BY I.D FINISH
GRC CONSOLE
PAINTED FINISH ( PT-4 ) CEILING BY I.D
CEILING BY I.D
1600
DECORATIVE 40mmx20mm
1600
GRC CONSOLE
PAINTED FINISH ( PT-4 )
FFL + 3.800
STONE WALL FINISH
(ST-1)
HT WET CLADDING
PA N D P A R WALL SYSTEM (ST-1)
R D ORA
A A P 1
ON N
ON N
PODOMORO PARK
P D A ANDUN NDON A
P D A ON N 2
ON N 2
MARK N
1100
1100
WINDOW UPLIGHT U D OR
20
1 : 50 0 0.5 1 1 : 50 0 0.5 1
±0.00 = +670.052
SCALE DATE NO
NA
DRAWN BY PROJECT NO
-1.50 = +668.552 2018008 A4.14
IWF STRUCTURE
Arch 22o2
GLOBAL DESIGN STUDIO
RE: STRUCTURE PTE.LTD
ROOF ( RF-1) STEEL GORDING Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
STEEL GORDING IWF STRUCTURE works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
IWF STRUCTURE RE: STRUCTURE conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
PAINTED KALSI BOARD CEILING FINISH BOARD CEILING FINISH © ARCH 22o2, all rights reserved.
170
170
60 CAST IRON WITH ROOF CAST IRON WITH ROOF
DRAIN PIPE RE : MEP DRAIN PIPE RE : MEP
BY I.D BY I.D
CEILING BY I.D
CEILING BY I.D
DECORATIVE PA N D R ON O
1600
40mmx20mm HOLLOW ON O R P
40mmx40mm STEEL
COLUMN UPLIGHT
HOLLOW FRAME
RE: MEP & SPECIALIST
PAINTED DUCO FINISH 1 2
LIGHTING
1130
3100
REAR ELEVATION
PA N DP A R
490
A P 1
PA N D P A R
R D ORA
A A P 1 GRC PAINTED FINISH
( PT-4 )
LINEAR UPLIGHT
RE: MEP & SPECIALIST KEYPLAN
LIGHTING
6900
RE MEP
POWDER COATING 50mm X 50mm ANGLE IRON
ALUMINIUM DOOR & WINDOW AS REQUIRED
EX ALLURE (8mm GLASS) RE : STRUCTURE
5240
5290
8mm GLASS A N D
PAINTED PLASTER
DECORATIVE WALL ( PT-4 )
PA N D P A R
3800
1100
WINDOW UPLIGHT
(ST-2) PODOMORO PARK
GF GF ANDUN NDON A
FFL -0.02 RE : MEP & SPECIALIST FLOOR FINISH BY I.D
POR 00 FFL -0.02 POR 00
LIGHTING
D D
WALL SECTION I WALL SECTION J U D OR
20
1 1 : 50 0 0.5 1 2 1 : 50 0 0.5 1
OR ON RU ON
A
DRA N
N
DRA
±0.00 = +670.052
-0.65 = +669.402 SCALE DATE NO
NA
22 JUN 2020
-0.80 = +669.252
OR
DRAWN BY PROJECT NO
-1.50 = +668.552 2018008 A4.15
COVERED
STRUCTURAL BEAM Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
SCREED &
WATERPROOFING NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
A RON ROO prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
DRA N R M P immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
+6.77 constructed in accordance with local statutory authority requirements, local building
150 170
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
PLASTERED PAINTED relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
DECORATIVE GRC on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
350
out rods to fully illustrate methods of construction of all specialist millwork, design
PROFILE ( PT-4 ) portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
70150
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
900
FFL +4.80
270
30
800
A RON ROO
500
PAINTED PALASTER
DRA N R M P
970
WALL FINISH (PT-1)
PAINTED KALSI
AFF+4.10 BOARD CEILING
FINISH 1
PAINTED KALSI
BOARD CEILING
FINISH
HT WET CLADDING
WALL SYSTEM (ST-3)
4120
PAINTED FINISH ( PT-4 )
FRONT ELEVATION
4200
FLOOR FINISH
FLOOR FINISH GF
FFL ±0.00 FFL +0.05 GARDEN BY
FFL -0.10 LANDSCAPE
OUTDOOR LOUNGE
FFL ±0.00
-0.15 FLOOR SLAB
PER STRUCTURE
-0.45
PODOMORO PARK
3300
COULMN
2150
FLOOR SLAB
BASEMENT U D OR
PER STRUCTURE
20
FFL - 3.30
OR ON RU ON
A
DRA N
N
DRA
NOTE :
-0.80 = +669.252
OR
DRAWN BY PROJECT NO
-1.50 = +668.552 2018008 A4.16
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
R D NOTICE
O A Do not scale this drawing, use figured dimensions only. This drawing has been
A RPROO N prepared based upon survey and other information supplied by others. All dimensions
2904 2000 100 and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
A RON A RON ROO constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
FFL + 4.75 FFL + 4.75 R D on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
800
800
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
PA N D P A R RU UR
ON R R RU UR
430
PAINTED KALSI PA N DP A R
1925
BOARD CEILING A N P 1
2600
FINISH
PAINTED KALSI
RU UR
BOARD CEILING
R RU UR
FINISH
PP OOR DRA N POWDER COATING
R M P ALUMINIUM WINDOW
4750
4750
2
R AR A ON
GRC COLUMN COVER EX ALLURE
4100 PAINTED FINISH ( PT-4 ) (8mm GLASS)
4100
3700
UP & DOWNLIGHT
RE: MEP & SPECIALIST
LIGHTING FLOOR SLAB
PER STRUCTURE
FLOOR FINISH BY I.D RON A ON 1
3300
CONCRETE COLUMN
PER STRUCTURE
2450
2450
2550
2050
RETAINING WALL
PAINTED FINISH
FLOOR FINISH
U AND R ON
CURB CURB
BASEMENT
FFL - 3.30
BASEMENT
FFL - 3.20
BASEMENT
FFL - 3.30 FFL - 3.20 BASEMENT PODOMORO PARK
FFL - 3.30 ANDUN NDON A
FLOOR SLAB
PER STRUCTURE
MARK N
A R
2
E" C U D OR
20
OR ON RU ON
WALL SECTION M WALL SECTION N
A
±0.00 = +670.052
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A4.17
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
GALTECTO relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
ROOF ( RF-1) on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
PA N D P A R
ON R
PAINTED KALSI
1915 BOARD CEILING
FINISH
STONE CLADDING
WALL SYSTEM (ST-3)
4750
PEDESTAL U AND R ON
STONE FINISH (ST-2)
GF
FFL ± 0.00 PANTRY
PORCH
FLOOR FINISH PODOMORO PARK
FFL -0.02 BY I.D ANDUN NDON A
FFL -0.05
FLOOR SLAB
PER STRUCTURE
MARK N
A R
2
U D OR
20
OR ON RU ON
11
A
DRA N
WALL SECTION O
N
1
DRA
1 : 50 0 0.5 1
±0.00 = +670.052
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A4.18
3 2
D
A5.04 A5.04
2&3
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
A5.04
DF
825
825
Do not scale this drawing, use figured dimensions only. This drawing has been
HT-4 prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
HT-4 HT-4 MOISTURE works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
FD RESISTANCE control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
GYPSUM BOARD PAINTED PLASTER MOUNTED relating to the project or projects for which this drawing has been prepared. This
DF FD drawing is also to be read in conjunction with drawings, specifications, schedules and
HT-3 HT-3 SINGLE FAUCET
HT-3
E CEILING PAINTED 3 WALL FINISH (PT-2) so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
850
850
FINISH ( PT-5 ) portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
HT-3 structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
GF GF to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
1B"
4000
1B' DF DF
1
825
875
MEETING
ROOM
CEO
ROOM
PLASTER
DF
FD
DF FD
DF DF
WALL FINISH
RUANG
CONTROL
MALE FEMALE
P.FILTER-2
TP-2 TP-1 P.FILTER-1
SEWAGE PIT
RUANG RUANG
POMPA
UTILITY 2
(PT-2 )
40.86m
1630
1630
TOILET TOILET
TP-2
RUANG
LVMDP
TP-1
OUT GOING 1
INCOMMING
PLN
008
6145
009
-0.100 -0.100
MOUNTED
3200
3200
FFL-3.22 FFL-3.22 PT-1 SINGLE PT-1 KEYPLAN - BASEMENT
ST-7
FAUCET
E' HT-1 HT-1
NOTE :
ST-7
FOR MATERIAL
008 009 SEE DRAWING : A10.04.04
900
900
FOR SANITARY SCHEDULE
CT-1 CT-1 SEE DRAWING : A5.09
1B'
2000
B BASEMENT BASEMENT
4 FFL -3.20 FFL -3.22 FFL -3.20 FFL -3.22
300
300
A5.04 FFL-3.20
A5.04
C 4&5 A
DETAIL TOILET - PLAN 3 A5.04
1 1 : 50
FFL
-0.02
GF
FFL±0.00
D 4000
E' FFL GF D 4000
E' ISSUES AND REVISIONS
MOISTURE -0.02 FFL±0.00
RESISTANCE
GYPSUM BOARD
CEILING PAINTED
FINISH ( PT-5 )
PODOMORO PARK
BANDUNG, INDONESIA
AFF +2.80 AFF +2.80
HT-3
MIRROR HT-3
MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm
1520 1520
HT-3
TOILET URINAL GALLERY
PARTITION PARTITION HT-3
1200
1200
3200
3200
2250
WASTAFEL
150
DRAWINGS
150
HT-4 STONE FINISH
200
200
( ST-7 ) SHEET TITLE
900
900
BASEMENT WATER BASEMENT DETAIL TOILET
FFL -3.20 FFL -3.22 HT-3 PROOFING FFL -3.20 FFL -3.22 HT-3 FFL -3.20 BASEMENT
WATER
PROOFING 200mm SCALE DATE SHEET NO
22 UN 2020
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
U AND R ON
PODOMORO PARK
ANDUN NDON A
MARK N
A R
2
U D OR
20
OR ON RU ON
A
DRA N
N
DRA
SANITARY
SCHEDULE
O
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A5.05
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
LINE OF
BUILDING
NOTICE
ABOVE Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
PROPERTY specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
LINE © ARCH 22o2, all rights reserved.
