Professional Documents
Culture Documents
Ltd
Project: 385MWDC/250MWAC
Owner's Engineer: Avant Garde Engineers and Consultants (P) Ltd
EPC: SIEMENS Gamesa
Drawing/Doc Title: SGRE-SEPL-AP-TR-QAP-001
Drawing/Doc No: GSBUC 2018-00052-109-1, GSBUC 2018-00052-109-2
GSBUC 2018-00052-109-2 (Rev 3)
Rev No:
GSBUC 2018-00052-109-1 (Rev 2)
Category: C
Date 16.04.2019
Status
Sl.No Drawing No Avant/Agnitra Comments (07.01.19) SGRE Reply Avant/Agnitra Comments (04.04.19) SGRE Reply (16.04.19)
(open/Close)
Total station LC shall be 1 sec and accuracy Based on the application and the criticality Total station LC shall be 1 sec and accuracy
Need to discuss this Point for final
shall be 1 sec. The same shall be TS accuracy will be upto 5 sec.Included in shall be 1 sec. The same shall be Open
Conclusion.
mentioned. the FQP. mentioned.
Concrete Mix design approvals from
This is Covered under Design Mix (Section
external Third party agency to be submitted Noted and Point Closed Closed
3.11) and it will be taken care at Site
2 GSBUC 2018-00052-109-2 using the site raw materials
Write reference code for curing of
IS 456 is Reference Noted and Point Closed Closed
concrete/ brick work, plastering
The sand to be used for civil constructions This will be defined in the Drawing /
shall be defined with alternate available Specification and compliance will be Kindly indicate as a check list in QAP Included in Checklist. File Attached Open
sand types ensured at site.
Concrete Mix design approvals from
This is Covered under Design Mix (Section
external Third party agency to be submitted Kindly indicate as a check list in QAP Included in Checklist. File Attached Open
2.7) and it will be taken care at Site
using the site raw materials.
Write reference code for curing of
IS 456 is Reference Noted and Point Closed Closed
concrete.
The sand to be used for civil constructions This will be defined in the Drawing /
3 GSBUC 2018-00052-109-1 shall be defined with alternate available Specification and compliance will be Kindly indicate as a check list in QAP Included in Checklist. File Attached Open
sand types ensured at site.
Site repairs / rectifications, please specify,
as invariably we will be doing some repairs File Attached for reference. Noted and Point Closed Closed
at site.
Method Statement / SOP is a "Restricted" Method statement is shared by SGRE in a
Method statements for all activities shall be Method statements for all activities shall
Document as per SGRE Policy and hence separate communication. So please close Open
provided part of the FQP. be provided part of the FQP.
not sharable. this point in FQP.
QAP GSBUC 2018-00052-109-2
FIELD QUALITY PLAN Rev.No 3
Date 12-Apr-18
PLANT CIVIL WORKS - ROOMS & FOUNDATIONS Project All
Customer All
QUANTUM OF CHECK RESPONSIBILITY
COMPONENT / CHARACTERISTICS / INSPECTION TYPE OF ACCEPTANCE FORMAT OF
CL.NO INSTRUMENT REF DOCUMENT REMARKS
OPERATION ACTIVITIES PARAMETERS CHECK SUB-CONT / NORMS RECORD SG SG
QUALITY VENDOR
PROJECT PROJECTS QA/TPIA
1 LAYOUT MARKING
TS Accuracy Upto
Quality of Marking Instrument Report NA Each Each Test Report NABL Certificate CR P* R R
5 Sec
1.1 Co-ordinate Marking Room/Foundation Co-ordinate Marking Measure Total Station 100% Every Time Dwg / Spec Dwg / Spec IR P W W
Layout Marking for Foundations Visual NA 100% Every Time Dwg / Spec Dwg / Spec IR P W W
2 EARTH WORK
