You are on page 1of 1

8000

This distance dependant Rodding eye provided for tanks for


230 3770 115 3655 230 600 x 450mm manhole up to 45 persons. Larger tanks (46-100)
on invert depth of
cover and frame to have additional manhole and r.e. to
incoming pipe.
be omitted. Slab thickness varies - see table below
230

230
ground level

1.192
Wallplate Wallplate Old cor. iron sheets or tar

M
+2.700 +2.700 25mm clearance
2 Lintel Lintel drums over pipe trench

O
M +2.350 +2.350

b.i.w
O

SEE TABLE
O

D
R

BE

75mm 100mm
3655

3655
ED
R B 100mm burnt clay or

1.065
TE
f.f.l f.f.l porous conc. agricultural
AS

+0.250 NGL +0.250 NGL drain pipes laid with


12mm open joints.
M

2385
38mm stone aggregate
115

115
b.i.w WEST ELEVATION

S
SCALE 1.100
885

BA ND LET

M
O
230 915 "A" "A"

2000
230 THIS DISTANCE TO BE

O
A OI
3

R
T
DETERMINED ON SITE
M

TH
1155
O
3655

SECTION
O
12230

12230
115
R
D

SCALE 1:25
BE

1000
Wallplate Wallplate

115
+2.700 +2.700
Lintel Lintel
115

+2.350 +2.350 230 915 "A" "A" 230 THIS DISTANCE TO BE


DETERMINED ON SITE
G

460
EN
IN

3185
H
N

1200

TC
IN
3000

KI

f.f.l f.f.l

1220
+0.250 NGL +0.250 NGL

610
230230
125
299 931 230

EAST ELEVATION SCALE 1.100

460
VERANDAH
PLAN
SCALE 1:25 SEPTIC TANK DIMENSIONS
3770 3655
305 ROOF PLAN SCALE 1.100 No. of Dimension Dimension Slab

20°
305 230
230
8000
Wallplate Wallplate Persons A B Thickness
+2.700 +2.700
Lintel Lintel 10 1.370 0.690 63mm
+2.350 +2.350
11 - 15 1.750 0.840 63mm
SCALE 1.100 16 - 20 2.060 0.910 75mm
FLOOR PLAN 21 - 30 2.510 1.140 75mm
AREA 92 sq m 31 - 45 3.050 1.450 75mm
f.f.l f.f.l
+0.250 NGL +0.250 NGL 46 - 60 3.660 1.680 100mm

230470

230470

230470
230470
61 - 80 4.120 1.980 100mm

700
81 - 100 5.030 2.290 113mm
690 690

575 575
KEY
Wallplate
+2.700
Wallplate
+2.700
Cross section AA Scale 1:100 CONSTRUCTION NOTES
Lintel Lintel
+2.350 +2.350
NEW BRICKWORK
ROOF
NEW CONCRETE CONCRETE ROOFING RIDGE
ON CONCERETE ROOFING TILES
NEW WOOD ON 50x38MM SOFTWOOD TILE BATTENS AT 300MM CENTRES SKEW NAILED TO TRUSSES.
ON ENGINEERED ROOF TRUSSES AT ±750MM CENTRES.
NEW STEEL ON 114x38MM SOFTWOOD WALLPLATE
f.f.l f.f.l FIXED TO WALL WITH HOOP IRONS.
+0.250 NGL +0.250 NGL NEW DRAINAGE ROOF PITCH 18°
Window Schedule
ROOF DRAINAGE
150x125MM G.I. GUTTER
NORTH ELEVATION SCALE 1.100 100 x 75 G.I. DOWNPIPES
ALL TO MANUFACTURER'S FIXING DETAILS
1000 500 P.C. DRIPSTONE UNDER EACH R.W.D.P.
500 500 1012
500
CEILINGS
500 500 500