EXPOSED
MEETING
AFF+2.750
ROOM
LEGENDS
EXPOSED EXPOSED
PT6
AFF+2.750 AFF+2.750
DOWNLIGHT
PT6 PT6
E DOWNLIGHT EMERGENCY
DOWNLIGHT ADJUSTABLE
EXPOSED
TL
EXPOSED AFF+2.750 EXPOSED E
EXPOSED
AFF+2.750 AFF+2.750 PT6
AFF+3.000 TL EMERGENCY
EXPOSED
PT6 PT6
PT6 AFF+3.000
CEO
ROOM RM
EXPOSED PT6
AFF+2.750
SEE MEP FOR EXACT LIGHT
PT6
PT6 EXPOSED PT6
FIXTURE TYPE & SPECS.
PT6 AFF+2.750
EXPOSED
EXPOSED
AFF+3.000 PT6
AFF+3.000
PT6
MEETING
PT6 ROOM
PT6
PT6 EXPOSED
AFF+3.000
EXPOSED
EXPOSED DF
AFF+3.000 PT6
AFF+3.000 EXPOSED PT6
FD
DF FD
EXPOSED EXPOSED
PT6 GYPSUM GYPSUM AFF+3.000 AFF+3.000 AFF+3.000
DF
BOARD BOARD
DF
P.FILTER-2
TP-2 TP-1 P.FILTER-1
EXPOSED
SEWAGE PIT
AFF+3.000
PT6
EXPOSED
RUANG RUANG
AFF+3.000
POMPA 2
EXPOSED
UTILITY 40.86m
AFF+3.000 PT6
PT6
EXPOSED
TP-2
RUANG
AFF+3.000
LVMDP
TP-1
PT6 EXPOSED
AFF+3.000
OUT GOING 1
INCOMMING
PLN
PT5
6145
PODOMORO PARK
BANDUNG, INDONESIA
MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm
GALLERY
ISSUED FOR
FOR CONSTRUCTIONS
DRAWINGS
SHEET TITLE
N
SCALE DATE SHEET NO
22 UN 2020
DRAWN BY PROJECT NO
20 8008 A7.01
STEEL CATWALK RE :
STRUCTURE
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
-0.20 A
PAINTED STEEL LADDER
50 UP TO CATWALK ABOVE NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
20
60
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
50
00
immediately to CA prior to works being undertaken. Contractors are to ensure that all
19 works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
B
control requirements and all relevant codes of practice. This drawing is to be read in
50 conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
39 ROOF relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
00 ACCESS HATCH on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
30 out rods to fully illustrate methods of construction of all specialist millwork, design
45
portion & subcontractor elements of the construction. These drawings should include
50
C but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
00
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
20 specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
00 to producing shop and setting out drawings.
30
C'
© ARCH 22o2, all rights reserved.
15
00
PROPERTY LINE 39
50 LEGENDS
19
50 DOWNLIGHT
60
50
20
pp-screen
DOWNLIGHT EMERGENCY
00
LINE OF BASEMENT 00
33
LEVEL BELOW D DOWNLIGHT ADJUSTABLE
TL
D
A A 0
-0.20
TL EMERGENCY
3250
FFL -0.15
SFL -0.45
RM
A' SEE MEP FOR EXACT LIGHT
2750
B
6000
PORCH
FFL -0.05
R
1500
R
2000 3490 1995 14000
P A 100 P A 100
C A
D
200 6 000
P
FD FD
D 16
08
0
14
A 200
0
7500
P UM 0
A
D
0
OARD D D
00 60
20
A 200 A 200
13
A 200
N NAN
P
A 2 800
0 0
D
A
D
200
60
D A 200
A
D
200
12
4000
D
00
D A 200 60
A 200
D
11
20
E' D A 200
1500 2000
00
00
A 200
6 0
D
E A 200
300 10
00
E'' 32
2900
N NAN
4500
A 2 800
UP
2 00 9
7
8' 9' LINE OF EXPANSION JOINT
F
FFL -1.20
U AND R ON
6000
8
PODOMORO PARK
G ANDUN NDON A
D
A 0
MARK N
A R
2
1 2 3 4 5 6 7 7' OR ON RU ON
A
DRA N
N
DRA
CEILING PLAN
REFLECTED CEILING PLAN GROUND FLOOR
O
GROUND FLOOR
N
NO
1 SCALE DATE
NA
DRAWN BY PROJECT NO
2018008 A7.02
1. DOOR TYPES
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
AS SCHEDULE
NOTICE
AS SCHEDULE
AS SCHEDULE
AS SCHEDULE
AS SCHEDULE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
AS SCHEDULE AS SCHEDULE AS SCHEDULE AS SCHEDULE AS SCHEDULE portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
ALUMINUM GLASS DOOR ALUMINUM GLASS DOOR ALUMINUM DOOR STEEL DOOR STEEL DOOR structural steelwork, M&E services, case goods, cabinetry, joinery work and other
TYPE A1 TYPE A2 TYPE A4 TYPE D1 TYPE D3 specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
2. FRAME TYPES
50
1000
50
50
RE : DOOR SIZE (AS SCHEDULE) RE : DOOR SIZE (AS SCHEDULE) RE : DOOR SIZE (AS SCHEDULE) RE : DOOR SIZE (AS SCHEDULE) RE : DOOR SIZE (AS SCHEDULE)
50 50 50 50
RE : DOOR SIZE (AS SCHEDULE)
50 800 50 450 50 50 50 50 50 50 50
50
50
50
50
50
50
RE : DOOR SIZE (AS SCHEDULE)
2650
2020
2150
450
80
50
1000 1800 1000 1400
SINGLE DOOR DOUBLE DOOR DOUBLE DOOR SINGLE DOOR & WINDOW SINGLE DOOR DOUBLE DOOR
ALUMINUM FRAME ALUMINUM FRAME ALUMINUM FRAME DOUBLE DOOR & WINDOW SINGLE DOOR & WINDOW ALUMINIUM FRAME STEEL FRAME STEEL FRAME
TYPE 1 TYPE 2 ALUMINUM FRAME ALUMINIUM FRAME TYPE 7 TYPE 1B TYPE 2B
TYPE 3
TYPE 4 TYPE 5
AS SCHEDULE
5mm
GROOVE
LINE
U AND R ON
STEEL
ASTRAGAL
DOOR
50
100
1512
ALUMINUM ALUMINUM GLASS WINDOW
AS SCHEDULE
PODOMORO PARK
GLASS WINDOW TYPE 1F MATERIAL : ALUMINUM MATERIAL : STEEL ANDUN NDON A
TYPE 1A
M1 M2
FROSTED SEAL
GLASS RUBBER
MARK N
15 35 15
RE : WINDOW SIZE (AS SCHEDULE) RE : WINDOW SIZE (AS SCHEDULE) RE : WINDOW SIZE (AS SCHEDULE) RE : WINDOW SIZE (AS SCHEDULE)