Dimension (Length, Width & Depth) Measure MS Tape 100% 30% Dwg / Spec Dwg / Spec IR P W RW/R
Cement Storage at site Visual NA Each lot Each lot IS:4082 Verification at site NA P R R
Steel Storage at site Visual NA Each lot Each lot IS:4082 Verification at site NA P R R
Freedom from cracks, surface flaws, Lamination Visual NA Each lot Each lot IS:1786 Physical Check NA P* R R
3.2 Quality of Steel
Physical Properties (Yield Stress, Tensile
Strength, Elongation, Bend & Rebend Test) and Report/Test NA Each lot Each lot IS:1786 IS:432 MTC/ELTR P* R/W R/W
Chemical Properties
Plywood for concrete
shuttering work (moisture content, glue adhesion
Report NA Each Each IS:4990, IS:1734 Good Condition MTC P* R R
in dry state, water resistance test, modulus of
elasticity as per mnfc)
Quality of Shuttering
3.3 Steel Shutter for Concrete
Materials
(Dimension,Bend,Welded Visual NA Each Each IS:4990 Good Condition NA P* R R
Joints,Fasteners,Template Support)
Soundness of shuttering ,
Visual NA Each Each IS:2750 Undamaged NA P* R R
staging & scaffolding
Page 2 of 8
QAP GSBUC 2018-00052-109-2
FIELD QUALITY PLAN Rev.No 3
Date 12-Apr-18
PLANT CIVIL WORKS - ROOMS & FOUNDATIONS Project All
Customer All
QUANTUM OF CHECK RESPONSIBILITY
COMPONENT / CHARACTERISTICS / INSPECTION TYPE OF ACCEPTANCE FORMAT OF
CL.NO INSTRUMENT REF DOCUMENT REMARKS
OPERATION ACTIVITIES PARAMETERS CHECK SUB-CONT / NORMS RECORD SG SG
QUALITY VENDOR
PROJECT PROJECTS QA/TPIA
Concrete Mix Ratio Visual NA 100% 30% IS:4925, IS:456 Dwg / Spec IR P* R RW/R
No loose soil on
Base surface is leveled and rammed Visual NA 100% 30% IS:456 IR P* W RW/R
surface
Shuttering Dimension Check (Length , Width &
Plain Cement Concrete Measure MS Tape 100% 30% IS:456 Dwg / Spec IR P W RW/R
3.8 thickness)
(PCC)
Center Line Check Measure MS Tape 100% 30% IS:456 Dwg / Spec IR P W RW/R
Water Level / Auto
Top Level of PCC Visual 100% 30% IS:456 Dwg / Spec IR P W RW/R
Level
Concrete Curing Visual Water Tanker 3 times/day 3 times/day IS:456 Min. 7days CC P RW R
Cuttting & Bending of Steel Bars Measure NA 100% 30% IS:2502, SP:34 BBS IR P W R
Type & Dimension of steel bars Visual NA 100% 30% IS:2502, SP:34 Dwg / Spec IR P W RW/R
Adequate Dowels, chair, spacer bars, etc., Visual NA 100% 30% IS:2502, SP:34 Dwg / Spec IR P W RW/R
Cover Block provided for concrete cover Visual NA 100% 30% IS:2502, SP:34 Verification at site IR P W RW/R
Dimension & Surface of Shuttering Measure MS Tape 100% 30% IS:14687 Dwg / Spec IR P W RW/R
Concrete Mixture - Mobile Transit Mixer Report AJAX Fiori / RMC Each Each IS:1791/IS:12119 Certificate CR P* W W
Weighing Scale /
Concrete Mix Ratio Report 100% 30% Design Mix Report Design Mix Report TR P W R
Reinforced Cement Batch Report
3.11
Concrete (RCC)
Concrete Compaction & Finishing of Surface Visual Vibrator 100% Random IS:456 Good Finish IR P W RW/R
Post Concreting: Plumb, Line, Inserts position & Nylon wire, Plumb
Visual Each Each Dwg / Spec Good Condition IR P* R R
Honeycombs bob, MS Tape
Concrete Curing Visual Water Tanker 3 times/day 3 times/day IS:456 Min. 7days CC P RW R
Slump Cone
Concrete Slump Test Measure Each Batch Random IS:516 Design Mix Report TR P* W W
Apparatus
3.12 Concrete Testing
Concrete Compressive Strength Test (7 & 28 Sampling Sampling 100% Strength on
Measure CTM IS:456, IS:516 TR P* W W
Days) IS:456 IS:456 28th day
Page 3 of 8
QAP GSBUC 2018-00052-109-2
FIELD QUALITY PLAN Rev.No 3
