You are on page 1of 40

0 1 2 3 4 5 6 7 8 9

NEW NO.9,(OLD NO.5),2nd MAIN ROAD-EXTN.


NEHRU NAGAR INDUSTRIAL ESTATE, PERUNGUDI-P.O
CHENNAI-600 096

SYSPRO AUTOMATION PHONE : +91 44 2454 1627


TELE-FAX: +91 44 2454 1259
E-MAIL : sysproautomation@dataone.in

TURBINE INDICATORS PANEL


(PANEL COMPLIED CE/PED NORMS)

PROJECT NAME: KARADENIZ HOLDING A.S, TURKEY.


THIS DRAWING IS THE PROPERTY OF SYSPRO AUTOMATION, CHENNAI-96.

PROJECT DESCRIPTION: 16MW-15KV TG SET


AND REPRODUCTION OF THIS DRAWING IN ANY FORM IS PROHIBITED.

CLIENT: TRIVENI TURBINE LTD.

MANUFACTURER: SYSPRO AUTOMATION


DRAWING NO: SA-14-89A-01
P.O REF: 2000014256
P.O DATE: 02.08.2014
QUANTITY: 1 No

DRAWING SUBMITTED:
REFERENCE DRAWING Nos. (IF ANY)
FOR APPROVAL
FOR INFORMATION
FINAL
ASBUILT
DESIGNED BY: S.S.R

THIS SHEET, BEARING THE MAIN TITLE OF THE DRAWING, DRAWING NUMBER AND THE REVISION DETAILS, IS THE COVER SHEET FOR ALL SUBSEQUENT SHEETS HAVING THE SAME DRAWING NUMBERS.WHILE REVISING, THE REVISION INDEX,DATE,DETAILS OF
THE REVISIONS AND THE SHEETS REVISED SHALL BE ENTERED IN THE REVISION TABLE OF THIS COVER SHEET.THE LATEST REVISION INDEX SHALL BE ENTERED ON TO THE COVER SHEET AS WELL AS TO ALL THOSE SHEETS WHICH HAVE GOT REVISED.
FOR THOSE SHEETS WHERE REVISIONS HAVE NOT BEEN MADE, THE PREVIOUS REVISION INDEX SHALL BE RETAINED.

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TP
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 1
PAGE DESCRIPTION Title page / cover sheet
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

Table of contents SYS TBL NEW

ASSIGNMENT PAGE PAGE DESCRIPTION REV-1 REV-2 REV-3 REV-4

=TGP +TP

1 Title page / cover sheet

=TGP +TBC

2 Table of contents : =TGP+TP/1 - =TGP+WIR/23

3 Table of contents : =TGP+TUB/24 - =TGP+TER/40

=TGP +GA

4 LEGEND FOR SYMBOL

5 TECHNICAL SPECIFICATIONS

6 TECHNICAL SPECIFICATIONS

7 G.A OF TGP WITH PRESSURE AND TEMPERATURE TRANSMITTER CABINET.(FRONT AND SIDE VIEW)

8 G.A OF TGP WITH PRESSURE AND TEMPERATURE TRANSMITTER CABINET.(REAR VIEW DETAILS)

9 G.A OF TGP WITH PRESSURE TRANSMITTER CABINET.(GLAND PLATE DETAILS)

10 IA OF TURBINE INDICATORS PANEL

=TGP +ENL

11 Enclosure legend : =TGP+WIR-PI-100 - =TGP+WIR-TI-226

=TGP +WIR

12 230V AC POWER DISTRIBUTION SCHEME

13 110V DC/24V DC POWER DISTRIBUTION SCHEME

14 24V DC POWER DISTRIBUTION SCHEME

15 WIRING DIAGRAM FOR DIGITAL INDICATORS

16 WIRING DIAGRAM FOR DIGITAL INDICATORS

17 WIRING DIAGRAM FOR DIGITAL INDICATORS

18 WIRING DIAGRAM FOR DIGITAL INDICATORS

19 WIRING DIAGRAM FOR PRESSURE INDICATORS AND PRESSURE TRANSMITTERS

20 WIRING DIAGRAM FOR PRESSURE INDICATORS AND PRESSURE TRANSMITTERS

21 WIRING DIAGRAM FOR PRESSURE INDICATORS AND PRESSURE TRANSMITTERS

22 WIRING DIAGRAM FOR PRESSURE TRANSMITTERS

23 WIRING DIAGRAM FOR TEMPERATURE TRANSMITTERS

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TBC
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 2
PAGE DESCRIPTION Table of contents : =TGP+TP/1 - =TGP+WIR/23
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

Table of contents SYS TBL NEW

ASSIGNMENT PAGE PAGE DESCRIPTION REV-1 REV-2 REV-3 REV-4

=TGP +TUB

24 FITTINGS DETAILS

25 TUBING SCHEME FOR PRESSURE TRANSMITTERS

26 TUBING SCHEME FOR PRESSURE TRANSMITTERS

27 TUBING SCHEME FOR PRESSURE TRANSMITTERS

28 TUBING SCHEME FOR PRESSURE TRANSMITTERS

29 TUBING SCHEME FOR PRESSURE TRANSMITTERS

30 TUBING SCHEME FOR PRESSURE TRANSMITTERS

31 LOOSE SUPPLY ITEMS

32 MAKE AND MODEL NO OF COMPONENTS

=TGP +TER

33 Terminal diagram =TGP+WIR-X1 =TGP+WIR-X2 =TGP+WIR-X3 =TGP+WIR-X4 =TGP+WIR-X5

34 Terminal diagram =TGP+WIR-X5 =TGP+WIR-X6

35 Terminal diagram =TGP+WIR-X6 =TGP+WIR-X7

36 Terminal diagram =TGP+WIR-X7 =TGP+WIR-X8

37 Terminal diagram =TGP+WIR-X8

38 Terminal diagram =TGP+WIR-X9

39 Terminal diagram =TGP+WIR-X9 =TGP+WIR-X10

40 Terminal diagram =TGP+WIR-X10

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TBC
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 3
PAGE DESCRIPTION Table of contents : =TGP+TUB/24 - =TGP+TER/40
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

LEGEND FOR SYMBOLS:

DEVICE NAME DEVICE TAG SYMBOL


1 1 3

MINIATURE CIRCUIT BREAKER F 2 2 4

(SP MCB) (DP MCB)

11

DOOR LIMIT SWITCH S


12
(NO)

13
THERMOSTAT S
14

P N
SPACE HEATER E

INTERNAL ILLUMINATION P N
H
TUBE LIGHT

TERMINAL X 1

PE
PANEL EARTH PE

IE

INSTRUMENT EARTH IE

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + GA
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 4
PAGE DESCRIPTION LEGEND FOR SYMBOL
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

RULES IEEE

a). PRESSURE/TEMP. INDICATOR CABINET= W-800mm, D- 800mm(INCLUDING DOORS), H- 1915mm (INCLUDING 15mm ANTI VIBRATION PAD AND 100mm BASE CHANNEL)
PANEL
b). PRESSURE TRANSMITTER CABINET = W-800mm, D- 800mm(INCLUDING DOORS), H- 1915mm
DIMENSIONS
(INCLUDING 15mm ANTI VIBRATION PAD AND 100mm BASE CHANNEL)

BASE CHANNEL
STRUCTURE DIMENSIONS - 100x50x50x3 COLOUR - BLACK
DETAILS
(MAKER= RITTAL)
TYPE INDOOR OUTDOOR CLOSED OPENED SELFSTAND WALLMOUNT DESK INGRESS PROTECTION (IP-52)

THICKNESS(mm) FRONT= 3.0 DOOR= 2.0 GLAND PLATE= 1.6, 2.3, 3.0 OTHER= 1.6

DOOR DOUBLE DOOR SINGLE DOOR

HANDLE WITH KEY WITHOUT KEY MAKER= SYSPRO TYPE= 3 WAY LOCK

DOOR STOPPER ATTACHED NOT PROVIDED

MATERIAL CRCA

OUTSIDE DIN RAL 7035 TEXTURE WITH SAMPLE COLOUR WITHOUT SAMPLE COLOUR
COATING COLOUR
INSIDE DIN RAL 7035 TEXTURE WITH SAMPLE COLOUR WITHOUT SAMPLE COLOUR

COLOUR OF INSTRUMENTS MAKER STANDARD COLOUR OF HANDLES OF SWITCHES MAKER STANDARD

TOP BOTTOM RIGHT SIDE LEFT SIDE BACK OTHERS ( )


CABLE ENTRY
BY TERMINAL BLOCKS BY CONNECTOR OTHERS ( )

TUBE ENTRY BOTTOM

WIRING METHOD BY WIRING DUCT BUNDLING OTHERS ( )