5mm GROOVE LINE
A R
2
U D OR
20
OR ON RU ON
A
5mm
DRA N
N
GROOVE
LINE
DRA
900
900
200
TYPE
ALUMINUM ALUMINUM ALUMINUM
O
ALUMINUM
GLASS WINDOW GLASS WINDOW GLASS WINDOW GLASS WINDOW
TYPE 1B TYPE 1C TYPE 1D TYPE 1E
MATERIAL : STEEL
M3 SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008
A10.01.11
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
U AND R ON
PODOMORO PARK
ANDUN NDON A
MARK N
A R
2
U D OR
20
OR ON RU ON
A
DRA N
N
DRA
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008
A10.01.12
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
U AND R ON
PODOMORO PARK
ANDUN NDON A
MARK N
A R
2
U D OR
20
OR ON RU ON
A
DRA N
N
DRA
HARDWARE GROUP
O
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008
A10.01.13
FLOOR SLAB FLOOR SLAB FLOOR SLAB FLOOR SLAB
ABOVE
AERATED
ABOVE
AERATED
ABOVE
AERATED
ABOVE
AERATED
Arch 22o2
GLOBAL DESIGN STUDIO
CONCRETE (AAC) CONCRETE (AAC) CONCRETE (AAC) CONCRETE (AAC) PTE.LTD
100mm 100mm 100mm 100mm
PAINTED
PAINTED GYPSUM PLASTER WALL PAINTED GYPSUM PAINTED GYPSUM NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
BOARD CEILING UNLESS MORTAR 25mm BOARD CEILING BOARD CEILING prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
UNLESS DESIGNED DESIGNED UNLESS DESIGNED UNLESS DESIGNED works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
UNLESS PAINTED PLASTER portion & subcontractor elements of the construction. These drawings should include
WALL UNLESS HOMOGENEOUS HOMOGENEOUS but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
DESIGNED PAINTED PLASTER specialist finishes and features. The dimensional accuracy of this drawing as it relates
DESIGNED BY I.D PAINTED TILE UNLESS PAINTED TILE UNLESS to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
BY I.D WALL UNLESS © ARCH 22o2, all rights reserved.
PLASTER WALL DESIGNED BY I.D PLASTER WALL DESIGNED BY I.D
DESIGNED BY I.D
UNLESS UNLESS
FINISH SCHEDULE FINISH SCHEDULE DESIGNED FINISH SCHEDULE DESIGNED FINISH SCHEDULE
RE: A10.04.04 RE: A10.04.04 BY I.D RE: A10.04.04 BY I.D RE: A10.04.04
HT-2 FINISH LINE OF FLOOR LINE OF FLOOR HT-2 FINISH LINE OF FLOOR HT-2 FINISH LINE OF FLOOR
1 WALL TYPE 1A SCALE 1 : 10 2 WALL TYPE 1A" SCALE 1 : 10 3 WALL TYPE 1B SCALE 1 : 10 4 WALL TYPE 1B' SCALE 1 : 10
150
PAINTED GYPSUM PAINTED GYPSUM
BOARD CEILING BOARD CEILING
METAL METAL UNLESS DESIGNED
HOLLOW HOLLOW BY I.D
STUD STUD
1200
9 76 9 9 9 9 76 9 250
5 PARTITION TYPE 3A SCALE 1 : 10 6 PARTITION TYPE 3A' SCALE 1 : 10 7 PARTITION TYPE 3B SCALE 1 : 10 8 WALL TYPE 4A SCALE 1 : 10
FLOOR SLAB
U AND R ON
ABOVE
PODOMORO PARK
ANDUN NDON A
MARK N
A R
2
U D OR
20
PAINTED
CONCRETE OR ON RU ON
A
WALL FINISH
DRA N
N
DRA
LINE OF FLOOR
250
SCALE DATE NO
NA
22 JUN 2020
A10.02.11
OR
DRAWN BY PROJECT NO
9 WALL TYPE 4A' SCALE 1 : 10 2018008
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
A A
© ARCH 22o2, all rights reserved.
7 7
1200 1210 1200 1200 1210 1200
1500
C C
FD FD
PT-4
P UM
OARD
A 200
WUDHU C C KEYPLAN
2150
2150
1060 1060
PT-4
FD FD FD FD
BATAS SUCI
PT-4
2
B 2
B
A10.02.14 A10.02.14
MUSHOLA P UM
OARD
3870
3870
FFL+0.100
PT-4 PT-4 A 200
HT-6
P
PT-4
U AND R ON
PODOMORO PARK
ANDUN NDON A
1 1
A10.02.14 A10.02.14
MARK N
A R
2
U D OR
FLOOR PLAN CEILING PLAN
20
1 1 : 50 2 1 : 50 OR ON RU ON
A
DRA N
N
DRA
INTERIOR DETAIL
MUSHOLA
O
SCALE DATE NO
NA
22 JUN 2020
A10.02.13
OR
DRAWN BY PROJECT NO
2018008
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
PAINTED GYPSUM PAINTED GYPSUM and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
BOARD CEILING BOARD CEILING works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
AFF +3.200 AFF +3.200 AFF +3.200 AFF +3.200 so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
PAINTED PLASTER PAINTED PLASTER structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
WALL FINISH WALL FINISH to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
WINDOW
PT-4
WOOD PLANK
PT-4 ATTACHED ON WALL PT-4 PT-4
400 600 950
MOUNTED SINGLE
FAUCET
RAM
HT-6 A N
C 7
SECTION A SECTION B
1 1 : 50 2 1 : 50
PAINTED GYPSUM
BOARD CEILING
PAINTED PLASTER
WALL FINISH
1890
PT-4 PT-4
WOOD PLANK U AND R ON
ATTACHED ON WALL
MARK N
915
WATERPROOFING A R
2
200
FFL +0.080
290
OR ON RU ON
A
7
DRA
INTERIOR DETAIL
SECTION C MUSHOLA
3
O
1 : 50
SCALE DATE NO
NA
22 JUN 2020
A10.02.14
OR
DRAWN BY PROJECT NO
2018008
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
LINE OF
BUILDING NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
ABOVE and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
PROPERTY specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
LINE © ARCH 22o2, all rights reserved.
