Professional Documents
Culture Documents
Code : BV-CM-AP-LTR-2022-004
Proj. Code : CR-60236
Date : 5 August 2022
As agreed during our construction coordination meeting, kindly provide site survey along
perimeter (diaphragm walls) at underground level for the proposed secondary wall cover at
basement 2. Provide clear distance of diaphragm wall from gridline for every possible
interval. This is to check whether the 150mm perimeter trench drain have conflict with
existing diaphragm walls which might affect parking areas. See attached as built of
diaphragm walls for your reference.
Noted by:
BUREAU VERITAS
32nd Floor Philamlife Tower 8767 Paseo De Roxas, Makati City 1227 Metro Manila
Email: www.bureauveritas.com