You are on page 1of 21

VEDANTA LIMITED

Cairn Oil & Gas

SULPHATE REMOVAL PLANT


GA DRAWINGS OF THE DOSING SKIDS WITH DETAILS OF
TANKS, PUMPS, PIPING, STRUCTURE, BOM
Doc No: G225IEXM08-SRP-M-DWG-0001
OWNER’S CONSULTANT & PMC

TRACTEBEL ENGINEERING PVT. LTD.

EPC CONTRACTOR

ION EXCHANGE INDIA LIMITED

ACCUDYNE INDUSTRIES INDIA PVT. LTD.

A4 12-12-2019 Issued for Review & Comments ST GV MGS PC

A3 15-11-2019 Issued for Review & Comments ST GV MGS PC

A2 29-08-2019 Issued for Review & Comments ST GV MGS


Anjali Saxena
PC
09/01/2020 1

Prepared Checked Approved Approved


Refer attached CRS for Comments

Rev Date Purpose of Issue


by by By By
P.012563 (CAIRN's SRP Project)
CONTRACTORS DOCUMENT REVIEW SHEET
GA DRAWINGS OF THE DOSING SKIDS WITH DETAILS OF TANKS,
Document Name :
PUMPS, PIPING, STRUCTURE, BOM
Document No. / Revision : G225IEXM08-SRP-M-DWG-0001/A3 Review Status: 2 Prepared by : ASA Checked by : SDG
No. Reference, Para, etc. PMC Comments IEIL Response Dated 15.11.2019 Resolution on Meeting Dated 15.11.2019 IEIL Response Dated 12.12.2019
IEIL to note that review of Contractor's document by CAIRN/ PMC
shall not relieve the Contractor of his responsibility for correct
Design, Engineering and Construction. The sole responsibility of
the correctness of Design, Engineering & Construction shall lie Noted.
G2 General NOTED.
with the Contractor irrespective of the fact that the Point Closed.
Drawings/Documents submitted are reviewed or not reviewed by
CAIRN/ PMC. The contractor shall correct all faulty design &
construction detected at any stage of work without any cost & time
IEIL to provide platform for ease of maintenance for each dosing Noted.
M1 NOTED & INCORPORATED
skid. Point Closed.
Noted.
M2 IEIL to show approach with handrail, rungs to the platform. NOTED & INCORPORATED
Point Closed.
Pipe & fittings MOC shall be similar as per approved P & ID's & Noted.
M3 NOTED & INCORPORATED
Piping Material Specification.Please confirm. Point Closed.
LT shall be in IEIL scope of supply.
Please confirm the scope of level transmitter mounted on dosing
However, Accudyen to show the LT in the
M4 tank as same is not shown in this GA drawing (under major NOTED & INCORPORATED NOTED & INCORPORATED
Skid GA Drawing.
boughtout item)
Point Closed.
All tank nozzles shall be inline to the approved P & ID's. IEIL to Noted.
M5 NOTED & INCORPORATED
note & confirm. Point Closed.
Refer our comments on DATASHEET, GA AND CROSS-
SECTION DRAWING FOR DOSING PUMPS & update this Noted.
M6 NOTED & INCORPORATED
drawing. Further dosing pump capacity shown in not correct. Point Closed.
Please correct.
Liquid volume & nominal capacity of each tank is as per approved Noted.
M7 NOTED & INCORPORATED
process calculation & PDS of tank. IEIL to note & confirm. Point Closed.
Noted.
However, IEIL/Accudyne shall provide &
All drains shall be routed to drain sump via local trench by IEIL.
M8 NOTED & INCORPORATED show closed piping for al the drain lines upto NOTED & INCORPORATED
IEIL to note & confirm.
Drain Sump for NaOCl Dosing Skids.

1 of 2
No. Reference, Para, etc. PMC Comments IEIL Response Dated 15.11.2019 Resolution on Meeting Dated 15.11.2019 IEIL Response Dated 12.12.2019

All wetted parts of material shown in this drawing shall be Noted.


M9 NOTED & INCORPORATED
compatible with the intended chemical used. IEIL to note & confirm. Point Closed.
As Level Transmitters does not require noted . We have provided rungs on
Valve, instruments shall be installed at approachable height to regural maintenance and maximum Tank the rear side of the skid to
M10 NOTED & INCORPORATED
operate. IEIL to ensure & confirm. Height is around 2 Metre,hence portable approach the LT , and also width of
ladder is sufficient for maintenance job. platform is increased
Noted.
All 3D model review recommendations shall be incorporated in this Accudyne to incorporate the relevant
M11 NOTED & INCORPORATED NOTED & INCORPORATED
drawing. IEIL to note & confirm. comments from 90% Model Review, if any.

Removable lids with hinge have been


provided,whereveer dissolving baskets have
M12 Please confirm all dosing tanks are hinged type with removable lid. NOTED & INCORPORATED NOTED & INCORPORATED
been provided. Accudyne to reflect the same
in this drawing.
BAFFLE PLATE DETAILS PROVIDED IN THE TANK Noted.
M13 IEIL to add the baffle details in the drawing.
DETAIL DWG Point Closed.
Noted.
M14 Refer comments on GA drawing for updation. NOTED & INCORPORATED
Point Closed.
Please correct the dosing pump head
M15 NOTED & INCORPORATED
mentioned in this document.
Approval Category Description
1 Approved
2 Approved with comments
3 Rejected
4 For Information

2 of 2
N
EY56

TR

VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD


NOIT
A
D
N
U
OF & ER
UTC
U
RTS ,GNIPIP
DIKS G
NISO
D DICA R
OF MO
BH TW
IA
G STL
OB
VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD

PIPING,STRUCTURE&FOUNDATION
BOLTSGAWITHBOMFORACIDDOSINGSKID
EY56
TR

VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD


N
OIT
A
D
N
UOF & ER
UTC
U
RTS ,GNIPIP
DIKS G
NISO
DCITSU
A
C R
OF MO
BH TW
IA
G STL
OB
VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD

PIPING,STRUCTURE&FOUNDATION
BOLTSGAWITHBOMFORCAUSTIC DOSINGSKID
TP-03
TP-08

TP-07
N

TP-12

TP-09

TP-13

TP-06

TP-11

TP-05
TP-10

TP-04
TP-01

VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TP-12
TP-11 TRACTEBEL
ENGINEERING PVT. LTD.
TP-01

TP-10 SULPHATE REMOVAL PLANT


TP-13
ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD


N
OIT
A
D
N
U
OF & ER
UTC
U
RTS ,GNIPIP
DIKS G
NISO
D LCO
A
N R
OF MO
BH TW
IA
G STL
OB
VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD

PIPING,STRUCTURE&FOUNDATION
BOLTSGAWITHBOMFORNaOClDOSINGSKID
N

VEDANTA LIMITED
TP-06
Cairn Oil & Gas : DLF Atria, Phase-2,
TP-07
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
TP-05
TP-05 TP-01
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD


N
OITA
D
N
U
OF & ERUTC
U
RTS ,GNIPIP
DIKS G
NISO
D SBS R
OF MO
BH TW
IA
G STL
OB
VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD

PIPING,STRUCTURE&FOUNDATION
BOLTSGAWITHBOMFORSBSDOSINGSKID
N

VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD


N
OITA
D
N
U
OF & ERUTC
U
RTS ,G NIPIP
T
N
A
LA
CSIT
N
A-D
EEF-FN R
OF MO
BH TW
IAG STL
OB
DIKS G
NISO
D
VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD

PIPING,STRUCTURE&FOUNDATION
BOLTSGAWITHBOMFORANTISCALANTDOSINGFORNFFEED
N

VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD


N
OITA
D
N
U
OF & ERUTC
U
RTS ,GNIPIP
DIKS G
NISO
DTN
A
L
U
GA
O
CROF MO
BH TW
IA
G STL
OB
VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD

PIPING, STRUCTURE & FOUNDATION


BOLTS GA WITH BOM FOR COAGULANT DOSING SKID
N

VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD


N
OITA
D
N
U
OF & ER
UTC
U
RTS ,G NIPIP
E
DIC
OIBG
NIZIDIX
ONONR
OF MO
BH TW
IAG STL
OB
DIKS G
NISO
D
VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD


PIPING, STRUCTURE & FOUNDATION
BOLTS GA WITH BOM FOR NON OXIDISING
BIOCIDE DOSING TANK
NOTES :
1. ALL DIMENSIONS ARE IN MM
2140

172
182
123 598 1419

N 838

2033
000
Ø1

REFERENCE DWG. :
165 1. P&ID G225IEXM08-SRP-M-P&ID-0001 (08)
2052

2. TANK GA G225IEX-SRP-P-DS-0042
4100

4100
3. PUMP GA G225IEXM08-SRP-M-DWG004

689
165
Ø10
00

1378
837

260

721 1419
202

2140

200
VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
300

Jacaranda Marg, DLF City,


Gurugram-122002, Haryana, India

~2195

~2195
1535

TRACTEBEL
~2195

1174
ENGINEERING PVT. LTD.
1536
1835
1354

SULPHATE REMOVAL PLANT

361
ION EXCHANGE (INDIA) LTD.
361

721 1419 1419 598


123
200

260 2140 2140


ACCUDYNE INDUSTRIES INDIA PVT.LTD
776
181

1378 689 2033 N


OIT
AD
N
U
OF & ER
UTC
U
RTS ,G NIPIP
T
N
A
LA
CSIT
N
A-D
EEF-O
R R
OF MO
BH TW
IAG STL
OB
4100 DIKS G
NISO
D
VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD

PIPING,STRUCTURE&FOUNDATION
BOLTSGAWITHBOMFORANTISCALANTDOSINGFORROFEED
NOTES :
1. ALL DIMENSIONS ARE IN MM

200
157
1950
120 1830

823

2050
N
00
Ø8

125
3920

3920
1972

REFERENCE DWG. :
1. P&ID G225IEXM08-SRP-M-P&ID-0001 (09)
2. TANK GA G225IEX-SRP-P-DS-0042
3. PUMP GA G225IEXM08-SRP-M-DWG004

835
Ø80
0
170
823

1035
628 1322
145

351 1950

200

VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India
~2087
1522

TRACTEBEL

~2087

~2087
ENGINEERING PVT. LTD.
1322

1165
604

120
SULPHATE REMOVAL PLANT
785
181

357
ION EXCHANGE (INDIA) LTD.
181

1035 835 2050 181 1322 628

3920 170 1950


200

351 628 1322


199

1950 ACCUDYNE INDUSTRIES INDIA PVT.LTD


N
OITA
DN
U
OF & ER
UTC
U
RTS ,G NIPIP
T
N
A
LA
CSIT
N
ATCEJER-O
R R
OF MO
BH TW
IAG STL
OB
DIKS G
NISO
D
VEDANTA LIMITED
Cairn Oil & Gas : DLF Atria, Phase-2,
Jacaranda Marg, DLF City,
Gurugram-122002, Haryana, India

TRACTEBEL
ENGINEERING PVT. LTD.

SULPHATE REMOVAL PLANT

ION EXCHANGE (INDIA) LTD.

ACCUDYNE INDUSTRIES INDIA PVT.LTD


PIPING, STRUCTURE &
FOUNDATION BOLTS GA WITH BOM FOR
RO REJECT ANTISCALANT DOSING SKID