NOTE :
015
CT-1
012
HT-2
07
HT-2
CC-2
08
HT-2
HT-2
09
HT-2 CEO 016
ROOM HT-2
005 017
HT-2 CT-1
004 HT-5
003 HT-2 006 011
HT-2 HT-2 HT-2
HT-2
MEETING
ROOM 010
HT-2 018
002 HT-2
HT-2
HT-2
028
DF
HT-2
001 HT-2
TOILET TOILET FD
CT-1 DF
FFL -3.22
FD
025
026 HT-2
040 HT-2 033 027
FFL - 3.20 029 024 023 022
RUANG
CC-1 HT-2
HT-2 HT-2
HT-2
HT-2
HT-2 HT-2
CONTROL 036 031
CT-1 HT-2
P.FILTER-2
TP-2 TP-1 P.FILTER-1
SEWAGE PIT
037
038
CC-1
CC-1
RUANG RUANG
POMPA
UTILITY 40.86m 2
041
CC-1
TP-2
RUANG
LVMDP
TP-1
039
CC-1
OUT GOING 1
PLN
INCOMMING
6145
PODOMORO PARK
BANDUNG, INDONESIA
MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm
GALLERY
ISSUED FOR
FOR CONSTRUCTIONS
DRAWINGS
SHEET TITLE
BASEMENT FLOOR PLAN
1 1 : 300
FLOOR FINISH PLAN
N
SCALE DATE SHEET NO
22 UN 2020
DRAWN BY PROJECT NO
20 8008
A10.04.01
Arch 22o2
GLOBAL DESIGN STUDIO
34
PTE.LTD
51
MARKETING GALLERY -0.20 A HVAC VERTICAL DUCT
AREA BY I.D
10
00
( NOT IN CONTRACT ) 0
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
205 prepared based upon survey and other information supplied by others. All dimensions
60
and levels are to be checked on site by contractors and inconsistencies reported
50 immediately to CA prior to works being undertaken. Contractors are to ensure that all
19
0
works under their responsibility or the responsibility of their sub-contractors are
50
0
constructed in accordance with local statutory authority requirements, local building
05 control requirements and all relevant codes of practice. This drawing is to be read in
3
39
50 B conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
WPC-4 on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
00
30
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
45
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
PORCH
50 structural steelwork, M&E services, case goods, cabinetry, joinery work and other
20FFL -0.05
00
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
15
50
00
PROPERTY LINE 39
GENSET - EXHAUST NOTE :
50
19
50 FOR MATERIAL
60
20
pp-screen
00
LINE OF BASEMENT 00 SEE DRAWING : A10.04.03
33
D
50
LEVEL BELOW
00
-0.20
A
10
3250
00
FFL -0.15
SFL -0.45
A'
2750
BY I.D
B
6000
WPC-4
PORCH
FFL -0.05
1500
2000 3490 1995 14000
C HT-6 60
0 0
14
HT-5
0
08
FD FD
16
00
7500
HT-6
60
FLOOR FINISH
BY TENANT 13
00
60
D 12
4000
00
60
E' 11
1500 2000
00
60
E 30
0
10
0 0
E'' FLOOR FINISH
32
4500
BY TENANT
0 0 9
72
UP
LINE OF MARK N
CANOPY
A R
2
1 2 3 4 5 6 7 7' OR ON RU ON
A
DRA N
N
FLOOR FINISH
DRA
TO MATCH DROP-OFF
TERRACE RE : LANDSCAPE FLOOR FINISH PLAN
O
N
SCALE DATE NO
1
NA
DRAWN BY PROJECT NO
2018008
A10.04.02
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
U AND R ON
PODOMORO PARK
ANDUN NDON A
MARK N
A R
2
U D OR
20
OR ON RU ON
A
DRA N
N
DRA
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008
A10.04.03
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
U AND R ON
PODOMORO PARK
ANDUN NDON A
MARK N
A R
2
U D OR
20
OR ON RU ON
A
DRA N
N
DRA
MATERIAL
SCHEDULE
O
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008
A10.04.04
ASPHALT
SHINGLE ROOF
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
150
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
1960
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
D C B A
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
4mm ACP WITH HOLLOW METAL
PER PRE FABRICTOR ON STEEL
200
STRUCTURE
COLOR : GREY/SUB SILVER
520 3900 150 3900 150 3900 150 3900 520 600
500
6 5 4 3 4mm ACP WITH HOLLOW METAL 400
2 PER PRE FABRICTOR ON STEEL 638
A10.07.01 A10.07.01 A10.07.01 A10.07.01
STRUCTURE
A10.07.01
4mm ACP WITH HOLLOW METAL COLOR : GREY/SUB SILVER
150
PER PRE FABRICTOR ON STEEL
DECORATIVE PARAPET PLAN STRUCTURE
1 1 : 100 COLOR : GREY/SUB SILVER
KEYPLAN - ROOF PLAN
250
D C B A
100
150
250
ASPHALT
SHINGLE ROOF
150 100
760
R4 REVISI PLAN PENAMBAHAN
NOTASI ATAP
09-09-19
PENAMBAHAN DUDUKAN
LAMPU
410
220
125 150
STEEL
200
STRUCTURE
RE: STRUCUTURE
600
220
700
6 5 4 3
SECTION D
A10.07.01 A10.07.01 A10.07.01 A10.07.01 6 1 : 20 A DR O
150
BALUSTRADE
RE : MEP &
LIGHTING SPECIALIST LINEAR BACKLIGHT
MARK
BALUSTRADE A R
410
RE : MEP &
410
865
DRA
275
280
EXTERIOR DETAIL
STEEL STRUCTURE STEEL STRUCTURE (DETAIL DECORATIVE
RE: STRUCUTURE RE: STRUCUTURE
PARAPET)
200
200
200
SCALE DATE O
5
D C B A
4mm ACP WITH
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
HOLLOW METAL PER PRE
FABRICTOR ON STEEL 4mm ACP WITH
STRUCTURE HOLLOW METAL PER PRE
NOTICE
COLOR : GREY/SUB SILVER FABRICTOR ON STEEL Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
STRUCTURE and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
COLOR : GREY/SUB SILVER constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
200 relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
40mm x40mm © ARCH 22o2, all rights reserved.
STEEL HOLLOW
RE: STRUCUTURE
750
LINEAR BACKLIGHT
BALUSTRADE
RE : MEP &
LIGHTING SPECIALIST
280
KEYPLAN - ROOF PLAN
STEEL STRUCTURE
200
RE: STRUCUTURE
6 5 4 3
A10.07.02 ELEVATION A10.07.02 A10.07.02 A10.07.02
2 1 : 20
SECTION A
3 1 : 20
700 7420 700 ROOF DRAIN
RE: MEP
700
150
LINEAR BACKLIGHT
BALUSTRADE
250
RE : MEP &
LIGHTING SPECIALIST
200
100
200
150
7420
7420
40mm x40mm A DR O
STEEL HOLLOW
RE: STRUCUTURE
410
750
750
750
PODOMORO PARK
A D DO A
150
MARK
180 100
A R
280
280
2
700
700
D OR
OR
20
STEEL STRUCTURE
200
200
200
O R O
A
RE: STRUCUTURE
DRA
700 7420 700
DRA
1 1 : 100 4 1 : 20
5 1 : 20 6 1 : 20
20 APR 2020
OR
DRAWN BY PROJECT NO
2018008
A10.07.02
B
G F E" E E' D C Arch 22o2
GLOBAL DESIGN STUDIO
6000 4500 1500 2000 4000 7500 PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
ROOF DRAIN immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
6 control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
FLAT CONCRETE ROOF so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 WITH WATERPROOFING out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
PAINTED SKYLIGHT to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
6MM + 6MM LAMINATED GLASS ON
POWDER COATING SKYLIGHT FRAME
A 2
FINISH GOOD SYSTEM EX ALLURE ON
8000
5000
15000
7 ROOF PLAN
R1
G PLASTERED PAINTED
F E" E E' D C R1
GYPSUM CEILING
6000 4500 1500 2000 4000 7500 1. PERUBAHAN UKURAN SKYLIGHT
LAPANGAN
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
SECTION A
2 1 : 100 5 7
7 A10.07.03
U AND R ON
FLAT CONCRETE ROOF
4
6 7 PAINTED SKYLIGHT
6MM + 6MM LAMINATED GLASS
WITH WATERPROOFING BEAM PER
STRUCTURE
8000 A10.07.03
150
FRAME FINISH GOOD SYSTEM DECORATIVE GRC PROFILE
EX ALLURE ON PAINTED HOLLOW CEILING BY I.D ANDUN NDON A
METAL ROOF FRAME SYSTEM.