NON-INSULATED CLIMP-STYLE TERMINALS EYE- TYPE FORK- TYPE PIN- TYPE FOR BENTLY NEVEDA

DEVICE NO.(INSIDE THE PANEL) BY WHITE LABLE BY SILVER LABLE

EYEBOLTS PROVIDED NOT PROVIDED

DRAWING POCKET PROVIDED NOT PROVIDED

ANTI VIBRATION PAD PROVIDED NOT PROVIDED 5mm 10mm 15mm

MAIN NAME PLATE SIZE: 63 x 300 63 x 400 25 x 300 ATTACHING METHOD: GLUED SCREW

INSTRUMENT NAME PLATE SIZE: 96 x 15 50 x 15 40 x 50 AS APPLICABLE OTHERS ( ) ATTACHING METHOD: GLUED SCREW
NAME PLATES
PANEL TAG PLATE SIZE: 95 x 65 OTHERS ( )

NAME PLATE COLOUR BLACK WHITE

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + GA
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 5
PAGE DESCRIPTION TECHNICAL SPECIFICATIONS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

COLOUR OF WIRES
PHASE WIRE SIZE COLOUR OF TB
INLAND EXPORT CE COMPLIED
4 sq.mm
PHASE RED BROWN BROWN
SINGLE PHASE 2.5 sq.mm
2 WIRE
NEUTRAL BLACK BLUE BLUE ( )

PHASE RED RED RED 4 sq.mm


110V AC 2.5 sq.mm
NEUTRAL BLACK BLUE BLUE ( )
POWER

POSITIVE (+) GREY BROWN BROWN 4 sq.mm


110V DC
MAIN CIRCUIT 2.5 sq.mm
NEGATIVE (-) BLACK GREY GREY ( )

4 sq.mm
24V DC POSITIVE (+) GREY YELLOW YELLOW
MULTISTRAND PVC SHEATHED COPPER
CONDUCTOR FOR POWER AND SIGNAL

2.5 sq.mm
CIRCUIT

FUSED TERMINAL BLOCK : BLACK


SIMPLEX TERMINAL BLOCK: GREY
NEGATIVE (-) BLACK BLUE BLUE 1.5 sq.mm
SPECIFICATION OF WIRES

GREEN STRIPPED GREEN STRIPPED 6 sq.mm


EARTH/GROUND GREEN
YELLOW YELLOW 1.5 sq.mm

4-20mA (+) WHITE WHITE WHITE


ANALOG I/O
24V DC 0.75 sq.mm
4-20mA (-) BLUE BROWN BROWN WITH SHIELDING

SHIELD CABLING - - GREEN

DIGITAL I/O
24V DC GREY GREY GREY 1.5 sq.mm
RELAY CONTACT
BROWN GREY GREY
SIGNAL

OUTPUT

COM2 WHITE WHITE RED


0.75 sq.mm
3 WIRE RTD COM1 WHITE WHITE RED

RTD ORANGE ORANGE WHITE

EARTH BUS a). 25 X 6 mm TINNED COPPER - TO BE CONNECTED TO EARTH STUDS.

EARTHING BOLT SIZE M12 x 40

PANEL WEIGHT 400 Kgs. (APPROXIMATE)

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + GA
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 6
PAGE DESCRIPTION TECHNICAL SPECIFICATIONS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

800
1600
25 750 25
800 800
TUBE LIGHT-1 TUBE LIGHT-3

235

1
YOKOGAWA PARA DISP
2
YOKOGAWA PARA DISP
3
YOKOGAWA PARA DISP
4
YOKOGAWA PARA DISP
100
PV PV PV PV

48 UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn

60 118 96 60 96 60 96 60 96 118 100


YOKOGAWA PARA DISP YOKOGAWA PARA DISP

PV PV

48 5
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn
6
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn

60 118 96 60 96 430 100


YOKOGAWA PARA DISP YOKOGAWA PARA DISP YOKOGAWA PARA DISP YOKOGAWA PARA DISP

PV PV PV PV

48 8
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn
9
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn
10
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn
7
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn

60 118 96 60 96 60 96 60 96 118 100


YOKOGAWA PARA DISP YOKOGAWA PARA DISP YOKOGAWA PARA DISP YOKOGAWA PARA DISP

PV PV PV PV

48 11
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn
12
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn
13
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn
14
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn

60 118 96 60 96 60 96 60 96 118 100


YOKOGAWA PARA DISP YOKOGAWA PARA DISP YOKOGAWA PARA DISP

PV PV PV

48 15
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn
16
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn
17
UM33A 1 2 3 4 5 6 7 8 EV
SET/
ENTER

Fn

118 96 60 96 60 96 274

SINGLE LEAF DOOR SINGLE LEAF DOOR


WITH THREE POINT LOCK WITH THREE POINT LOCK
1800
1915

1680

1085
1200
PRESSURE,TEMPERATURE INDICATOR
PRESSURE TRANSMITTER PANEL
& TEMPERATURE TRANSMITTER PANEL

15
115 100

FRONT VIEW RIGHT SIDE VIEW

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + GA
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. G.A OF TGP WITH PRESSURE AND PAGE NUMBER 7
PAGE DESCRIPTION
REV.NO DATE REVISION DETAILS DRAWN BY TEMPERATURE TRANSMITTER CABINET.(FRONT AND SIDE VIEW) TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

1600
800 800
TUBE LIGHT-4 TUBE LIGHT-2

SINGLE LEAF DOOR SINGLE LEAF DOOR


WITH THREE POINT LOCK WITH THREE POINT LOCK

1800 1800

DRAWING POCKET

PRESSURE,TEMPERATURE INDICATOR
PRESSURE TRANSMITTER PANEL
& TEMPERATURE TRANSMITTER PANEL

DOOR STOPPER
(TYP.)
15
115 100

EARTHING BOLT (TYP.)


B
TO BE CONNECTED
REAR VIEW TO THE EARTH STRIP
INSIDE THE PANEL

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + GA
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. G.A OF TGP WITH PRESSURE AND PAGE NUMBER 8
PAGE DESCRIPTION
REV.NO DATE REVISION DETAILS DRAWN BY TEMPERATURE TRANSMITTER CABINET.(REAR VIEW DETAILS) TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

FRONT
FRONT

A 800 800
800 800

800 800

REAR
REAR
TOP VIEW
BASE CHANNEL DETAILS.
SECTION 'B-B'
FRONT

800 800

100

14 25
800

52.5 14

125

FOUNDATION DETAILS
REAR
DETAIL- A

BOTTOM GLAND PLATE DETAILS.

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + GA
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. G.A OF TGP WITH PRESSURE TRANSMITTER PAGE NUMBER 9
PAGE DESCRIPTION
REV.NO DATE REVISION DETAILS DRAWN BY CABINET.(GLAND PLATE DETAILS) TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

1600 1600
800 800 800 800
DLS-1 TUBE LIGHT-1 TUBE LIGHT-3 DLS-3 DLS-4 TUBE LIGHT-2 DLS-2
TUBE LIGHT-4

CABLE TRAY 40x80

-TT-102 -TT-101 -TT-300

CABLE TRAY 40x80


-F3 -F4 -F5 -F6 -F7 -F8 -F9 -F10-F11-F12-F13-F14-F15-F16-F17 -PT-101 -PT-100 -PT-102
-PT-201 -PT-204

CABLE TRAY 40x80


-F18-F19-F20-F21-F22-F23-F24-F25-F26-F27-F28
-PT-200 -PT-203 -PT-205
-PX-100
-PX-101
-PX-102
-PX-201
-PX-203
-PX-205

CABLE TRAY 40x80

CABLE TRAY 40x80 -S5 -F1-F2 (230V (P) (230V (N)


BUS) BUS)

-PSU
-X5 -X9

-X6
CABLE TRAY 40x80

CABLE TRAY 40x80

CABLE TRAY 40x80


CABLE TRAY 40x80
1800 1800 1800 1800
-H5

-E1
-X10
-X7
CABLE TRAY 60x80
CABLE TRAY 60x80

CABLE TRAY 40x80


-X8

-X1
-X2
-X3
-X4

15 15
115 100 115 100

FRONT VIEW DOOR OPEN REAR VIEW DOOR OPEN

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + GA
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 10
PAGE DESCRIPTION IA OF TURBINE INDICATORS PANEL
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

