You are on page 1of 2

N

A6
CO-ORDINATES
OF DIAGONALLY
OPPOSITE
LOCATIONS TO
BE SHOWN

LEGEND:

Jagadeesh Digitally signed by


Jagadeesh Gowda G

Gowda G 10:12:57 +05'30'


Date: 2023.12.07
2

NOTES :-

*Approval is given subject to the condition that


all the comments marked on the drawing are
incorporated by contractor in the next
submission of this drawing
* Approval is given based on the information
currently available, if there is any change in the
relevant discipline drawing, this drawing and
relevant details shall be updated and verified
before proceeding with construction.
AS PER * It should be noted that any changes as a result
of contractors engineering (Including hold
CALCULATION
removal) shall have no time and cost impact.
REPORT, 20 NOS.
Y20 IS SUFFICIENT.
WHY Y25 HAS
BEEN PROVIDED?

BHAGYAM
14 INFILL WELLS PROJECT

GA & RC DETAILS OF FOUNDATION E HOUSE AND


STRUCTURAL PLATFORM AT BWP-05 A1

B302MEL3-BWP05-C-DWG-3013-01 01 OF 02 A2
N

A6

LEGEND:

It is
indicated
as tubular
in detail

Correct the
representation
to Pipe. NOTES :-

BHAGYAM
14 INFILL WELLS PROJECT

GA & RC DETAILS OF FOUNDATION E HOUSE AND


STRUCTURAL PLATFORM AT BWP-05 A1

B302MEL3-BWP05-C-DWG-3013-01 02 OF 02 A2

You might also like