BEAM PER
5000 STEEL STRUCTURE STRUCTURE GLASS FRAME,
RE: STRUCTURE RE : STRUCTURE
MARK N
80
FLAT CONCRETE ROOF CEILING BY I.D
FFL +6.70 FFL +6.70 WITH WATERPROOFING 6MM FRAMELESS GLASS A R
950
2
FFL +4.75
FFL +4.75 R1 FFL +4.75 SCREED & R1
SCREED &
WATERPROOFING
DRA N
N
WATERPROOFING 50 50
DRA
SLOPE TO DRAIN
EXTERIOR DETAIL
140 (DETAIL SKYLIGHT)
O
SCREED &
WATERPROOFING
3 1 : 100 4 1 : 50 5 1 : 20
22 JUN 2020
OR
DRAWN BY PROJECT NO
R1
2018008
A10.07.03
10mm PAINTED GRC
WITH HOLLOW METAL
PER PRE FABRICTOR
ON STEEL STRUCTURE
ROOF DRAIN
RE: MEP
GALVALUMNE
METAL ROOF
GALTECTO
ROOF (RF-1)
10mm PAINTED GRC
WITH HOLLOW METAL
GALVALUMNE
METAL ROOF
ROOF DRAIN
RE: MEP
Arch 22o2
GLOBAL DESIGN STUDIO
700 7420 700 PER PRE FABRICTOR PTE.LTD
ON STEEL STRUCTURE
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
A 3000
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
E' works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
700
700
2000
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
E SLOPE SLOPE
4000 A
1500
60
00
B
45
00
C'
15
00
60
00
D
3250
6000
A'
E''
B
6000
ALUMINUM GRILL LOUVER C
60
0 0
14
7500
0 0
60
13
00
60
D
12
4000
00
60
E' 11
1500 2000
00
60
4500
00 9
72
8' 9'
F
6000
8
G
4000
7420
7420
6000 6000 6000 7000 7000 8000 7000 4619
1 2 3 4 5 6 7 7'
3
A10.07.04
F E" E
F B
700
700
2 SECTION A
2 1 : 50
A10.07.04
6000
4
A10.07.04 3000
U AND R ON
GALVALUMNE
METAL ROOF
PODOMORO PARK
SLOPE SLOPE ANDUN NDON A
ALUMINUM
GRILL LOUVER
MARK N
740
U D OR
20
6000
DRA N
N
DRA
2 3 EXTERIOR DETAIL
(DETAIL ROOF
DETAIL 1 WATER TANK)
O
4 1 : 20
SCALE DATE NO
NA
3 1 : 50
OR
DRAWN BY PROJECT NO
2018008
A10.07.04
11 12
6000
5670
D
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
D SCREEN FABRICTOR TO PROVIDE SUPPORT & immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
FRAME, APPROVAL, BRACKET, ETC AS REQUIRED control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
PROVIDE SHOP DRAWINGS FOR OWNER/ARCH drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
1900 1900 1900 RE : STRUCTURE on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
GRC CONSOLE
PAINTED FINISH 5
( PT-4 ) A10.07.05
1600
1 1 : 50 FINISH GRC COLUMN COVER
40mm x 40mm PAINTED FINISH
4
11 12 STEEL HOLLOW
6000 A10.07.05 KALSI PLANK STRUCTURE GRC CONSOLE
PAINTED FINISH PAINTED FINISH
( PT-4 )
DECORATIVE LASER CUT METAL SCREEN
PAINTED DUCO FINISH ON 40mm x 40mm HOLLOW
STEEL. GENERAL CONTRACTOR & METAL
SCREEN FABRICTOR TO PROVIDE SUPPORT &
FRAME, APPROVAL, BRACKET, ETC AS REQUIRED
1600
GRC CONSOLE
PAINTED FINISH
( PT-4 )
PAINTED PLASTER
GRC DECORATIVE
GATE WALL ( PT-1 )
SECTION
3 1 : 50
ELEVATION
2 1 : 50
U AND R ON
PAINTED KALSI
BOARD CEILING
PODOMORO PARK
160
FINISH
ANDUN NDON A
DECORATIVE LASER CUT METAL SCREEN
PAINTED DUCO FINISH ON 40mm x 40mm HOLLOW
140
A R
1600
315 FRAME, APPROVAL, BRACKET, ETC AS REQUIRED
PROVIDE SHOP DRAWINGS FOR OWNER/ARCH
2
RE : STRUCTURE
U D OR
20
GRC CONSOLE
OR ON RU ON
A
( PT-4 )
DRA
160
40
SCALE DATE NO
NA
4 5
OR
DRAWN BY PROJECT NO
1 : 25 1 : 25
2018008
A10.07.05
11
6000
12 11
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
4 DOWN PIPE
ROOF DRAIN
A8.01.01 A B RE : MEP NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
50 50 200
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
GRC COLUMN works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
COVER PAINTED conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
50
relating to the project or projects for which this drawing has been prepared. This
FINISH ( PT-4 ) drawing is also to be read in conjunction with drawings, specifications, schedules and
DOWN PIPE so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
ROOF DRAIN out rods to fully illustrate methods of construction of all specialist millwork, design
RE : MEP PEDESTAL portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
GRC COLUMN to site conditions is not guaranteed. The contractor must verify all site dimensions prior
1265
to producing shop and setting out drawings.
350
COVER PAINTED © ARCH 22o2, all rights reserved.
PAINTED PLASTER GRC
FINISH ( PT-4 )
DECORATIVE GATE WALL
815
PEDESTAL ( PT-1 )
1265
PAINTED PLASTER GRC 40mm x 40mm STEEL
DECORATIVE GATE WALL HOLLOW STRUCTURE
2 ( PT-1 )
A10.07.06
50
40mm x 40mm STEEL
50
HOLLOW STRUCTURE
254 1086 400 1900 400 1086 254 400 100100 485 100100100100
5380 1485
PAINTED PLASTER GRC
DETAIL DECORATIVE 3 4
DETAIL 1
DECORATIVE GATE WALL
( PT-1 )
GATE WALL - PLAN A10.07.06 A10.07.06 4 1 : 25
1 1 : 50
11 12 D DECORATIVE 40mmx20mm D
HOLLOW ON 40mmx40mm
6000 STEEL HOLLOW FRAME
DECORATIVE 40mmx20mm PAINTED DUCO FINISH
HOLLOW ON 40mmx40mm
STEEL HOLLOW FRAME
PAINTED DUCO FINISH
40mm x 40mm STEEL
1265 HOLLOW STRUCTURE 1265
350
HT WET CLADDING
WALL SYSTEM (ST-1)
5340
5340
U AND R ON
4252
DECORATIVE GATE WALL DECORATIVE GATE WALL
( PT-1 ) ( PT-1 ) PODOMORO PARK
ANDUN NDON A
1
A8.01.01 MARK N
A A R
POWDER COATING ALUMINIUM
2
OR ON RU ON
A
PEDESTAL
STONE FINISH
(ST-2)
DRA N
N
DRA
EXTERIOR DETAIL
250 870 145 1120 145 (DETAIL DECORATIVE
287 400 200 487,5 400 1900 400 487,5 200 400 287 GATE WALL)
O
1265 1265
4875
SCALE DATE NO
NA
2 3 4
OR
DRAWN BY PROJECT NO
1 : 50 1 : 50 1 : 50
2018008
A10.07.06
Arch 22o2
STAINLESS STEEL
CONCRETE BASE
BRUSHED FINISH
60mm FLAGPOLE
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
50
20
50
19
50
1000
39
00
30
50
20
00
30
50
39
50
19
50 pp-screen
20
00
33
1500
2000 3490 1995 14000
FD FD
0
08
16
A5.07
ET
NS
GE
U
RD
GA LN
2
P
UP
1
1000
PLAN
60mm STAINLESS
60mm STAINLESS
STEEL BRUSHED
STEEL BRUSHED
CONCRETE BASE
1 : 50
600
1
FINISH
FINISH
150
500
7000
1000
8000
U AND R ON
PODOMORO PARK
ANDUN NDON A
MARK N
A R
1000
2
ELEVATION
7000 U D OR
20
OR ON RU ON
A
DRA N
N
DRA
1 : 25
500
EXTERIOR DETAIL
(DETAIL SCREEN)
O
2
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008
A10.07.07
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
4 NOTICE
A10.07.08 Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
1 DOWN PIPE
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
ROOF DRAIN out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
RE : MEP structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
250
STRUCTURE
COLUMN UPLIGHT GRC COLUMN
100 RE: MEP & COVER PAINTED
800
100
SPECIALIST FINISH ( PT-4 )
LIGHTING
250
4x4 HOLLOW
3 4x4 HOLLOW
1 A10.07.08 STEEL FRAME
STEEL FRAME
STRUCTURE
A STRUCTURE
GRC COLUMN
6 COVER PAINTED IWF STRUCTURE
550
A10.07.08 FINISH ( PT-4 ) RE : STRUCTUR
KEYPLAN -
COLUMN 1 SECTION @ B.O.H COLUMN 1 PLAN A DETAIL 2
1 1 : 100 3 1 : 20 0 0.5 1 5 1 : 20 0 0.5 1
ROO RU UR A O
1 ROO R 1
A10.07.08
R RU UR
U R GRC COLUMN
R M P COVER PAINTED
FINISH ( PT-4 )
350 350 ROO N 4x4 HOLLOW
R M P N STEEL FRAME
P A STRUCTURE
SLOPE ROOF DRAIN PIPE
A AN DM A U AND R ON
UPPOR RA K M P RE: MEP
170
N P A
IWF STRUCTURE PODOMORO PARK
CAST IRON WITH ROOF RE : STRUCTUR ANDUN NDON A
DRAIN PIPE RE : MEP
350
N ON
KALSI PLANK MARK N
PAINTED FINISH ( PT-4 )
A R
2
STONE PEDESTAL
PAINTED KALSI BOARD
( ST-2 ) U D OR
CEILING FINISH
20
OR ON RU ON
A
DRA N
N
DRA
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008