EQUIPMENTS LIST OF TURBINE INDICATORS PANEL TGP CE TIP

ITEM NO TAG NO ITEM DESCRIPITION SERVICE DESCRIPITION RANGE MAKE BEZEL CUTOUT DEPTH REMARKS

1.DIGITAL PRESSURE INDICATORS


24V DC AUX.SUPPLY,SIGNAL INPUT:4-20mA, WITH 4-20mA RETRANSMISSION
1 PI-100 PRESSURE INDICATOR INLET STEAM PRESSURE 0 to 25 bar YOKOGAWA 96x48mm 92x44mm 100.00 mm
OUTPUT AND TWO ALARM CONTACTS
24V DC AUX.SUPPLY,SIGNAL INPUT:4-20mA, WITH 4-20mA RETRANSMISSION
2 PI-101 PRESSURE INDICATOR EXHAUST STEAM PRESSURE -1 to 1.5 bar YOKOGAWA 96x48mm 92x44mm 100.00 mm
OUTPUT AND TWO ALARM CONTACTS
24V DC AUX.SUPPLY,SIGNAL INPUT:4-20mA, WITH 4-20mA RETRANSMISSION
3 PI-102 PRESSURE INDICATOR WHEEL CASE STEAM PRESSURE 0 to 25 bar YOKOGAWA 96x48mm 92x44mm 100.00 mm
OUTPUT AND TWO ALARM CONTACTS
24V DC AUX.SUPPLY,SIGNAL INPUT:4-20mA, WITH 4-20mA RETRANSMISSION
4 PI-201 PRESSURE INDICATOR LUBE OIL PRESSURE 0 to 4 bar YOKOGAWA 96x48mm 92x44mm 100.00 mm
OUTPUT AND TWO ALARM CONTACTS
24V DC AUX.SUPPLY,SIGNAL INPUT:4-20mA, WITH 4-20mA RETRANSMISSION
5 PI-203 PRESSURE INDICATOR CONTROL OIL PRESSURE 0 to 40 bar YOKOGAWA 96x48mm 92x44mm 100.00 mm
OUTPUT AND TWO ALARM CONTACTS
24V DC AUX.SUPPLY,SIGNAL INPUT:4-20mA, WITH 4-20mA RETRANSMISSION
6 PI-205 PRESSURE INDICATOR TRIP OIL PRESSURE 0 to 4 bar YOKOGAWA 96x48mm 92x44mm 100.00 mm
OUTPUT AND TWO ALARM CONTACTS

2.DIGITAL SPEED INDICATOR


24V DC AUX.SUPPLY,SIGNAL INPUT:4-20mA, WITH 4-20mA RETRANSMISSION
7 SI-200 DIGITAL SPEED INDICATOR TURBINE SPEED 0 -9999 RPM YOKOGAWA 96x48mm 92x44mm 100.00 mm
OUTPUT AND TWO ALARM CONTACTS

3.DIGITAL TEMPERATURE INDICATORS


DIGITAL TEMPERATURE 24V DC AUX.SUPPLY,SIGNAL INPUT :K-TYPE THERMOCOUPLE, WITH 4-20mA
8 TI-100 INLET STEAM TEMP. 0 - 400 DEG. C. YOKOGAWA 96x48mm 92x44mm 100.00 mm
INDICATOR RETRANSMISSION OUTPUT AND TWO ALARM CONTACTS
DIGITAL TEMPERATURE 24V DC AUX.SUPPLY,SIGNAL INPUT :K-TYPE THERMOCOUPLE, WITH 4-20mA
9 TI-101 EXHAUST STEAM TEMP. 0 - 200 DEG. C. YOKOGAWA 96x48mm 92x44mm 100.00 mm
INDICATOR RETRANSMISSION OUTPUT AND TWO ALARM CONTACTS
DIGITAL TEMPERATURE 24V DC AUX.SUPPLY,SIGNAL INPUT :K-TYPE THERMOCOUPLE, WITH 4-20mA
10 TI-103 NOZZLE CHEST TEMP. 0 - 400 DEG. C. YOKOGAWA 96x48mm 92x44mm 100.00 mm
INDICATOR RETRANSMISSION OUTPUT AND TWO ALARM CONTACTS
DIGITAL TEMPERATURE LUBE OIL TEMPERATURE 24V DC AUX.SUPPLY,SIGNAL INPUT :RTD, Pt-100 WITH 4-20mA RETRANSMISSION
11 TI-218 0 - 200 DEG. C. YOKOGAWA 96x48mm 92x44mm 100.00 mm
INDICATOR BEFORE COOLER OUTPUT AND TWO ALARM CONTACTS
DIGITAL TEMPERATURE LUBE OIL TEMPERATURE 24V DC AUX.SUPPLY,SIGNAL INPUT :RTD, Pt-100 WITH 4-20mA RETRANSMISSION
12 TI-219 0 - 200 DEG. C. YOKOGAWA 96x48mm 92x44mm 100.00 mm
INDICATOR AFTER COOLER OUTPUT AND TWO ALARM CONTACTS
DIGITAL TEMPERATURE TURBINE DE BEARING OIL 24V DC AUX.SUPPLY,SIGNAL INPUT :RTD, Pt-100 WITH 4-20mA RETRANSMISSION
13 TI-222 0 - 200 DEG. C. YOKOGAWA 96x48mm 92x44mm 100.00 mm
INDICATOR INLET TEMPERATURE OUTPUT AND TWO ALARM CONTACTS
DIGITAL TEMPERATURE TURBINE NDE BEARING OIL 24V DC AUX.SUPPLY,SIGNAL INPUT :RTD, Pt-100 WITH 4-20mA RETRANSMISSION
14 TI-223 0 - 200 DEG. C. YOKOGAWA 96x48mm 92x44mm 100.00 mm
INDICATOR INLET TEMPERATURE OUTPUT AND TWO ALARM CONTACTS
DIGITAL TEMPERATURE GEARBOX BEARING OIL INLET 24V DC AUX.SUPPLY,SIGNAL INPUT :RTD, Pt-100 WITH 4-20mA RETRANSMISSION
15 TI-224 0 - 200 DEG. C. YOKOGAWA 96x48mm 92x44mm 100.00 mm
INDICATOR TEMPERATURE OUTPUT AND TWO ALARM CONTACTS
DIGITAL TEMPERATURE 24V DC AUX.SUPPLY,SIGNAL INPUT :RTD, Pt-100 WITH 4-20mA RETRANSMISSION
16 TI-225 LUBE OIL TEMPERATURE 0 - 200 DEG. C. YOKOGAWA 96x48mm 92x44mm 100.00 mm
INDICATOR OUTPUT AND TWO ALARM CONTACTS
DIGITAL TEMPERATURE 24V DC AUX.SUPPLY,SIGNAL INPUT :RTD, Pt-100 WITH 4-20mA RETRANSMISSION
17 TI-226 CONTROL OIL TEMPERATURE 0 - 200 DEG. C. YOKOGAWA 96x48mm 92x44mm 100.00 mm
INDICATOR OUTPUT AND TWO ALARM CONTACTS

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + ENL
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 11
PAGE DESCRIPTION Enclosure legend : =TGP+WIR-PI-100 - =TGP+WIR-TI-226
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

1 1 1 1 1 1 3
ON/OFF
-S1 -S2 -S3 -S4 SWITCH -F2
DOOR LIMIT DOOR LIMIT DOOR LIMIT DOOR LIMIT 4A 2 4
2 2 2 2 2
SWITCH-1 SWITCH-2 SWITCH-3 SWITCH-4

13
-S5
2 4 THERMOSTAT 14
-F1
16 A 1 3

PE
-H1 -H2 -H3 -H4 -E1
X1 X2 X1 X2 X1 X2 X1 X2 X1 X2
-H5
SPACE HEATER
INTERNAL INTERNAL INTERNAL INTERNAL 5A, 3-PIN
ILLUMINATION-1 ILLUMINATION-2 ILLUMINATION-3 ILLUMINATION-4 SERVICE SOCKET
(PRESSURE,TEMPERATURE (PRESSURE,TEMPERATURE (PRESSURE,TEMPERATURE (PRESSURE,TEMPERATURE WITH ON/OFF
INDICATOR PANEL) INDICATOR PANEL) TRANSMITTER PANEL) TRANSMITTER PANEL) SWITCH
FRONT VIEW REAR VIEW FRONT VIEW REAR VIEW (UNIVERSAL PIN TYPE)

PE

-X1 1 2 3

230V AC, 50HZ


FROM ACDB
(BY CLIENT)

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + WIR
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 12
PAGE DESCRIPTION 230V AC POWER DISTRIBUTION SCHEME
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