Date 12-Apr-18
PLANT CIVIL WORKS - ROOMS & FOUNDATIONS Project All
Customer All
QUANTUM OF CHECK RESPONSIBILITY
COMPONENT / CHARACTERISTICS / INSPECTION TYPE OF ACCEPTANCE FORMAT OF
CL.NO INSTRUMENT REF DOCUMENT REMARKS
OPERATION ACTIVITIES PARAMETERS CHECK SUB-CONT / NORMS RECORD SG SG
QUALITY VENDOR
PROJECT PROJECTS QA/TPIA
4 FINISHING WORKS
MS Tape, Plumb
Dimension Check and Plum Level Measure 100% 30% IS:2212 Dwg / Spec IR P W RW/R
bob
Soaking of bricks in Water Visual - 100% Random IS:2212 Verification at site IR P RW R
4.1 Brick Work
Plumb Bob, Spirit
Verticality and Linear Alignment of brick wall Measure 100% 30% IS:2212 Verification at site IR P W RW/R
Level
Brick Wall is not raised over the standard height Visual MS Tape 100% 30% IS:2212 Dwg / Spec IR P W RW/R
Doors, Windows, openings, pockets & Duct
Measure MS Tape 100% 30% IS:2212 Dwg / Spec IR P W RW/R
Work etc.,
Curing of Brick wall Visual Water Tanker 3 times/day 3 times/day IS:456 Min. 7days CC P RW R
Sieve the Sand Visual Sieve Mesh 100% Weekly once IS:2386_1,6 IS:383 MTC/TR P* R R
Sand: Particle Size Distribution, Fineness Measure IS Sieve Set Each Load Each Load IS:2386_1,6 IS:383 IR P W RW/R
Mortar Preparation Measure Volumn Batch 100% 30% IS:456 Dwg / Spec IR P RW RW/R
Curing of Plaster Wall Visual Water Tanker 3 times/day 3 times/day IS:456 Min. 7days CC P RW R
4.3 Grano Flooring Concrete Compaction & Finishing of Surface Visual Tamper 100% Random IS:456 Good Finish IR P W RW/R
Curing for Flooring Visual Ponding 3 times/day 3 times/day IS:456 Min. 7days CC P RW R
Remove all the loose/hardened mortar from the
Visual NA 100% 30% IS:1237, IS:1443 Verification at site IR P W RW/R
surface
Mortar bedding should be compacted Visual Tamper 100% 30% IS:1237, IS:1443 Verification at site IR P W RW/R
4.4 Tiles Laying
Set out & check the right angle by placing tiles at MS Tape, Tri-
Measure 100% 30% IS:1237, IS:1443 Dwg / Spec IR P W RW/R
the corner of the room. square
Clean the tiling surface properly & Curing Visual NA 3 times/day 3 times/day IS:456 Min. 7days CC P RW R
Approved Brand & Shade of Paint Used Visual NA Each Each IS:2395_1,2 Dwg / Spec IR P W R
Requirement of cement rendering work in
Visual NA 100% 30% IS:2395_1,2 Verification at site IR P W R
painting area
Proper mixing and stirring of paint Visual NA 100% 30% IS:2395_1,2 Verification at site IR P W R
4.6 Painting
Gap between first coat and second coat of
Visual NA Each Each IS:2395_1,2 Verification at site IR P W R
painting (24hrs)
No. of Coats executed as per Drawing Visual NA Each Each IS:2395_1,2 Dwg / Spec IR P W R
Finish / Final coat is uniform without patches or
Visual NA Each Each IS:2395_1,2 Good Finish IR P W R
flooded
Page 4 of 8
QAP GSBUC 2018-00052-109-2
FIELD QUALITY PLAN Rev.No 3
Date 12-Apr-18
PLANT CIVIL WORKS - ROOMS & FOUNDATIONS Project All
Customer All
QUANTUM OF CHECK RESPONSIBILITY
COMPONENT / CHARACTERISTICS / INSPECTION TYPE OF ACCEPTANCE FORMAT OF
CL.NO INSTRUMENT REF DOCUMENT REMARKS
OPERATION ACTIVITIES PARAMETERS CHECK SUB-CONT / NORMS RECORD SG SG
QUALITY VENDOR
PROJECT PROJECTS QA/TPIA
5 BOUNDARY WALL
Fixing Pre-Cast Panels and Barbed Wire Visual NA 100% Random Dwg / Spec Dwg / Spec IR P W R
LEGENDS:
QAP-Quality Assurance Plan, MTC-Material Test Certificate, IR-Inspection Report, TR-Test Report, ELTR-External Lab Test Report, CR-Calibration Report, CC-Curing Card.