A10.07.08
1
A10.07.09
GRC COVER
1
A10.07.09 Arch 22o2
GLOBAL DESIGN STUDIO
5 PAINTED FINISH ( PT-4 ) PTE.LTD
A10.07.09 DECORATIVE HOLLOW
50MM X 50MM METAL SCREEN
ANGLE IRON AS REQUIRED NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
1 RE STRUCTURE prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
GRC COLUMN COVER on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
PAINTED FINISH but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
GRC COVER
4 PAINTED FINISH ( PT-4 )
A10.07.09
300
300
B 6 50MM X 50MM
450
450
A10.07.09 ANGLE IRON AS REQUIRED
50
50
COLUMN UPLIGHT RE STRUCTURE
RE: MEP & SPECIALIST
200
50
2 600
LIGHTING
40
GRC COVER
25 200 25 PAINTED CONSOLE
600 FINISH ( PT-4 )
DOWN PIPE
DOWN PIPE ROOF DRAIN
ROOF DRAIN RE : MEP
3 RE : MEP
A10.07.09
KEYPLAN -
COLUMN 2 SECTION @ FUNCTION HALL
1 1 : 75 0 0.5 1
IWF STRUCTURE
1 RE : STRUCTUR
A10.07.09
GALTECTO
ROOF (RF-1)
PAINTED FINISH GRC
ROOF LIGHTING CONSOLE ON 40mm
RE: MEP & LIGHTING METALHOLLOW ( PT-4 ) ISSUES AND REVISIONS
SPECIALIST
GUTTER
RE : MEP ROOFDRAIN PIPE PODOMORO PARK
RE MEP BANDUNG, INDONESIA
350 GALVANIZED METAL
350 SUPPORT BRACKET MEP &
SLOPE
LIGHTING SPECIALIST
40mm x 40mm STEEL MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm
170
25 HOLLOW STRUCTURE
CAST IRON WITH ROOF
DRAIN PIPE RE : MEP
GALLERY
KALSI PLANK ISSUED FOR
285
PAINTED FINISH ( PT-4 )
FOR CONSTRUCTIONS
PAINTED KALSI BOARD
160 DRAWINGS
CEILING FINISH
GRC COLUMN SHEET TITLE
COVER PAINTED
PAINTED FINISH GRC FINISH ( PT-4 )
CONSOLE ON 40mm COLUMN 2 DETAIL
METALHOLLOW ( PT-4 )
KEYPLAN - ROOF PLAN DETAIL 1 DETAIL 2
2 1 : 500 0 5 10 5 1 : 20 6 1 : 20 SCALE DATE SHEET NO
22 UN 2020
DRAWN BY PROJECT NO
201 00
A10.07.09
6 E"
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
GRC COLUMN
COVER PAINTED
930
NOTICE
FINISH ( PT-4 ) Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
930
CONCRETE ROOF GRC COLUMN control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
WITH SCREED & COVER PAINTED relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
5 FINISH ( PT-4 )
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
WATERPROOFING out rods to fully illustrate methods of construction of all specialist millwork, design
970
portion & subcontractor elements of the construction. These drawings should include
A10.07.10 but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
970
WF STEEL
STRUCTURE
PAINTED
RE: STRUCTURE
CONCRETE ROOF
CEILING FINISH
BY ID
5950
650
GRC COLUMN GRC COLUMN
5950
COVER PAINTED COVER PAINTED 200 300 150
FINISH ( PT-4 ) FINISH ( PT-4 )
4050
GRC COLUMN
COVER PAINTED
2 WF STEEL FINISH ( PT-4 )
4050
STRUCTURE
A10.07.10
RE: STRUCTURE WF STEEL
STRUCTURE
RE: STRUCTURE
STAIR FLOOR
FINISH BY ID CONCRETE PEDESTAL CONCRETE PEDESTAL
RE: STRUCTURE RE: STRUCTURE
4
100
FFL -0.02 A10.07.10
R1 PERUBAHAN PEDESTAL
KEYPLAN -
COLUMN SECTION SECTION
1 3
1 : 50 1 : 50
DETAIL 1
4 1 : 20
3 6 650
A10.07.10 200 300 150
WF STEEL
600 STRUCTURE U AND R ON
RE: STRUCTURE
CONCRETE PEDESTAL
175 50 175
RE: STRUCTURE GRC COLUMN
PODOMORO PARK
50
COVER PAINTED
ANDUN NDON A
FINISH ( PT-4 )
WF STEEL
STRUCTURE
E'' RE: STRUCTURE MARK N
650
850
WF STEEL A R
2
CEILING FINISH OR ON RU ON
400 BY ID
A
COVER PAINTED
200 300 150 FINISH ( PT-4 ) EXTERIOR DETAIL
650
( DETAIL COLUMN 3 )
O
2 1 : 20 5 1 : 20
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008
A10.07.10
G G
G 910 910
100 710 100
PAINTED FINISH GRC
CONSOLE ON 40mm
METALHOLLOW ( PT-4 )
100 710 100 Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
PEDESTAL
RE: STRUCTURE
DOWN PIPE constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
600
ROOF DRAIN
600
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
RE : MEP on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
WF STEEL STRUCTURE but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
4 structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
A10.07.11
RE : STRUCTUR to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
B GRC COLUMN
50 50
50 50 COVER PAINTED
FINISH ( PT-4 )
LIGHTING LIGHTING
6 COLUMN PLAN A COLUMN PLAN B
A10.07.11 3 1 : 20 4 1 : 20
3
A10.07.11
A
5
A10.07.11
400
2 GRC COLUMN
COVER PAINTED
FINISH ( PT-4 ) G
KEYPLAN -
PAINTED FINISH GRC
COLUMN SECTION DROP-OFF
1 1 : 75 0 0.5 1
CONSOLE ON 40mm x 40mm
METAL HOLLOW ( PT-4 )
G
WF STEEL STRUCTURE
1
RE : STRUCTUR
A10.07.11
N AR UP
R M P P A N
1500
FD FD
CONCRETE PEDESTAL
UP
RE: STRUCTURE ( PT-6 ) MARK N
A R
2
U D OR
400
20
OR ON RU ON
A
DRA N
N
DRA
2 1 : 500 0 5 10 5 1 : 20 6 1 : 20
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008
A10.07.11
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
6 7
8000 FLOOR STAIR NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
FINISH BY ID prepared based upon survey and other information supplied by others. All dimensions
COVER PAINTED
4 FINISH ( PT-4 )
900
3
CONCRETE PEDESTAL
2 RE: STRUCTURE
A
1
2
2225
A10.07.12
1550
1250
FFL -0.65 PAINTED PLANTER
BOX FINSIH ( PT-3 )
2 1
A10.07.13 A10.07.13
6 7
8000
GRC COLUMN
COVER PAINTED
FINISH ( PT-4 )
U AND R ON
8800
800 7200 800 CONCRETE PEDESTAL PODOMORO PARK
RE: STRUCTURE ANDUN NDON A
FFL -0.02
5
4
MARK N
126
3
630
FLOOR STAIR
2
FFL -0.65 FINISH BY ID
1 A R
2
U D OR
PAINTED PLANTER
20
A10.07.13 DRA N
N
DRA
EXTERIOR DETAIL
( DETAIL PLANTER
& STAIR )
O
SECTION A
2 1 : 50 SCALE DATE NO
NA
12 JUN 2020
OR
DRAWN BY PROJECT NO
2018008
A10.07.12
E'' Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
GRC COLUMN
WF STEEL STRUCTURE NOTICE
COVER PAINTED Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
RE : STRUCTUR and levels are to be checked on site by contractors and inconsistencies reported
FINISH ( PT-4 ) immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
800 CONCRETE PEDESTAL conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
GRC COLUMN FFL -0.02 RE: STRUCTURE
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
COVER PAINTED out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
FINISH ( PT-4 ) but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
100
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
2355 to site conditions is not guaranteed. The contractor must verify all site dimensions prior
126
BOX FINSIH ( PT-3 )
FFL -0.02 RE: STRUCTURE
630
HCS RE: STRUCTURE FLOOR STAIR
630
FINISH BY ID
FFL -0.65
FFL -0.80 FFL -0.65
SECTION B DETAIL 1
1 1 : 50 3 1 : 20
E''
GRC COLUMN
COVER PAINTED
FINISH ( PT-4 )
GRC COLUMN
COVER PAINTED CONCRETE PEDESTAL
FFL -0.02 RE: STRUCTURE
FINISH ( PT-4 )
FFL -0.14
126
2355
HCS RE: STRUCTURE
CONCRETE PEDESTAL FFL -0.27
FFL -0.02 RE: STRUCTURE 300
FFL -0.39 U AND R ON
5
4
3 HCS RE: STRUCTURE 300
FFL -0.52
630
FLOOR STAIR
FFL -0.65 1
2
FINISH BY ID PODOMORO PARK
FFL -0.80 FLOOR STAIR FFL -0.65 ANDUN NDON A
FINISH BY ID PAINTED PLANTER
BOX FINSIH ( PT-3 )
PAINTED PLANTER
BOX FINSIH ( PT-3 )
MARK N
4
A R
2
A10.07.12
U D OR
20
OR ON RU ON
A
DRA N
N
SECTION C DETAIL 2
DRA
2 1 : 50 4 1 : 20
EXTERIOR DETAIL
( DETAIL PLANTER
& STAIR )
O
SCALE DATE NO
NA
12 JUN 2020
OR
DRAWN BY PROJECT NO
2018008
A10.07.13
CAST IRON WITH ROOF