-PSU

+
110V DC PSU
110V DC/24V DC
-
10 AMPS POWER SUPPLY UNIT
WITH INBUILT DIODE
E
DC OK
24V DC
13 14 + -
PE

PSU HEALTHY
CONTACT
1 3
-F4
10 A 2 4

-X3 1 2

TO PLC

1 3 1 3 1 3 1 3 1 3 1 3
-F5 -F6 -F7 -F8 -F9 -F10
2A 2 4 2A 2 4 2A 2 4 2A 2 4 2A 2 4 2A 2 4

1 3
-PX100+ -PX100- -PX101+ -PX101- -PX102+ -PX102- -PX201+ -PX201- -PX203+ -PX203- -PX205+ -PX205-
-F3 19.0 19.0 19.5 19.5 20.0 20.0 20.5 20.5 21.0 21.0 21.5 21.5
20 A 2 4

24V DC+ / 14.0

24V DC- / 14.0

1 3 1 3 1 3 1 3 1 3 1 3
-F11 -F12 -F13 -F14 -F15 -F16
2A 2 4 2A 2 4 2A 2 4 2A 2 4 2A 2 4 2A 2 4
-X2 1 2

110V DC
FROM BATTERY
CHARGER CUM DCDB
-PI100+ -PI100- -PI101+ -PI101- -PI102+ -PI102- -PI201+ -PI201- -PI203+ -PI203- -PI205+ -PI205-
19.3 19.3 19.8 19.8 20.3 20.3 20.8 20.8 21.3 21.3 21.8 21.8

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + WIR
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 13
PAGE DESCRIPTION 110V DC/24V DC POWER DISTRIBUTION SCHEME
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

24V DC+ / 13.9

24V DC- / 13.9

1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3
-F17 -F18 -F19 -F20 -F21 -F22 -F23 -F24
2A 2 4 2A 2 4 2A 2 4 2A 2 4 2A 2 4 2A 2 4 2A 2 4 2A 2 4

-SI200+ -SI200- -TI100+ -TI100- -TI101+ -TI101- -TI103+ -TI103- -TI218+ -TI218- -TI219+ -TI219- -TI222+ -TI222- -TI223+ -TI223-
15.2 15.2 15.5 15.6 15.9 15.9 16.2 16.2 16.5 16.6 16.9 16.9 17.2 17.2 17.5 17.5

1 3 1 3 1 3 1 3
-F25 -F26 -F27 -F28
2A 2 4 2A 2 4 2A 2 4 2A 2 4

-X4 1 2

-TI224+ TI224- -TI225+ -TI225- -TI226+ -TI226- SPARE


17.9 17.9 18.3 18.3 18.7 18.8

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + WIR
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 14
PAGE DESCRIPTION 24V DC POWER DISTRIBUTION SCHEME
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

TE-100 TE-101
K TYPE K TYPE
THERMOCOUPLE * THERMOCOUPLE *

FIELD

FIELD
4-20mA INPUT SIGNAL
FROM GOVERNOR

-X5 1 2 3 -X6 1 2 3 -X6 4 5 6

IE IE IE

SI-200 TI-100 INLET STEAM TEMPERATURE TI-101 EXHAUST STEAM TEMPERATURE


204:+ 203:- 202:+ 203:- 207 208 MODEL: UM33A-000-10/DC 202:+ 203:- 207 208 MODEL: UM33A-000-10/DC
SPEED INDICATOR
RANGE: 0-400 DEG.C RANGE: 0-200 DEG.C
MODEL: UM33A-000-10/DC mV INPUT 4-20 mA DC mV INPUT 4-20 mA DC
INPUT SIGNAL MAKE: YOKOGAWA MAKE: YOKOGAWA
RANGE: 0-9999 RPM (K-TYPE RE-TRANSMISSION (K-TYPE RE-TRANSMISSION
MAKE: YOKOGAWA THERMOCOUPLE) OUTPUT THERMOCOUPLE) OUTPUT
ALARM OUTPUT RELAY ALARM OUTPUT RELAY ALARM OUTPUT RELAY
CONTACT RATING CONTACT RATING CONTACT RATING
230V AC,1A 230V AC,1A 230V AC,1A
30V DC,1A(RESISTANCE LOAD) 30V DC,1A(RESISTANCE LOAD) 30V DC,1A(RESISTANCE LOAD)
POWER SUPPLY POWER SUPPLY POWER SUPPLY
ALARM-1 ALARM-2 ALARM-1 ALARM-2 ALARM-1 ALARM-2
108:NO 109:C 106:NO 107:C 111:+ 110:- 112:E 108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E 108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E

PE PE PE
-SI200+

-SI200-

-TI100+

-TI101+
14.2

14.2

-TI100-

-TI101-
14.3

14.4
14.3

14.4
-X5 4 5 6 7
24V DC -X7 1 2 3 4 -X7 5 6 7 8
SUPPLY 24V DC 24V DC
TO PLC TO PLC SUPPLY TO PLC SUPPLY

* NOTE:
TO BE WIRED AT SITE USING
K-TYPE T/C COMPENSATING CABLE
3 03.12.2014 FINAL R.C.B
2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + WIR
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 15
PAGE DESCRIPTION WIRING DIAGRAM FOR DIGITAL INDICATORS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

RTD-218 RTD-219
TE-103 FIELD FIELD
x2 x2
K TYPE
THERMOCOUPLE *
x1 x1

-X8 3 2 1 4 -X8 7 6 5 8
FIELD

IE IE

-X6 7 8 9 -X6 10 11 12 -X6 13 14 15

IE IE IE

TI-103 NOZZLE CHEST STEAM TEMPERATURE TI-218 LUBE OIL TEMPERATURE


TI-219 LUBE OIL TEMPERATURE
202:+ 203:- 207 208 MODEL: UM33A-000-10/DC 201 202 203 207 208 201 202 203 207 208
BEFORE COOLER AFTER COOLER
RANGE: 0-400 DEG.C
mV INPUT 4-20 mA DC 4-20 mA DC MODEL: UM33A-000-10/DC 4-20 mA DC MODEL: UM33A-000-10/DC
MAKE: YOKOGAWA RTD INPUT RTD INPUT
(K-TYPE RE-TRANSMISSION RE-TRANSMISSION RANGE: 0-200 DEG.C RE-TRANSMISSION RANGE: 0-200 DEG.C
THERMOCOUPLE) OUTPUT OUTPUT MAKE: YOKOGAWA OUTPUT MAKE: YOKOGAWA
ALARM OUTPUT RELAY ALARM OUTPUT RELAY ALARM OUTPUT RELAY
CONTACT RATING CONTACT RATING CONTACT RATING
230V AC,1A 230V AC,1A 230V AC,1A
30V DC,1A(RESISTANCE LOAD) 30V DC,1A(RESISTANCE LOAD) 30V DC,1A(RESISTANCE LOAD)
POWER SUPPLY POWER SUPPLY POWER SUPPLY
ALARM-1 ALARM-2 ALARM-1 ALARM-2 ALARM-1 ALARM-2
108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E 108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E 108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E

PE PE PE
-TI103+

-TI218+

-TI219+
-TI103-

-TI218-

-TI219-
14.5

14.6

14.7
14.5

14.6

14.7
-X7 9 10 11 12 -X7 13 14 15 16 -X7 17 18 19 20
24V DC 24V DC 24V DC
TO PLC SUPPLY TO PLC SUPPLY TO PLC SUPPLY

* NOTE:
TO BE WIRED AT SITE USING
K-TYPE T/C COMPENSATING CABLE

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + WIR
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 16
PAGE DESCRIPTION WIRING DIAGRAM FOR DIGITAL INDICATORS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

RTD-222 RTD-223 RTD-224


FIELD FIELD FIELD
x2 x2 x2

x1 x1 x1

-X8 11 10 9 12 -X8 15 14 13 16 -X8 19 18 17 20

IE IE IE

-X6 16 17 18 -X6 19 20 21 -X6 22 23 24

IE IE IE

TI-222 TURBINE DE BEARING


TI-223 TURBINE NDE BEARING
TI-224 GEARBOX BEARING
201 202 203 207 208 OIL INLET TEMPERATURE 201 202 203 207 208 OIL INLET TEMPERATURE 201 202 203 207 208 OIL INLET TEMPERATURE
4-20 mA DC MODEL: UM33A-000-10/DC 4-20 mA DC MODEL: UM33A-000-10/DC 4-20 mA DC MODEL: UM33A-000-10/DC
RTD INPUT RTD INPUT RTD INPUT
RE-TRANSMISSION RANGE: 0-200 DEG.C RE-TRANSMISSION RANGE: 0-200 DEG.C RE-TRANSMISSION RANGE: 0-200 DEG.C
OUTPUT MAKE: YOKOGAWA OUTPUT MAKE: YOKOGAWA OUTPUT MAKE: YOKOGAWA
ALARM OUTPUT RELAY ALARM OUTPUT RELAY ALARM OUTPUT RELAY
CONTACT RATING CONTACT RATING CONTACT RATING
230V AC,1A 230V AC,1A 230V AC,1A
30V DC,1A(RESISTANCE LOAD) 30V DC,1A(RESISTANCE LOAD) 30V DC,1A(RESISTANCE LOAD)
POWER SUPPLY POWER SUPPLY POWER SUPPLY
ALARM-1 ALARM-2 ALARM-1 ALARM-2 ALARM-1 ALARM-2
108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E 108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E 108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E

