Final Bill Status (Pkg-I to IV)

Packages Contractor Letter Date Our Letter Date Remarks


Return of Submitted Final Payment Statement with advised
to re-submit the final bill after incorporating all the
Package-I Submitted GPL/UPEIDA/PKG-I/2018-19/3363 9/23/2022 EGIS/TL/PE/GYATRI/PKG-I/900 10/19/2022
observation which has been detailed to representative of
EPC Contractor.
Reminder-I
EGIS/TL/PE/GYATRI/PKG-I/914 3/31/2023
for Submission of Final Bill by EPC Contractor.
Reminder-II
EGIS/TL/PE/GYATRI/PKG-I/916 4/21/2023
for Submission of Final Bill by EPC Contractor.
Reminder-III
EGIS/TL/PE/GYATRI/PKG-I/919 5/10/2023
for Submission of Final Bill by EPC Contractor.
Reminder-IV
EGIS/TL/PE/GYATRI/PKG-I/920 5/20/2023
for Submission of Final Bill by EPC Contractor.
Package-II Submitted GPL/UPEIDA/PKG-II/2018-19/3208 5/5/2022 EGIS/TL/PE/GYATRI/PKG-2/630 5/14/2022 Return on dated 14-05-2022
Submitted GPL/UPEIDA/PKG-II/2018-19/3277 6/18/2022 EGIS/TL/PE/GYATRI/PKG-2/642 7/6/2022 Return on dated 06-07-2022

EGIS/TL/PE/GAYATRI/PKG-2/646 7/25/2022 Letter for Re-Submission of the Final Bill by EPC Contractor

Returned on dated 09-09-2022


The Final Payment Statement has been checked by
Authority Engineer and some of the items was not found in
order which was detailed to the representative of EPC
Submitted GPL/UPEIDA/PKG-II/2018-19/3329 8/9/2022 EGIS/TL/PE/GYATRI/PKG-2/654 9/9/2022 Contractor. Moreover, COS order has not been issued of all
change of scope notices.
EPC Contractor was advised to resubmit the bill after
incorporating necessary correction with all supporting
documents.

Returned on dated 19-11-2022


The Final Payment Statement has been re-checked by
Authority Engineer and found necessary corrections has
not been done properly even some Cost Estimates is
Submitted GPL/UPEIDA/PKG-II/2018-19/3365 23-09-2022 EGIS/TL/PE/GYATRI/PKG-2/665 11/19/2022
pending which to be submitted by EPC Contractor.
EPC Contractor was advised to resubmit the bill after
incorporating necessary correction with all supporting
documents after incorporating all COS.
Returned on dated 25-02-2023
Price escalation in submitted final payment statement was
not as per UPEIDA’s letter no.
7383/UPEIDA/18/1156-VII/Tech dated 11.01.2023 and
Submitted GPL/UPEIDA/PKG-II/2018-19/3415 2/6/2023 EGIS/TL/PE/GYATRI/PKG-2/671 2/25/2023 some correction in value of measurement was to be
corrected as per supplementary Agreement. The same
communicated in detail to representative of EPC Contractor
and advised to re-submit the final payment statement at
earliest after necessary correction
Packages Contractor Letter Date Our Letter Date Remarks
Reminder-I
EGIS/TL/PE/GYATRI/PKG-II/674 3/31/2023
for Submission of Final Bill by EPC Contractor.
Reminder-II
EGIS/TL/PE/GYATRI/PKG-II/676 4/21/2023
for Submission of Final Bill by EPC Contractor.
Reminder-III
EGIS/TL/PE/GYATRI/PKG-II/679 5/10/2023
for Submission of Final Bill by EPC Contractor.

Submitted GPL/UPEIDA/PKG-II/2018-19/3422 5/13/2023 Under Review with Authority Engineer

For Re-submission
EPC Contractor was advised to resubmit the Final Stage
Package-III Submitted APCO/EGIS//21-22/701 4/16/2022 EGIS/TL/PE/APCO/PKG-3/646 4/22/2022 Payment along with required documents for our review at
earliest \to avoid the delay in finalization of Final Payment
Certificate.

