Reinforcement of Return Wall
r 14.93
k 0.347
Design Parameters : j 0.884
250 250 250 2000 1500 250 250 250 2000 2000
h-1000
P1
GWL
1000 P2
P3
t3 Pc Pb Pa
t2
Design of Apron t1
h-1000
P1
GWL
1000 + t3/2 P2
P3
t3/2 Pc Pb Pa
t2
C/S 18.02 0.125 14.23 -5.16 Kn-m 18.00 0.125 12.75 -6.64 Kn-m
102 175 OK 693 mm² 375 mm² 199 mm² 500 mm² ###
C/S 102 175 OK 692 mm² 375 mm² 255 mm² 500 mm² ###
1-1
12 Ø @ 183 10 Ø @ 210 12 Ø @ 304 10 Ø @
Wing
12 Ø @ 183 10 Ø @ 210 12 Ø @ 304 10 Ø @
2-2
1-1
t1 t1
S1
E1
S3
W1 h
S2
W2
E2 S4
t3
t2 L t2
C/S
2-2
Bar Curtailment
SECTION 1-1
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
SECTION 2-2
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
t1
t3
L t2
t1
t3
L t2
Calculated Remarks
distance 'd'
Curtailment
mm ###
mm ###
`
rinkage (S3 /S4)
157
157
157
157
200
200
200
STRUCTURAL DESIGN OF RCC DRAIN
Ec 3650982 Es 200,000
r 14.93
k 0.347
Design Parameters : j 0.884
250 250 250 2500 1500 250 250 250 2500 2000
h-1000
P1
GWL
1000 P2
P3
t3 Pc Pb Pa
t2
133 175 OK 1178 mm² 375 mm² 375 mm² 500 mm²
C/S 133 175 OK 1178 mm² 375 mm² 375 mm² 500 mm²
Design of Apron t1
h-1000
P1
GWL
1000 + t3/2 P2
P3
t3/2 Pc Pb Pa
t2
33.93 0.125 29.19 -6.45 Kn-m 33.90 0.125 27.35 -8.30 Kn-m
140 175 OK 1305 mm² 375 mm² 248 mm² 500 mm² ###
C/S 140 175 OK 1304 mm² 375 mm² 319 mm² 500 mm² ###
1-1
16 Ø @ 171 10 Ø @ 210 12 Ø @ 304 10 Ø @
Wing
16 Ø @ 171 10 Ø @ 210 12 Ø @ 304 10 Ø @
2-2
1-1
t1 t1
S1
E1
S3
W1 h
S2
W2
E2 S4
t3
t2 L t2
C/S
2-2
Bar Curtailment
SECTION 1-1
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
SECTION 2-2
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
t1
t3
L t2
t1
t3
L t2
Calculated Remarks
distance 'd'
Curtailment
mm ###
mm ###
`
rinkage (S3 /S4)
157
157
157
157
200
200
200
STRUCTURAL DESIGN OF RCC DRAIN
Ec 3650982 Es 200,000
r 14.93
k 0.347
Design Parameters : j 0.884
275 275 275 2500 1500 300 300 300 3000 2000
h-1000
P1
GWL
1000 P2
P3
t3 Pc Pb Pa
t2
133 200 OK 1031 mm² 412.5 mm² 412.5 mm² 550 mm²
C/S 174 200 OK 1764 mm² 412.5 mm² 412.5 mm² 550 mm²
Design of Apron t1
h-1000
P1
GWL
1000 + t3/2 P2
P3
t3/2 Pc Pb Pa
t2
34.12 0.138 28.98 -7.20 Kn-m 57.94 0.150 48.70 -12.21 Kn-m
141 200 OK 1148 mm² 412.5 mm² 242 mm² 550 mm² ###
C/S 183 225 OK 1733 mm² 450 mm² 365 mm² 600 mm² ###
1-1
16 Ø @ 195 10 Ø @ 191 12 Ø @ 276 10 Ø @
Wing
16 Ø @ 114 10 Ø @ 191 12 Ø @ 276 10 Ø @
2-2
1-1
t1 t1
S1
E1
S3
W1 h
S2
W2
E2 S4
t3
t2 L t2
C/S
2-2
Bar Curtailment
SECTION 1-1
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
SECTION 2-2
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
t1
t3
L t2
t1
t3
L t2
Calculated Remarks
distance 'd'
Curtailment
mm ###
mm ###
`
rinkage (S3 /S4)
143
143
143
131
200
200
200
STRUCTURAL DESIGN OF RCC DRAIN
WSD METHOD
Design Parameters :
fc' = 25.00 N/mm2 3627 PSI fc = 11.25 N/mm2 gconc = 24.00 Kn/m3 Es
fy = 420 N/mm 2
60929 PSI fs = 168.00 N/mm 2
gs(moist) = 17.40 Kn/m 3
Ec
j= 11.75 º FS= 2 Ka = 0.660 gs(Sat) = 18.90 Kn/m3 n
R = 1.715 gs(Sub) = 9.09 Kn/m3 r
gw(Water)= 9.81 Kn/m 3
k
j
300 300 300 2500 2500 325 325 325 3000 3000
h-1000
P1
GWL
1000 P2
P3
t3 Pc Pb Pa
t2
134 225 OK 915 mm² 450 mm² 450 mm² 600 mm²
C/S 175 225 OK 1566 mm² 450 mm² 450 mm² 600 mm²
Design of Apron t1
h-1000
P1
GWL
1000 + t3/2 P2
P3
t3/2 Pc Pb Pa
t2
34.20 0.150 24.32 -12.39 Kn-m 58.11 0.163 42.54 -19.13 Kn-m
141 225 OK 1022 mm² 450 mm² 370 mm² 600 mm² ###
C/S 184 250 OK 1563 mm² 487.5 mm² 514 mm² 650 mm² ###
1-1
16 Ø @ 220 10 Ø @ 176 12 Ø @ 253 10 Ø @
Wing
16 Ø @ 128 10 Ø @ 176 12 Ø @ 253 10 Ø @
2-2
1-1
t1 t1
S1
E1
S3
W1 h
S2
W2
E2 S4
t3
t2 L t2
C/S
2-2
Bar Curtailment
SECTION 1-1
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
SECTION 2-2
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
200,000
25,500
7.84
14.93
0.344
0.885
t1
t3
L t2
t1
t3
L t2
Calculated Remarks
distance 'd'
Curtailment
mm ###
mm ###
`
rinkage (S3 /S4)
131
131
131
121
200
200
200
STRUCTURAL DESIGN OF RCC DRAIN
WSD METHOD
Design Parameters :