PE PE PE
-TI222+

-TI223+

-TI224+
-TI222-

-TI223-

-TI224-
14.8

14.9

14.2
14.8

14.9

14.2
-X7 21 22 23 24 -X7 25 26 27 28 -X7 29 30 31 32
24V DC 24V DC 24V DC
TO PLC SUPPLY TO PLC SUPPLY TO PLC SUPPLY

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + WIR
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 17
PAGE DESCRIPTION WIRING DIAGRAM FOR DIGITAL INDICATORS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

RTD-225 RTD-226
FIELD FIELD
x2 x2

x1 x1

-X8 23 22 21 24 -X8 27 26 25 28

IE IE

-X6 25 26 27 -X6 28 29 30

IE IE

TI-225 TI-226
201 202 203 207 208 LUBE OIL TEMPERATURE 201 202 203 207 208 CONTROL OIL TEMPERATURE
4-20 mA DC MODEL: UM33A-000-10/DC 4-20 mA DC MODEL: UM33A-000-10/DC
RTD INPUT RTD INPUT
RE-TRANSMISSION RANGE: 0-200 DEG.C RE-TRANSMISSION RANGE: 0-200 DEG.C
OUTPUT MAKE: YOKOGAWA OUTPUT MAKE: YOKOGAWA
ALARM OUTPUT RELAY ALARM OUTPUT RELAY
CONTACT RATING CONTACT RATING
230V AC,1A 230V AC,1A
30V DC,1A(RESISTANCE LOAD) 30V DC,1A(RESISTANCE LOAD)
POWER SUPPLY POWER SUPPLY
ALARM-1 ALARM-2 ALARM-1 ALARM-2
108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E 108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E

PE PE
-TI225+

-TI226+

-TI226-
-TI225-
14.3

14.4

14.4
14.3

-X7 33 34 35 36 -X7 37 38 39 40
24V DC 24V DC
TO PLC SUPPLY TO PLC SUPPLY

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + WIR
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 18
PAGE DESCRIPTION WIRING DIAGRAM FOR DIGITAL INDICATORS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

-PT-100 -PT-101
INLET STEAM PRESSURE EXHAUST STEAM PRESSURE NOTE:
0 to 25 bar -1 to 1.5 bar 2 WIRE FOR SIGNAL ISOLATOR (PT INPUT)
1 (POSITIVE TERMINAL)
3 (NEGATIVE TERMINAL)
4 WIRE FOR SIGNAL ISOLATOR (4-20mA INPUT)
3 (POSITIVE TERMINAL)
+ - + - 2 (NEGATIVE TERMINAL)

-PX100- / 13.4 -PX101- / 13.5


24V DC 24V DC
SUPPLY -PX100+ / 13.3 SUPPLY -PX101+ / 13.4

14:+ 15:- 1:+ 2 3:- 14:+ 15:- 1:+ 2 3:-


-PX-100

-PX-101
SIGNAL ISOLATOR SIGNAL ISOLATOR

11 10 8 7 11 10 8 7

IE IE

-X9 1 2 3 -X9 4 5 6

TO PLC TO PLC

PI-100 PI-101
204:+ 203:- 207 208 INLET STEAM PRESSURE 204:+ 203:- 207 208 EXHAUST STEAM PRESSURE
4-20 mA DC MODEL: UM33A-000-10/DC 4-20 mA DC MODEL: UM33A-000-10/DC
4-20mA RE-TRANSMISSION RANGE: 0 to 25bar 4-20mA RE-TRANSMISSION RANGE: -1 to 1.5 bar
INPUT OUTPUT MAKE: YOKOGAWA INPUT OUTPUT MAKE: YOKOGAWA
ALARM OUTPUT RELAY ALARM OUTPUT RELAY
CONTACT RATING CONTACT RATING
230V AC,1A 230V AC,1A
30V DC,1A(RESISTANCE LOAD) 30V DC,1A(RESISTANCE LOAD)
POWER SUPPLY POWER SUPPLY
ALARM-1 ALARM-2 ALARM-1 ALARM-2
108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E 108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E

PE PE
-PI100+

-PI101+
-PI100-

-PI101-
13.3

13.4
13.4

13.5
-X10 1 2 3 4 -X10 5 6 7 8
24V DC 24V DC
TO PLC SUPPLY TO PLC SUPPLY

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + WIR
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. WIRING DIAGRAM FOR PRESSURE INDICATORS PAGE NUMBER 19
PAGE DESCRIPTION
REV.NO DATE REVISION DETAILS DRAWN BY AND PRESSURE TRANSMITTERS TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

-PT-102 -PT-201
WHEEL CASE STEAM PRESSURE LUBE OIL PRESSURE NOTE:
0 to 25 bar 0 to 4 bar 2 WIRE FOR SIGNAL ISOLATOR (PT INPUT)
1 (POSITIVE TERMINAL)
3 (NEGATIVE TERMINAL)
4 WIRE FOR SIGNAL ISOLATOR (4-20mA INPUT)
3 (POSITIVE TERMINAL)
+ - + - 2 (NEGATIVE TERMINAL)

-PX102- / 13.6 -PX201- / 13.7


24V DC 24V DC
SUPPLY -PX102+ / 13.5 SUPPLY -PX201+ / 13.6

14:+ 15:- 1:+ 2 3:- 14:+ 15:- 1:+ 2 3:-


-PX-102

-PX-201
SIGNAL ISOLATOR SIGNAL ISOLATOR

11 10 8 7 11 10 8 7

IE IE

-X9 7 8 9 -X9 10 11 12

TO PLC TO PLC

PI-102 PI-201
204:+ 203:- 207 208 WHEEL CASE STEAM PRESSURE 204:+ 203:- 207 208 LUBE OIL PRESSURE
4-20mA 4-20 mA DC MODEL: UM33A-000-10/DC 4-20mA 4-20 mA DC MODEL: UM33A-000-10/DC
INPUT RE-TRANSMISSION RANGE: 0 to 25bar INPUT RE-TRANSMISSION RANGE: 0 to 4 bar
OUTPUT MAKE: YOKOGAWA OUTPUT MAKE: YOKOGAWA
ALARM OUTPUT RELAY ALARM OUTPUT RELAY
CONTACT RATING CONTACT RATING
230V AC,1A 230V AC,1A
30V DC,1A(RESISTANCE LOAD) 30V DC,1A(RESISTANCE LOAD)
POWER SUPPLY POWER SUPPLY
ALARM-1 ALARM-2 ALARM-1 ALARM-2
108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E 108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E

PE PE
-PI102+

-PI201+
-PI102-

-PI201-
13.5

13.6
13.6

13.7
-X10 9 10 11 12 -X10 13 14 15 16
24V DC 24V DC
TO PLC SUPPLY TO PLC SUPPLY

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + WIR
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. WIRING DIAGRAM FOR PRESSURE INDICATORS PAGE NUMBER 20
PAGE DESCRIPTION
REV.NO DATE REVISION DETAILS DRAWN BY AND PRESSURE TRANSMITTERS TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

-PT-203 -PT-205
CONTROL OIL PRESSURE TRIP OIL PRESSURE NOTE:
0 to 40 bar 0 to 4 bar 2 WIRE FOR SIGNAL ISOLATOR (PT INPUT)
1 (POSITIVE TERMINAL)
3 (NEGATIVE TERMINAL)
4 WIRE FOR SIGNAL ISOLATOR (4-20mA INPUT)
3 (POSITIVE TERMINAL)
+ - + - 2 (NEGATIVE TERMINAL)

-PX203- / 13.8 -PX205- / 13.9


24V DC 24V DC
SUPPLY -PX203+ / 13.7 SUPPLY -PX205+ / 13.8

14:+ 15:- 1:+ 2 3:- 14:+ 15:- 1:+ 2 3:-


-PX-203

-PX-205
SIGNAL ISOLATOR SIGNAL ISOLATOR

11 10 8 7 11 10 8 7

IE IE

-X9 13 14 15 -X9 16 17 18

TO PLC TO PLC

PI-203 PI-205
204:+ 203:- 207 208 CONTROL OIL PRESSURE 204:+ 203:- 207 208 TRIP OIL PRESSURE
4-20mA 4-20 mA DC MODEL: UM33A-000-10/DC 4-20mA 4-20 mA DC MODEL: UM33A-000-10/DC
INPUT RE-TRANSMISSION RANGE: 0 to 40bar INPUT RE-TRANSMISSION RANGE: 0 to 4 bar
OUTPUT MAKE: YOKOGAWA OUTPUT MAKE: YOKOGAWA
ALARM OUTPUT RELAY ALARM OUTPUT RELAY
CONTACT RATING CONTACT RATING
230V AC,1A 230V AC,1A
30V DC,1A(RESISTANCE LOAD) 30V DC,1A(RESISTANCE LOAD)
POWER SUPPLY POWER SUPPLY
ALARM-1 ALARM-2 ALARM-1 ALARM-2
108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E 108:NC 109:C 106:NC 107:C 111:+ 110:- 112:E

