Eastern Railways Unified Standard Schedule Of Rates 2011(CONTENTS)
Chapter Name of Chapter Page references
No. Chapter-wise In Book 1 Earth Work 1 to 6 1 to 6 2 Carriage of Materials 1 to 8 7 to 14 3 Plain Concrete 1 to 5 15 to 19 4 Reinforced Cement Concrete 1 to 6 20 to 25 5 Brick Work 1 to 8 26 to 33 6 Stone Work 1 to 7 34 to 40 7 Wood Work 1 to 31 41 to 71 8 Steel And Aluminium Work 1 to 9 72 to 80 9 Flooring, Paving And Dado 1 to 14 81 to 94 10 Roofs And Ceilings 1 to 29 95 to 123 11 Finishing Masonry 1 to 9 124 to 132 12 Painting, Polishing And Varnishing 1 to 6 133 to 138 13 Water Supply 1 to 24 139 to 162 14 Drainage And Sewerage 1 to 11 163 to 173 15 Sanitary Installations 1 to 20 174 to 193 16 Horticulture And Landscaping 1 to 18 194 to 211 17 Miscellaneous Building Works 1 to 14 212 to 225 18 Dismantling And Demolishing 1 to 6 226 to 231 19 Bridge Works : Substructure 1 to 11 232 to 242 20 Bridge Works : Superstructure - R.C.C. 1 to 4 243 to 246 21 Bridge Works : Superstructure - Steel 1 to 5 247 to 251 22 Bridge Works - Miscellaneous 1 to 10 252 to 261 23 Roads And Platform Works 1 to 10 262 to 271 24 Fencing And Boundary Marks 1 to 5 272 to 276 25 Supply Of Materials 1 to 12 277 to 288
Signature Not Verified Digitally signed by TARACHAND Date: 2018.04.21 06:58:31 PDT Reason: IREPS-CRIS Location: New Delhi