fc' = 25.00 N/mm2 3627 PSI fc = 11.25 N/mm2 gconc = 24.00 Kn/m3 Es
fy = 420 N/mm 2
60929 PSI fs = 168.00 N/mm 2
gs(moist) = 17.40 Kn/m 3
Ec
j= 11.75 º FS= 2 Ka = 0.660 gs(Sat) = 18.90 Kn/m3 n
R = 1.715 gs(Sub) = 9.09 Kn/m3 r
gw(Water)= 9.81 Kn/m 3
k
j
325 325 325 3500 2000 275 275 275 2000 2500
h-1000
P1
GWL
1000 P2
P3
t3 Pc Pb Pa
t2
220 250 OK 2227 mm² 487.5 mm² 487.5 mm² 650 mm²
C/S 97 250 OK 431 mm² 487.5 mm² 487.5 mm² 650 mm²
Design of Apron t1
h-1000
P1
GWL
1000 + t3/2 P2
P3
t3/2 Pc Pb Pa
t2
91.10 0.163 79.56 -15.60 Kn-m 18.05 0.138 10.75 -9.00 Kn-m
231 250 OK 2450 mm² 487.5 mm² 420 mm² 650 mm² ###
C/S 103 200 OK 607 mm² 412.5 mm² 303 mm² 550 mm² ###
1-1
20 Ø @ 141 10 Ø @ 162 12 Ø @ 234 10 Ø @
Wing
12 Ø @ 262 10 Ø @ 162 12 Ø @ 234 10 Ø @
2-2
1-1
t1 t1
S1
E1
S3
W1 h
S2
W2
E2 S4
t3
t2 L t2
C/S
2-2
Bar Curtailment
SECTION 1-1
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
SECTION 2-2
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
200,000
25,500
7.84
14.93
0.344
0.885
t1
t3
L t2
t1
t3
L t2
Calculated Remarks
distance 'd'
Curtailment
mm ###
mm ###
`
rinkage (S3 /S4)
121
121
121
143
200
200
200
STRUCTURAL DESIGN OF RCC DRAIN
WSD METHOD
j=
Design Parameters :
fc' = 25.00 N/mm2 3627 PSI fc = 11.25 N/mm2 gconc = 24.00 Kn/m3 Es
fy = 420 N/mm 2
60929 PSI fs = 168.00 N/mm 2
gs(moist) = 17.40 Kn/m 3
Ec
j = 63.409 º FS= 0 Ka = 0.060 gs(Sat) = 18.90 Kn/m3 n
R = 1.715 gs(Sub) = 9.09 Kn/m 3
r
gw(Water)= 9.81 Kn/m3 k
gwheel = 12.50 Kn/m3 j
300 300 300 2500 2500 325 325 325 3500 2500
h-1000
P1
GWL
1000 P2
P3
t3 Pc Pb Pa
t2
Design of Apron t1
h-1000
P1
GWL
1000 + t3/2 P2
P3
t3/2 Pc Pb Pa
t2
3.08 0.150 -6.79 -12.39 Kn-m 6.87 0.163 -7.98 -18.96 Kn-m
1-1
12 Ø @ 886 10 Ø @ 176 12 Ø @ 253 10 Ø @
Wing
20 Ø @ 1167 10 Ø @ 176 12 Ø @ 253 10 Ø @
2-2
1-1
t1 t1
S1
E1
S3
W1 h
S2
W2
E2 S4
t3
t2 L t2
C/S
2-2
Bar Curtailment
SECTION 1-1
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
SECTION 2-2
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
0.5
1
tan-1(1/0.5) 2 63.409
200,000
25,500
7.84
14.93
0.344
0.885
t1
t3
L t2
t1
t3
L t2
Calculated Remarks
distance 'd'
Curtailment
mm ###
mm ###
`
rinkage (S3 /S4)
131
131
131
121
200
200
200
STRUCTURAL DESIGN OF RCC TRAPEZOIDAL DRAIN 1
0.5
WSD METHOD
j = tan-1(1/1) 2 63.409 º
Design Parameters :
Design of Wall t1
h-1000 H
P1 S1 W1
GWL P3 1 h
1000 P2 S2
P4
W2
t3 Pw Pse Pwhl Pem t3
P
L2 t2 L1
L
Calculation of Horizontal Pressures
Section 1-1
Pem Pwhl Pse Pw
1.77 34.425 0.55 9.80
Section 1-1
Wt Lever Moments
(Kn) Arm (Kn-m)
(m)
W1 = 18.11 0.63 11.32
W2 = 21.60 1.00 21.60
S1 = 29.36 1.69 49.55
S2= 14.68 1.17 17.12
Sum 83.76 Kn 99.59 Kn-m
Section 1-1
Wt Lever Moments
(Kn) Arm (kn-m)
(m)
P1 = 1.51 1.57 2.36
P2 = 1.77 0.50 0.89
P3 = 34.43 1.35 46.47
P4 = 5.17 0.33 1.72
Sum 42.88 Kn 51.45 Kn-m
171 175 OK 2084 mm² 375 mm² 375 mm² 500 mm²
Design of Apron t1
h-1000
P1
GWL P3 h
1000 +t3/2
P2
P3
t3
t3/2 Pw Pse Pwhl Pem
P
L2 t2 L1
L
Section 1-1
Pem Pwhl Pse Pw
2.01 37.29 11.14 12.017
Section 1-1
Wt Lever Moments
(Kn) Arm (kn-m)
(m)
P1 = 1.71 1.79 3.06
P2 = 2.46 0.61 1.51
P3 = 37.29 1.46 54.54
P4 = 14.18 0.41 5.79
Total 55.64 Kn Mend = 64.90 Kn-m
Section 1-1
Concrete Soil w kn w kn
18.112 47.84 9.06 38.27
Section 1-1
Mheel Mtoe
(Water face)
130 375 OK 565 mm² 563 mm² 90 mm² 750 mm² - mm Should not made
Steam
16 Ø @ 96 10 Ø @ 210 12 Ø @ 304 10 Ø @ 157
1-1
Apron
t1 t1
S1
E1
S3
W1 h
S2
W2
E2 S4
t3
t2 L t2
16 Ø @ 96 16 Ø @ 75 12 Ø @ 304 12 Ø @ 200
1-1
Apron
Bar Curtailment
SECTION 1-1
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
`
STRUCTURAL DESIGN OF RCC TRAPEZOIDAL DRAIN
250 450 450 3700 3050 650 1950 1000 0.5 1.118
Design of Wall t1
GWL
h-1000 H
P1 S1 W1
GWL P3 1 h
1000 P2 S2
P4 S3 h1
P5
W2 Psu
t3 Pw Pse Pwhl Pem t3
P
L2 t2 L1
L
Calculation of Horizontal Pressures
Section 1-1
Pem Pwhl Pse Pw Psu
17.85 19.856 3.45 9.80 3.45
Section 1-1
Wt Lever Moments
(Kn) Arm (Kn-m)
(m)
W1 = 31.08 1.35 41.96
W2 = 32.94 1.53 50.23
S1 = 125.54 2.56 321.70
S2= 31.39 1.75 54.90
