CHECKS CHECKS
B.S - F.S RISE-FALL
4.263- 4.261 1.367-1.369
-0.002 -0.002
Reduced Dist Remarks
6.7422 OBM(KING WILLIAMS)
7.4602
7.4602
7.4462
7.3962
7.4632
7.4382
7.3572
7.4582
7.4302
7.3412
7.4432
7.4082
7.3142
7.4262
7.4132
7.2712
7.4052
7.3852
7.3262
7.4592
6.7402 OBM(KING WILLIAMS)
CHECKS
LAST R.L- 1st R.L
6.7402-6.7422
-0.002
Volume of excavation
Ground point Calculation of reduced levels - formation level
A1 7.1112-7.4602
B1 7.1112-7.4462
C1 7.1112-7.3962
A2 7.1112-7.4632
B2 7.1112-7.4382
C2 7.1112-7.3572
A3 7.1112-7.4582
B3 7.1112-7.4302
C3 7.1112-7.3412
A4 7.1112-7.4432
B4 7.1112-7.4082
C4 7.1112-7.3142
A5 7.1112-7.4262
B5 7.1112-7.4132
C5 7.1112-7.2712
A6 7.1112-7.4052
B6 7.1112-7.3852
C6 7.1112-7.3262
TOTAL
MEAN HIEGHT
MH= 11.7116/40
MH = 0.29279
Formation level R.L 7.1112
Corner Height (h) No. of squares (n) product (h*n)
0.3492 1 0.3492
0.3352 2 0.6704
0.285 1 0.285
0.351999999999999 2 0.704
0.327 4 1.308
0.246 2 0.492
0.347 2 0.694
0.319 4 1.276
0.23 2 0.46
0.332 2 0.664
0.297 4 1.188
0.202999999999999 2 0.406
0.315 2 0.63
0.302 4 1.208
0.16 2 0.32
0.294 1 0.294
0.2740 2 0.548
0.2150 1 0.215
40 11.7116
Volume = (Grid X Grid) total product/4
(9x7.3)11.7116/4 = 192.36303
VOLUME OF SOIL ESCAVATED = 192.36 m3