Report No: RP- RO TYPE (A/B):-

Project No: SAP CODE:

1. Call-up Order No: _________________________ Contract No: ______________________________

2. Call-Up Issued by: ___________________________________________________________________

3. Name of Retail Outlet: M/s. __________________________________________________________

4. Location
(Address):____________________________________________________________________________

5. District: ___________________________________________________________________________

6. Name of Field Officer: Mr. ___________________________________________________________

7. Dealer/Manager Name: Mr. __________________________________________________________

8. Contact No. of Dealer / Manager: _____________________________________________________

9. Date of Audit: ___________________ Date of Last Audit: ___________________

10. Name of Auditor/ Engineer: _________________________________________________________

11. Class ‘A’ License No: ___________________ Valid Upto: ___________________

12. Power Connection: Single / Three Phases

13. Size of EB Incomer Cable from SEB___________________ No of Core: Type of Conductor:

14. Sanctioned Load: ___________________

15. Brief Details on solar Energy available at the RO:

_____________________________________________________________________________

Received Copy On
(Signature of Auditor/Electrical Engineer)
(SIGNATURE OF DEALER/MANAGER WITH SEAL)

1
Part-I. Name of RO.: Date:

Item Recommendation / Required


Sr. No. Activity Observation
Description Remark Status Yes/No
Check whether lugs are provided at each termination
1.01 Ok / Not Ok
points and crimped properly.
Check whether cable glands are FLP and are of correct
Ok / Not Ok
1.02 size.
Check for proper and firm fixing of glands. Ok / Not Ok

Terminal connections of the motor to be checked for


1.03 Ok / Not Ok
having proper Lugs by opening the Junction box.

*FLP Junction Box inside the DU / MPD to be


checked for

Dispensing Loose / missing nuts and bolts. Ok / Not Ok


1.04
Unit
Open / Hanging Covers Ok / Not Ok

Missing Covers Ok / Not Ok


Check whether excessive current is being drawn by DU
motor by use of Tong Tester. Amperage observed for
1.05 Ok / Not Ok
each motor to be recorded. The proper cooling of the
motor should also be checked.
Cable size for each DU to be checked for adequacy. The
1.06 Ok / Not Ok
cable sizes for each DU to be recorded.
Check the neutral to earth voltage at the junction box. It
1.07 Ok / Not Ok
should not exceed 4 Volts.
Check proper and firm fixing of Cable Glands at the
2.01 Ok/Not Ok
junction boxes.

2.02 Yard & Canopy All light fittings to be checked for missing screws / Ok/Not Ok
Lighting damaged gaskets etc.
Check the functionality of light fittings, check for any
2.03 Ok/Not Ok
damages or deformations.
2.04 Check whether the wattage inscribed on the lamps Ok/Not Ok
2
Item Recommendation / Required
Sr. No. Activity Observation
Description Remark Status Yes/No
matches with the wattage inscribed on the fixture.
Check if following Minimum illumination level (lux)
shall be maintained in various areas of the RO for
2.05
safety and visibility. This is to be marked on the
layout drawing to be provided by IOC.
2.06 Area Lux

2.07 Approach Area = 50 Ok/Not Ok

2.08 Under the Canopy = 150 Ok/Not Ok


2.09 Sales/ Dealers Room = 100 Ok/Not Ok

2.10 Electrical Room =100 Ok/Not Ok

Check if cable glands are available Yes/No/NA


3.01
And securely fixed to the junction box. Yes/No/NA

Main Signage Check if any

3.02 Loose Connection Yes/No/NA

Exposed Wiring Yes/No/NA


Check the earthing connections of the following
equipments for continuity after opening, cleaning of
4.01 the earthing joint for removal of rust / foreign
materials. Any damage / shortcoming in earthing to
be recorded against each equipment.
4.02 Earthing Storage Tanks- At two Points Yes/No
systems
4.03 Dispensing units -At two Points Yes/No

4.04 Canopy Columns- At least two columns Yes/No/NA

4.05 Yard Light Poles Yes/No/NA

3
Item Recommendation / Required
Sr. No. Activity Observation
Description Remark Status Yes/No
4.06 Digital Tyre Inflator Yes/No/NA

