Site Acceptance Test SAT Supervisory Control and Data Acquisition Scada

You might also like

You are on page 1of 1

93/09/25 :‫تاريخ صدور‬ ‫نظامنامه سيستم رله و حفاظت‬

5 :‫شماره تجديد نظر‬


99/07/01 :‫تاريخ تجديد نظر ويرايش‬ ‫شبکه انتقال برق ايران‬ ‫معاونت برنامهريزي و نظارت بر امنيت شبکه‬
‫مديريت مطالعات و حفاظت شبکه‬

PW Pilot Wire
REF Restricted Earth Fault
SAS Substation Automation System
SAT Site Acceptance Test
SCADA Supervisory Control And Data Acquisition
SHZ Short Zone
SLD Single Line Diagram
SIR Source Impedance Ratio
SOTF Switch on to Fault
TCS Trip Circuit Supervision
TOR Trip on Reclose
TMS Time Multiplier Setting
ULTC Under Load Tap Changer
UVLS Under Voltage Load Shedding
VT Voltage Transformer
VTS Voltage Transformer Supervision
VTFF VT Fuse Failure
WS Work Station

21

You might also like