RISK ASSESSMENT
Project: Aljada - Gate 1 & 2 Buildings at Block G Date: 25/07/2023 Rev: 00
Activity: Fire Pump Installation Ref:
S No Hazards Identified People at Initial Risk Residual Risk Remarks /
Activity Control Measures Responsibilities
Involved Risks Risk L S R L S R
PTW to be applied and obtained prior to start, if
spark producing activity is performed.
Defective tools should not be issued or used to
perform a task.
Monthly inspection should be carried out by the
electrician and record to be kept at the store.
All portable power tools should be fitted with
Defective adequate fuse protection either in the tool body or
equipment Hearing in its electrical plug.
Electricity losses The weight, size and type of tool should be
Improper
Eye injury selected to suit the job being carried out.
use of
equipment Don’t lay the cables around the access way, it
Crushing Workers
Poor should be proper routing.
Working
maintenan Back Injury Co- Industrial distribution board and socket only to be
with power workers
09 ce Burns 2 3 6 used at site.
tools ( Drill Operators
Untrained No joints shall be made in electrical cable.
machine )
workers Electrocutio Staff
n Visitors Cable hangers shall be used to avoid the direct
Flying
contact of power tools cable with the scaffolding
object Ringing in members.
Noise and the
vibration Electrical connection shall be routed through
ear/Deafne
Fire ss ELCB only.
Dust Correct rate of ELCB should be used ( Ex:- 30ma
only acceptable)
Only those persons who have been adequately
trained and experienced in the use of the tool
should be allowed to use the same.
Tools should be stored and maintained in good
working condition.
Appropriate PPE Should use ( Goggles, Mask,
Page-6
RISK ASSESSMENT
Project: Aljada - Gate 1 & 2 Buildings at Block G Date: 25/07/2023 Rev: 00
Activity: Fire Pump Installation Ref:
S No Hazards Identified People at Initial Risk Residual Risk Remarks /
Activity Control Measures Responsibilities
Involved Risks Risk L S R L S R
Ear plug, Gloves, Shoe, Helmet, Overall, Vest )
Page-7
RISK ASSESSMENT
Project: Aljada - Gate 1 & 2 Buildings at Block G Date: 25/07/2023 Rev: 00
Activity: Fire Pump Installation Ref:
S No Hazards Identified People at Initial Risk Residual Risk Remarks /
Activity Control Measures Responsibilities
Involved Risks Risk L S R L S R
Defective tools should not be issued or used to
Slip, trip perform the task, to be checked by store keeper.
and fall Don’t extend the spanner by using a pipe as an
Working Damaged extension bar.
with Hand warn out Fatigue Hand tools shall be free from oil, grease & etc.
tools ( hand tools Operators
Trigger Chisel’s head shall have safety cap to avoid finger
Hack saw, Flying Workers
11 finger 2 3 6 injury. 1 3 3
wood saw, objects Co-
screw Mushroom Cuts and workers Never use a file as a lever.
driver, Heads abrasions Never use a screw driver as a chisel.
spanner ) Using Use eye/ face protection when there is flying
incorrect materials hazard, wear gloves while required to
type protect the hands.
Use right tools for the job.
PTW to be applied and obtained prior to start
Untrained, work.
unauthoriz
Calibrated pressure gauge only to be used for
ed
Workers pressure testing.
Fatality • Never pressure test the system/ pipe above its
Faulty
Flushing,
pressure Property Workers designed pressure.
pressure
gauge damage Co- Never do hot work on a pressurized system (
12 and 3 3 9 1 3 3
Poor workers always de-pressurize )
leakage Fractures
testing
lighting Staff Close supervision to be done at all times. • Proper
Improper Full body lighting to be provided in around the working area.
identificatio injury
Use always regulators and never pressurize the
n
Bursting of system directly without regulator.
pipes Warning signs and boards should be provided
And area to be well barricaded.
Page-8
RISK ASSESSMENT
Project: Aljada - Gate 1 & 2 Buildings at Block G Date: 25/07/2023 Rev: 00
Activity: Fire Pump Installation Ref:
S No Hazards Identified People at Initial Risk Residual Risk Remarks /
Activity Control Measures Responsibilities
Involved Risks Risk L S R L S R
Unauthoriz Warning boards should be provided and
ed/ barricaded.
Electrical
untrained Appropriate fire extinguisher should be placed in
connection Electric
Person
testing shock and Workers to the work area ( Dry powder, CO2, Fire blanket )
Faulty
13 used with Burns Co- 2 3 6 Appropriate PPE Should use ( Electric insulated
Instrument
multi workers gloves, Electric resistivity Shoe, Helmet, Overall,
meter and Improper Cut and
identificatio abrasion Vest )
ammeter
n Calibrated/ certified multi meter only should be
Electricity used.
Drink plenty of water.
Dehydratio Workers
n Employees shall be trained about heat stress
Working in Co-
Heat symptoms & first aid measures.
14 hot Sunburn workers 2 3 6
weather
Stress
Superviso Avoid highly physical tasks during the hottest part
Skin rs of the day.
Cancer Isotonic drinks to be provided.
General housekeeping, Remove all surface,
Fire
Poor Workers unwanted waste materials from the building.
Work housekeep Bad Co- All necessary precautions will be adopted to
15 Completio ing Environme workers 2 3 6 prevent fire.
Slip/Trip/ ntal Staff
n Regular housekeeping under competent and
Fall conditions Visitors proper supervision must be taken.
Pest Issues
Page-9
RISK ASSESSMENT
Project: Aljada - Gate 1 & 2 Buildings at Block G Date: 25/07/2023 Rev: 00