Subcontracting Process:
Subcontracting Process is a Special Procurement Process where a company
outsources certain Manufacturing Processes to a Subcontracting Vendor.
This is typically sending raw materials or semi-finished components to the
Subcontractor Premises, where they perform processes to create finished Products.
Then the finished products are returned to the Customer.

Overview of Subcontracting Process:

Plant Subcontractor

Purchase Order

Raw Materials

Goods Transfer by Mvt Type 541

Finished Product

GR-101 Consuming the Raw Mat.by 543


Mvt Type

In the above process, we can see the Manufacturing of PCBs by sending Electronic
Components to Subcontractor and then getting back the PCBs as Finished Products
from them.

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Steps Involved in Subcontracting Process:


1. Create a Material Master for Raw Materials & Finished Product - MM01
2. Create a BOM for Finishd Product – CS01
3. Create a Purchase Requisition with “Item Category” as “L” – ME51N
4. Create a Sub-Contracting Vendor - XK01
5. Create a Purchase Order w.r.t.PR with “Item category” as “L”- ME21N
6. Transfer the Goods to Subcontractor - ME2O / MB1B
7. Goods Receipt - MIGO
8. Invoice Receipt – MIRO
Scenario 1:
A Simple Cycle for the Subcontract Procurement Process without BOM
RAW MATERIALS
VENDOR SUB CONTRACTOR

FINISHED
PRODUCT

Step 1: Create a Material Master for Raw Materials & Finished Product –
MM01

Raw Material was Created.

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Finished Product was Created.


Step 2: Creating Purchase Requisition with “Item Category”- “L”- ME51N

Add Raw Material in the Components tab under the Material data tab in Item level
1.In Item level, Select Material Data tab, then select Component Tab
2.Add Raw Materials to it

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Adding the Raw Materials Component

Then Save it, Purchase requisition number 0010013798 was created.


Step 3: Creating Subcontracting Vendor – XK01

Vendor 0000100396 has been created for company code 1000 purchasing
organization 1000

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Step 4: Creating Purchase Order – ME21N

Adding the Raw Material Component

Standard PO created under the number 4500017414

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Step 5: Transfer Posting the Raw Materials to Vendor-ME2O


Stock Overview of Raw Materials:

Now, Transfer Posting the Raw Material to Subcontractor by using the T-Code
ME2O
By Giving the Essential Inputs and hit Execute button

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Now, Select the Check box of the Material and select the post goods issue, then
enter the required value of the Material which is to be send to Vendor

Transfer the Goods by Mvt.Type 541 & Enter the Quantity

The Quantity 100 Mapped from


the Purchase documents by
adding the Components on it

Now check the Stock Overview of Material, it is transfer to the Vendor Stock

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Step 6: Goods Receipt-MIGO

Check the Material Document

Here, Mvt.Type 101 is Goods Receipt for Finished Product


Mvt.Type 543 is Consumption of Raw Materials

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Now, Check the Stock Review of Finished Product, it returned to own plant

Accounting Entries:

BSX - AB239 - Material Received to Plant’s inventory (Cost of both Raw Mat +
Finished Product)
WRX- AB239 - Account Clearance to Vendor (Paying the Cost of Finished
Product, Here Price of Finished Product is 100 & Qty is 100, So,100*100 = 10000)
BSV - AB239 - (Raw Mat Cost (10,000) + GR/IR Clearing Acc.(10,000))
FRL - AB239 - Service Charges for Subcontractor to make the Finished Product
BSX - AB238- Cost of Raw Material sent to Subcontractor’s inventory
GBB - AB238 – Clearing Account for Client

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Scenario 2:
A Simple Cycle for the Subcontract Procurement Process BOM
A bill of Materials (BOM) is a list of Components and their Quantities that are
required to Produce a finished product.
Creating a BOM – CS01
Consider the scenario that we need the Motor Cycle, So the components required
to Manufacture the Motor cycle are Wheels, Engine, Chain, and other components.
For example, we will take Wheels, Chain & Engine to create a BOM to get a
Finished Product Motor Cycle.
So that we can create 3 Raw Materials for Wheels, Chain & Engine, and 1 Finished
Product for 1 Motor Cycle.