PE PE
-PI203+

-PI205+
-PI203-

-PI205-
13.8
13.7

13.8

13.9
-X10 17 18 19 20 -X10 21 22 23 24
24V DC 24V DC
TO PLC SUPPLY TO PLC SUPPLY

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + WIR
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. WIRING DIAGRAM FOR PRESSURE INDICATORS PAGE NUMBER 21
PAGE DESCRIPTION
REV.NO DATE REVISION DETAILS DRAWN BY AND PRESSURE TRANSMITTERS TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

-PT-200 -PT-204
LUBE OIL PRESSURE CONTROL OIL PRESSURE
0 to 4 bar 0 to 40 bar

+ - + -

-X9 19 20 21 22 23 24

TO PLC TO PLC

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + WIR
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 22
PAGE DESCRIPTION WIRING DIAGRAM FOR PRESSURE TRANSMITTERS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

RTD
TE-102 TE-101 TE-300
K-TYPE THERMOCOUPLE * K-TYPE THERMOCOUPLE * FIELD
x2

x1

-X9 34 35 36 37
IE

2 3 2 3 1 2 3
-TT-300
-TT-102 -TT-101 CONDENSATE TEMPERATURE
INLET STEAM TEMPERATURE EXHAUST STEAM TEMPERATURE
AFTER HOTWELL
0-400 DEG.C 0-200 DEG.C
0-200 DEG.C

+ - + - + -

-X9 25 26 27 28 29 30 31 32 33

TO PLC TO PLC TO PLC

TEMPERATURE TRANSMITTER

SL.NO ITEM TAG.NO SERVICE DESCRIPTION MODEL NO MAKE RANGE (DEG.C)

1 TT TT-102 INLET STEAM TEMPERATURE YTA110 EA2DB YOKOGAWA 0-400

2 TT TT-101 EXHAUST STEAM TEMPERATURE YTA110 EA2DB YOKOGAWA 0-200

3 TT TT-300 CONDENSATE TEMPERATURE AFTER HOTWELL YTA110 EA2DB YOKOGAWA 0-200

* NOTE:
TO BE WIRED AT SITE USING
K-TYPE T/C COMPENSATING CABLE BY M/s.TTL
3 03.12.2014 FINAL R.C.B
2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + WIR
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 23
PAGE DESCRIPTION WIRING DIAGRAM FOR TEMPERATURE TRANSMITTERS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

NOTE:

1). FITTINGS, TUBES & VALVES PED CONFORMING


MAKE OF FITTINGS, TUBES & VALVES:
2). MOC: SS.
ITEM DESCRIPTION MAKE CONFORMITY
FITTINGS & VALVES PARKER PED CONFORMITY
FITTING DETIAL:
TUBES SWAGELOK PED CONFORMITY

1a. 1/2" O.D X 1/2" NPT (M) B.H MALE CONNECTOR


MODEL NO.:8MBC8N-316

1b. 1/2" O.D X 1/2" NPT (M) MALE CONNECTOR


MODEL NO.:8MSC8N-316

1c. 1/2" O.D X 1/2" NPT (F) FEMALE CONNECTOR


MODEL NO.:8FSC8N-316

1d. 1/4" O.D X 1/2" NPT (M) MALE CONNECTOR


MODEL NO.:4MSC8N-316

1e. BLOCK AND BLEED VALVE


MODEL NO.:HLS2VNC
MAX. WORKING PR.: 414 BAR UPTO 260°C

1f. 1/4" O.D X 1/4" NPT (M) MALE CONNECTOR


MODEL NO.:4MSC4N-316

2a. 1/2" O.D EQUAL TEE


MODEL NO.:8ET8-316

2a1. 1/2" O.D (Run) x 1/4" (Branch) EQUAL TEE

2b. 1/2" O.D X 1/4" O.D REDUCING UNION

2c. 1/4" O.D BALL VALVE


MAX. WORKING PR.: 414 BAR AT (-54)-177°C

2d. 1/4" EQUAL TEE

2f1. 1/2" NPTF X 1/2" NB SW SCH. 80 SS ADAPTOR

2f2. 1/2" NPTF X 1/4" NB SW SCH. 40 SS ADAPTOR

3a. 1/2" O.D TUBE,


MODEL NO.:316L-1/2" OD X 0.049" WT-6ME

3b. 1/4" O.D TUBE,


MODEL NO.:316-1/4" OD X 0.035" WT

4. 1/2" O.D, PIG TAIL SYPHON.

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TUB
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 24
PAGE DESCRIPTION FITTINGS DETAILS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

REF. PAGE 24 FOR


DESCRIPTION OF FITTINGS
IDENTIFIED HERE.

-PT-200 -PT-201

1b 1b
1e 1e

1b 1f 1b 1f

2a

3a 3b 3b

1a
2f2

TUBING SCHEME FOR LUBE OIL PRESSURE LINE

PROCESS TUBE ENTRY INTERFACE


SL.NO ITEM TAG.NO SERVICE DESCRIPTION MODEL NO MAKE RANGE (bar) TEMPERATURE IN (DEG.C)
PRESSURE AT BULK HEAD PLATE
1 PT PT-200 LUBE OIL PRESSURE EJA530E-JBS4N-012EL YOKOGAWA 0-4
2 kg/sq.cm 55 1/2" NB SW
2 PT PT-201 LUBE OIL PRESSURE EJA530E-JBS4N-012EL YOKOGAWA 0-4

NOTE:
1).THE PRESSURE PRODUCTS NAMELY PRESSURE TRANSMITTER (PT) AND THE PRESSURE GAUGE ARE PED/CE COMPLIANT BY THE RESPECTIVE OEM MANUFACTURER.
2). THE CONTROL GEAR AND TUBE ARE SS AND ARE DESIGNED AND TESTED FOR THE DESIGN PRESSURE AS PER PED DIRECTIVE 97/23/EC.

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TUB
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 25
PAGE DESCRIPTION TUBING SCHEME FOR PRESSURE TRANSMITTERS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

REF. PAGE 24 FOR


DESCRIPTION OF FITTINGS
IDENTIFIED HERE.

-PT-203 -PT-204 #

1b 1b
1e 1e

1b 1f 1b 1f

3a 3b 3a 3b

1a 1a
2f2 2f2

TUBING SCHEME FOR CONTROL OIL PRESSURE LINE

PROCESS TUBE ENTRY INTERFACE


SL.NO ITEM TAG.NO SERVICE DESCRIPTION MODEL NO MAKE RANGE (bar) TEMPERATURE IN (DEG.C)
PRESSURE AT BULK HEAD PLATE
1 PT PT-203 CONTROL OIL PRESSURE EJA530E-JCS4N-012EL YOKOGAWA 0-40 25 kg/sq.cm 55 1/2" NB SW

2 PT PT-204 CONTROL OIL PRESSURE EJA530E-JCS4N-012EL YOKOGAWA 0-40 25 kg/sq.cm 55 1/2" NB SW

NOTE: #
TWO NUMBERS SEPEARTE TAPPING PROVIDED FOR CONTROL OIL EQUIPMENT ALONE AS PER M/s. TTL CONSENT

NOTE:
1).THE PRESSURE PRODUCTS NAMELY PRESSURE TRANSMITTER (PT) AND THE PRESSURE GAUGE ARE PED/CE COMPLIANT BY THE RESPECTIVE OEM MANUFACTURER.
2). THE CONTROL GEAR AND TUBE ARE SS AND ARE DESIGNED AND TESTED FOR THE DESIGN PRESSURE AS PER PED DIRECTIVE 97/23/EC.

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TUB
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 26
PAGE DESCRIPTION TUBING SCHEME FOR PRESSURE TRANSMITTERS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

REF. PAGE 24 FOR


DESCRIPTION OF FITTINGS
IDENTIFIED HERE.

