Ref.

Code : BV-CM-AP-LTR-2022-004
Proj. Code : CR-60236
Date : 5 August 2022

ATTENTION : Engr. Guillermo Bartolome


Group Manager – EEI Corp.

: Engr. Danilo Diaz


Construction Manager – EEI Corp.

PROJECT : ARCOVIA PALAZZO

SUBJECT : SITE SURVEY OF DIAPHRAGM WALL FOR SECONDARY


WALL COVER

Dear Engr. Bartolome:

As agreed during our construction coordination meeting, kindly provide site survey along
perimeter (diaphragm walls) at underground level for the proposed secondary wall cover at
basement 2. Provide clear distance of diaphragm wall from gridline for every possible
interval. This is to check whether the 150mm perimeter trench drain have conflict with
existing diaphragm walls which might affect parking areas. See attached as built of
diaphragm walls for your reference.

We look forward for your utmost cooperation.

Very truly yours,


BUREAU VERITAS PHILIPPINES

James Michael Madrid


Civil Engineer

Noted by:

Ar. Honorio Resurreccion


OIC -QAQC Manager

BUREAU VERITAS