4.07 Electrical Panel-At two Points. Yes/No

4.08 Main and Facility Signage Yes/No/NA

4.09 Decantation points Yes/No

4.10 Air Compressor Yes/No/NA

DG Sets - Neutral earthing at two points Yes/No/NA


4.11
Whether Separate Earth pits for DG Set Neutral Earthing
Yes/No/NA
is Provided?
4.12 Air conditioners Yes/No/NA

4.13 Product Pipelines Yes/No

4.14 Lightning Arrestor, if any Yes/No/NA

4.15 Electrical Distribution Boards. Yes/No/NA


Measure the Earthing resistance for following by
Meggar and values recorded. The individual earth pit
4.16
resistance should not be more than 4 ohms. Also
check availability of Nickle-Cadmium Nut / Bolts.
See Table
4.17 Earth Pit 1 No.10
4.18 Earth Pit 2
4.19 Earth Pit 3

4.20 Earthing grid resistance (Should be less than 1 ohm)


Comment on overall effectiveness of the earthing
system, suggest for improvement if required. Combined
4.21
earthing grid and Earthing pits resistance (Should be
less than 1 ohm)

4
Item Recommendation / Required
Sr. No. Activity Observation
Description Remark Status Yes/No
Combined earthing grid and Earthing pits resistance
4.22
(Should be less than 1 ohm)

5.1 Check that all the light fittings and fixtures are functional. Ok/Not Ok

Check MCBs in the distribution boards for


Sales Building Proper Fixing Ok/Not Ok
5.2
Operational Ok/Not Ok
Correct Rating Ok/Not Ok
Estimation of entire load of the RO and phase wise
Load Distribution and providing recommendation for See Table
6.01
necessary modification in load connections and No. 1 & 5
associated cabling works.
Wires inside the panel to be checked for

Proper Dressing, Ok/Not Ok

6.02 Insulation Rupture Ok/Not Ok


Loose Connections Ok/Not Ok
Electrical Load Including proper size of Lugs properly crimped. Ok/Not Ok
Check for Quality of State electricity Board supply at
6.03 Retail Outlet regarding voltage fluctuation – record Ok/Not Ok
readings Min. 5 readings at 30 minutes interval.
Check for Suitability/Rating of installed Voltage
6.04 Ok/Not Ok
stabilizers/CVTs if installed.
6.05 *Ensure that Cable glands are fixed properly and firmly. Ok/Not Ok

6.06 *Check that cables are properly tagged for easy Ok/Not Ok
identification.

5
Item Recommendation / Required
Sr. No. Activity Observation
Description Remark Status Yes/No
Checked following Safety devices for operationally
and its proper fixing to the panel to be recorded.
6.07 ELCB Ok/Not Ok

MCCB Ok/Not Ok
Check that following equipments & their Selection
Switches are working properly
6.08 Ammeter Ok/Not Ok

Voltmeter Ok/Not Ok
Ensure that panel covers are securely tightened to the
6.09 Ok/Not Ok
body of the panel.

*Checking of dust/soot/cobwebs inside panels of


DG Set Ok/Not Ok
6.10
Air Compressor Ok/Not Ok

Main Panel Ok/Not Ok


Checking of water accumulation inside the electrical Ok/Not Ok
room/ cable trenches.
6.11
If present identification of cause of accumulation and
recommendation of remedial measures. (Write Details)
Check for Safety equipments, viz. are displayed
properly
Rubber Mat Ok/Not Ok
6.12
CO2 Fire Extinguisher Ok/Not Ok

Display of Shock Treatment Chart Ok/Not Ok

6
Item Recommendation / Required
Sr. No. Activity Observation
Description Remark Status Yes/No
Displays of Danger Sign on face of panel Ok/Not Ok

Hand Gloves Ok/Not Ok

6.13 Check for Spare / Unplugged holes in the Panel. Ok/Not Ok


Check the functionality of Indicating equipments and Ok/Not Ok
6.14
lamps.
Check for Shut down of Mains power supply
/Change over switch during Emergency for
All Dispensing Pumps Ok/Not Ok
6.15
Associated Equipments Ok/Not Ok

Familiarity of the same to operating personal. Ok/Not Ok


Checking for following Clear Spaces for Power
Distribution Panel. Automatic Voltage Stabilizer /
UPS:
In front of the Equipment-1000mm
Behind the Equipment
6.16 > 750mm (if approach is required)
< 200mm (If approach is not required)
At Sides
> 750 mm Between the Equipments
< 200 mm (If Approach is not required)
Check for any following flammable materials are
stored in the generator room?
6.17 DG Sets LPG Cylinders Ok/Not Ok/NA

Cardboard Cartons etc., Ok/Not Ok/NA

7
Item Recommendation / Required
Sr. No. Activity Observation
Description Remark Status Yes/No
Check whether generator room