S3= 12.29 0.33 3.99
Sum 233.23 Kn 472.79 Kn-m
b = 1000 mm
deff √(Mu/φRb)
Factored, MU = φAsfy(d-a/2)
As = 1671.7
Equation 0
236 263 OK 1672 mm² 675 mm² 900 mm² 900 mm²
h-1000
P1
GWL P3 h
1000 +t3/2
P2
P3
t3
t3/2 Pw Pse Pwhl Pem
P
L2 t2 L1
L
Section 1-1
Concrete Soil w kn w kn
34.748 102.27 11.39 52.45
Factored Moments
Section 1-1 Section 1-1
Mheel Mtoe Mheel Mtoe
(Water face) (Water face)
b = 1000 mm
deff √(Mu/φRb)
Factored, MU = φAsfy(d-a/2)
225 363 OK 1181 mm² 563 mm² 750 mm² 750 mm² - mm Should not made
T16-100mm E1
W1 T12-120mm
T12-150mm E2
T12-150mm W2 W2 T12-150mm
T16-150mm T1
T16-150mm B1
T12-150mm E2 Reinforcement of Return Wall
Bar Curtailment
SECTION 1-1
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
T16-175mm E1
W1 T12-150mm
T12-175mm E2
W2 T12-150mm
T16-175mm T1
T16-175mm B1 E2 T12-175mm
Reinforcement of Wall
STRUCTURAL DESIGN OF RCC TRAPEZOIDAL DRAIN
Design of Wall
t1
h-1000
P1
GWL
P3
1000
P2
P4
t3
Pw Pse Pwhl Pem
Section 1-1
Pem Pwhl Pse Pw
9.47 16.905 3.75 12.26
Section 1-1
Wt Lever Moments
(Kn) Arm (Kn-m)
(m)
W1 = 26.97 2.68 72.14
W2 = 23.40 0.98 22.81
Sum 50.37 Kn 94.96 Kn-m
b = 1000 mm
deff √(Mu/φRb)
Factored, MU = φAsfy(d-a/2)
t1
h-1000
P1
GWL
P3
1000
P2
P4
t3
Pw Pse Pwhl Pem
Section 1-1
Concrete Water w kn w kn
30.153 26.49 20.80 18.27
Factored Moments
Section 1-1 Section 1-1
Mheel Mtoe Mheel Mtoe
(Water face) (Water face)
b = 1000 mm
deff √(Mu/φRb)
Earth face
Sec. Main Shrinkage (E2)
Steam
16 Ø @ 194 12 Ø @ 201 12
1-1
Toe Heel
16 Ø @ 194 12 Ø @ 201 12
1-1
16 Ø @ 194 12 Ø @ 201 12
T16-175mm E1
W1 T12-150mm
T12-175mm E2
W2 T12-150mm
T16-175mm T1
T16-175mm B1 E2 T12-175mm
Reinforcement of Wall
16 Ø @ 194 16 Ø @ 175 12
1-1
Toe Heel
16 Ø @ 194 16 Ø @ 175 12
1-1
16 Ø @ 194 16 Ø @ 175 12
Bar Curtailment
SECTION 1-1
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
º
Kn/m3
Kn/m3
Kn/m3
Kn/m3
Kn/m3
Kn/m2
GWL
W1 h
1
W2
t3
P
t2 L1
L
mm2
Exposed face
Main Shrinkage
mm² 750 mm²
GWL
W1 h
1
W2
t3
P
t2 L1
L
Mtoe
(Water face)
Kn-m
mm2
Calculated Remarks
Exposed face distance 'd'
Shrinkage Curtailment
750 mm² - mm Should not made
Exposed face
Main Shrinkage (W2)
Ø @ 151 12 Ø @ 151
Ø @ 151 12 Ø @ 151
Ø @ 151 12 Ø @ 151
T12-150mm
T12-150mm
Exposed/Bootom Face
Main Recommd. (W1 + B1)
Ø @ 151 12 Ø @ 150
Ø @ 151 12 Ø @ 150
Ø @ 151 12 Ø @ 150
0.407 m
T16-175mm E1
W1 T12-150mm
T12-175mm E2
W2 T12-150mm
T16-175mm T1
T16-175mm B1 E2 T12-175mm
Reinforcement of Wall
T16-175mm E1
W1 T12-150mm
T12-175mm E2
W2 T12-150mm
T16-175mm T1
T16-175mm B1 E2 T12-175mm
Reinforcement of Wall
STRUCTURAL DESIGN OF RCC TRAPEZOIDAL DRAIN
Design of Wall
t1
h-1000
P1
GWL
P3
1000
P2
P4
t3
Pw Pse Pwhl Pem
Section 1-1
Pem Pwhl Pse Pw
12.06 19.32 3.75 12.26
Section 1-1
Wt Lever Moments
(Kn) Arm (Kn-m)
(m)
W1 = 31.16 3.18 98.92
W2 = 29.40 1.23 36.02
Sum 60.56 Kn 134.93 Kn-m
b = 1000 mm
deff √(Mu/φRb)
Factored, MU = φAsfy(d-a/2)
t1
h-1000
P1
GWL
P3
1000
P2
P4
t3
Pw Pse Pwhl Pem
Section 1-1
Concrete Water w kn w kn
34.832 30.90 17.86 15.85
Factored Moments
Section 1-1 Section 1-1
Mheel Mtoe Mheel Mtoe
(Water face) (Water face)
b = 1000 mm
deff √(Mu/φRb)
Earth face
Sec. Main Shrinkage (E2)
Steam
16 Ø @ 194 12 Ø @ 201 12
1-1
Toe Heel
16 Ø @ 194 12 Ø @ 201 12
1-1
16 Ø @ 194 12 Ø @ 201 12
T16-175mm E1
W1 T12-150mm
T12-175mm E2
W2 T12-150mm
T16-175mm T1
T16-175mm B1 E2 T12-175mm
Reinforcement of Wall
16 Ø @ 194 16 Ø @ 175 12
1-1
Toe Heel
16 Ø @ 194 16 Ø @ 175 12
1-1
16 Ø @ 194 16 Ø @ 175 12
Bar Curtailment
SECTION 1-1
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
º
Kn/m3
Kn/m3
Kn/m3
Kn/m3
Kn/m3
Kn/m2
GWL
W1 h
1
W2
t3
P
t2 L1
L
mm2
Exposed face
Main Shrinkage
mm² 750 mm²
GWL
W1 h
1
W2
t3
P
t2 L1
L
Mtoe
(Water face)
Kn-m
mm2
Calculated Remarks
Exposed face distance 'd'
Shrinkage Curtailment
750 mm² - mm Should not made
Exposed face
Main Shrinkage (W2)
Ø @ 151 12 Ø @ 151
Ø @ 151 12 Ø @ 151
Ø @ 151 12 Ø @ 151
T12-150mm
T12-150mm
Exposed/Bootom Face
Main Recommd. (W1 + B1)
Ø @ 151 12 Ø @ 150