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

The Raw Materials & Finished Products are Created

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Now, create a BOM for Finished Product

List the Raw Materials Components with Quantity to Manufacture the Motor Cycle
as a Finished Product

We Require 10 no.s of finished Products, So we require the Raw materials multiple


of Finished Products with the quantities in BOM

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Create Purchase Order – ME21N

Adding the Component to the Finished Material to send to subcontractor

This Data Will Automatically Fetch from BOM

The values of Raw Materials increased as per the requirement of Finished Product
Then, Save it
Standard PO created under the number 4500017416

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Transfer Posting - ME2O

Select the Materials which are send to Vendor, then Select Post Goods Issue

Transfer the Goods to Vendor by Mvt.Type 541

Check the Material in Subcontractor Stock

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Goods Receipt – MIGO

Check the Material Document what are the Mvt. Types are recorded – MB03

Goods Receipt – AB333 – 101


Vendor Consumable Materials – 543

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Stock overview for Finished Product – MMBE

The Finished Product Received as per the purchase order


Accounting Entries:

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Scenario 3:
In this Scenario,We Requesting to the Supplyin Vendor to send the Materials
directly to the Subcontracting Vendor Address then we will receive the
Finished product from subcontractor
Create Raw Materials & Finished Products – MM01

The Raw Material & Finished Products are Created

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Working Process:
Sending PO for Raw Mat
to Supplying Vendor with
Subcontractor Address SUPPLYING
PLANT
VENDOR
Supplying Vendor
send Materials to
Subcontractor

FINISHED SUBCONTRACTOR
PRODUCT
Subcontractor sends
finished Product to own
Plant

Create Purchase Order – ME21N


First, create a Normal PO for Raw Materials through Supplying Vendor that they
send a Materials to Subcontractor

In item Detail, Select the Delivery Tab Address and Enter the Subcontractor
Vendor Address.
Then Save it, Standard PO created under the number 4500017418
Then do the Goods receipt to receive the Materials from the Supplying Vendor.

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Create Goods Receipt – MIGO


Create a Goods Receipt with Respect to the Supplying Vendor Purchase Order

Then, Save it
Now check the Material Stock Overview

After GR, the Raw Material is stocked in subcontractor vendor’s premises

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Create Purchase Order – ME21N


Now, create a Purchase order for finished product to send to Subcontracting
Vendor with “Item Category” as “L”

Add Raw Material Components

Then Save it, Standard PO created under the number 4500017419


Here No Transfer Posting is Needed because the supplying vendor sent the
Raw Material to the Subcontractor Directly.

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Create Goods Receipt – MIGO


Create a GR with Respect to Subcontracting Purchase Order for finished Product

Check the Stock Overview of the finished product

Now the Finished Product received to the plant as per the requirement

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

For Mvt.Type Recording Check the Material Document – MB03

Accounting Entries:

Scenario 4:
Subcontracting Process run through MRP
Steps to be involved:
1. Create Material Master for Raw Materials – MM01
2. Create Finished Products with MRP Views – MM01
3. Create a BOM for Finished Product – CS01
4. Cretae Purchase infor Record – ME11
5. Create a Source List – ME01
6. Create a MRP Run – MD02
7. Create Purchase Order – ME21N
8. Transfer Posting of Raw Materials – ME2O
9. Goods Receipt - MIGO
10. Invoice Receipt – MIRO

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Create Material Master for Raw Materials & Fiished Product – MM01

Material Master for Raw Materials are Created.

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Material Master for Finished Product is created with MRP Views.


Create a BOM for Finished Product – CS01

BOM is created for the finished product AB340with required components list and
Quantities.

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Create Purchase Info Record – ME11


Create Purchase Info Record for finished product Material & Vendor Combination

Purchasing info record 5300005968 1000 L 1000 created


Create Source List– ME01

Maintain the valid from and to dates, vendor and select the fix box to fix the
vendor for the material and selecct MRP as 1

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Check the Material Availability– MD04

There is no availability of the Material, so we need to run the MRP


Run MRP– MD02

Check the parameters

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Planned orders created, so that we get a PR from it

Now Check in MD04

The Value is Fetched from Material


Master dta in MRP View

Purchase Requisition is Created 10013799


Then, we can create Purchase order

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Display Purchase Requisition – ME53N

Create Purchase Order- ME21N

The Raw Materials Quantities are fetched from Material Master and quantities are
updated from the purchase order. 4500017420

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Transfer Posting – ME2O

The Raw Materials are transfer to vendor

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Check the Stock overview of Raw Materials

The stock Moved to the Subcontractor premises


Create Goods Receipt – MIGO

Check the Recorded Movement Types

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Check the Stock Overview of Finished Product

The Finished Product Send to Plant as per PO Requirement


Accounting Entries:

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Scenario 5: Subsequent Adjustment


In Subsequent Adjustment there will be a two Concepts namely called,
1. Over Consumption
2. Under Consumption
Over Consumption
Over consumption is a situation where the subcontractor uses more materials than
the quantity specified in the Purchase Order.
Here, Consider the scenario that the vendor uses 5 Extra quantities of one raw
materials. For that we have to do subsequent adjustment as over consumption.

Material Master data for raw Materials are Maintained.

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Material Master for Finished Product is Maintained.


