You are on page 1of 1

1 2 3 4 5 6 7 8

This document is protected by copyright and design Rights. Any unauthorised reproduction would be an infringement and may lead to appropriate legal action
@ Ethical Power Connections Copyright

Do not scale from this drawing

RCBO (L1) 1
2 32A TYPE B
SOCKETS RING LV CONTROL ROOM
1L1 2
RCBO (L2) 3
A 2 32A TYPE B 1L2 A
SOCKETS RING HV SWITCHGEAR ROOM 4
MCB3 (L3) 5 L1
2 32ATYPE D
110V DC BATTERY AND CHARGER LV CR
1L3 6 N1
MCB4 (L1) 7
2 6A TYPE B
LIGHTING CIRCUIT LV CR
2L1 8

MCB5 (L2) 9
2 6A TYPE B 2L2 10
LIGHTING CIRCUIT HV SWITCHGEAR R
MCB6 (L3) 11
2 6A TYPE B 2L3 12
INTRUDER PANEL LV CR
MCB7 (L1) 13
2 6A TYPE B
EXTERNAL PIR LIGHTING CIRCUIT
3L1 14

MCB8 (L2) 15 H5.A101


2 6A TYPE 3L2
132kV EARTH SWITCH A101 MB 16 H6.A101
B MCB9 (L3) 17 L4 B
2 32A TYPE B 3L3 18 N4
33kV SWITCHGEAR LVAC BOARD
MCB10 (L1) 19
2 16A TYPE B
2KW HEATER #1 HV SG ROOM
4L1 20

MCB11 (L2) 21 L1
2 16A TYPE B 4L2 22 N1
2KW HEATER LV CR
MCB12 (L3) 23 L4 REFERENCE DRAWINGS:
2 6A TYPE C 4L3
SUMP PUMP HV CR BASEMENT 24 N4
MCB13 (L1) 25 EPC-0431-P-E-IC-020: LVAC / DC Multicore Cables Block Diagram
2 16A TYPE B
AIR CONDITIONER LV CR
5L1 26
EPC-0431-P-E-IC-021: Multicore cable Schedules -1
MCB14 (L2) 27 L1
2 16A TYPE B 5L2 EPC-0431-P-E-IC-022: Multicore cable Schedules -2
DE HUMIDIFIER HV ROOM 28 N1
MCB15 (L3) 29
2 16A TYPE B 5L3 30
EPC-0431-P-E-IC-023: Multicore cable Schedules -3
POWER PLANT CONTROLLER LVR
C C
2
MCB16 (L1)
6A TYPE B 6L1
31 H21
SCADA MARSHALLING KIOSK 32 H22
2
MCB17 (L2)
10A TYPE B 6L2
33 H1
132kV CB A110 CNTR/RELAY PNL 34 H2
MCB18 (L3) 35
2 16A TYPE B
33kV CB TXR INCOMER (H06)
6L3 36

MCB18 (L3) 37
2 16A TYPE C 7L1 38
ARENCO COP1 METER PANEL
MCB19 (L3) 39
2 16A TYPE B 7L2 40
ARENCO IRIS PANEL
MCB20 (L3) 41 SCALE AT 1:1
2 16A TYPE B 7L3 42
SPARE
MCB21 (L3) 43
2 25A TYPE B 8L1 0m 25mm 50mm 75mm
D SPARE 44
D
MCB22 (L3) 45
2 16A TYPE B 8L2 46
SPARE
MCB23 (L3) 47
2 16A TYPE B 8L3 48
SPARE
MCB24 (L1) 49 L8 EARTH BAR
2 10A TYPE B 9L1
INTERCEPTOR ALARM PANEL 50 N8
2
MCB25 (L2)
10A TYPE B 9L2
51 L5
132/33kV TX BUND SUMP PUMP 52 N5
2
MCB26 (L3)
6A TYPE B 9L3
53
PRELIMINARY ISSUE
FLUENCE TELCO ARRAY RACK 54 00
MCB27 (L1,L2,L3) 10L1 55 L1
4
32A TYPE B 56 L2 BCS IM 12/02/24
132kV TRANSFORMER 10L2
COOLING CONTROL CUBICLE 57 L3
E 10L3 58 N DESCRIPTION E
MCB28 (L1) 59 REV
2 6A TYPE B
ARENKO NTW SWITCH1
11L1 60

MCB29 (L2) 61
DESIGNED CHECKED APPROVED DATE
2 6A TYPE B
ARENKO NTW SWITCH2
11L2 62

MCB30 (L3) 63
2 6A TYPE B 11L3 64
ARENKO FIREWALL1
MCB31 (L1) 65
2 6A TYPE B
ARENKO FIREWALL2
12L1 66

MCB32 (L2) 67
2 6A TYPE B
FLUENCE MASTER FIRE PANEL1
12L2 68

0 Sp 0 Sp 0 Sp 0 Sp
2
MCB33 (L3)
6A TYPE B 12L3
69 0 Sp 0 Sp 0 Sp 0 Sp 0 Sp 0 Sp 0 Sp
FLUENCE MASTER FIRE PANEL2 70
3110 GREAT WESTERN COURT,
F STOKE GIFFORD, BRISTOL F

3 CORE
2 CORE
3 CORE

3 CORE

3 CORE

3 CORE
BS34 8HP
2 CORE

L1
3 CORE

3 CORE
4 CORE

2 CORE

L1 (t) 01726 218618


125A 4POLE L2 www.epconnect.co.uk
L2
SWITCH Project:
L3 L3
P105 P103 P104 Sizing John BESS Project
N N P102 P108 P109

P106 P122 P124 P111 P112


Title: INTER CONNECTION DIAGRAM
12W, TPN LVAC DISTRIBUTION BOARD (400V AC)
4 CORE

132kV CONTROL ROOM


G G
Drawing Status:
110V DC BATTERY & CHARGER
DEHUMIDIFIER

LVAC DISRIBUTON BOARD


(132kV CONTROL ROOM)

(132kV CONTROL ROOM)

(132kV CONTROL ROOM)

(33kV SWITCHGEAR ROOM)


132/33kV TRANSFORMER

132kV EARTH SWITCH


132/33kV TRANSFORMER

SUMP PUMP
132kV CIRCUIT BREAKER

2kW HEATER
SCADA MARSHALLING KIOSK
COOLING CONTROL CUBICLE

INTERCEPTOR ALARM PANEL

A101 MECH BOX


A110 CONTROL/RELAY PANEL
BUND SUMP PUMP

FOR APPROVAL
P101

Grid Ref (6 fig): SJ510917


PANEL
MANUAL CHANGEOVER

Site address: RAINHILL SUBSTATION


LEA GREEN ROAD, ST.
HELENS
WA9 4QD

H H

DWG No: SHEET: SCALE (A2): REV:

EPC-0431-P-E-IC-016 1 OF 1 NTS 00