Returned on dated 04-05-2022


EPC Contractor re-submitted the Final Bill without
incorporating the observations properly which was told
earliest vide letter 646/22-04-2022
Submitted APCO/UPEIDA/22/5593 4/25/2022 EGIS/TL/PE/APCO/PKG-3/652 5/4/2022
EPC Contractor was again advised to resubmit the Final
Stage Payment along with required documents for our
review at earliest \to avoid the delay in finalization of Final
Payment Certificate.

EGIS/TL/PE/APCO/PKG-3/670 7/25/2022 For Re-Submission of the Final Bill by EPC Contractor

The Final Payment Statement checked by AE and some of


the items was not found in order.
Submitted APCO/HO-UPEIDA/2021-22/5653 8/19/2022 EGIS/TL/PE/APCO/PKG-3/679 9/9/2022 EPC Contractor was advised to resubmit the Final Payment
Statement with all the required documents which was told
earlier to representative of EPC Contractor

Reminder-I
EGIS/TL/PE/APCO/PKG-3/700 3/31/2023
for Submission of Final Bill by EPC Contractor.
Reminder-II
EGIS/TL/PE/APCO/PKG-3/706 4/21/2023
for Submission of Final Bill by EPC Contractor.
Reminder-III
EGIS/TL/PE/APCO/PKG-3/709 5/10/2023
for Submission of Final Bill by EPC Contractor.
Reminder-IV
EGIS/TL/PE/APCO/PKG-3/712 5/20/2023
for Submission of Final Bill by EPC Contractor.
Packages Contractor Letter Date Our Letter Date Remarks
Return on dated 18-08-2022
Package-IV Submitted F/GRIL/SISA-IV/R-313/1816 8/16/2022 EGIS/TL/PE/GRIL/PKG-4/663 8/18/2022 Required documents for scrutiny of the Final Bill not
submiited by the EPC Contractor.

Return
The Final Payment Statement checked by AEs and quantity
of the some items was not found in order the same
communicated to representative of the Contractor. EPC
Submitted F/GRIL/SISA-IV/R-313/1817 8/22/2022 EGIS/TL/PE/GRIL/PKG-4/667 9/9/2022 Contractor advised to resubmit the Final Payment
Statement after incorporating the corrections which
comunicated to representative of the contractor and after
getting all COS orders with supporting documents

Return
Price escalation in submitted final payment statement was
not as per UPEIDA’s letter no.
7383/UPEIDA/18/1156-VII/Tech dated 11.01.2023 and
Submitted F/GRIL/SISA-IV/R-313/1848 2/6/2023 EGIS/TL/PE/GRIL/PKG-4/685 3/31/2023 some correction in value of measurement was to be
corrected as per supplementary Agreement. The same
communicated in detail to representative of EPC Contractor
and advised to re-submit the final payment statement at
earliest after necessary correction

Submitted F/GRIL/SISA-IV/R-313/1865 4/18/2023 Under Review with Authority Engineer

* As per Contract Clause 19.3.1 c,


Contractor shall submit to the Authority's Engineer for consideration six copies of a Final Payment Statement (the "Final Payment Statement") for Works, with supporting documents showing
in detail, in the form prescribed by the Authority's Engineer:
a) the summary of Contractor's Stage Payment claims for Works as submitted in accordance with Clause 19.4;
b) the amounts received from the Authority against each claim; and
c) any further sums which the Contractor considers due to it from the Authority.

Status of Final Bill


Package-I EPCContractor has not re-submitted the Final Bill and 01 No. Cost estimate of COS.
Package-II EPC Contractor has re-submitted the Final Bill on dated 13.05.2023 and it is under review with AE but 01 No. Cost eatimate of COS is till pending with EPC Contractor
Package-III EPC Contractor has not re-submitted the Final Bill and 01 No. Cost estimate is still pending with EPC Contractor.
Package-IV EPC Contractor has re-submitted the Final Bill and 01 No. Cost estimate of COS. It is under review with AE.