Ø @ 151 12 Ø @ 150
Ø @ 151 12 Ø @ 150
0.400 m
Name of Subproject : Damda Khal Dr. & WC Subproject (SP: 62032)
Name of Structure : Ramda Khal Weir-1 at Ch. 5+685 Km (Khal)
Design Parameters :
fc' = 25.00 N/mm2 3627 PSI fc = 11.25 N/mm2 gconc = 24.00 Kn/m3
fy = 420 N/mm 2
60929 PSI fs = 189.00 N/mm 2
gs(moist) = 17.40 Kn/m3
j= 12 º Ka = 0.66 gs(Sat) = 18.90 Kn/m3
R= 1.78 gs(Sub) = 9.09 Kn/m3
gw(Water)= 9.81 Kn/m3
Section 1-1 Section 2-2 Section 3-3
t1 t2 t3 h L t1 t2 t3 h L t1 t2 t3 h L
R/S 300 300 300 3000 3300
C/S 250 250 250 2000 3300 275 275 275 2500 3300
Design of Wingwall t1 t1
h-1000
P1
GWL h
1000 P2
P3
t3 Pc Pb Pa t3
t2 L t2
C/S 11.48 6.00 9.80 17.23 6.00 9.80 -11.48 6.00 9.80
171 215 OK 1465 mm² 570 mm² 570 mm² 760 mm²
2-2 1-1
95 165 OK 584 mm² 570 mm² 570 mm² 760 mm²
C/S 131 190 OK 969 mm² 570 mm² 570 mm² 760 mm²
20 -85 Not OK -51 mm² 570 mm² 570 mm² 760 mm²
Design of Apron t1 t1
h-1000
P1
GWL h
1000 + t3/2 P2
P3
t3
t3/2 Pc Pb Pa
t2 L t2
C/S 11.48 6.75 11.03 17.23 6.82 11.15 -11.48 6.00 9.80
C/S 11.8 0.00 11.80 6.65 16.23 0.00 16.23 9.08 0.00 0.00 0.00 ###
C/S 17.55 0.125 8.50 -10.47 Kn-m 34.03 0.138 21.67 -14.50 Kn-m #DIV/0! #DIV/0! ### #DIV/0! Kn-m
Checking of depth Required steel area (mm²) Calculated Remarks
dreq davail Earth face Exposed face distance 'd'
Sec. (mm) (mm) Main Shrinkage Main Shrinkage Curtailment
### -85 #DIV/0! ### mm² 570 mm² ### mm² 760 mm² #DIV/0! m #DIV/0!
R/S ### -85 #DIV/0! ### mm² 570 mm² ### mm² 760 mm² #DIV/0! m #DIV/0!
3-3
180 215 OK 1618 mm² 570 mm² 535 mm² 760 mm² - m Should not made
570
2-2 1-1
99 165 OK 640 mm² 570 mm² 382 mm² 760 mm² #DIV/0! mm #DIV/0!
C/S 138 190 OK 1077 mm² 570 mm² 459 mm² 760 mm² Err:502 mm Err:502
### -85 #DIV/0! ### mm² 570 mm² ### mm² 760 mm² #DIV/0! mm #DIV/0!
S1
E1
S3
W1 h
S2
W2
E2 S4
t3
t2 L t2
SECTION 1-1
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
SECTION 2-2
Note : If the actual bar curtailment from the top is less than 1.00m, Bar curtailment is not required.
SECTION 3-3
-*-*- -*-*- -*-*- -*-*- -*-*- -*-*- -*-*- -*-*- -*-*- -*-
-*-*- -*-*- -*-*- -*-*- -*-*- -*-*- -*-*- -*-*- -*-*- -*-
97
SCHEMATIC VIEW OF BARREL
4.30 m
| | ---*----- -----------------
300 mm \\\///\\\///\\\///
| |
4.30 m
----- - ------ ----------------- ---*----- ---------
300 mm | /
-/-- -- | - ----------------- ----- --------
| | | | |
| | | | |
3.70 m | | | |
| | | | |
| | | | |
| | | | |
-/-- -- | - ----------------- ----- -----------------
700 mm | /
----- - ------ ----------------- ----------------- --------
| | | |
700 mm 450 mm
| | | |
/ ----------------- ----/
| 1.50 m |
LIVE LOAD
Live load is considered negligible when the depth of fill is greater than the
distance between abutments and is greater than 2.5 m.
WARNING: Analysis assumes D > 1 m (distributed load with overlap between wheels)
Depth of Fill(D) = 0.00 m
Distance between Abutments (L) = 3.45 m
-*-*- -*-*- -*-*- -*-*- -*-*- -*-*- -*-*- -*-*- -*-*- -*-
98
Length along Embankment = 1.75 * Depth of Fill
= 0.00 m
99
Pier Load = (No. * Height * Thickness * Weight of Concrete) / Barrel Width
LOAD ON ABUTMENTS
Top Slab C/l = Ca * (Height Soil + Height Soil Surcharge) * Weight of Soil
The Height of Soil Surcharge is the equivalent height of soil due to the Live Vehicle
Loading. For H10 Loading, the Height of Soil Surcharge is 0.60 m.
Bottom Slab C/l = Ca * (Height Soil + Height Soil Surcharge) * Weight of Soil
= 0.58 * 4.95 * 19.60 = 56.02 KN/m²
LOAD ON PIERS
The critical design condition for piers is during the maintenance period, when
one vent is full of water and the adjacent vent is empty.
SUMMARY OF LOADS
Load on Abutments
(Top of Member) = 8.49 KN/m²
(Bottom of Member) = 56.02 KN/m²
Load on Piers
(Top of Member) = 18.15 KN/m²
(Bottom of Member) = 59.35 KN/m²
100
2.3 DISTRIBUTION FACTOR
A sketch giving the barrel vent, joint and member designation is shown below. Only
half of the barrel is analyzed, the second half is assumed symmetric to the first.