536 536
500 500

1072
GYPSUM PLASTER CEILING SKEW NAILED TO

536 536
View
1500

536 536
38 x 38MM SOFTWOOD TIMBER BRANDERING SKEW NAILED TO TRUSSES AT

1072

1072
APPROXIMATELY 400MM CENTRES ONE WAY AND SECURED WITH 75 x 500 x 200MM HIGH
1512 NOGGINGS SKEW NAILED TO TRUSSES AND AT POSITIONS DETERMINED BY SPECIALIST
2000 1000 WALLS
BRICK ON EDGE CILL WITH DAMP PROOF COURSE UNDER,ON ALL WINDOWS
APPROVED BRICKFORCE EVERY FOURTH COURSE OR AS OTHERWISE SPECIFIED BY THE
Wallplate Wallplate STRUCTURAL ENGINEER
+2.700
Lintel
+2.700
Lintel Dimensions 2,000×1,500 1,512×1,072 1,000×1,072 1,000×1,500 ALL WALLS TO BE PLASTERED WITH 20MM THICK PLASTER BOTH INTERNALLY AND
EXTERNALLY UNLESS SPECIFIED OTHERWISE
+2.350 +2.350 CONCRETE LINTOLS ABOVE ALL OPENINGS AND TO ENGINNER'S DETAILS EXCEPT FOR
Quantity 6 1 2 1 ARCHES WHERE CONTRACTOR MUST SUBMIT DRAWINGS TO ENGINEER FOR APPROVAL
Marker W1 W2 W3 W4 ROOM VENTILATION
MINIMUM FOUR AIR BRICK PER ROOM,TWO OVER A DOOR AND TWO OVER A WINDOW
Charcoal-grey Charcoal-grey Charcoal-grey Charcoal-grey ROOMS WITHOUT DIRECT EXTERNAL VENTILATION TO HAVE EITHER PERFORATED
Frame finish powder coating powder coating powder coating powder coating TRAP DOOR OR EGG - CRATE CEILING OR PREFERABLY MECHANICAL VENTILATION
f.f.l f.f.l
+0.250 NGL +0.250 NGL TO BE USED
Powder-coated Powder-coated Powder-coated Powder-coated AIR BRICKS TO BE AS INDICATED ON FLOOR PLANS
Frame aluminum aluminum aluminum aluminum
FLOORS
Location Bathroom and toilet LOWEST STRUCTURAL FLOOR LEVEL AT GROUND FLOOR TO BE 150MM MINIMUM ABOVE
Bedrooms, Dinning Kitchen Toilet
Kitchen FINISHED GROUND LEVEL
SOUTH ELEVATION SCALE 1.100 PROVIDE DAMP PROOF COURSES ON ALL WALLS AT 150MM MINIMUM ABOVE FINISHED
GROUND LEVEL
40MM CEMENT/SAND SCREED ON ALL FLOORS
ON 125MM CONCRETE SURFACEBED CAST AS SPECIFIED BY STRUCTURAL ENGINEER
ON POLYTHENE DAMP PROOF MEMBRANE AS SPECIFIED AND/OR APPROVED BY
THE STRUCTURAL ENGINEER
ON TERMITE PROOF TREATED 150MM WELL COMPACTED HARDCORE DONE BY SPECIALIST
SEWERAGE
ALL DRAINS BELOW GROUND LEVEL TO BE SALT GLAZED EARTHENWARE PIPES
SOIL PIPES ABOVE GROUND LEVEL TO BE CAST IRON
DRAINS TAKEN UNDER THE FLOOR SLAB TO BE CAST IRON AND TO BE
dpm ENCASED IN CONCRETE
250 micron dpc INSPECTION EYES TO BE PROVIDED AT EVERY BEND AND JUNCTION
GRADIENT OF 100MMØ STEEL GALVANISED PIPES TO BE MINIMUM 1:60 BELOW
Y12 HIGH TENSILE ROD REINFORCING BAR 4No. GROUND LEVEL
GRADIENT OF 100MMØ CAST IRON PIPE ABOVE GROUND LEVEL TO BE
MINIMUM 1:80
900mm precast
concrete paving 230X230MM REINFORCED CONCRETE RING BEAM
200

DRAWN BY : N.M.JAISI
NGL CEILING
R8 MILD STEEL REINFORCING BINDERS AT 250MM CENTRES 12mm plasterboard ceiling nailed to 38x38mm
230 timber battens fixed to underside of the beams trusses
25MM CONCRETE MINIMUM COVER TO REINFORCEMENT -tyro leon plaster finish with 150mm smooth margins. PROJECT TITLE Proposed House
-100mm wood crown moulding cornice. ZAKA
RC BEAM DETAIL
-3 coats external pva ceiling paint.
1:25

DRAINAGE
-all drainage work to be carried out in compliance with the relevant WORKING DRAWING
Municipal bye laws Floor plan
-all pipework to be laid at fall of 1:40
-when laid underground, all pipework to be on a 150mm bed of Sections
FOUNTATION NOTES sand with 150mm sand cover prior to back filing with excavated material,
40mm floor finish on Specified floor finish
40mm thick conc. screed to falls on, Topside of Cill external cill back-fill being compacted in layers not exceeding 150mm. Elevation
100mm concrete slab on -all pipes to be min. of 450mm below ngl.
100mm conc slab reinforced with wire mesh
Varies+ -where drainage pipes pass below walls and perking areas they are to be Site plan
230

150mm compacted hardcore ref DPM on,


150mm rammed well compacted hardcore
Final layer of hardcore surface to be treated
cast iron encased in min. 100mm concrete
against termites by specialist prior to laying DPM Inspection eyes to be provided at every pipe bend and junction
All foundation to structural engineers drawings, internal cill Invert level to be 450mm below NGL at start of drain
details, specifications and approvals.
Foundation depth to be determined on site. terrazzo
690 NB. Foundation depth to be determined on site. CLIENT : MR NGWEBU
ROOM VENTILATION
Minimum of four airvents per room, exact positioning to be to builder's
discretion. Rooms without direct external ventilation to have either
FOUNDATION DETAILS perforated trap door or egg-crate ceiling or preferably mechanical
1:20 typical window cill details ventilation to be used.
scale 1:20

You might also like