-PT-205

1b
1e

1b 1f

3a 3b

1a
2f2

TUBING SCHEME FOR TRIP OIL PRESSURE LINE

PROCESS TUBE ENTRY INTERFACE


SL.NO ITEM TAG.NO SERVICE DESCRIPTION MODEL NO MAKE RANGE (bar) TEMPERATURE IN (DEG.C)
PRESSURE AT BULK HEAD PLATE
1 PT PT-205 TRIP OIL PRESSURE EJA530E-JBS4N-012EL YOKOGAWA 0-4 1.6 kg/sq.cm 55 1/2" NB SW

NOTE:
1).THE PRESSURE PRODUCTS NAMELY PRESSURE TRANSMITTER (PT) AND THE PRESSURE GAUGE ARE PED/CE COMPLIANT BY THE RESPECTIVE OEM MANUFACTURER.
2). THE CONTROL GEAR AND TUBE ARE SS AND ARE DESIGNED AND TESTED FOR THE DESIGN PRESSURE AS PER PED DIRECTIVE 97/23/EC.

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TUB
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 27
PAGE DESCRIPTION TUBING SCHEME FOR PRESSURE TRANSMITTERS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

REF. PAGE 24 FOR


DESCRIPTION OF FITTINGS
IDENTIFIED HERE.

-PT-101

1b
1e

1b 1f

3a 3b

1a
2f1

TUBING SCHEME FOR EXHAUST STEAM PRESSURE LINE

MAKE TUBE ENTRY INTERFACE


SL.NO ITEM TAG.NO SERVICE DESCRIPTION MODEL NO RANGE (bar) PROCESS PRESSURE TEMPERATURE IN (DEG.C)
AT BULK HEAD PLATE
1 PT PT-101 EXHAUST STEAM PRESSURE EJA530E-JBS4N-012EL YOKOGAWA -1 to 1.5 0.11 ATA -0.89 kg/sq.cm 100 1/2" NB SW

NOTE:
1).THE PRESSURE PRODUCTS NAMELY PRESSURE TRANSMITTER (PT) AND THE PRESSURE GAUGE ARE PED/CE COMPLIANT BY THE RESPECTIVE OEM MANUFACTURER.
2). THE CONTROL GEAR AND TUBE ARE SS AND ARE DESIGNED AND TESTED FOR THE DESIGN PRESSURE AS PER PED DIRECTIVE 97/23/EC.

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TUB
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 28
PAGE DESCRIPTION TUBING SCHEME FOR PRESSURE TRANSMITTERS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

REF. PAGE 24 FOR


DESCRIPTION OF FITTINGS
IDENTIFIED HERE.

-PT-100

1b
1e

1b 1f

3a 3b

1a
2f1

TUBING SCHEME FOR INLET STEAM PRESSURE LINE

MAKE TUBE ENTRY INTERFACE


SL.NO ITEM TAG.NO SERVICE DESCRIPTION MODEL NO RANGE (bar) PROCESS PRESSURE TEMPERATURE IN (DEG.C)
AT BULK HEAD PLATE
1 PT PT-100 INLET STEAM PRESSURE EJA530E-JCS4N-012EL YOKOGAWA 0-25 14.5 BARA 13.5 kg/sq.cm 320 1/2" NB SW

NOTE:
1).THE PRESSURE PRODUCTS NAMELY PRESSURE TRANSMITTER (PT) AND THE PRESSURE GAUGE ARE PED/CE COMPLIANT BY THE RESPECTIVE OEM MANUFACTURER.
2). THE CONTROL GEAR AND TUBE ARE SS AND ARE DESIGNED AND TESTED FOR THE DESIGN PRESSURE AS PER PED DIRECTIVE 97/23/EC.

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TUB
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 29
PAGE DESCRIPTION TUBING SCHEME FOR PRESSURE TRANSMITTERS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

REF. PAGE 24 FOR


DESCRIPTION OF FITTINGS
IDENTIFIED HERE.

-PT-102

1b
1e

1b 1f

3a 3b

1a
2f1

TUBING SCHEME FOR WHEEL CASE STEAM PRESSURE LINE

MAKE TUBE ENTRY INTERFACE


SL.NO ITEM TAG.NO SERVICE DESCRIPTION MODEL NO RANGE (bar) PROCESS PRESSURE TEMPERATURE IN (DEG.C)
AT BULK HEAD PLATE
1 PT PT-102 WHEEL CASE STEAM PRESSURE EJA530E-JCS4N-012EL YOKOGAWA 0-25 14.5 BARA 13.5 kg/sq.cm 320 1/2" NB SW

NOTE:
1).THE PRESSURE PRODUCTS NAMELY PRESSURE TRANSMITTER (PT) AND THE PRESSURE GAUGE ARE PED/CE COMPLIANT BY THE RESPECTIVE OEM MANUFACTURER.
2). THE CONTROL GEAR AND TUBE ARE SS AND ARE DESIGNED AND TESTED FOR THE DESIGN PRESSURE AS PER PED DIRECTIVE 97/23/EC.

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TUB
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 30
PAGE DESCRIPTION TUBING SCHEME FOR PRESSURE TRANSMITTERS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

LOOSE SUPPLY ITEMS

PRESSURE TRANSMITTER

SL.NO ITEM TAG.NO SERVICE DESCRIPTION MODEL NO MAKE RANGE (bar) ACCESSORIES

1 PT PT-103 SEALING STEAM HEADER PRESSURE EJA530E-JBS4N-012E YOKOGAWA 0-4

WITH 2 VALVE SS MANIFOLD ALONG WITH 1/2"OD X 1/2"NPTM


2 PT PT-300 CONDENSATE HEADER PRESSURE EJA530E-JBS4N-012E YOKOGAWA 0-16
SS MALE CONNECTOR & MOUNTING ACCESSORIES.
3 PT PT-202 JACKING OIL HEADER PRESSURE EJA530E-JDS4N-012E YOKOGAWA 0-250

DIFFERENTIAL PRESSURE TRANSMITTER

SL.NO ITEM TAG.NO SERVICE DESCRIPTION MODEL NO MAKE RANGE IN (mmWc) ACCESSORIES SQUAREROOT EXTRACTION

WITH 3 VALVE INTEGRAL SS MANIFOLD


1 DPT DPT-100 TCV-101 FLOW (DIFFERNTIAL PRESSURE ACROSS TCV 101) EJA110E-JMS5J-912EB YOKOGAWA 0-10,000 ALONG WITH 1/2"OD X 1/2"NPTM NOT REQUIRED
SS MALE CONNECTOR &
MOUNTING ACCESSORIES.

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TUB
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 31
PAGE DESCRIPTION LOOSE SUPPLY ITEMS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

MAKE AND MODEL NO OF COMPONENTS

ITEM NO. SERVICE DESCRIPTION MAKE CE/PED CONFORMITY MODEL NO SUPPLIED BY


1. FITTINGS & VALVES PARKER PED CONFORMITY REFER SHEET NO: 22
2. TUBES SWAGELOK PED CONFORMITY REFER SHEET NO: 22
3. PANEL RITTAL CE CONFORMITY PS4688.009
4. TERMINAL BLOCKS PHOENIX CE CONFORMITY UK2.5B.V2
5. MCB's SCHNEIDER CE CONFORMITY C60H/XC60
6. DOOR LIMIT SWITCH RITTAL CE CONFORMITY SZ4127-010
7. INTERNAL ILLUMINATION RITTAL CE CONFORMITY SZ4138-140 M/s. SYSPRO
8. SINGLE CORE CABLE RR CABLES CE CONFORMITY - AUTOMATION
9. TWO CORE CABLE LAP CABLES CE CONFORMITY -
10. PRESSURE TRANSMITTER YOKOGAWA CE & PED CONFORMITY REFER SHEET NO: 23 to 28
11. TEMPERATURE TRANSMITTER YOKOGAWA CE CONFORMITY REFER SHEET NO: 21
12. DIGITAL PRESSURE & TEMPERATURE INDICATORS YOKOGAWA CE CONFORMITY UM33A-000-10/DC
13. SPACE HEATER RITTAL CE CONFORMITY SK3105.304
14. THERMOSTAT RITTAL CE CONFORMITY SK3110.000

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TUB
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 32
PAGE DESCRIPTION MAKE AND MODEL NO OF COMPONENTS
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

