You are on page 1of 2

DIELON PATIK

Process Engineer

WORKING EXPERIENCE
PROCESS ENGINEER
PT. LAUTAN ORGANO WATER
JULY 2018 - NOW
Technical Division (Planning & Design)

OBJECTIVE
I am looking for an opportunity in a PLANNING
reputed company which will help me - Prepare Technical Troposal for a tender including
deliver my best and upgrade my Project Spesification, Equipment Spesification, and
Engineering & analytical skill and Project Schedule
meet the objectives of the company.
- Providing Cost Estimation including Capital

LANGUAGE
Expanditure, Operational Cost and Financial Analysis.

DESIGN
ENGLISH
- Responsible to do FEED and Complete all detailed
Fluent
equipment spesification proposed in tender stage
TOEFL PBT SCORE : 515
- Completing all drawing needed for Construction &
INDONESIA Manufacturing Work (Layout, Piping Layout, Unit Drawing,
Native etc.)
- Colaborating with Procurement, Installation,
CONTACT PROFILE Electrical and Commisioning Team at their respective jobs

081933614636
dielonp6@gmail.com
INTERNSHIP ENGINEER
PT. PERTAMINA EP ASSET 4
EDUCATION JULY - AUGUST 2016
RAM (Reliability, Availability
CHEMICAL ENGINEERING, UNIVERSITAS
Maintenance) Department
INDONESIA.
Assisting RAM Department on Pump Analysis
BACHELOR DEGREE.
AUGUST 2013 - SEPTEMBER 2017

GPA : 3.22 / 4.00


LIST OF PROJECT
YEARS PROJECT NAME PROJECT DETAIL

Finishing a design & Integrating new


New Water Treatment Unit for filtration unit as an expansion of
2018
Petrochemical Plant in Cilegon existing plant, also performing Test &
Commisioning for the sytem

Designing an improvement to overcome


Improvement of DMI & Reverse
a fluctuation of Sillica, Mangan &
2019 Osmosis Sytem for Packaging
Chlorine value to the existing Water
Film Industry in Sidoarjo
Treatment Plant.

Municipal Water Treatment for Planning & Designing an expansion of


2019 Domestic Use in Pantai Indah existing Municipal Water Treatment
Kapuk in Jakarta Plant

Pilot Testing to Recycle waste Making a Pilot Plant to treat waste from
2019 water for Paper & Packaging Paper Manufacturing Process become
Manufacture in Karawang Production Water

Designing & Integrating a Dryer


Drum Dryer Expansion for
2020 Equipment as an expansion of existing
Battery Industry in Cibitung
Waste Water Treatment Plant

New Water Treatment Unit for Integrating new Filtration Unit as an


2021
Fatty Alcohol Plant in Dumai expansion of existing Filtration system

Chemical Injection System for Planning & Designing a chemical


2021 Film Sheet Manufacurer in injection system used as an additive for
Cilegon Chiller System

Planinng & Designing a New Water


Water Treatment Upgrading for
2021 Treatment Plant, also a Modification of
Refinery Plant in Tarjun
existing sytem to upgrade the capacity

You might also like