You are on page 1of 2

Get More & Save Time with

HPS Distribution Transformers

How can we help you save?


HPS Distribution transformers offer more
pre-installed standard features.
For YOU this means: • less extra parts to buy
• less time & labor cost to install
Standard Features:
• Type 3R enclosures
• Integrated wall mounting brackets (up to 1000lbs.)*
• Factory installed primary, secondary and neutral lugs
(up to 271A)*
• Expanded neutral bar for multiple neutral connections
• Factory installed main grounding lugs
• Removable lugs provide for easy field lug size
changes or repairs
• Separate HV and LV terminal boards for easy cable
installation
• All taps individually labelled for easy installation
• Conduit knockouts (up to 225kVA)*
• Bottom cable entry area
• Outward facing base mounting holes for quick and easy
installation
• Captive pem-nuts for reliable and easy removal of
front/back panels
• 10kV BIL on all 3 phase LV distribution
transformers
• Dual UL and CSA certification
• Industry leading reliability
*please consult HPS for details

How do you save? Add up all the extra costs


Typical Competitor’s
Typical Competitor’s
HPS* Additional Material
Additional Labor Time
and Labor Costs
Compare the Primary and Secondary Lugs Free up to 271 amp $25 to $100 30 min.

installation time Drip Shield Standard $50 to $200 15 to 30 min.


Knock-Outs Free up to 225 kVA $45 to $75 20 min.
and total savings Wall Mounting Brackets Free up to 45 kVA $50 to $150 15 to 30 min.
when you buy HPS Base Mounting Holes Pointed Outward 75 kVA and up $10 to $50 5 to 15 min.

Total Costs $0 $205 to $675 115 to 155 min.

*kVA ranges are for standard 150°C rise general purpose transformers. Please consult catalog and E-Quotes for other products.

www.hammondpowersolutions.com
Get More & Save Time with
HPS Distribution Transformers

Integrated wall mounting brackets for Standard type 3R enclosure on all low Expanded neutral bar for multiple
ease of installation at no extra cost voltage HPS transformers customer connections

Factory installed main grounding lugs Bottom cable entry area (where Offset outward facing floor installation
applicable) holes for easy power tool access

Standard Type Integrated


3R Enclosure Pre-Installed Primary Lugs Drip Shield Separate High Voltage &
Low Voltage Terminal Boards
for Safe & Easy Cabling

Pre-Installed
Secondary Lugs

Integrated Conduit Vibration Isolation


Wall Mounting Knock-Outs Pads Factory Installed Installer Friendly Outward Expanded Neutral Bar For
Brackets Grounding Lugs Facing Enclosure Easier Multiple Neutral
Mounting Holes Connections

CANADA UNITED STATES


595 Southgate Drive 1100 Lake Street
www.hammondpowersolutions.com Guelph, Ontario Baraboo, Wisconsin
N1G 3W6 53913-2866 SENCOM
1-888-798-8882 1-866-705-4684 March 2020

You might also like