A C E G I K
*-------- *-------- *-------- *-------- *---- *
| | | | |
| | | | |
| 1 | 2 | 3 | 4 | 5
| | | | |
| | | | |
*-------- *-------- *-------- *-------- *---- *
B D F H J L
101
2.4 MOMENT DISTRIBUTION
1. The end moments of each member are first approximated by considering the members
as fixed at both ends.
2. For equilibrium, the sum of the bending moments at each joint must be equal to
zero. The sum of the Fixed End Moments (FEM) calculated above are unlikely to
equal zero, so a balancing moment must be introduced at each joint.
3. The balancing moment at each joint is distributed amongst all the members
meeting at that joint in proportion to their relative stiffness. The relative
stiffness of each member is determined by its Distribution Factor (Dis.Fct.).
The Distributed Moment (DM) applied at the ends of each member is calculated by
multiplying the balancing moment by the member's Distribution Factor.
4. The effect of applying the Distributed Moment at one end of a member, is to produce
a moment of half the magnitude but the same sign at the other end of the member.
This moment at the remote end of the member, is called the Carry-over Moment (COM).
5. The Carry-over Moments produce further unbalanced moments at each joint, which
are then distributed. The carry-over procedure must then be repeated.
Successive operations (Trials) are continued until the unbalanced moments are
negligible. A Resultant Moment (RM) at each member is calculated after each
operation to document how fast the unbalanced moments converge to zero.
TRIAL 1 TRIAL 2
Joint Member Dis.Fct. FEM DM RM COM DM RM COM
A AB 0.309 40.42 -10.48 29.94 6.14 -1.89 34.19 0.87
AC 0.691 -6.47 -23.48 -29.94 0.00 -4.24 -34.19 0.00
B BA 0.331 -54.40 12.27 -42.13 -5.24 1.73 -45.63 -0.95
BD 0.669 17.29 24.84 42.13 0.00 3.51 45.63 0.00
C CA 0.000 6.47 0.00 6.47 -11.74 0.00 -5.27 -2.12
CD 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CE 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
D DB 0.000 -17.29 0.00 -17.29 12.42 0.00 -4.87 1.75
DC 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DF 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
E EC 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EF 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EG 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
F FD 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
FE 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
FH 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
G GE 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GH 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GI 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
H HF 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
HG 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
HJ 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I IG 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
IJ 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
IK 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
J JH 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
JI 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
JL 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Once the loads and end moments have been determined, it is possible to calculate
the end reactions, the locations of zero shear (Loc/sz) and the maximum mid span
moments for each member in the barrel.
Clockwise rotation is considered positive, for both end and mid span moments.
The mid span moments are calculated at the location of zero shear and are the
summation of all moments taken from Joint(1) to the location of zero shear.
102
Moment(KNm) Reaction(KN) from Moment
(1) (2) (1) (2) (1) (2) Joint(1) Max(KNm)
TOP SLAB
A C -34.89 -7.69 43.41 -2.01 1.97 7.78
C E 0.00 0.00 0.00 0.00 0.00 0.00
E G 0.00 0.00 0.00 0.00 0.00 0.00
G I 0.00 0.00 0.00 0.00 0.00 0.00
I K 0.00 0.00 0.00 0.00 0.00 0.00
BOTTOM SLAB
B D 46.36 -2.80 70.98 29.00 1.47 -5.93
D F 0.00 0.00 0.00 0.00 0.00 0.00
F H 0.00 0.00 0.00 0.00 0.00 0.00
H J 0.00 0.00 0.00 0.00 0.00 0.00
J L 0.00 0.00 0.00 0.00 0.00 0.00
ABUTMENT
A B 34.89 -46.36 48.37 87.10 2.27 -30.97
DESIGN MOMENTS
Once the moments and shears for all members have been calculated, the maximum values
are chosen for the design of member thickness and reinforcement.
ABUTMENTS PIERS
Exposed Face Tension = 30.97 KNm Exposed Face Tension = 86.10 KNm
Earth Face(Top) Tension = 34.89 KNm
Earth Face(Bottom) Tension= 46.36 KNm
DESIGN SHEARS
103
Modulus of Elasticity of Concrete (Ec) --> 2.51E+7 KN/m²
MEMBER THICKNESS
The effective depth of the member (dr) is calculated for both the moment and
shear conditions.
dr(Moment) = (M/(R*b))^0.5
M = Design Moment = 34.89 KNm
R = Resisting Moment Coef. = 1.34E+3 KN/m²
b = Unit Width of Member = 1.00 m
dr(Moment) = 162 mm
dr(Shear) = V/(v*b)
V = Design Shear = 43.41 KN
v = Allowable Shear Stress of Concrete = 4.57E+2 KN/m²
dr(Shear) = 95 mm
The effective depth values for moment and shear are compared and the
maximum is used for design.
tr = dr + c = 162 + 60 = 222 mm
SHRINKAGE REINFORCEMENT
The coefficient K1 depends on the Length of the Member and the Face (Exposed
or Earth Face) being designed. The recommended values for K1 are shown below:
104
Use 12 mm ø @ 200 mm c/c (Ast = 565 mm²) <-----
TOP REINFORCEMENT
M
Ast = Required Area of Steel = -----------
fs * j * da
105
34.89 * 1.00E+09
Ast = ---------------------------------------------- = 854 mm²
1.89E+5 * 0.901 * 240
BOTTOM REINFORCEMENT
M
Ast = Required Area of Steel = -----------
fs * j * da
7.78 * 1.00E+09
= ---------------------------------------------- = 190 mm²
1.89E+5 * 0.901 * 240
MEMBER THICKNESS
The effective depth of the member (dr) is calculated for both the moment and
shear conditions.
dr(Moment) = (M/(R*b))^0.5
M = Design Moment = 46.36 KNm
R = Resisting Moment Coef. = 1.34E+3 KN/m²
b = Unit Width of Member = 1.00 m
dr(Moment) = 186 mm
dr(Shear) = V/(v*b)
V = Design Shear = 70.98 KN
v = Allowable Shear Stress of Concrete = 4.57E+2 KN/m²
dr(Shear) = 155 mm
The effective depth values for moment and shear are compared and the
maximum is used for design.