CTM-Compression Testing Machine, IS-Indian Standard, RMC-Ready Mix Concrete, MT-Metric Ton, NDT-Non Destructive Test, SOP-Standard Operating Procedure, RO-Reverse Osmosis.
SG-Siemens Gamesa, QA-Quality, TPIA-Third Party Inspection Agency, P-Perform, P*-Arrangement, W-Witness, RW-Random Witness, R-Review.
NOTE:
- In case of requirement of any additional activity other than mentioned in this FQP the same will be incorporated with mutual agreement before commencement of the additional activity.
- Quality of Batching and Lab Set-up (Calibration certificates) shall be taken care at site.
- ELTR - External Laboratory engaged for testing work shall be certified by government approved bodies like NABL (in case of India).
- In case of absence of MTC for Raw Materials, testing shall be carried out at NABL approved laboratory and report shall be ensured and reviewed by Quality Person at site.
- Quantum of check: Quality person at site shall check 100% for any component / operation activities started at first time. After good adherance of the first work, QA person shall follows quantum of check as mentioned in QAP.
- RW: could be performed after getting inspection call from Project team. Performed in such a way that it does not affects the construction progress at site.
Page 5 of 8
QAP GSBUC 2018-00052-109-1
FIELD QUALITY PLAN Rev.No 2
Date 12-Apr-18
MODULE MOUNTING STRUCTURE (MMS) Project All
Customer All
COMPONENT / QUANTUM OF CHECK RESPONSIBILITY
CHARACTERISTICS / INSPECTION TYPE OF ACCEPTANCE FORMAT OF SG
CL.NO OPERATION INSTRUMENT CRITICALITY SUB-CONT / REF DOCUMENT VENDO SG REMARKS
PARAMETERS CHECK QUALITY NORMS RECORD QA/TPI
ACTIVITIES PROJECT R PROJECTS
A
1 MODULE MOUNTING STRUCTURE FOUNDATION
Marking Instrument Calibration Visual Total Station Major Each Each Test Report NABL Certificate CR P R R
Co-ordinates
1.1 Pile Co-ordinate Marking Marking Co-ordinates as per Dwg Measure Total Station Major 100% 30% Dwg / Spec IR P W RW/R
Sheet
Co-ordinates
Marking Identification Visual Nail / Ribbon Minor 100% Random Dwg / Spec IR P W RW/R
Sheet
Dimensions (Depth & Diameter of hole) Measure MS Tape Major 100% 30% IS:2911_1_2 Dwg / Spec IR P W RW/R
Use of Jig / Fixtures Visual NA Minor 100% Random Dwg / Spec Good Condition IR P R R
Cover for Post Measure MS Tape Minor 100% 30% IS:2911_1_2 Dwg / Spec IR P W RW/R
Embedded Length of Post Measure MS Tape Critical 100% 30% IS:2911_1_2 Dwg / Spec IR P W RW/R
Post to Post Distance (E-W & N-S) Measure MS Tape Major 100% 30% IS:2911_1_2 Dwg / Spec IR P W RW/R
1.3 Column Post Installation Horizontal Alignment of Post Visual Nylon wire Minor 100% 30% IS:2911_1_2 Single Line IR P W RW/R
Verticality of Post Measure Spirit Level Meter Major 100% 30% IS:2911_1_2 90° ± 1° IR P W RW/R
Water Tube Level,
Post Top Level within Table Visual Minor 100% 30% IS:2911_1_2 Dwg / Spec IR P W RW/R
Nylon wire
Diagonal Distance of Post Measure MS Tape Major 100% 30% Dwg / Spec Dwg / Spec IR P W RW/R
Table to Table Distance (E-W & N-S) Measure MS Tape Critical 100% 30% Dwg / Spec Dwg / Spec IR P W RW/R
Cement Storage at site Visual NA Major Each lot Each lot IS:4082 Verification at site NA P R R
Steel Storage at site Visual NA Minor Each lot Each lot IS:4082 Verification at site NA P R R