6.18 Properly Ventilated Ok/Not Ok/NA

Clean and Dry Ok/Not Ok/NA


MCBs & Various switches to be checked for Ok/Not Ok/NA
7.01
operationally /Proper fixing to the panel.
Ensure that asbestos rope is wrapped up properly to the Ok/Not Ok/NA
7.02
exhaust pipe.
Check the frequency of the DG set on operation. If
7.03 unacceptable fluctuations then recommend corrective Ok/Not Ok/NA
measures.
7.04 Checking & Recording of output current in each phase. Ok/Not Ok/NA

7.05 Check for Neutral point of DG Set is earthed. Yes/No/NA

8.01 Cable Insulation condition to be checked. OK/Not Ok

Check whether lugs are provided at each termination


8.02 OK/Not Ok
points and crimped properly.
Cable Network Whether overheating is observed? Yes/No
for Entire RO
8.03 If heating observed in any cable, then cause for same to
be identified and remedial action to be advised. (Write
Details)
Check whether Earthing provided is as per Standard
8.04 OK/Not Ok
Drawing as per IOC specification.
Whether Lightening Arrester is installed separately? Yes/No/NA
9.01 Whether Lightening Arrester is installed on High mast
Yes/No/NA
lighting poles?
Other Whether Lightening arrestor is connected to separate
9.02 Observations earth pit?
9.03 One Earth Pit for LA Yes/No/NA

9.04 Two Earth Pit for LA Yes/No/NA


8
Item Recommendation / Required
Sr. No. Activity Observation
Description Remark Status Yes/No
Whether Emergency Shutdown System with minimum 2
9.05 ESD buttons has been provided as per standard Yes/No
drawing?
9.06 Whether ESD working properly? Yes/No

Whether the earthing system is provided for entire


9.07 loading / unloading system for auto LPG / CNG facilities, Yes/No/NA
if available at RO?
9.08 Whether individual Fuse / MCB is provided in neutral? Yes/No

Whether covers are provided to DB / Main Panel / Bus


9.09 Yes/No
Bar / Main Switch / Changeover Switch?
Whether labeling on the switchboard for the identification
9.10 Yes/No
of circuits is provided?
Whether all panel doors are earth with flexible braided
9.11 Yes/No
connection?
9.12 Whether PVC tapped joints are there? Yes/No

9.13 Other Whether firefighting buckets are filled with Dry Sand? Yes/No
Observations
9.14 Whether firefighting buckets are provided with top cover? Yes/No

9.15 Whether earthing to DG set Body is provided? Yes/No

Check if two earth pit.one near tanks & other near power
9.16 panel are available and they are connected in grid with Yes/No
50mmx10mm GI strip as per drawing
Whether 32x6 mm GI Flat is provided for storage tank
9.17 Yes/No
earthing
Whether 50x10 mm GI Flat is provided for main panel
9.18 Yes/No
earthing.

9
SYSTEM DOCUMENT FOR ELECTRICAL SAFETY AUDIT (AS PER OISD-225)

Sl.
Item Observation Remarks/Details Required Status
No.
A. Deviation from laid down procedure
Deviation from Statutory Requirements as laid down in
Indian Electricity Rules, Petroleum Rules, OISD
Standards, viz.
Whether PESO (Petroleum and Explosives Safety Take photograph of
Yes/No
Organization) License is available? Certificate
Whether PESO (Petroleum and Explosives Safety Take photograph of
Yes/No
Organization) License is valid? Certificate
Take photograph of
Availability of approved fire license (if applicable) Yes/No
Certificate
Take photograph of
Whether approval for electrical connection is available? Yes/No/NA
Certificate
1. Whether the existing facilities are as per approved Take photograph of
Yes/No/NA
layout plan? Certificate
Take photograph of
Weights & Measures certificate No. Yes/No
Certificate
Take photograph of
Permission from local Municipality/Panchayat Yes/No
Certificate
Whether following safety messages are displayed?
Tel No of Police Take photograph Yes/No
Fire Brigade Take photograph Yes/No
No smoking Take photograph Yes/No
Explosive license no. Take photograph Yes/No
Equipments enclosure mismatch with corresponding
zone of application
Checked whether flameproof equipment is provided
1.1 Yes/No
near DU
Checked whether flameproof equipment is provided
Yes/No
near Tank
1.2
1.3 Material not as per respective Indian Standards Yes/No
1.4
B. Insulation, Grounding & Lightning Protection
10
Sl.
Item Observation Remarks/Details Required Status
No.
2 Grounding & Lightning Protection Systems are not as per IS-3043 & IS -2309
2.1
Checked Neutral point of Transformer is earthed. Yes/No/NA
2.2

