Item Description Unit Qty
No
Control Room Building and Substations
1 Taking delivery of the free issue materials from store or
yard like, GI conduits, bend, JB , Tee etc as required and
cutting, bending as per drg and to suit site requirement and
installed it at any height and location to the satisfaction of
the engineer. All consumables like screw, , fasteners, etc RM 2950
shall be arranged by the subcon as required to install it.
The above is required for any services to complete the
building EIT work
Other Buildings
5 Taking delivery of the free issue materials from store or
yard like, GI conduits, bend, JB , Tee etc as required and
cutting, bending as per drg and to suit site requirement and
RM 5562
installed it at any height and location to the satisfaction of
the engineer. All consumables like screw, , fasteners, etc RM 5562
shall be arranged by the subcon as required to install it.
The above is required for any services to complete the
building EIT work
Notes : Above Job considered to be done in 5 months in full (All Building Quantities), May very depends on the Front Availab
The bove rates are only Direct Cost, Indirect Cost to be Added
Salary Consiedered Electrician-130 OMR Permonth, Helper-90 OMR Permnth and Foreman/Supervisor/Chargehand-300 OM
Since the Total Cost is coming very Less and Considering the Front Availability, Care to take while giving Subcontra
General Total Manhours Required
Manhour for completing the Full Total
UNIT RATE
Norms Per Quantity as per the Mandays Total Rate
Derived
Unit Calculated Installation (5 Months)
Installation Norms
3500.000
epends on the Front Availability.