Professional Documents
Culture Documents
Autocad Chapter 5
Autocad Chapter 5
25A 80A
40A 40A
65A
Can Bottle
Filling room Liquid Pasteurizer Pasteurizer
PVC
ST
K Free processing
Can filler Bottle filler Tube type
Deaerator Cushion Filling room Liquid processing CIP room Free Hot water Liquid
tank rinser water tank sterilize device antroom room anteroom equipment processing
rinser water
tank
room Sink
C
PVC
PV
25A 40A
STK 80A 80A
LAÀU 1
C
PV PV
C C
PVC
OÁNG THOAÙT PHAÂN PVC 114
ST
OÁNG CAÁP NÖÔÙC PVC 42
K
40A
15A
C
50A 50A
PVC
STK
PVC
Passage
anteroom
25A 15A 15A 15A 15A 15A
25A 25A 25A 15A 25A 25A 32A
Liquid Liquid
processing room processing
Compound Solution Stock Free 2 Kneader 1 Kneader 2 room Sterilized water Blanching Washing Raw material Men's Women's rest Quality Quality
Raw material Raw material Staff room
tank tank tank Free 3 making device machine machin processing rest room room inspection inspection
processing processing
roomsink sink sink room 1 room 1
room free 1 room free 2
PVC 27
PVC
N
PVC
PVC
PVC
HAÀM 80A 80A
Chiller
80A 80A
SGP: Tieâ u chuaån jis veà oáng theùp caù c bon cho
PV C
ST ñöôøng oáng thoâng thöôøng.
PVC From water treatment room 40A 50A 40A
K
to chiller room A: (DN) Ñöôøng kính danh nghó a cuûa oáng (mm).
PV
C SGP: Standard JIS :SGP
PV
C
STK
A: (DN) nominal diameter (mm).
PV C 40A 50A 40A
Piping( galvanized steel pipe
PVC BS1387:1985-CLASSBS -MEDIUM )
RA HO Á GA
THOAÙT
G1 COÂNG COÄN
G Jelly Tube type
PW :Pure Water / Nu ? c tinh khi?t (L/h)
Blanching
Sterilize sterilize machine
& cool tank
PV C device
PV C
G5
VEÀ HOÁ GA
PV C
HAÀM PHAÂN
Giới thiệu 4
BV mặt bằng
Giới thiệu 5
BV chi tiết
Thực hành 6
Yêu cầu:
• Print pdf.
Thực hành 7
A A
B
Thực hành 8
1 3 4 1
2
2
Thực hành 9
1 4 3 1
1
2 2
2
Thực hành 10
Nâng cao 11
Sử dụng LISP
Tải LISP lên: Lệnh: AP
Sử dụng LISP
Xem tên câu lệnh LISP: mở file LISP bằng notepad.
Nâng cao 13
- Lệnh: XREF.
khảo.
2. Chọn tỷ lệ.
3
3. Chọn điểm gốc tọa
độ