Create Purchase Order – ME21N

Adding the Raw Material Component to


send to Subcontractor

Standard PO created under the number 4500017421

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Transfer Posting – ME2O

Do Transfer Posting by Mvt.Type 541by selecting the raw materials

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Check the Subcontractor vendor Stock – MBLB

A Later days , Subcontractor consumes 5 more units of AB341 Raw Maerial


without purchase order
For this , We to do transfer posting – MB1B- 541

Check Vendor Stock

5 units added in AB341

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Goods Receipt – MIGO


Make Goods Receipt with Respect to Purchase Order

Check the Movement Types Recordings

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Subsequent Adjustment - MIGO


Make a Subsequent Adjustment for Extra 5 Units with respect to purchase order

Check the Movement Types Recordings

For Subsequent Adjustment over consumption 121 Credit Mvt. Type recorded
Accounting Entries:

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Accounting Entries for Over Consumption Subsequent Adjustment:

Subsequent Adjustment – Under Consumption:


Under Consumption is a situation where the subcontractor uses less materials
than the quantity specified in the Purchase Order
I will take the same Material used in the Over consumption.
Raw Materials – AB341 & AB342
Finished Product – AB343
Create a Purchase Order - ME21N

Adding Raw Material Component to send

Then, Save it. Standard PO created under the number 4500017422

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Transfer Posting – ME2O

Transfer Posting through Mvt. Type 541

Two items are Posted, now check with the subcontractor stock

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Stock in Subcontractor – MBLB


Stock Transferred to the Subcontractor place

Goods Receipt – MIGO


Goods Receipt with respect to Purchase Order

Check the Movement Types Recordings – MB03

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Accounting Entries:

Subsequent Adjustment – Under Consumption – MIGO


Consider the Vendor has 5 Units Remaining, they Made a finished Product with 95
Units and We need the 5 Units Back. So we doing Under Consumption in
Subsequent Adjustment with respect to Purchase Order

Check the Under


Consumption
Check box

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Check the Movement Types Recordings – MB03

Accounting Entries:

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Scenario 6: To Receiving the By-Product / Scrapping from the Subcontractor


By-Product is a secondary product that is produced during the processing of a
finished Product.
Scrap is Waste that is produced during the Processing of Finished Products.
I’m taking the same materials AB341, AB342 & AB343
Raw Materials – AB341 & AB342
Finished Product – AB343
Let’s Consider AB341 as a Raw Material & AB342 as a By-product / Scrapping
Create Purchase Order – ME21N

Add the Raw Material Component

Here Minus Sign Indicates


that the Material is
By-Product/scrap
Then, Save it, Standard PO created under the number 4500017423

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Transfer Posting – ME2O

Already in Stock

No Need to Maintain the Stock for By-product/Scrap Material(AB342)

Then, Check the Subcontractor Vendor Stock

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Check the Subcontractor Vendor Stock – MBLB

Create Goods Receipt – MIGO

Check the Movement Types Recordings – MB03

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Now, Check the Stock Overview of By-product / Scrap

By-product / Scrap

Accounting Entries:

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Scenario 7: To Receive the Raw Materials Component Back once the


Subcontractor Purchase order is raised and components to the Subcontractor
vendor
Let’s consider the scenario that the PO is Deleted after issuing the Raw
Materials to Subcontractor Vendor, so we need the Raw Materials back in our
warehouse.
For that, we use the T-Code MBST to get back the Material to our
Ware House
In this scenario, I’ll take 1 Raw Material & 1 Finished Product
Create Material Master for Raw Material & Finished Product-MM01

Material Master are Maintained for Raw Material & Finished Product

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Create Purchase Order – ME21N

Adding the Raw Material Component

Then, Save it. Standard PO created under the number 4500017424


Now, Transfer the Goods to the Subcontractor

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Transfer Posting – ME2O

1 Item is Posted

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Go to ME22N and delete Line item 10


Select the Line item10 & select the Delete Option to delete & Save it.

Now, Go to MB51, To find the Material Document of the transfer Posting


Give the Essential inputs & Execute it

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Double click the Material Document Number to Overview the Document

Check the Transfer Posting details


To Cancel the Material Document – MBST

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Now, Check the Stock Overview of AB344

No Accounting documents are Generated


So, No Accounting Entries are Recorded

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Scenario 8: Recursive Case`


A Recursive Case is nothing but, A Material is Subjected to Subcontracted
then we get the same Material to our plant
For example, A Diesel Engine is Sent to a Subcontractor for repair and then
we get it back after repair from the vendor
Let’s Consider the Material AB345 is sent to Vendor for Repair and get it back
after repair
Create Purchase Order – ME21N

For Recursive Process, have to enter the same Material in the add component
fields.
Then, Save it. Standard PO created under the number 4500017425

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Transfer Posting – ME2O

Stock Overview

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Goods Receipt – MIGO

Stock Overview after Goods Receipt

https://www.linkedin.com/in/hari-vijayakumar
V.HARI
SAP MM CONSULTANT

Material Document – MB03

Accounting Entries:

https://www.linkedin.com/in/hari-vijayakumar

You might also like