2.3 The Lightning/Surge Arrestors are in place Yes/No/NA

The Lightning/Surge Arrestors are connected to Earth. Yes/No/NA


2.4 Earth Resistance High Ok/Not Ok

2.5 Insulation Resistance Low, less than 1 Mega Ohm Ok/Not Ok


Write details/Location
All panel doors are not earthed with flexible braided
2.6 Yes/No
connection

2.7

C. Protection & Metering System

3 Protection System is not operating

3.1

3.2 Under-voltage Protection not working Ok/Not Ok/NA


Over-voltage Protection not working Ok/Not Ok/NA

Phase Unbalance Protection not working Ok/Not Ok/NA

3.3 Neutral Snap, Phase failure Protection not working Ok/Not Ok/NA

3.4
D. Loose connection & overheating

4.1 Loose connection in cable termination Ok/Not Ok

11
Sl.
Item Observation Remarks/Details Required Status
No.
4.2
E. Safety
Non-functioning of Lighting fixtures, especially in
the strategic zones viz. near the Dispenser, Tank
5.1
Farm Area, Front & Rear of Sales Room, Electrical
Room
Non-functioning of Lighting fixtures at DU Ok/Not Ok

Non-functioning of Lighting fixtures at Tank Farm Area Ok/Not Ok


Non-functioning of Lighting fixtures at Front & Rear of
Ok/Not Ok
Sales Room
Non-functioning of Lighting fixtures at Electrical Room Ok/Not Ok
Safety equipment, viz. Insulating mats conforming to
IS:15652:2006 having ISI mark, CO2 Fire Extinguisher,
Shock Treatment Chart, Flameproof Torch are not in
their designated places

5.2

Flameproof Torch is available Yes/No


Repairing work being carried out without any authorized
5.3 Yes/No
Work-permit (Work Permit is available)
Components material used are of poor sub-standard
5.4 Ok/Not Ok
quality
Labels/Tagmarking/ ferruling on equipments, cables,
feeders, cable cores are missing

5.5

Whether ferruling is provided on cable cores Yes/No

12
Sl.
Item Observation Remarks/Details Required Status
No.
5.6 Drawing/Documents not available in panels Ok/Not Ok
F. Repair & Maintenance

6.1
6.2

13
Cu= Copper, Al= Aluminum, BB= Busbar, EM= Energy
M/s= Main Switch, C/O = Changeover, STB= Stabilizer,
Meter, X’mer= Transformer, SFU= Switch Fuse Unit,
DU= Dispensing Unit, AC= Air Compressor, WCR=
FSU= Fuse Switch Unit, KKF= Kit Kat Fuse Single Line Diagram Water Cooler

Name of Ro:

14
EP = Earth Pit, SP= Street Pole, UP= Unloading Point, DU-Dispensing Unit, MS= Petrol, HSD= Diesel, HM= High Mast, HL= HP
Logo, HD= Hoarding, AM= Air Machine, AC= Air Compressor, WR= Waiting Room

Earth Pit / Earthing Layout Diagram

Name of Ro:

15
Cable Layout Diagram
Name of Ro:

16
M/s. EARTHING TEST CERTIFICATE

Location: M/s. ______________________________________________

This is to certify that we have carried out the earthing test and equipment by earth tester on (Date)________________ resistance in ohms (Ω)
are as follows:

Reading
Between Shell/
Pit Facility Earthing Resistance of Earthing
Equipment & Earthing
No (Description of Connection Plate/ Pipe
Strip
Activity) Grid No. Point I Point II
Min. Max.
Min. Max

Earth Tester Details: S. No _________

Next Testing Due Date: _______________________________

(Signature of Auditor/Electrical Engineer)

Received copy on ____________

(Signature of Dealer/Manager with Seal)

17
Acknowledgement

This is acknowledge that Auditors from………………………………………………………… have

visited our Premises i.e., ………………………………………………………………………………… &

conducted Electrical Safety Audit on………………….....