106
c = Coverage + 1/2 Dia.Reinforcement = 60 mm
tr = dr + c = 186 + 60 = 246 mm
SHRINKAGE REINFORCEMENT
The coefficient K1 depends on the Length of the Member and the Face (Exposed
or Earth Face) being designed. The recommended values for K1 are shown below:
TOP REINFORCEMENT
M
Ast = Required Area of Steel = -----------
fs * j * da
5.93 * 1.00E+09
Ast = ---------------------------------------------- = 54 mm²
1.89E+5 * 0.901 * 640
BOTTOM REINFORCEMENT
107
Ast = Required Area of Steel = -----------
fs * j * da
46.36 * 1.00E+09
= ---------------------------------------------- = 425 mm²
1.89E+5 * 0.901 * 640
3.4 ABUTMENTS
MEMBER THICKNESS
The thickness of the abutments often increases between the top and bottom of the
member, because the soil pressure increases with depth. To take into consideration
the variable abutment thickness, the member thickness is checked at both the
top and bottom.
The effective depth of the member (dr) is calculated for both the moment and
shear conditions.
dr(Moment) = (M/(R*b))^0.5
M = Design Moment = 34.89 KNm
R = Resisting Moment Coef. = 1.34E+3 KN/m²
b = Unit Width of Member = 1.00 m
dr(Moment) = 162 mm
dr(Shear) = V/(v*b)
V = Design Shear = 48.37 KN
v = Allowable Shear Stress of Concrete = 4.57E+2 KN/m²
dr(Shear) = 106 mm
The effective depth values for moment and shear are compared and the
maximum is used for design.
tr = dr + c = 162 + 60 = 222 mm
108
The effective depth of the member (dr) is calculated for both the moment and
shear conditions.
dr(Moment) = (M/(R*b))^0.5
M = Design Moment = 46.36 KNm
R = Resisting Moment Coef. = 1.34E+3 KN/m²
b = Unit Width of Member = 1.00 m
dr(Moment) = 186 mm
dr(Shear) = V/(v*b)
V = Design Shear = 87.10 KN
v = Allowable Shear Stress of Concrete = 4.57E+2 KN/m²
dr(Shear) = 191 mm
The effective depth values for moment and shear are compared and the
maximum is used for design.
tr = dr + c = 191 + 60 = 251 mm
SHRINKAGE REINFORCEMENT
The coefficient K1 depends on the Length of the Member and the Face (Exposed
or Earth Face) being designed. The recommended values for K1 are shown below:
M
Ast = Required Area of Steel = -----------
fs * j * da
The actual Effective Depth of Section is calculated at the point of Zero Shear
(Max.Moment), because the thickness of the abutments often increases between
the top and bottom of the member.
109
l = Length of Member = 4.20 m
d(zs) = Distance to Zero Shear (from top of member) = 2.27 m
30.97 * 1.00E+09
Ast = ---------------------------------------------- = 399 mm²
1.89E+5 * 0.901 * 456
Length of Member = Height of Barrel(plus Top & Bottom Slab) = 4.70 m < 9 m
ta = Actual thickness of Member = 700 mm > 380 mm
K1 (Exposed Face) = 0.0015
The Steel Requirement is calculated at both the top and bottom of the member,
because the thickness of the abutments often increases between the top and bottom.
M
Ast = Required Area of Steel = -----------
fs * j * da
34.89 * 1.00E+09
Ast(top) = ---------------------------------------------- = 854 mm²
1.89E+5 * 0.901 * 240
46.36 * 1.00E+09
Ast(bottom) = ---------------------------------------------- = 425 mm²
1.89E+5 * 0.901 * 640
The Steel Requirement at the top and bottom of the member are compared and the
maximum value is taken for design purposes.
Length of Member = Height of Barrel(plus Top & Bottom Slab) = 4.70 m < 9 m
ta = Actual thickness of Member = 700 mm > 380 mm
K1 (Earth Face) = 0.0010
110
Use 16 mm ø @ 150 mm c/c (Ast = 1340 mm²) <-----
3.5 PIERS
MEMBER THICKNESS
The effective depth of the member (dr) is calculated for both the moment and
shear conditions.
dr(Moment) = (M/(R*b))^0.5
M = Design Moment = 86.10 KNm
R = Resisting Moment Coef. = 1.34E+3 KN/m²
b = Unit Width of Member = 1.00 m
dr(Moment) = 254 mm
dr(Shear) = V/(v*b)
V = Design Shear = 95.79 KN
v = Allowable Shear Stress of Concrete = 4.57E+2 KN/m²
dr(Shear) = 210 mm
The effective depth values for moment and shear are compared and the
maximum is used for design.
tr = dr + c = 254 + 60 = 314 mm
SHRINKAGE REINFORCEMENT
The coefficient K1 depends on the Length of the Member and the Face (Exposed
or Earth Face) being designed. The recommended values for K1 are shown below:
111
Length of Exposed Length of Extended Barrel = 7.15 m
Member Face ta = Actual Thickness of Member = 450 mm
<= 9 m 0.0015 b = Unit Width of Member = 1.00 m
> 9m 0.0020
86.10 * 1.00E+09
Ast = ---------------------------------------------- = 1296 mm²
1.89E+5 * 0.901 * 390
Length of Member = Height of Barrel(plus Top & Bottom Slab) = 4.70 m < 9 m
ta = Actual thickness of Member = 450 mm > 380 mm
K1 (Exposed Face) = 0.0015
CONCRETE
M.S.ROD
Top Slab 1 4.45 4.05 1340 754 565 565 456 8,200
Bott.Slab 1 4.45 4.85 754 1340 565 377 514 9,300
112
Abutments 2 4.45 4.70 754 1340 565 377 997 17,900
