M C K KUTTY ENGINEERS PVT LTD.

NAME OF PROJECT : BF#1 1264 M3 BLAST FURNACE DATE :- 23_03_2024


CONTRACTOR : M C K KUTTY ENGINEERS PVT LTD. REPORT NO:- MCK/ ESL/001
CLIENT : ESL / VEDANTA
DESCRIPTION OF WORK : TUYER HOLDER ASSEMBLY PROTOCOL

DISTANCE B/W SHELL DISTANCE B/W DISTANCE B/W TUYERE HOLDER


DISTANCE B/W SHELL
WATER LEVEL TUYERE OUTSIDE & FLANGE SHELL OUTSIDE & SHELL OUTSIDE & TO HOLDER
OUTSIDE & FLANGE ROOT GAP ( mm )
HOLDER TO HOLDER OUTSIDE ( BOTTOM FLANGE OUTSIDE ( FLANGE OUTSIDE ( HOLDER TILTING IN ( ˚ ) CENTRE LINE
OUTSIDE ( TOP SIDE )
SIDE ) RIGHT SIDE ) LEFTSIDE ) DISTANCE
TUYER
REMARKS
NO.
1 Mtr. FROM
OFF SET
VERTICAL HORIZONTAL HOLDER OUTSIDE
OBSERVATION REQUIRED OBSERVATION REQUIRED OBSERVATION OBSERVATION OBSERVATION REQUIRED OBSERVATION DISTANCE OF REQUIRED REQUIRED OBSERVATION
HEIGHT DISTANCE TOWORDS SHELL
CENTRE
CENTER
L R
1 -2 -2 146 144 146 147 139 138 10.91 11.22 572 23 549 109 2 2 TO 4 1315

2 -2 -2 146 146 146 146 139 140 10.91 10.94 570 22 548 106 2 2 TO 4 1315

3 1 -1 146 146 146 146 140 140 10.91 10.82 571 22 549 105 2 2 TO 4 1316

4 -1 -1 146 146 146 146 140 139 10.91 10.84 571 23 548 105 2 2 TO 4 1314

5 -1 0 146 146 146 146 141 141 10.91 11.1 573 23 550 108 2 2 TO 4 1314

6 0 1 146 145 146 147 140 143 10.91 10.98 573 22 551 107 2 2 TO 4 1315

7 0 0 146 146 146 146 139 139 10.91 10.9 571 21 550 106 2 2 TO 4 1316

8 -1 0 146 146 146 147 141 142 10.91 10.9 572 22 550 106 2 1 TO 4 1313

9 0 0 146 146 146 148 140 140 10.91 11.023 571 22 549 107 2 2 TO 4 1314

10 -1 0 146 146 146 146 139 141 10.91 11.023 571 22 549 107 2 2 TO 4 1315

11 -2 0 146 146 146 147 141 140 10.91 10.92 571 22 549 106 2 2 TO 4 1314

12 -2 -2 146 146 146 146 139 139 10.91 10.9 570 20 550 106 2 2 TO 4 1313

13 -2 -1 146 145 146 146 140 141 10.91 11.1 572 22 550 108 2 1 TO 4 1315

14 -1 0 146 145 146 146 140 140 10.91 11.24 573 20 553 110 2 2 TO 4 1314

15 -2 -1 146 146 146 146 141 141 10.91 11.12 571 22 549 108 2 2 TO 4 1315

16 -2 -3 146 145 146 146 138 139 10.91 11.1 572 22 550 108 2 2 TO 4 1316

17 0 0 146 145 146 146 139 139 10.91 11.04 570 22 548 107 2 2 TO 4 1313

18 -2 0 146 146 146 146 141 142 10.91 11.08 573 22 551 108 2 2 TO 4 1316

19 0 -1 146 146 146 147 139 140 10.91 11.2 577 22 555 110 2 2 TO 4 1315

20 -2 0 146 146 146 147 141 142 10.91 11.006 572 22 550 107 2 2 TO 4 1314

MCK MND ESL / VEDANTA

NAME SHIBAPRASAD JANA

SIGN.

DATE
M C K KUTTY ENGINEERS PVT LTD.

NAME OF PROJECT : BF#1 1264 M3 BLAST FURNACE DATE: 23_03_2024


CONTRACTOR : M C K KUTTY ENGINEERS PVT LTD. REPORT NO :- MCK / ESL / 001
CLIENT : ELECTRO STEEL VEDANTA BOKARO
DESCRIPTION OF WORK : TUYER HOLDER ALIGNMENT PROTOCOL

T
H
- F
2 D
H
F
D

M C K KUTTY ENGG.PVT.LTD. ESL (VEDANTA) BOKARO MND


NAME

SIGN