Professional Documents
Culture Documents
Main-Con : Client :
Equipment ID :
ITEM
ACTION RESULT
NO. Job Done?
Yes / No
1 Actuator is powered on PASS / FAIL
Yes / No
2 Actuator able to open the valve PASS / FAIL
Yes / No
3 Actuator able to close the valve PASS / FAIL
Yes / No
4 Check for any leakage PASS / FAIL
Yes / No
5 Any abnormal sound during operation PASS / FAIL
Yes / No
6 Check for any loosen screw PASS / FAIL
Comment:
Performed by : Witness by :
Signature : Signature :
Designation : Designation :
Project : Maintenance at Bedok and Pulau Tekong Waterworks
Equipment :
Equipment ID :
ITEM
ACTION RESULT
NO. Job Done?
To clean foreign material from the faces, Yes / No
1 PASS / FAIL
guide before operation
Screw thread cleaned, inspected for Yes / No
2 PASS / FAIL
wear and re-greased every six months
Yes / No
3 Actuator able to close the gate PASS / FAIL
Yes / No
4 Actuator able to open the gate PASS / FAIL
Yes / No
5 Any abnormal sound during operation PASS / FAIL
Check for any loosen screw and tighten Yes / No
6 PASS / FAIL
it.
Comment:
Performed by : Witness by :
Signature : Signature :
Designation : Designation :