Socavación General Blench (1969)

2
q
m Caudal unitario
12
s

dm 20 mm Diámetro medio fondo

Fb d 0.1875
d ft
8.4265 1.2731
ft 2
s

Fb Fb dm m ft
Fb 1.1531 Fb 3.78
2 2
s s
2
3
q
Sc 0.6
1 Sc 3m Sc 9.8 ft Socavación general
3
Fb

blench dm , q 0.1875
dm
ft
Fb 8.4265 1.2731
ft 2
s
2
3
q
0.6
1 dm 0.0656 ft
3
Fb

blench dm , q 3m

Referencias:

1. Mobile-Bed Fluviology, Blench (1969).


2. Computing Degradation Local Scour, Pemberton & Lara (1984).
3. Guidelines for Evaluating Pipeline Channel Crossing Hazards to Ensure Effective Burial, USBR, (2019).
4. Bank Stabilization Design Guidelines, USBR (2015).
5. HEC-RAS 6.3 User's Manual (2023)
ROC, marzo 2023

1/2
4 Apr 2024 16:39:29 - soc_gen_blench.sm

Ajuste Curva de Blench


interp

T
xx 0.0003 0.001 0.003 0.01 0.1 1 4 ft
T ft
yy 0.45 1.05 1.65 2.4 4.1 7.1 9.7
2
s
β
2 function definition
ft x , β β x β
1 3
1
initial value
β0 1
1
xx yy 0.0003 0.5676
β LMSA , , β0
ft ft 0.001 1.0339
2 0.003 1.5617 8.4265
s
β 0.01 2.2798 0.1875
0.1 4.1985 1.2731
1 7.1533
4 9.6551

100.0

10.0

1.0

0.1 -4 -3 -2 -1 0 1
10 10 10 10 10 10

2/2