Piers 1 4.45 4.70 754 754 495 8,900
----------------- ----------------- ----------------- ----------------- ----------------- ----------------- ----------------- ----------------- ----------------- -----------------
Total 2463 44,300
MATERIAL COST
113
Name of Subproject : Damda Khal Dr. & WC Subproject (SP: 62032)
Name of Structure : Ramda Khal Weir-1 at Ch. 5+685 Km (Khal)
SECTION DATA
C/S R/S
Floor Initial Final SecG-G SecH-H Sec I-I Floor Initial Final SecC-C SecC1-C1 SecD-D Sec H-H
Length 9800 1800 800 7200 Length 9800 1800 1750 2650 800 7200
Width 3450 6500 Width 3750 6500
Slope 0.156 2600 9800 Slope 0.140 2600 9800
Final Width 3450 4010 4259 6500 Final Width 3750 4255 4241 4494 4480 6500
Slab thic. 700 400 0 800 7200 S. thic 700 400 0 800 7200
Length 8000 800 8000 Length 8000 800 8000
Slope 0.0375 670 400 Slope 0.038 702 668 670 400
Wing thic. 700 400 645 620 400 700 400 645 646 619 620 400
Length 9800 Thick Length 9800 Thick
Slope 0.0306 Slope 0.031
26.922 -26.922
0.648 -0.648
-0.648 0.648
1.296 -1.296
-1.296 1.296
2.591 -2.591
3.527 -3.527
-7.054 7.054
27.858 -27.858
0.500 0.500
-26.922
-13.749
A C
0.500
13.749
7.054
8.709
-2.591
1.296
-1.296
0.648
-0.648
26.922
-0.648
-1.296
-8.709
-7.054
0.648
1.296
2.591
0.500
-42.591
-17.419
-19.054
19.054
17.419
42.591
-0.648
-1.296
-2.591
-3.527
-1.296
-0.648
0.648
1.296
0.500
0.500
3.527
2.591
1.296
0.648
B D
0.500 0.500
53.891 -53.891
-17.419 17.419
8.709 -8.709
-2.591 2.591
1.296 -1.296
-1.296 1.296
0.648 -0.648
-0.648 0.648
42.591 -42.591
Sheet2
64 @
ALT 159 ƒ
Alt 157 ¥
166 ª
167 º
171 ½
172 ¼
174 «
175 »
200 + _¤»¤¶§#ì$%%&'()*
241 ±
297 ) a
298 * b
./ c 1
d 2
e 3
f 4
g 5
h 6
i 7
j 8
k 9
l 10
m 11
n 12
o 13
p 14
q 15
r 16
s 17
t 18
u 19
v 20
w 21
x 22
y 23
z 24
A 25
B 26
C 27
D 28
E 29
F 30
G 31
H 32
Page 116
Sheet2
I ! 33
J " 34
K # 35
L $ 36
M % 37
N & 38
O ' 39
P ( 40
Q ) 41
R * 42
S + 43
T , 44
U - 45
V . 46
W / 47
X 0 48
Y 1 49
Z 2 50
1 3 51
2 4 52
3 5 53
4 6 54
5 7 55
6 8 56
_ 9 57
a : 58
a ; 59
a < 60
a = 61
a > 62
a ? 63
a @ 64
a A 65
a B 66
a C 67
a D 68
a E 69
a F 70
a G 71
a H 72
a I 73
a J 74
a K 75
a L 76
a M 77
a N 78
a O 79
a P 80
Page 117
Sheet2
a Q 81
a R 82
a S 83
a T 84
a U 85
a V 86
a W 87
a X 88
a Y 89
a Z 90
a [ 91
a \ 92
a ] 93
a ^ 94
a _ 95
a ` 96
a a 97
a b 98
a c 99
a d 100
a e 101
a f 102
a g 103
a h 104
a i 105
a j 106
a k 107
a l 108
a m 109
a n 110
a o 111
a p 112
a q 113
a r 114
a s 115
a t 116
a u 117
a v 118
a w 119
a x 120
a y 121
a z 122
a { 123
a | 124
a } 125
a ~ 126
a 127
a � 128
Page 118
Sheet2
a � 129
a � 130
a � 131
a � 132
a � 133
a � 134
a � 135
a � 136
a � 137
a � 138
a � 139
a � 140
a � 141
a � 142
a � 143
a � 144
a � 145
a � 146
a � 147
a � 148
a � 149
a � 150
a � 151
a � 152
a � 153
a � 154
a � 155
a � 156
a � 157
a � 158
a � 159
a � 160
� 161
� 162
� 163
� 164
� 165
� 166
� 167
� 168
� 169
� 170
� 171
� 172
� 173
� 174
� 175
� 176
Page 119
Sheet2
� 177
� 178
� 179
� 180
� 181
� 182
� 183
� 184
� 185
� 186
� 187
� 188
� 189
� 190
� 191
� 192
� 193
� 194
� 195
� 196
� 197
� 198
� 199
� 200
� 201
� 202
� 203
� 204
� 205
� 206
� 207
� 208
� 209
� 210
� 211
� 212
� 213
� 214
� 215
� 216
� 217
� 218
� 219
� 220
� 221
� 222
� 223
� 224
Page 120
Sheet2
� 225
� 226
� 227
� 228
� 229
� 230
� 231
� 232
� 233
� 234
� 235
� 236
� 237
� 238
� 239
� 240
� 241
� 242
� 243
� 244
� 245
� 246
� 247
� 248
� 249
� 250
� 251
� 252
� 253
� 254
� 255
Err:502 256
Err:502 257
Err:502 258
Err:502 259
Err:502 260
Err:502 261
Err:502 262
Err:502 263
Err:502 264
Err:502 265
Err:502 266
Err:502 267
Err:502 268
Err:502 269
Err:502 270
Err:502 271
Err:502 272
Page 121
Sheet2
Err:502 273
Err:502 274
Err:502 275
Err:502 276
Err:502 277
Err:502 278
Err:502 279
Err:502 280
Err:502 281
Err:502 282
Err:502 283
Err:502 284
Err:502 285
Err:502 286
Err:502 287
Err:502 288
Err:502 289
Err:502 290
Err:502 291
Err:502 292
Err:502 293
Err:502 294
Err:502 295
Err:502 296
Err:502 297
Err:502 298
Err:502 299
Err:502 300
Err:502 301
Err:502 302
Err:502 303
Err:502 304
Err:502 305
Err:502 306
Err:502 307
Err:502 308
Err:502 309
Err:502 310
Err:502 311
Err:502 312
Err:502 313
Err:502 314
Err:502 315
Err:502 316
Err:502 317
Err:502 318
Err:502 319
Err:502 320
Page 122
Sheet2
Err:502 321
Err:502 322
Err:502 323
Err:502 324
Err:502 325
Err:502 326
Err:502 327
Err:502 328
Err:502 329
Err:502 330
Err:502 331
Err:502 332
Err:502 333
Err:502 334
Err:502 335
Err:502 336
Err:502 337
Err:502 338
Err:502 339
Err:502 340
Err:502 341
Err:502 342
Err:502 343
Err:502 344
Err:502 345
Err:502 346
Err:502 347
Err:502 348
Err:502 349
Err:502 350
Err:502 351
Err:502 352
Err:502 353
Err:502 354
Err:502 355
Err:502 356
Err:502 357
Err:502 358
Err:502 359
Err:502 360
Err:502 361
Err:502 362
Err:502 363
Err:502 364