Freedom from cracks, surface flaws, Lamination Visual NA Minor Each lot Each lot IS:1786 Physical Check NA P* R R
2.2 Quality of Steel
Physical Properties (Yield Stress, Tensile
Strength, Elongation, Bend & Rebend Test) and Report/Test NA Major Each lot Each lot IS:1786 IS:432 MTC/ELTR P* R/W R/W
Chemical Properties
Quality of Coarse Sieve Analysis, Flakiness Index, Aggregate
Once per Once per
2.3 Aggregate Crushing Value/Abrasion Value/Impact Value, Report/Test Lab Instruments Major IS:2386_1,2,3,4 IS:383 ELTR/TR P* R/W R/W
Source Source
(20mm/12.5mm) Specific Gravity and Moisture Content
Sieve Analysis, Fineness Modulus, Specific
Quality of Fine Aggregate Once per Once per IND-PIN-FAWIN-012-
2.4 Gravity, Fineness, Silt Content and Moisture Report/Test Lab Instruments Major IS:2386_1,2,3 IS:383 ELTR/TR P* R/W R/W
(R.Sand / M.Sand) Source Source R06
Content
Page 6 of 8
QAP GSBUC 2018-00052-109-1
FIELD QUALITY PLAN Rev.No 2
Date 12-Apr-18
MODULE MOUNTING STRUCTURE (MMS) Project All
Customer All
COMPONENT / QUANTUM OF CHECK RESPONSIBILITY
CHARACTERISTICS / INSPECTION TYPE OF ACCEPTANCE FORMAT OF SG
CL.NO OPERATION INSTRUMENT CRITICALITY SUB-CONT / REF DOCUMENT VENDO SG REMARKS
PARAMETERS CHECK QUALITY NORMS RECORD QA/TPI
ACTIVITIES PROJECT R PROJECTS
A
Acidity, Alkalinity, pH Value, Organic Solids,
Quality of Water for Once per Once per
2.5 Inorganic Solids, Sulphates, Chlorides and Report NA Major IS:3025_22 IS:456 ELTR P* R R
Construction Source Source
Suspended Matters
IS:269/IS:8112/IS:
Cement Grade Report NA Minor Each Each Design Mix IR P W R
12269/IS:1489
Concrete Mixture - Mobile Transit Mixer Report AJAX Fiori / RMC Major Each Each IS:1791/IS:12119 Certificate CR P* W W
Concrete Curing Visual Water Tanker Minor 100% 3 times/day IS:456 Min. 7days CC P RW R
Slump Cone
Concrete Slump Test Measure Minor Each Batch Random IS:516 Design Mix Report TR P* W W
Apparatus
2.8 Concrete Testing
Concrete Compressive Strength Test (7 & 28 6cubes/ 100% Strength on
Measure CTM Critical 6cubes/ 25cum IS:456, IS:516 TR P* W W
Days) 25cum 28th day
Rafter Alignment Visual Nylon Wire Major 100% 30% Dwg / Spec Single Line IR P W RW/R
Rafter Inclination Measure Digi. Inclinometer Major 100% 30% Dwg / Spec Dwg / Spec IR P W RW/R
Bracing & Gusset Plate Arrangement Visual NA Major 100% 30% Dwg / Spec Dwg / Spec IR P W RW/R
Correct Fasteners used (Size & Grade) Visual NA Minor 100% 30% Dwg / Spec Dwg / Spec IR P W RW/R
Rafter Lower End Ground Clearance Measure Measuring Tape Major 100% 30% Dwg / Spec Min.500mm IR P W RW/R
Upto Rafter Fastener Assembly & Torque Torque Chart in
Measure Torque Wrench Critical 100% 30% Dwg / Spec IR P W RW/R
Applied Dwg
Purlin Alignment Visual Nylon wire Major 100% 30% Dwg / Spec Single Line IR P W RW/R
3.1 MMS Assembly
Purlin Splice Coupler Arrangement Measure MS Tape Major 100% 30% Dwg / Spec Dwg / Spec IR P W RW/R
Torque Chart in
Purlin Fastener Assembly & Torque Applied Measure Torque Wrench Critical 100% 30% Dwg / Spec IR P W RW/R
Dwg
Module Rail Alignment Visual Nylon wire Major 100% 30% Dwg / Spec Single Line IR P W RW/R
Module Rail Fastener Assembly & Torque Torque Chart in
Measure Torque Wrench Critical 100% 30% Dwg / Spec IR P W RW/R
Applied Dwg
Run thro' bolt,
Torque Marking Visual Permanent Marker Minor 100% 30% SOP - Fasteners washer, nut, IR P RW R