Name, Seal & Signature

18
Part-II. Name of RO.: Date

Table No.1: - Details of Connected Load


Total
Sr. No. of not Working
Location Type of Equipment Wattage Quantity in
No. lamps / equipment’s
Nos
1

10

11

12

13

14

15

16

17

18

19

20 Dispensing Unit No.1/STP-1

21 Dispensing Unit No.2/STP-2

22 Dispensing Unit No.3/STP-3

23 Dispensing Unit No.4/STP-4

24 Dispensing Unit No.5/STP-5

25 Outside Water Motor

26 Air Compressor Motor Phase 1/3:

Outside Water Cooler

19
Table No.2: - Voltage Measurement at Main Incomer (30 min. interval)

Voltage Measurement
Sr.
Time R-N Y-N B-N N-E
No.
V V V V
1

Table No.3: - Current Measurement at Main Incomer


Current Measurement
Sr.
Time R Phase Y Phase B Phase
No.
A A A
1

Note: Write Reason for single/ two phase load distribution, if available. e.g.

20
Table No.4 Load Distribution Details: When Lights are OFF

R (Amp) Y B

Load Distribution Details: When Lights are ON

R (Amp) Y B

Table No.5: - Load Distribution

Sr. Load On R- Phase Load On Y- Phase Load On B- Phase Remark

e. g. Canopy lights, Yard lights, hoardings, signage, sales building, DU, Compressor (if 1ph)

21
Table No.6: - Stabilizer / CVT Details
Working Connected Overall Earthing
Model
Sr. Rating Condition Equipment’s (All Status Status
Make (CVT /
No. (VA/ KVA) (Ok / Not Load/DU Motor / (Ok / Not (Ok /
Stabilizer)
Ok) Display) Ok) Not Ok)
1
2
3
4
5
6
7
8
9
10

Table No.7: - Power Measurement at DG Set

Sr. Capacity Voltage Frequency


Make 3 ph / 1 ph Current (A) RPM
No. (KVA) (V) in (Hz)
1
2

Phase Voltage Frequency


Measurement Current Measurement
Measurement Variation Range
Sr. DG Taken on
No. Identification Load / No RN YN BN R Y B
Hz.
Load V V V A A A
1
2
3
4

Table No.8: - Earth Continuity Testing at Plug Points Office Building / Sales Room

Sr. Earth Continuity Voltage Between Neutral &


Location
No. (Ok / Not Ok) Earth (V)
1 Plug Point-1

2 Plug Point-2

3 Plug Point-3

4 Plug Point-4

5 Plug Point-5

22
Table No.9: - Insulation Resistance Testing

Insulation Resistance
Location
Sr. in Mega Ohm.
From To
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Remark for problems in insulation testing:

23
Table No.10:- Earth pit Resistance

Brick
Individual Earth Nickle- Earth Pit
Nuts Masonry Distance Weather
Earth Resistance Grid pit Earth pit Cadmium Identification
Sr. & Bolt with Top Between Funnel
pit Earth Pit For of Earth Resistance Kept maintained Nut/Bolt Board is
No. Status Cover is two is
No. Electrode (>1 ohm) Clean wet (Y/N) Material provided
(Y/N) Provided earth pit provided
(>4 ohm) (Y/N) (NC/MS/GI/SS) (Y/N)
(Y/N)

10

24
Table No.11:- Dispensing Unit Details
Dispensing Dry
Voltage Cable Earthing Product
Unit for Cable Sand
DU. Sr. No. of Nozzle Make/ Totalizer Betn N- Two Pipeline
Model No. Fuel Type Length Size Sq. filled in
No. Pumps No Manufacturer Reading E in Points Earthing
(MS/HSD/ in M mm Pump
Volt (Yes/No) (Yes/No)
Power) Pedestal

25
Table No.12:- MPD / Dispensing Unit Motor Details

FLP JB Cleanli Motor


Glands Lugs
Measur Status Glands Lugs are FLP JB Oil/ ness body
Status at Crimped
DU. Sr. No. of Amp Pha ed for provided provided Status Fuel around condit
Model W RPM Make JB properly
No. Pumps (A) se Current Motor at JB at JB (Ok/Not leakag motor ion
(SC/DC/ at JB
(A) (Ok/Not (Y/N) (Y/N) Ok) e (Ok/Not (Ok/N
FLP/NP) (Y/N)
Ok) ok) ot ok)

26
Table No.13: Quantity of Motors at Dispensing Unit

Dispensing Unit No. of Motors

DU No. 1

DU No. 2

DU No. 3

DU No. 4

DU No. 5

DU No. 6

DU No. 7

DU No. 8

Table No.14: Lux Measurements

Lux Measurements
Sr.
Area Sample Sample Remark
No. Sample 1 Sample 2 Sample 3 Sample 4
5 6
1 Approach Entry
2 Approach Exit