DRAIN PIPE RE : MEP Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
CONCRETE ROOF WITH
CONCRETE ROOF WITH SCREED & WATERPROOFING
SCREED & WATERPROOFING NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
400 and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
WF STEEL STRUCTURE constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
RE: STRUCTURE conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
AFF+4.10 AFF+4.10 drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
GRC COLUMN COVER on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
PAINTED FINISH ( WP-1 ) 4 but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
A10.07.14 CEILING FINISH to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
4100
PAINTED FINISH ( WP-1 )
POWDER COATING ALUMINIUM
WINDOW EX ALLURE
(6mm GLASS)
2 40mm x 40mm STEEL
A10.07.14 HOLLOW STRUCTURE
KEYPLAN -
COLUMN SECTION SECTION
1 1 : 50 3 1 : 50
3
A10.07.14 CONCRETE ROOF WITH
SCREED & WATERPROOFING
WF STEEL STRUCTURE
RE: STRUCTURE U AND R ON
FFL -0.02
PAINTED PLASTER
WALL FINISH ( PT-3 ) DOWN PIPE
275 RE: MEP PODOMORO PARK
ANDUN NDON A
DOWN PIPE
RE: MEP AFF+4.10 AFF+4.10 CEILING FINISH
275
BY ID
40mm x 40mm STEEL MARK N
FFL -0.05
HOLLOW STRUCTURE
175 50 175 GRC COLUMN COVER A R
2
2 1 : 20 4 1 : 20
DETAIL COLUMN 4
O
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008
A10.07.14
FLOOR FINISH BY ID
5
7000
6 Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
B NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
E" works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
FFL -0.02 conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
A on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
960
portion & subcontractor elements of the construction. These drawings should include
2 but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
960
UP
FFL - 0.65 NOTE :
±0.00 = +670.052
905 5920 1050
FLOOR FINISH TO
MATCH STONE DROP
OFF TERRACE BY
LANDSCAPE
DETAIL RAMP 1 - PLAN 3
1 1 : 100 A11.01
FFL - 0.02
FFL - 0.325
800
FFL - 0.65
905 5920
40 U AND R ON
4 E"
A11.01
PODOMORO PARK
ANDUN NDON A
40 40MM STAINLESS STEEL PIPE RAIL &
40MM STAINLESS
POST BRUSHED FINISH
STEEL PIPE RAIL &
POST BRUSHED FINISH
MARK N
800
BASEPLATE BY
A R
800
RAILING SPECIALIST
2
FFL ± 0.02
180
RAMP 1 DETAIL
DETAIL RAMP 1 - SECTION B DETAIL
O
3 1 : 50 4 1 : 10
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A11.01
1
Arch 22o2
MEETING
ROOM
A12.03
6 CEO
ROOM
GLOBAL DESIGN STUDIO
PTE.LTD
MEETING
ROOM
DF
FD
DF FD
DF DF
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
RUANG
prepared based upon survey and other information supplied by others. All dimensions
2000 CONTROL
TP-2 TP-1
P.FILTER-2
P.FILTER-1
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
SEWAGE PIT
RUANG RUANG
works under their responsibility or the responsibility of their sub-contractors are
POMPA
UTILITY
constructed in accordance with local statutory authority requirements, local building
2
40.86m
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
TP-2
RUANG
LVMDP
relating to the project or projects for which this drawing has been prepared. This
TP-1
drawing is also to be read in conjunction with drawings, specifications, schedules and
OUT GOING 1
INCOMMING
PLN
so forth prepared by others and which are relevant to the project or projects identified
C on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
6145
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
255
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
LOCATION specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
1200
12 13 14 15 16 17 HT-2
2680
FFL -3.27
250
11 250
B
2 HT-5
A12.03
1200
UP
10 9 8 7 6 5 4 3 2 1
R1
R1
1 6
A12.03
PODOMORO PARK
BANDUNG, INDONESIA
1200
DN
12 13 14 15 16 17 18 19 20 21
MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm
FFL -0.02
250
GALLERY
250
11
B
2 HT-5 ISSUED FOR
A12.03
FOR CONSTRUCTIONS
1200
DRAWINGS
10 9 8 7 6 5 4 3 2 SHEET TITLE
2 A DRAWN BY PROJECT NO
1 : 50
20 8008 A12.01
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
C 6 but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
PAINTED GYPSUM
BOARD CEILING (PT-5)
900
GF
FFL ±0.00
FFL -0.02 21 FFL -0.02 R1
2130
9
8 8
4 7 250 1200 5MM + 5MM LAMINATED 7
A12.03 6 GLASS CLEAR 6 250
5 PAINTED EXPOSED 5
4 CONCRETE (PT-6) 4
3 3
900
FLOOR FINISH 1
155
BASEMENT (HT-2) 300 2 U AND R ON
FFL -3.27 A12.03 1
FFL -3.27
1200
PODOMORO PARK
ANDUN NDON A
MARK N
SECTION A SECTION B R1 A R
1 2
2
R1
1 : 50 1 : 50
U D OR
20
OR ON RU ON
A
DRA N
N
DRA
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A12.02
50MM x 50MM. STAINLESS STEEL RAIL
& POST 401 BRUSHED FINISH Arch 22o2
GLOBAL DESIGN STUDIO
50
PTE.LTD
& POST 401 BRUSHED FINISH Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
5MM + 5MM LAMINATED 5MM + 5MM LAMINATED
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
A12.03
50MM x 50MM. STAINLESS STEEL RAIL
900
& POST 401 BRUSHED FINISH
BASEPLATE BY
RAILING SPECIALIST
STAINLESS STEEL
250 BASEPLATE COVER
BASEPLATE BY BRUSHED FINISH BY
RAILING SPECIALIST RAILING SPECIALIST
STAINLESS STEEL FLOOR FINISH
BASEPLATE COVER ( HT-2 )
BRUSHED FINISH BY
155
RAILING SPECIALIST
HOMOGENEOUS TILE FLOOR
HOMOGENEOUS TILE FINISH ON HCS STRUCTURE
FLOOR FINISH (HT-5) RE : STRUCTURE
HCS RE STRUCTURE
CONCRETE ANCHOR
BY RAILING SPECIALIST
150 150
DETAIL 1 DETAIL 2
300 1 1 : 10 2 1 : 10 R1
R1 TANGGA TERBARU
20
RAILING SPECIALIST
ANCHOR
WALL PLATE BY RAILING SPECIALIST
BY RAILING SPECIALIST
STAINLESS STEEL
50MM x 50MM. STAINLESS STEEL RAIL
BASEPLATE COVER
& POST 401 BRUSHED FINISH
BRUSHED FINISH BY
RAILING SPECIALIST
U AND R ON
150
GLASS SEALANT
18 18 BY RAILING SPECIALIST PAINTED PLASTER
WALL FINISH PODOMORO PARK
15
MARK N
15
10
HOMOGENEOUS TILE A R
150
OR ON RU ON
A
RAILING SPECIALIST
DETAIL RAILING
20
DRAWN BY PROJECT NO
1:5 1 : 10
2018008 A12.03
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
50mmx50mm so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
50mmx50mm STAINLESS STEEL
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
STAINLESS STEEL PIPE RAIL & POST structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
PIPE RAIL & POST HOMOGENEOUS TILE to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
280
280 815
280
1300 1300
1200
1200
INTERMEDIATE INTERMEDIATE
19 18 17 16 15 14 13 12 11 10 9 8 DECK 19 18 17 16 15 14 13 12 11 10 9 8
LANDING LANDING
A 2 3 4 5 6 7
FFL -2.070 A FFL -0.050
2 3
VOID
4 5 6 7
FFL -2.070
1 1
1200
1200
A12.05 A12.05
FFL -3.270
8' 8'
GARDEN
BY LANDSCAPE
MULTI - PURPOSE
LAWN BY LANDSCAPE
7' 7'
U AND R ON
MARK N
A R
2
U D OR
20
OR ON RU ON
A
DRA N
N
DRA
STAIR DETAIL
O
SCALE DATE NO
NA
22 JUN 2020
OR
DRAWN BY PROJECT NO
2018008 A12.04
50mmx50mm
510
STAINLESS STELL
HAND RAIL Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
HOMOGENEOUS TILE
FLOOR FINISH (WPC-4)
900
NOTICE
DECK Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
FFL ±0.000 -0.050 HOMOGENEOUS TILE and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
-0.150 FLOOR FINISH (CT-2) works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
