You are on page 1of 4

1

By Naresh Saini

Ac Installation Process

reliancedigital.in
2
Ac Installation Process

Call Centre Number for AC Installation: 1800 889 1044


• For AC Installation, Customer to call on our Toll Free number at 1800 889 1044

Standard Installation Charges (including GST)

AC TYPE PRICE

reliancedigital.in
SPLIT AC INSTALLATION CHARGEABLE 1415

WINDOW AC INSTALLATION CHARGEABLE 590

Additional Charges & Payments

• Additional material charges for non-standard installations will be charged as per the rates mentioned resQ AC
brochure. (Available in ASP)
• Payment for installation/additional material to be made at the time of installation.
3
SPLIT AC INSTALLATION CHARGES
Standard Split AC Installation Non Standard Split AC Installation
(Included in Installation charges) (Chargeable Extra)

Interconnecting pipe with insulation if required (Rs.924~Rs.1076 per Meter) - Copper


Indoor unit (IDU) mounting on wall
pipe laying (Rs.200/Meter)

ODU Bracket cost Max. Rs. 999/- (Wall Mount) + Installation of ODU Bracket (Rs.200/-
Outdoor unit (ODU) mounting at serviceable location
fixing Charges)

Drilling one hole on a brick wall ( No core cutting) Extra Electrical cable if required (4Core Rs.130/Meter & 3Core Rs.110/Meter)

Connect ODU with IDU unit Supply & installation of flexible drain-pipe (Rs.80/Meter)

Core Cutting Charges (Stone wall/Concrete wall/Pillar/etc.) as per vendor quote


Laying of interconnected copper pipe between IDU & ODU
(Customer to ensure Society permission)

reliancedigital.in
Vacuuming the piping along with indoor unit Dismantling of OLD SAC unit Rs.500/

Customer to arrange for Civil / Masonry work / Ladder / Scaffolding according to


Laying of drain-pipe for water and connecting with IDU
safety at site if required

Connecting ODU and IDU using standard wire length provided by Brand Scaffolding if required according to safety at site

Commissioning of the unit Installation at the sites on old refrigerant pipes, nitrogen flushing & pressure testing

Sealing the holes with white cement / POP MCB or Power Socket or Electrical point related work

Connecting AC stabilizer if purchased by customer Drilling more than one hole for copper pipe connectivity between IDU and ODU

Checking the machine performance & providing Demo Grill/Glass cutting and welding work to be organized by customer if required
4

Thank you

reliancedigital.in

You might also like