Under the
3
Canopy/Near DU

4 Side of Canopy
Sales/Dealer
5
Room
Electrical Panel
6
Room
Near Unloading
7
Point

27
Table No.15: Material Required for Correction Work

Sr. Approximate
Material Unit Remark
No. Qty. Nos
1 Hand Gloves,
2 Shock treatment chart
3 Danger Notice board
4 ELCB
5 Emergency switch device (ESD)
6 Ammeter
7 Voltmeter
8 Voltmeter selector switch
9 Ammeter selector switch
10 LT Insulating Mats/Rubber Mat
11 LED type Phase indicator lamp
Fire Extinguishers (Co2 and Clean Agent)
12
4.5kg
13 Supply of 4 Bucket Fire stand
14 Supply Of 9 Liter Fire Buckets
Cable termination for 3 Core x 2.5 sq. mm. For Electrical panel
15
Non-FLP Glands
16 FLP Glands for DU

17 FLP Glands for Signage

18 FLP Glands for Hoarding

19 Single phase servo stabilizer of 5KVA


20 Single phase air-cooled 500VA CVT
21 Junction Box For Street Light Pole
For Signage, Hoarding, High Mast
22 Earthing 25 x 6 mm GI strip
Signage, Panel, Yard light pole
23 Earthing 50 x 10 mm GI strip For Main Grid Only
24 Earthing 32 x 6 mm GI strip For Tank Earthing
25 Earth Pit DG Neutral
26 Earth Pit for

28
Table No.16: Details of Light Fittings (Yard Pole / Hoarding / Canopy) Connected Load
No. of Non- Wattage Reason for
Loop Light Functioning Illumination Rectification Cable Cable
Location Functioning of Lamp Non- Phase KW
No. No. Yes/No (Lux) Advised Size Length
Lamp Fixture Functioning
Canopy (Loop Wise)

Hoarding

Signage

Air Compressor

Yard Light (Loop Wise)

29
Table No.17: Observations at Yard, Hoarding & Canopy Lights

Status (Yes / No / Ok / Not Ok)


Sr. Checkpoints Pole Pole Pole Pole Pole Pole Pole Pole Monolith Remark
Pole-1 Hoarding
-2 -3 -4 -5 -6 -7 -8 -9 /Signage
Check weather FLP junction box is
provided?
Check proper and firm fixing of Cable
1
Glands at the junction boxes.
All light fittings to be checked for
2
missing screws
All light fittings to be checked for
2(i)
damaged gaskets etc.
Check the functionality of light fittings
(Working / Not Working).
3
check for any damages or
deformations
Check the wattage inscribed on the
4
lamps.
Check the wattage inscribed on the
4(i)
fixture.
Whether the wattage inscribed on the
4(ii) lamps matches with the wattage
inscribed on the fixture.
5* Check for proper cleaning of fixtures.

5(i)* Check for Crimping of Lugs


Whether earthing connection is
provided to pole?

30
Table No.18: - Observations on Space at Panel Room

Checking for following Clear Spaces Power


Automatic
Sr. for Power Distribution Panel. Distribution UPS
Voltage Stabilizer
Automatic Voltage Stabilizer / UPS: Panel
1 In front of the Equipment-1000mm
Behind the Equipment
2
> 750mm (if approach is required)
3 < 200mm (If approach is not required)
At Sides
4
> 750 mm Between the Equipments
5 < 200 mm (If Approach is not required)

Table No.19: - Details of Cable for Various Load & Equipment


Cable No. of Core & Type of Glands Glands Over
Type of
Sr. Location Circumference Nominal area Cable Status Fixed heating
Conductor
No. in MM of conductor Flexible (SC/DC/ properly Observed
From To Sq. mm. Copper/ Al. /Armoured FLP/NP) (Y/N) (Y/N)

10

31
Details of Protective Devices
Current Rating
Sr. No For Equipment Switchgear Remark
in Amp
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Route Details of Retail Outlet


Name of Retail Outlet:-…………………………………………………………………………………………..

Route Details to reach this Outlet:-


………………………………………………………………………………………………………………………………………………………………………..

………………………………………………………………………………………………………………………………………………………………………..

………………………………………………………………………………………………………………………………………………………………………..

…………………………………………………………………………………………………………………………………………………………………

32

You might also like