Strip
External targets
=TGP+WIR-X1 Internal targets

function text jumper jumper Target designation Placement

230V AC, 50HZ FROM ACDB (BY CLIENT) 1 -F1:1 /10.0

= 2 -F1:3 /10.0

= 3 PE /10.1

Strip
External targets
=TGP+WIR-X2 Internal targets

function text jumper jumper Target designation Placement

110V DC FROM BATTERY CHARGER CUM DCDB 1 -F3:2 /11.0

= 2 -F3:4 /11.0

Strip
External targets
=TGP+WIR-X3 Internal targets

function text jumper jumper Target designation Placement

TO PLC 1 -PSU:13 /11.2

= 2 -PSU:14 /11.2

Strip
External targets
=TGP+WIR-X4 Internal targets

function text jumper jumper Target designation Placement

SPARE 1 -F28:2 /12.5

= 2 -F28:4 /12.5

Strip
External targets
=TGP+WIR-X5 Internal targets

function text jumper jumper Target designation Placement

4-20mA INPUT SIGNAL FROM GOVERNOR 1

= 2

= 3

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TER
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. Terminal diagram =TGP+WIR-X1 =TGP+WIR-X2 =TGP PAGE NUMBER 33
PAGE DESCRIPTION
REV.NO DATE REVISION DETAILS DRAWN BY +WIR-X3 =TGP+WIR-X4 =TGP+WIR-X5 TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

Strip
External targets
=TGP+WIR-X5 Internal targets

function text jumper jumper Target designation Placement

TO PLC 4 -SI-200-108:NO /13.0

= 5 -SI-200-109:C /13.0

= 6 -SI-200-106:NO /13.1

= 7 -SI-200-107:C /13.1

Strip
External targets
=TGP+WIR-X6 Internal targets

function text jumper jumper Target designation Placement

TO PLC 1

= 2

= 3

= 4

= 5

= 6

= 7

= 8

= 9

= 10

= 11

= 12

= 13

= 14

= 15

= 16

= 17

= 18

= 19

= 20

= 21

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TER
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 34
PAGE DESCRIPTION Terminal diagram =TGP+WIR-X5 =TGP+WIR-X6
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

Strip
External targets
=TGP+WIR-X6 Internal targets

function text jumper jumper Target designation Placement

TO PLC 22

= 23

= 24

= 25

= 26

= 27

= 28

= 29

= 30

Strip
External targets
=TGP+WIR-X7 Internal targets

function text jumper jumper Target designation Placement

TO PLC 1 -TI-100-108:NC /13.4

= 2 -TI-100-109:C /13.4

= 3 -TI-100-106:NC /13.4

= 4 -TI-100-107:C /13.4

= 5 -TI-101-108:NC /13.7

= 6 -TI-101-109:C /13.7

= 7 -TI-101-106:NC /13.8

= 8 -TI-101-107:C /13.8

= 9 -TI-103-108:NC /14.0

= 10 -TI-103-109:C /14.0

= 11 -TI-103-106:NC /14.1

= 12 -TI-103-107:C /14.1

= 13 -TI-218-108:NC /14.4

= 14 -TI-218-109:C /14.4

= 15 -TI-218-106:NC /14.4

= 16 -TI-218-107:C /14.4

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TER
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 35
PAGE DESCRIPTION Terminal diagram =TGP+WIR-X6 =TGP+WIR-X7
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

Strip
External targets
=TGP+WIR-X7 Internal targets

function text jumper jumper Target designation Placement

TO PLC 17 -TI-219-108:NC /14.7

= 18 -TI-219-109:C /14.7

= 19 -TI-219-106:NC /14.7

= 20 -TI-219-107:C /14.8

= 21 -TI-222-108:NC /15.0

= 22 -TI-222-109:C /15.0

= 23 -TI-222-106:NC /15.1

= 24 -TI-222-107:C /15.1

= 25 -TI-223-108:NC /15.3

= 26 -TI-223-109:C /15.4

= 27 -TI-223-106:NC /15.4

= 28 -TI-223-107:C /15.4

= 29 -TI-224-108:NC /15.7

= 30 -TI-224-109:C /15.7

= 31 -TI-224-106:NC /15.7

= 32 -TI-224-107:C /15.8

= 33 -TI-225-108:NC /16.1

= 34 -TI-225-109:C /16.1

= 35 -TI-225-106:NC /16.2

= 36 -TI-225-107:C /16.2

= 37 -TI-226-108:NC /16.6

= 38 -TI-226-109:C /16.6

= 39 -TI-226-106:NC /16.6

= 40 -TI-226-107:C /16.6

Strip
External targets
=TGP+WIR-X8 Internal targets

function text jumper jumper Target designation Placement

TO PLC 1

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TER
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 36
PAGE DESCRIPTION Terminal diagram =TGP+WIR-X7 =TGP+WIR-X8
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

Strip
External targets
=TGP+WIR-X8 Internal targets

function text jumper jumper Target designation Placement

TO PLC 2 x2 /14.4

= 3 x1 /14.4

= 4

= 5

= 6 x2 /14.7

= 7 x1 /14.7

= 8

= 9

= 10 x2 /15.0

= 11 x1 /15.0

= 12

= 13

= 14 x2 /15.3

= 15 x1 /15.3

= 16

= 17

= 18 x2 /15.7

= 19 x1 /15.7

= 20

= 21

= 22 x2 /16.1

= 23 x1 /16.1

= 24

= 25

= 26 x2 /16.6

= 27 x1 /16.6

= 28

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TER
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 37
PAGE DESCRIPTION Terminal diagram =TGP+WIR-X8
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

Strip
External targets
=TGP+WIR-X9 Internal targets

function text jumper jumper Target designation Placement

TO PLC 1 -PX-100:11 /17.1

= 2 -PX-100:10 /17.1

= 3 IE /17.1

= 4 -PX-101:11 /17.6

= 5 -PX-101:10 /17.6

= 6 IE /17.6

= 7 -PX-102:11 /18.1

= 8 -PX-102:10 /18.1

= 9 IE /18.1

= 10 -PX-201:11 /18.6

= 11 -PX-201:10 /18.6

= 12 IE /18.6

= 13 -PX-203:11 /19.1

= 14 -PX-203:10 /19.1

= 15 IE /19.1

= 16 -PX-205:11 /19.6

= 17 -PX-205:10 /19.6

= 18 IE /19.6

= 19 -PT-200 /20.3

= 20 -PT-200 /20.3

= 21

= 22 -PT-204 /20.4

= 23 -PT-204 /20.4

= 24

= 25 -TT-102 /21.3

= 26 -TT-102 /21.3

= 27

= 28 -TT-101 /21.4

= 29 -TT-101 /21.4

= 30

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TER
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 38
PAGE DESCRIPTION Terminal diagram =TGP+WIR-X9
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

Strip
External targets
=TGP+WIR-X9 Internal targets

function text jumper jumper Target designation Placement

TO PLC 31 -TT-300 /21.6

= 32 -TT-300 /21.6

= 33

= 34 x1 /21.6

= 35 x2 /21.6

= 36

= 37

Strip
External targets
=TGP+WIR-X10 Internal targets

function text jumper jumper Target designation Placement

TO PLC 1 -PI-100-108:NC /17.1

= 2 -PI-100-109:C /17.1

= 3 -PI-100-106:NC /17.2

= 4 -PI-100-107:C /17.2

= 5 -PI-101-108:NC /17.6

= 6 -PI-101-109:C /17.6

= 7 -PI-101-106:NC /17.7

= 8 -PI-101-107:C /17.7

= 9 -PI-102-108:NC /18.1

= 10 -PI-102-109:C /18.1

= 11 -PI-102-106:NC /18.2

= 12 -PI-102-107:C /18.2

= 13 -PI-201-108:NC /18.6

= 14 -PI-201-109:C /18.7

= 15 -PI-201-106:NC /18.7

= 16 -PI-201-107:C /18.7

= 17 -PI-203-108:NC /19.1

= 18 -PI-203-109:C /19.1

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TER
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 39
PAGE DESCRIPTION Terminal diagram =TGP+WIR-X9 =TGP+WIR-X10
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40
0 1 2 3 4 5 6 7 8 9

Strip
External targets
=TGP+WIR-X10 Internal targets

function text jumper jumper Target designation Placement

TO PLC 19 -PI-203-106:NC /19.2

= 20 -PI-203-107:C /19.2

= 21 -PI-205-108:NC /19.6

= 22 -PI-205-109:C /19.7

= 23 -PI-205-106:NC /19.7

= 24 -PI-205-107:C /19.7

3 03.12.2014 FINAL R.C.B


2 24.11.2014 REVISED AS PER E-MAIL COMMENTS DTD: 06.11.2014/24.11.2014 R.C.B = TGP
DRAWING NO SA-14-89A-01
1 23.09.2014 REVISED AS PER E-MAIL COMMENTS DTD: 08.09.2014 R.C.B + TER
0 17.07.2014 FIRST ISSUE R.C.B SYSPRO AUTOMATION CLIENT : TRIVENI TURBINE LTD. PAGE NUMBER 40
PAGE DESCRIPTION Terminal diagram =TGP+WIR-X10
REV.NO DATE REVISION DETAILS DRAWN BY TOTAL PAGES 40

You might also like