Err:502 365
Err:502 366
Err:502 367
Err:502 368
Page 123
Sheet2
Err:502 369
Err:502 370
Err:502 371
Err:502 372
Err:502 373
Err:502 374
Err:502 375
Err:502 376
Err:502 377
Err:502 378
Err:502 379
Err:502 380
Err:502 381
Err:502 382
Err:502 383
Err:502 384
Err:502 385
Err:502 386
Err:502 387
Err:502 388
Err:502 389
Err:502 390
Err:502 391
Err:502 392
Err:502 393
Err:502 394
Err:502 395
Err:502 396
Err:502 397
Err:502 398
Err:502 399
Err:502 400
Err:502 401
Err:502 402
Err:502 403
Err:502 404
Err:502 405
Err:502 406
Err:502 407
Err:502 408
Err:502 409
Err:502 410
Err:502 411
Err:502 412
Err:502 413
Err:502 414
Err:502 415
Err:502 416
Page 124
Sheet2
Err:502 417
Err:502 418
Err:502 419
Err:502 420
Err:502 421
Err:502 422
Err:502 423
Err:502 424
Err:502 425
Err:502 426
Err:502 427
Err:502 428
Err:502 429
Err:502 430
Err:502 431
Err:502 432
Err:502 433
Err:502 434
Err:502 435
Err:502 436
Err:502 437
Err:502 438
Err:502 439
Err:502 440
Err:502 441
Err:502 442
Err:502 443
Err:502 444
Err:502 445
Err:502 446
Err:502 447
Err:502 448
Err:502 449
Err:502 450
Err:502 451
Err:502 452
Err:502 453
Err:502 454
Err:502 455
Err:502 456
Err:502 457
Err:502 458
Err:502 459
Err:502 460
Err:502 461
Err:502 462
Err:502 463
Err:502 464
Page 125
Sheet2
Err:502 465
Err:502 466
Err:502 467
Err:502 468
Err:502 469
Err:502 470
Err:502 471
Err:502 472
Err:502 473
Err:502 474
Err:502 475
Err:502 476
Err:502 477
Err:502 478
Err:502 479
Err:502 480
Err:502 481
Err:502 482
Err:502 483
Err:502 484
Err:502 485
Err:502 486
Err:502 487
Err:502 488
Err:502 489
Err:502 490
Err:502 491
Err:502 492
Err:502 493
Err:502 494
Err:502 495
Err:502 496
Err:502 497
Err:502 498
Err:502 499
Err:502 500
Err:502 501
Err:502 502
Err:502 503
Err:502 504
Err:502 505
Err:502 506
Err:502 507
Err:502 508
Err:502 509
Err:502 510
Err:502 511
Err:502 512
Page 126
Sheet2
Err:502 513
Err:502 514
Err:502 515
Err:502 516
Err:502 517
Err:502 518
Err:502 519
Err:502 520
Err:502 521
Err:502 522
Err:502 523
Err:502 524
Err:502 525
Err:502 526
Err:502 527
Err:502 528
Err:502 529
Err:502 530
Err:502 531
Err:502 532
Err:502 533
Err:502 534
Err:502 535
Err:502 536
Err:502 537
Err:502 538
Err:502 539
Err:502 540
Err:502 541
Err:502 542
Err:502 543
Err:502 544
Err:502 545
Err:502 546
Err:502 547
Err:502 548
Err:502 549
Err:502 550
Err:502 551
Err:502 552
Err:502 553
Err:502 554
Err:502 555
Err:502 556
Err:502 557
Err:502 558
Err:502 559
Err:502 560
Page 127
Sheet2
Err:502 561
Err:502 562
Err:502 563
Err:502 564
Err:502 565
Err:502 566
Err:502 567
Err:502 568
Err:502 569
Err:502 570
Err:502 571
Err:502 572
Err:502 573
Err:502 574
Err:502 575
Err:502 576
Err:502 577
Err:502 578
Err:502 579
Err:502 580
Err:502 581
Err:502 582
Err:502 583
Err:502 584
Err:502 585
Err:502 586
Err:502 587
Err:502 588
Err:502 589
Err:502 590
Err:502 591
Err:502 592
Err:502 593
Err:502 594
Err:502 595
Err:502 596
Err:502 597
Err:502 598
Err:502 599
Err:502 600
Err:502 601
Err:502 602
Err:502 603
Err:502 604
Err:502 605
Err:502 606
Err:502 607
Err:502 608
Page 128
Sheet2
Err:502 609
Err:502 610
Err:502 611
Err:502 612
Err:502 613
Err:502 614
Err:502 615
Err:502 616
Err:502 617
Err:502 618
Err:502 619
Err:502 620
Err:502 621
Err:502 622
Err:502 623
Err:502 624
Err:502 625
Err:502 626
Err:502 627
Err:502 628
Err:502 629
Err:502 630
Err:502 631
Err:502 632
Err:502 633
Err:502 634
Err:502 635
Err:502 636
Err:502 637
Err:502 638
Err:502 639
Err:502 640
Err:502 641
Err:502 642
Err:502 643
Err:502 644
Err:502 645
Err:502 646
Err:502 647
Err:502 648
Err:502 649
Err:502 650
Err:502 651
Err:502 652
Err:502 653
Err:502 654
Err:502 655
Err:502 656
Page 129
Sheet2
Err:502 657
Err:502 658
Err:502 659
Err:502 660
Err:502 661
Err:502 662
Err:502 663
Err:502 664
Err:502 665
Err:502 666
Err:502 667
Err:502 668
Err:502 669
Err:502 670
Err:502 671
Err:502 672
Err:502 673
Err:502 674
Err:502 675
Err:502 676
Err:502 677
Err:502 678
Err:502 679
Err:502 680
Err:502 681
Err:502 682
Err:502 683
Err:502 684
Err:502 685
Err:502 686
Err:502 687
Err:502 688
Err:502 689
Err:502 690
Err:502 691
Err:502 692
Err:502 693
Err:502 694
Err:502 695
Err:502 696
Err:502 697
Err:502 698
Err:502 699
Err:502 700
Err:502 701
Err:502 702
Err:502 703
Err:502 704
Page 130
Sheet2
Err:502 705
Err:502 706
Err:502 707
Err:502 708
Err:502 709
Err:502 710
Err:502 711
Err:502 712
Err:502 713
Err:502 714
Err:502 715
Err:502 716
Err:502 717
Err:502 718
Err:502 719
Err:502 720
Err:502 721
Err:502 722
Err:502 723
Err:502 724
Err:502 725
Err:502 726
Err:502 727
Err:502 728
Err:502 729
Err:502 730
Err:502 731
Err:502 732
Err:502 733
Err:502 734
Err:502 735
Err:502 736
Err:502 737
Err:502 738
Err:502 739
Err:502 740
Err:502 741
Err:502 742
Err:502 743
Err:502 744
Err:502 745
Err:502 746
Err:502 747
Page 131