material
Table Identification Visual Paint Minor 100% Random Dwg / Spec Visible IR P R R
Page 7 of 8
QAP GSBUC 2018-00052-109-1
FIELD QUALITY PLAN Rev.No 2
Date 12-Apr-18
MODULE MOUNTING STRUCTURE (MMS) Project All
Customer All
COMPONENT / QUANTUM OF CHECK RESPONSIBILITY
CHARACTERISTICS / INSPECTION TYPE OF ACCEPTANCE FORMAT OF SG
CL.NO OPERATION INSTRUMENT CRITICALITY SUB-CONT / REF DOCUMENT VENDO SG REMARKS
PARAMETERS CHECK QUALITY NORMS RECORD QA/TPI
ACTIVITIES PROJECT R PROJECTS
A
3 MODULE MOUNTING ON STRUCTURE
Orientation of Module Visual NA Major 100% 30% Dwg / Spec Dwg / Spec IR P W RW/R
Module Alignment (Top & Bottom) & Sag Visual Nylon wire Minor 100% 30% Dwg / Spec Single Line IR P W RW/R
Module to Module Gap Visual Nylon Wire Minor 100% 30% Dwg / Spec Dwg / Spec IR P W RW/R
Module Inclination (Tilt Angle) Measure Digital Inclinometer Critical 100% 30% Dwg / Spec Dwg / Spec IR P W RW/R
Correct Fasteners used (Size & Grade) Visual NA Minor 100% 30% Dwg / Spec Dwg / Spec IR P W RW/R
3.3 Module Mounting
Torque Chart in
Fastener Assembly & Torque Applied Measure Torque Wrench Critical 100% 30% Dwg / Spec IR P W RW/R
Dwg
Run thro' bolt,
Torque Marking Visual Permanent Marker Minor 100% 30% SOP - Fasteners washer, nut, IR P RW R
material
Ground Clearance Measure MS Tape Major 100% 30% Dwg / Spec Dwg / Spec IR P W RW/R
No shadow on
Module Shadow Visual NA Critical 100% 30% NA active face of IR R R R
Module
Closed Cover Chamber for the control value Visual NA Minor 100% 30% Dwg / Spec Dwg / Spec IR P W R
Good for
Water Testing after installation of RO System Report NA Major Each Each IS:456 ELTR P* R R
Construction
Pressure Test, No leakage & Pipe damage Test Pressure Guage Major Each Random Dwg / Spec Dwg / Spec TR P* W R
LEGENDS:
QAP-Quality Assurance Plan, MTC-Material Test Certificate, IR-Inspection Report, TR-Test Report, ELTR-External Lab Test Report, CR-Calibration Report, CC-Curing Card.
CTM-Compression Testing Machine, IS-Indian Standard, RMC-Ready Mix Concrete, MT-Metric Ton, NDT-Non Destructive Test, SOP-Standard Operating Procedure, RO-Reverse Osmosis.
SG-Siemens Gamesa, QA-Quality, TPIA-Third Party Inspection Agency, P-Perform, P*-Arrangement, W-Witness, RW-Random Witness, R-Review.
NOTE:
- In case of requirement of any additional activity other than mentioned in this FQP the same will be incorporated with mutual agreement before commencement of the additional activity.
- Quality of Batching and Lab Set-up (Calibration certificates) shall be taken care at site.
- ELTR - External Laboratory engaged for testing work shall be certified by government approved bodies like NABL (in case of India).
- In case of absence of MTC for Raw Materials, testing shall be carried out at NABL approved laboratory and report shall be ensured and reviewed by SG-Quality Person.
- Quantum of check: Quality person at site shall check 100% for any component / operation activities started at first time. After good adherance of the first work, Quality person shall follows quantum of check as mentioned in QAP.
- RW: could be performed by getting inspection call from project team or else in random. This is can be performed in such a way that it does not affects the construction progress at site.
Page 8 of 8