Professional Documents
Culture Documents
2 L2
2 L2
L 10
IP
TL a
TM TA
R R
0 1 2 3 4 5 6 7 8 9 10
SV = 1 : 100
0 10 20 30 40 50 60 70 80 90 100
SH = 1 : 1000
bidang persamaan / reference level
+ 0.00 meter
PATOK HEKTOMETER
Hm 5 Hm 6 Hm 7 Hm 8 Hm 9
HECTOMETER STONE
NOMOR PROFIL
PROFILE NUMBER A9 A10 A11 A12 A13 A14 D1 D2 D3 D4
452.0
502.0
552.0
602.0
652.0
702.0
743.3
793.3
843.3
893.3
JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE
50.0 50.0 50.0 50.0 50.0 41.3 50.0 50.0 50.0
ACCUMULATED DISTANCE
11.84 11.84
12.40 12.40
12.44 12.44
11.74 11.74
12.37 12.37
12.42 12.42
12.06 12.06
11.99 11.99
12.41 12.41
12.17 12.17
ELEVASI TANGGUL KIRI
LEFT BANK LEVEL
YANG ADA
EXISTING
12.50
12.54
11.84
12.47
12.52
12.16
12.09
12.51
12.27
ELEVASI TANAH ASLI PADA AS SALURAN
GROUND LEVEL IN CENTER LINE
12.57
12.56
12.55
12.54
12.53
12.52
12.51
12.50
12.49
12.49
ELEVASI TANGGUL
BANK LEVEL
RENCANA
DESIGN
11.96
11.95
11.94
11.93
11.92
11.91
11.90
11.89
11.89
ELEVASI DASAR SALURAN
BED LEVEL