2. Equipment Procurement:
• Nitrogen Liquefaction Equipment:
• Specification: Cryogenic distillation unit capable of separating nitrogen from air
and liquefying it to produce liquid nitrogen.
• Supplier: XYZ Nitrogen Systems Ltd.
• Cost: 2,500,000 Ethiopian Birr
• Warranty: 5 years
• Storage Tanks:
• Specification: Insulated stainless steel tanks for storing liquid nitrogen.
• Supplier: ABC Storage Solutions Inc.
• Quantity: 2 tanks (each with a capacity of 50,000 liters)
• Cost: 500,000 Ethiopian Birr (per tank)
• Warranty: 10 years
• Piping and Distribution System:
• Specification: High-quality piping and valves for transferring liquid nitrogen from
production unit to storage tanks.
• Supplier: Piping Solutions Ltd.
• Cost: 200,000 Ethiopian Birr
• Warranty: 3 years
• Safety Equipment:
• Specification: Personal protective equipment (PPE), emergency shutdown systems,
and gas detection sensors for ensuring safe operation of the nitrogen production
facility.
• Supplier: Safety First Technologies Inc.
• Cost: 300,000 Ethiopian Birr
• Warranty: 2 years
• Installation Services:
• Specification: Professional installation and commissioning of nitrogen production
equipment and systems.
• Contractor: Engineering Solutions Ltd.
• Cost: 500,000 Ethiopian Birr
• Timeline: 3 months
• Training Program:
• Specification: Customized training program for staff members on the operation,
maintenance, and safety procedures of the nitrogen production facility.
• Training Provider: Nitrogen Training Institute
• Cost: 100,000 Ethiopian Birr
• Duration: 2 weeks
Total Equipment Procurement Cost:
• 2,500,000 ETB (Nitrogen Liquefaction Equipment)
• 1,000,000 ETB (Storage Tanks)
• 200,000 ETB (Piping and Distribution System)
• 300,000 ETB (Safety Equipment)
• 500,000 ETB (Installation Services)
• 100,000 ETB (Training Program) = 4,600,000 Ethiopian Birr
Note:
• Additional costs may include taxes, shipping, and import duties.
• Equipment specifications and suppliers may vary based on specific requirements and
market availability.
• Warranty periods and terms of service should be carefully reviewed to ensure adequate
coverage and support for the equipment.
• Procurement timelines and installation schedules should be coordinated to minimize
disruptions to New Leaf Fertility Center's operations.
This data provides an overview of the equipment procurement process and associated costs for
establishing the in-house nitrogen production facility at New Leaf Fertility Center. By carefully
selecting reliable suppliers and ensuring the quality and reliability of equipment, the center can
effectively implement the project and realize the benefits of in-house nitrogen production.