18
400
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
-0.450 17 -0.450 drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
16 on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
15
25mmx25mm but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
-0.600 14
STAINLESS STEEL to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
13 PIPE © ARCH 22o2, all rights reserved.
12
11
2 50mmx50mm
10
STAINLESS STEEL
3270
A12.05 INTERMEDIATE
9
PIPE RAIL & POST
8
LANDING
-2.070
2200
7
6
HOMOGENEOUS TILE
4 5
1300 FLOOR FINISH (CT-2)
A12.05 4
2 PAINTED PLASTER
BASEMENT
-3.270 1 -3.270 -3.300 FINISH WALL
FFL -3.270
FLOOR FINISH
(CT-2)
SUMPIT
RE: MEP
SECTION - A
1 1 : 50
125
25
25mmx25mm 25mmx25mm
50
100
100
PIPE RAIL & POST PIPE RAIL & POST
80
PIPE RAIL & POST 25
50 25
9 25mmx25mm
125
50mmx50mm 50mmx50mm
25
STAINLESS STEEL
PIPE RAIL & POST STAINLESS STEEL STAINLESS STEEL
PIPE RAIL & POST PIPE RAIL & POST
ISSUES AND REVISIONS
50mmx50mm 13 13 13 13
8 STAINLESS STEEL
PIPE RAIL & POST
ANCHOR ANCHOR
BY RAILING SPECIALIST BY RAILING SPECIALIST ODOMORO ARK
280
3
80
50
80
50
BANDUNG, INDONESIA
A12.05 25mmx25mm STAINLESS STEEL STAINLESS STEEL
STAINLESS STEEL BASEPLATE COVER BASEPLATE COVER
PIPE RAIL & POST 50 BRUSHED FINISH BY 50 BRUSHED FINISH BY
25
80 RAILING SPECIALIST 80 RAILING SPECIALIST MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm
25
BASEPLATE BY
25
HOMOGENEOUS TILE HOMOGENEOUS TILE GALLERY
RAILING SPECIALIST FLOOR FINISH (CT-2) FLOOR FINISH (CT-2)
25
STAINLESS STEEL
80
5
25
2 1 : 10 3 1:5 4 1:5
DRAWN BY PROJECT NO
A12.05
201 00
C
Arch 22o2
GLOBAL DESIGN STUDIO
2 2 PTE.LTD
900
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
400100 3500 100 750 1213 2425 1213 immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
100
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
1040
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
A
© ARCH 22o2, all rights reserved.
4000
4000
1
100
A14.01
1850
B
1
A14.01
1 1
5000 5000
B A B A
1
FLOOR PLAN - GENSET ROOM CEILING PLAN - GENSET ROOM
1 1 : 50
A14.01 2 1 : 50
4000
ODOMORO ARK
BANDUNG, INDONESIA
MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm
GALLERY
1 ISSUED FOR
FOR CONSTRUCTIONS
DRAWINGS
5000 SHEET TITLE
B A
DETAIL GENSET ROOM
DRAWN BY PROJECT NO
2018008 A14.01
ROOF DRAIN
RE: MEP
Arch 22o2
GLOBAL DESIGN STUDIO
3260 PTE.LTD
385
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
CONCRETE ROOF prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
immediately to CA prior to works being undertaken. Contractors are to ensure that all
RE: STRUCTURE works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
850
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
relating to the project or projects for which this drawing has been prepared. This
2100 drawing is also to be read in conjunction with drawings, specifications, schedules and
so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
out rods to fully illustrate methods of construction of all specialist millwork, design
portion & subcontractor elements of the construction. These drawings should include
PAINTED PLASTER but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
WALL FINISH specialist finishes and features. The dimensional accuracy of this drawing as it relates
3700
3700
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
3501
2200
1700
100
500 3700 650
5000 4000
B A 2 1
SECTION A SECTION C
1 1 : 50 3 1 : 50
ROOF DRAIN
RE: MEP
CONCRETE ROOF
RE: STRUCTURE
PAINTED PLASTER
WALL FINISH
3700
3501
ODOMORO ARK
BANDUNG, INDONESIA
2000
MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm
800
GALLERY
ISSUED FOR
500 900 3441
FOR CONSTRUCTIONS
DRAWINGS
5000 SHEET TITLE
DRAWN BY PROJECT NO
2018008 A14.02
3260
CONCRETE ROOF
RE: STRUCTURE
3260
Arch 22o2
GLOBAL DESIGN STUDIO
PTE.LTD
385
385
NOTICE
Do not scale this drawing, use figured dimensions only. This drawing has been
prepared based upon survey and other information supplied by others. All dimensions
and levels are to be checked on site by contractors and inconsistencies reported
850
immediately to CA prior to works being undertaken. Contractors are to ensure that all
works under their responsibility or the responsibility of their sub-contractors are
constructed in accordance with local statutory authority requirements, local building
control requirements and all relevant codes of practice. This drawing is to be read in
conjunction with relevant ARCH 22o2 drawings, specifications, schedules and so forth,
2100 relating to the project or projects for which this drawing has been prepared. This
560
drawing is also to be read in conjunction with drawings, specifications, schedules and
PIPE DRAIN so forth prepared by others and which are relevant to the project or projects identified
on this drawing. Contractor to supply, for comment by CA, shop drawings and setting
RE: MEP out rods to fully illustrate methods of construction of all specialist millwork, design
3920
3900
portion & subcontractor elements of the construction. These drawings should include
3700
but not be limited to stone work, paneling, metal work, roofing, windows, drainage,
3700
structural steelwork, M&E services, case goods, cabinetry, joinery work and other
specialist finishes and features. The dimensional accuracy of this drawing as it relates
to site conditions is not guaranteed. The contractor must verify all site dimensions prior
to producing shop and setting out drawings.
© ARCH 22o2, all rights reserved.
3050
EXHAUST FAN
RE: MEP
2200
1970
PAINTED PLASTER
WALL FINISH
4000 4000
1 2 2 1
CONCRETE ROOF
RE: STRUCTURE
3260 3260
385
385
PAINTED PLASTER
WALL FINISH
PIPE DRAIN
3900
3900
3700
3700
RE: MEP
ISSUES AND REVISIONS
3050
3050
ODOMORO ARK
BANDUNG, INDONESIA
PLUG INLET SOLAR
RE: MEP
MARKETING
THE ORIGINAL SIZE OF THIS DRAWING IS A3 420mm x 297mm
GALLERY
ISSUED FOR
FOR CONSTRUCTIONS
DRAWINGS
5000 5000
SHEET TITLE
B A A B
DETAIL GENSET ROOM
DRAWN BY PROJECT NO
2018008 A14.03